38A-110 Inspection report 38A-110Permit Inspections Listing Report
Printed 0n: Wed Mar 16, 2016by Permit No
SQL Statement: Map Like "38a" AND Block Like "110"
Block Lot Address (Work Location)Map
Permit Type
Subdivision (Builder's Lot)Permit No
Date / Time Requested
Zoning
Inspection Status
Contractor (Phone #)
InspectorType of InspectionPermit Status Work Description
District
CommentDate Inspected Date Signed Off
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Building
BP-2015-0262
Nov-13-2015
PV(100)/S
PARTIAL COMPLY
CUTLER ASSOCIATES INC (508) 757-75001.
Kyle J. ScottFINALAPPROVED CONSTRUCT 3 STORY 56,000 SQ FT
ASSISTED LIVING FACILITY FULL
PERMIT
Partial co issued 1st and 2nd floors11/13/2015 11/13/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Building Dec-14-2015
PV(100)/S
Full Comply
CUTLER ASSOCIATES INC (508) 757-75002.
Kyle J. ScottFINALAPPROVED CONSTRUCT 3 STORY 56,000 SQ FT
ASSISTED LIVING FACILITY FULL
PERMIT
Final CO issued all items completed12/14/2015 12/14/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Building May-01-2015
PV(100)/S
REQUESTED
CUTLER ASSOCIATES INC (508) 757-75003.
Kyle J. ScottFOOTINGSAPPROVED CONSTRUCT 3 STORY 56,000 SQ FT
ASSISTED LIVING FACILITY FULL
PERMIT
H & K, 15, 17-21.5 and remainedr of line F ok as shown on plans5/1/2015 5/1/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Building Apr-07-2015
PV(100)/S
FULL COMPLY
CUTLER ASSOCIATES INC (508) 757-75004.
Kyle J. ScottFOOTINGSAPPROVED CONSTRUCT 3 STORY 56,000 SQ FT
ASSISTED LIVING FACILITY FULL
PERMIT
Footings as shown on plan A0 to line 12 ok bar placed and tied4/7/2015 4/7/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Building Dec-29-2014
PV(100)/S
FULL COMPLY
CUTLER ASSOCIATES INC (508) 757-75005.
Kyle J. ScottFOOTINGSAPPROVED CONSTRUCT 3 STORY 56,000 SQ FT
ASSISTED LIVING FACILITY FULL
PERMIT
High wall footing ok no 7 bar placed12/29/2014 12/29/2014
Page 1 of 18GeoTMS® 2016 Des Lauriers Municipal Solutions, Inc.
Block Lot Address (Work Location)Map
Permit Type
Subdivision (Builder's Lot)Permit No
Date / Time Requested
Zoning
Inspection Status
Contractor (Phone #)
InspectorType of InspectionPermit Status Work Description
Permit Inspections Listing Report
by Permit No
District
CommentDate Inspected Date Signed Off
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Building
BP-2015-0262
Feb-19-2015
PV(100)/S
Full Comply
CUTLER ASSOCIATES INC (508) 757-75006.
Kyle J. ScottFOUNDATIONAPPROVED CONSTRUCT 3 STORY 56,000 SQ FT
ASSISTED LIVING FACILITY FULL
PERMIT
Portion back foundation wall2/19/2015 2/19/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Building Apr-24-2015
PV(100)/S
Full Comply
CUTLER ASSOCIATES INC (508) 757-75007.
Charles MillerFOUNDATIONAPPROVED CONSTRUCT 3 STORY 56,000 SQ FT
ASSISTED LIVING FACILITY FULL
PERMIT
slab section 0 to 18 with thickened structural sections4/24/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Building May-04-2015
PV(100)/S
Full Comply
CUTLER ASSOCIATES INC (508) 757-75008.
Kyle J. ScottFOUNDATIONAPPROVED CONSTRUCT 3 STORY 56,000 SQ FT
ASSISTED LIVING FACILITY FULL
PERMIT
Piers 19-22 H & K , 26-27 C All ok to plan5/4/2015 5/4/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Building Apr-22-2015
PV(100)/S
Full Comply
CUTLER ASSOCIATES INC (508) 757-75009.
Charles MillerFOUNDATIONAPPROVED CONSTRUCT 3 STORY 56,000 SQ FT
ASSISTED LIVING FACILITY FULL
PERMIT
section A22 - 28 ok4/22/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Building Apr-28-2015
PV(100)/S
PARTIAL COMPLY
CUTLER ASSOCIATES INC (508) 757-750010.
Charles MillerFOUNDATIONAPPROVED CONSTRUCT 3 STORY 56,000 SQ FT
ASSISTED LIVING FACILITY FULL
PERMIT
suspended slab over basement4/28/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Building Apr-30-2015
PV(100)/S
Full Comply
CUTLER ASSOCIATES INC (508) 757-750011.
Kyle J. ScottFOUNDATIONAPPROVED CONSTRUCT 3 STORY 56,000 SQ FT
ASSISTED LIVING FACILITY FULL
PERMIT
G-Line 16 to 28 ok as shown on print4/30/2015 4/30/2015
Page 2 of 18GeoTMS® 2016 Des Lauriers Municipal Solutions, Inc.
Block Lot Address (Work Location)Map
Permit Type
Subdivision (Builder's Lot)Permit No
Date / Time Requested
Zoning
Inspection Status
Contractor (Phone #)
InspectorType of InspectionPermit Status Work Description
Permit Inspections Listing Report
by Permit No
District
CommentDate Inspected Date Signed Off
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Building
BP-2015-0262
Mar-26-2015
PV(100)/S
Full Comply
CUTLER ASSOCIATES INC (508) 757-750012.
Kyle J. ScottFOUNDATIONAPPROVED CONSTRUCT 3 STORY 56,000 SQ FT
ASSISTED LIVING FACILITY FULL
PERMIT
WALL Portion B9-3 as shown on plan3/26/2015 3/26/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Building Jan-20-2015
PV(100)/S
Full Comply
CUTLER ASSOCIATES INC (508) 757-750013.
Kyle J. ScottFOUNDATIONAPPROVED CONSTRUCT 3 STORY 56,000 SQ FT
ASSISTED LIVING FACILITY FULL
PERMIT
Steps and ramp sections poured ok1/20/2015 1/20/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Building Jan-09-2015
PV(100)/S
Full Comply
CUTLER ASSOCIATES INC (508) 757-750014.
Kyle J. ScottFOUNDATIONAPPROVED CONSTRUCT 3 STORY 56,000 SQ FT
ASSISTED LIVING FACILITY FULL
PERMIT
Portion of back left rear wall1/9/2015 1/9/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Building Oct-14-2015
PV(100)/S
REQUESTED
CUTLER ASSOCIATES INC (508) 757-750015.
Kyle J. ScottPROGRESSAPPROVED CONSTRUCT 3 STORY 56,000 SQ FT
ASSISTED LIVING FACILITY FULL
PERMIT
Above ceilings 1st and 2nd floor bathrooms ok to close10/14/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Building Jun-29-2015
PV(100)/S
REQUESTED
CUTLER ASSOCIATES INC (508) 757-750016.
Kyle J. ScottPROGRESSAPPROVED CONSTRUCT 3 STORY 56,000 SQ FT
ASSISTED LIVING FACILITY FULL
PERMIT
Prepour third floor deck slab, wire down ready to pour6/29/2015 6/29/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Building Sep-23-2015
PV(100)/S
Full Comply
CUTLER ASSOCIATES INC (508) 757-750017.
Kyle J. ScottROUGH/FRAMINGAPPROVED CONSTRUCT 3 STORY 56,000 SQ FT
ASSISTED LIVING FACILITY FULL
PERMIT
Rough frame 3rd floor 0-16 Pass Ok9/23/2015 9/23/2015
Page 3 of 18GeoTMS® 2016 Des Lauriers Municipal Solutions, Inc.
Block Lot Address (Work Location)Map
Permit Type
Subdivision (Builder's Lot)Permit No
Date / Time Requested
Zoning
Inspection Status
Contractor (Phone #)
InspectorType of InspectionPermit Status Work Description
Permit Inspections Listing Report
by Permit No
District
CommentDate Inspected Date Signed Off
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Building
BP-2015-0262
Sep-30-2015
PV(100)/S
Full Comply
CUTLER ASSOCIATES INC (508) 757-750018.
Charles MillerROUGH/FRAMINGAPPROVED CONSTRUCT 3 STORY 56,000 SQ FT
ASSISTED LIVING FACILITY FULL
PERMIT
3rd floor pending plumbing and GC to finalize fire stopping9/30/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Building Nov-03-2015
PV(100)/S
FULL COMPLY
CUTLER ASSOCIATES INC (508) 757-750019.
Charles MillerROUGH/FRAMINGAPPROVED CONSTRUCT 3 STORY 56,000 SQ FT
ASSISTED LIVING FACILITY FULL
PERMIT
above ceilings 1st, 2nd, 3rd floors above ceiling fire caulk11/3/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Building Aug-24-2015
PV(100)/S
Full Comply
CUTLER ASSOCIATES INC (508) 757-750020.
Kyle J. ScottROUGH/FRAMINGAPPROVED CONSTRUCT 3 STORY 56,000 SQ FT
ASSISTED LIVING FACILITY FULL
PERMIT
Lower Level rough ok to close pending plumbing8/24/2015 8/24/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Building Sep-02-2015
PV(100)/S
Full Comply
CUTLER ASSOCIATES INC (508) 757-750021.
Kyle J. ScottROUGH/FRAMINGAPPROVED CONSTRUCT 3 STORY 56,000 SQ FT
ASSISTED LIVING FACILITY FULL
PERMIT
Front section first floor9/2/2015 9/2/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Building Sep-18-2015
PV(100)/S
Full Comply
CUTLER ASSOCIATES INC (508) 757-750022.
Kyle J. ScottROUGH/FRAMINGAPPROVED CONSTRUCT 3 STORY 56,000 SQ FT
ASSISTED LIVING FACILITY FULL
PERMIT
16 through 28 ok 2nd floor9/18/2015 9/18/2015
Permit No ( BP-2015-0262 ) TOTAL INSPECTIONS:22
Permit No ( BP-2015-0262 ) TOTAL FEES:$16,543.00
Page 4 of 18GeoTMS® 2016 Des Lauriers Municipal Solutions, Inc.
Block Lot Address (Work Location)Map
Permit Type
Subdivision (Builder's Lot)Permit No
Date / Time Requested
Zoning
Inspection Status
Contractor (Phone #)
InspectorType of InspectionPermit Status Work Description
Permit Inspections Listing Report
by Permit No
District
CommentDate Inspected Date Signed Off
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Electrical
EP-2015-0582
Mar-16-2015
PV(100)/S
PASSED
WAYNE J. GRIFFIN ELECTRIC, INC (508)
429-8830 ()
1.
Roger MaloSERVICESIGNED OFF TEMP UG SERVICE FOR CONSTRUCTION
TRAILERS AND TEMP POWER
temp3/16/2015
Permit No ( EP-2015-0582 ) TOTAL INSPECTIONS:1
Permit No ( EP-2015-0582 ) TOTAL FEES:$60.00
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Electrical
EP-2015-0692
Dec-14-2015
PV(100)/S
PASSED
WAYNE J. GRIFFIN ELECTRIC, INC (508)
429-8830 ()
1.
Roger MaloFINALSIGNED OFF NEW CONSTRUCTION 83 UNIT ASSISTED
LIVING FACILITY. 1600A SERVICE WITH
A 150KW GENERATOR.
12/14/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Electrical Oct-28-2015
PV(100)/S
PASSED
WAYNE J. GRIFFIN ELECTRIC, INC (508)
429-8830 ()
2.
Roger MaloFINALSIGNED OFF NEW CONSTRUCTION 83 UNIT ASSISTED
LIVING FACILITY. 1600A SERVICE WITH
A 150KW GENERATOR.
ceilings basement 1st floor rooms10/28/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Electrical Nov-04-2015
PV(100)/S
PASSED
WAYNE J. GRIFFIN ELECTRIC, INC (508)
429-8830 ()
3.
Roger MaloFINALSIGNED OFF NEW CONSTRUCTION 83 UNIT ASSISTED
LIVING FACILITY. 1600A SERVICE WITH
A 150KW GENERATOR.
1,2 basement hall ceilings11/3/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Electrical Nov-09-2015
PV(100)/S
FAILED
WAYNE J. GRIFFIN ELECTRIC, INC (508)
429-8830 ()
4.
Roger MaloFINALSIGNED OFF NEW CONSTRUCTION 83 UNIT ASSISTED
LIVING FACILITY. 1600A SERVICE WITH
A 150KW GENERATOR.
11/6/2015
Page 5 of 18GeoTMS® 2016 Des Lauriers Municipal Solutions, Inc.
Block Lot Address (Work Location)Map
Permit Type
Subdivision (Builder's Lot)Permit No
Date / Time Requested
Zoning
Inspection Status
Contractor (Phone #)
InspectorType of InspectionPermit Status Work Description
Permit Inspections Listing Report
by Permit No
District
CommentDate Inspected Date Signed Off
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Electrical
EP-2015-0692
Nov-12-2015
PV(100)/S
PARTIAL COMPLY
WAYNE J. GRIFFIN ELECTRIC, INC (508)
429-8830 ()
5.
Roger MaloFINALSIGNED OFF NEW CONSTRUCTION 83 UNIT ASSISTED
LIVING FACILITY. 1600A SERVICE WITH
A 150KW GENERATOR.
11/12/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Electrical Dec-14-2015
PV(100)/S
PASSED
WAYNE J. GRIFFIN ELECTRIC, INC (508)
429-8830 ()
6.
Roger MaloGeneratorSIGNED OFF NEW CONSTRUCTION 83 UNIT ASSISTED
LIVING FACILITY. 1600A SERVICE WITH
A 150KW GENERATOR.
12/11/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Electrical Aug-11-2015
PV(100)/S
REQUESTED
WAYNE J. GRIFFIN ELECTRIC, INC (508)
429-8830 ()
7.
Roger MaloOTHERSIGNED OFF NEW CONSTRUCTION 83 UNIT ASSISTED
LIVING FACILITY. 1600A SERVICE WITH
A 150KW GENERATOR.
no can not stairt wiring8/11/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Electrical Sep-18-2015
PV(100)/S
PASSED
WAYNE J. GRIFFIN ELECTRIC, INC (508)
429-8830 ()
8.
Roger MaloROUGHSIGNED OFF NEW CONSTRUCTION 83 UNIT ASSISTED
LIVING FACILITY. 1600A SERVICE WITH
A 150KW GENERATOR.
2nd floor9/18/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Electrical Sep-28-2015
PV(100)/S
PASSED
WAYNE J. GRIFFIN ELECTRIC, INC (508)
429-8830 ()
9.
Roger MaloROUGHSIGNED OFF NEW CONSTRUCTION 83 UNIT ASSISTED
LIVING FACILITY. 1600A SERVICE WITH
A 150KW GENERATOR.
3#floor9/28/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Electrical Jun-02-2015
PV(100)/S
PASSED
WAYNE J. GRIFFIN ELECTRIC, INC (508)
429-8830 ()
10.
Roger MaloROUGHSIGNED OFF NEW CONSTRUCTION 83 UNIT ASSISTED
LIVING FACILITY. 1600A SERVICE WITH
A 150KW GENERATOR.
6/2/2015
Page 6 of 18GeoTMS® 2016 Des Lauriers Municipal Solutions, Inc.
Block Lot Address (Work Location)Map
Permit Type
Subdivision (Builder's Lot)Permit No
Date / Time Requested
Zoning
Inspection Status
Contractor (Phone #)
InspectorType of InspectionPermit Status Work Description
Permit Inspections Listing Report
by Permit No
District
CommentDate Inspected Date Signed Off
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Electrical
EP-2015-0692
Aug-24-2015
PV(100)/S
PASSED
WAYNE J. GRIFFIN ELECTRIC, INC (508)
429-8830 ()
11.
Roger MaloROUGHSIGNED OFF NEW CONSTRUCTION 83 UNIT ASSISTED
LIVING FACILITY. 1600A SERVICE WITH
A 150KW GENERATOR.
basemant walls8/24/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Electrical Oct-06-2015
PV(100)/S
PARTIAL COMPLY
WAYNE J. GRIFFIN ELECTRIC, INC (508)
429-8830 ()
12.
Roger MaloROUGHSIGNED OFF NEW CONSTRUCTION 83 UNIT ASSISTED
LIVING FACILITY. 1600A SERVICE WITH
A 150KW GENERATOR.
3ed floor ceilings10/5/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Electrical May-27-2015
PV(100)/S
PASSED
WAYNE J. GRIFFIN ELECTRIC, INC (508)
429-8830 ()
13.
Roger MaloROUGHSIGNED OFF NEW CONSTRUCTION 83 UNIT ASSISTED
LIVING FACILITY. 1600A SERVICE WITH
A 150KW GENERATOR.
5/26/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Electrical Sep-02-2015
PV(100)/S
PASSED
WAYNE J. GRIFFIN ELECTRIC, INC (508)
429-8830 ()
14.
Roger MaloROUGHSIGNED OFF NEW CONSTRUCTION 83 UNIT ASSISTED
LIVING FACILITY. 1600A SERVICE WITH
A 150KW GENERATOR.
part 1st floor walls9/2/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Electrical Sep-09-2015
PV(100)/S
PASSED
WAYNE J. GRIFFIN ELECTRIC, INC (508)
429-8830 ()
15.
Roger MaloROUGHSIGNED OFF NEW CONSTRUCTION 83 UNIT ASSISTED
LIVING FACILITY. 1600A SERVICE WITH
A 150KW GENERATOR.
1st foor9/9/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Electrical Sep-14-2015
PV(100)/S
PASSED
WAYNE J. GRIFFIN ELECTRIC, INC (508)
429-8830 ()
16.
Roger MaloROUGHSIGNED OFF NEW CONSTRUCTION 83 UNIT ASSISTED
LIVING FACILITY. 1600A SERVICE WITH
A 150KW GENERATOR.
1/2 2# floor9/14/2015
Page 7 of 18GeoTMS® 2016 Des Lauriers Municipal Solutions, Inc.
Block Lot Address (Work Location)Map
Permit Type
Subdivision (Builder's Lot)Permit No
Date / Time Requested
Zoning
Inspection Status
Contractor (Phone #)
InspectorType of InspectionPermit Status Work Description
Permit Inspections Listing Report
by Permit No
District
CommentDate Inspected Date Signed Off
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Electrical
EP-2015-0692
Sep-23-2015
PV(100)/S
PASSED
WAYNE J. GRIFFIN ELECTRIC, INC (508)
429-8830 ()
17.
Roger MaloROUGHSIGNED OFF NEW CONSTRUCTION 83 UNIT ASSISTED
LIVING FACILITY. 1600A SERVICE WITH
A 150KW GENERATOR.
3ed floor9/23/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Electrical Jun-17-2015
PV(100)/S
PASSED
WAYNE J. GRIFFIN ELECTRIC, INC (508)
429-8830 ()
18.
Roger MaloROUGHSIGNED OFF NEW CONSTRUCTION 83 UNIT ASSISTED
LIVING FACILITY. 1600A SERVICE WITH
A 150KW GENERATOR.
2nd floor ceilings6/16/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Electrical Jun-30-2015
PV(100)/S
PASSED
WAYNE J. GRIFFIN ELECTRIC, INC (508)
429-8830 ()
19.
Roger MaloROUGHSIGNED OFF NEW CONSTRUCTION 83 UNIT ASSISTED
LIVING FACILITY. 1600A SERVICE WITH
A 150KW GENERATOR.
ceilings6/29/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Electrical Oct-09-2015
PV(100)/S
PASSED
WAYNE J. GRIFFIN ELECTRIC, INC (508)
429-8830 ()
20.
Roger MaloSERVICESIGNED OFF NEW CONSTRUCTION 83 UNIT ASSISTED
LIVING FACILITY. 1600A SERVICE WITH
A 150KW GENERATOR.
10/9/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Electrical Jul-30-2015
PV(100)/S
PASSED
WAYNE J. GRIFFIN ELECTRIC, INC (508)
429-8830 ()
21.
Roger MaloTRENCHSIGNED OFF NEW CONSTRUCTION 83 UNIT ASSISTED
LIVING FACILITY. 1600A SERVICE WITH
A 150KW GENERATOR.
service7/30/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Electrical Apr-23-2015
PV(100)/S
PASSED
WAYNE J. GRIFFIN ELECTRIC, INC (508)
429-8830 ()
22.
Roger MaloTRENCHSIGNED OFF NEW CONSTRUCTION 83 UNIT ASSISTED
LIVING FACILITY. 1600A SERVICE WITH
A 150KW GENERATOR.
slab work4/23/2015
Page 8 of 18GeoTMS® 2016 Des Lauriers Municipal Solutions, Inc.
Block Lot Address (Work Location)Map
Permit Type
Subdivision (Builder's Lot)Permit No
Date / Time Requested
Zoning
Inspection Status
Contractor (Phone #)
InspectorType of InspectionPermit Status Work Description
Permit Inspections Listing Report
by Permit No
District
CommentDate Inspected Date Signed Off
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Electrical
EP-2015-0692
Mar-19-2015
PV(100)/S
PASSED
WAYNE J. GRIFFIN ELECTRIC, INC (508)
429-8830 ()
23.
Roger MaloTRENCHSIGNED OFF NEW CONSTRUCTION 83 UNIT ASSISTED
LIVING FACILITY. 1600A SERVICE WITH
A 150KW GENERATOR.
3/19/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Electrical Mar-30-2015
PV(100)/S
PASSED
WAYNE J. GRIFFIN ELECTRIC, INC (508)
429-8830 ()
24.
Roger MaloTRENCHSIGNED OFF NEW CONSTRUCTION 83 UNIT ASSISTED
LIVING FACILITY. 1600A SERVICE WITH
A 150KW GENERATOR.
3/30/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Electrical Sep-30-2015
PV(100)/S
PASSED
WAYNE J. GRIFFIN ELECTRIC, INC (508)
429-8830 ()
25.
Roger MaloTRENCHSIGNED OFF NEW CONSTRUCTION 83 UNIT ASSISTED
LIVING FACILITY. 1600A SERVICE WITH
A 150KW GENERATOR.
outside lights9/29/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Electrical Sep-28-2015
PV(100)/S
PASSED
WAYNE J. GRIFFIN ELECTRIC, INC (508)
429-8830 ()
26.
Roger MaloTRENCHSIGNED OFF NEW CONSTRUCTION 83 UNIT ASSISTED
LIVING FACILITY. 1600A SERVICE WITH
A 150KW GENERATOR.
outside lights9/28/2015
Permit No ( EP-2015-0692 ) TOTAL INSPECTIONS:26
Permit No ( EP-2015-0692 ) TOTAL FEES:$6,815.00
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Electrical
EP-2016-0145
Nov-12-2015
PV(100)/S
PASSED
FAVULLI ELECTRIC (508) 753-29031.
Roger MaloFINALSIGNED OFF HVAC CONTROL WIRING
11/12/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Electrical Aug-28-2015
PV(100)/S
PASSED
FAVULLI ELECTRIC (508) 753-29032.
Roger MaloROUGHSIGNED OFF HVAC CONTROL WIRING
PIPES8/28/2015
Page 9 of 18GeoTMS® 2016 Des Lauriers Municipal Solutions, Inc.
Block Lot Address (Work Location)Map
Permit Type
Subdivision (Builder's Lot)Permit No
Date / Time Requested
Zoning
Inspection Status
Contractor (Phone #)
InspectorType of InspectionPermit Status Work Description
Permit Inspections Listing Report
by Permit No
District
CommentDate Inspected Date Signed Off
Permit No ( EP-2016-0145 ) TOTAL INSPECTIONS:2
Permit No ( EP-2016-0145 ) TOTAL FEES:$150.00
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Electrical
EP-2016-0196
Nov-12-2015
PV(100)/S
PASSED
EASTHAMPTON ELEC SERVICE INC (413)
527-2400
1.
Roger MaloFINALSIGNED OFF RUN CATV WILL FOR COMCAST
SYSTEM 2ND AND 3RD FLOOR
11/12/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Electrical Sep-18-2015
PV(100)/S
PASSED
EASTHAMPTON ELEC SERVICE INC (413)
527-2400
2.
Roger MaloROUGHSIGNED OFF RUN CATV WILL FOR COMCAST
SYSTEM 2ND AND 3RD FLOOR
9/18/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Electrical Sep-23-2015
PV(100)/S
PASSED
EASTHAMPTON ELEC SERVICE INC (413)
527-2400
3.
Roger MaloROUGHSIGNED OFF RUN CATV WILL FOR COMCAST
SYSTEM 2ND AND 3RD FLOOR
3ed floor9/23/2015
Permit No ( EP-2016-0196 ) TOTAL INSPECTIONS:3
Permit No ( EP-2016-0196 ) TOTAL FEES:$670.00
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Electrical
EP-2016-0211
Nov-12-2015
PV(100)/S
PASSED
HOWSE CORPORATION INC (978) 276-01061.
Roger MaloFINALSIGNED OFF PROVIDE CONTROL INTERLOCK WIRING
FOR BOILER. ALL WORK IS LOW
VOLTAGE
11/12/2015
Permit No ( EP-2016-0211 ) TOTAL INSPECTIONS:1
Permit No ( EP-2016-0211 ) TOTAL FEES:$30.00
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Gas
GP-2015-0526
Nov-30-2015
PV(100)/S
PASSED
J J BAFARO INC (508) 757-74291.
Larry EldridgeFinalSIGNED OFF BSMT - 2 BOILERS, 3 COOK STOVE,
OVEN & TEST - 4TH FLOOR - MAKEUP
AIR UNIT, 9 ROOF TOP UNIT
11/30/2015 11/30/2015
Page 10 of 18GeoTMS® 2016 Des Lauriers Municipal Solutions, Inc.
Block Lot Address (Work Location)Map
Permit Type
Subdivision (Builder's Lot)Permit No
Date / Time Requested
Zoning
Inspection Status
Contractor (Phone #)
InspectorType of InspectionPermit Status Work Description
Permit Inspections Listing Report
by Permit No
District
CommentDate Inspected Date Signed Off
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Gas
GP-2015-0526
Oct-21-2015
PV(100)/S
PASSED
J J BAFARO INC (508) 757-74292.
Larry EldridgeTestSIGNED OFF BSMT - 2 BOILERS, 3 COOK STOVE,
OVEN & TEST - 4TH FLOOR - MAKEUP
AIR UNIT, 9 ROOF TOP UNIT
10/21/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Gas Nov-06-2015
PV(100)/S
PASSED
J J BAFARO INC (508) 757-74293.
Larry EldridgeTestSIGNED OFF BSMT - 2 BOILERS, 3 COOK STOVE,
OVEN & TEST - 4TH FLOOR - MAKEUP
AIR UNIT, 9 ROOF TOP UNIT
kitchen gas train for equipt,11/6/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Gas Nov-12-2015
PV(100)/S
PASSED
J J BAFARO INC (508) 757-74294.
Larry EldridgeTestSIGNED OFF BSMT - 2 BOILERS, 3 COOK STOVE,
OVEN & TEST - 4TH FLOOR - MAKEUP
AIR UNIT, 9 ROOF TOP UNIT
INTERLOCK TEST PASSED11/12/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Gas Sep-02-2015
PV(100)/S
PASSED
J J BAFARO INC (508) 757-74295.
Larry EldridgeTestSIGNED OFF BSMT - 2 BOILERS, 3 COOK STOVE,
OVEN & TEST - 4TH FLOOR - MAKEUP
AIR UNIT, 9 ROOF TOP UNIT
9/2/2015
Permit No ( GP-2015-0526 ) TOTAL INSPECTIONS:5
Permit No ( GP-2015-0526 ) TOTAL FEES:$600.00
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Plumbing
PP-2015-0306
Nov-30-2015
PV(100)/S
PASSED
J J BAFARO INC (508) 757-74291.
Larry EldridgeFinalSIGNED OFF BSMT - CROSS CONN, GREASE SYSTEM,
DISHWASHER, 10 AREA DRAINS,
INTERCEPTOR, 5 KIT SINK, 2 LAVS,MOP
SINK, 2 TOILETS, WTR HTR, 1ST FLOOR -
DRINKING FOUNTAIN, 24 KIT SINKS, 25
LAVS, 23 SHOWER STALLS, MOP SINK,
25 TOILETS, SHAMPOO SINK, 2ND
FLOOR - TUB, 2 ARE
11/30/2015 11/30/2015
Page 11 of 18GeoTMS® 2016 Des Lauriers Municipal Solutions, Inc.
Block Lot Address (Work Location)Map
Permit Type
Subdivision (Builder's Lot)Permit No
Date / Time Requested
Zoning
Inspection Status
Contractor (Phone #)
InspectorType of InspectionPermit Status Work Description
Permit Inspections Listing Report
by Permit No
District
CommentDate Inspected Date Signed Off
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Plumbing
PP-2015-0306
Nov-09-2015
PV(100)/S
PARTIAL COMPLY
J J BAFARO INC (508) 757-74292.
Larry EldridgeFinalSIGNED OFF BSMT - CROSS CONN, GREASE SYSTEM,
DISHWASHER, 10 AREA DRAINS,
INTERCEPTOR, 5 KIT SINK, 2 LAVS,MOP
SINK, 2 TOILETS, WTR HTR, 1ST FLOOR -
DRINKING FOUNTAIN, 24 KIT SINKS, 25
LAVS, 23 SHOWER STALLS, MOP SINK,
25 TOILETS, SHAMPOO SINK, 2ND
FLOOR - TUB, 2 ARE
units 101-110, 222-22811/9/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Plumbing Nov-09-2015
PV(100)/S
PARTIAL COMPLY
J J BAFARO INC (508) 757-74293.
BOB MALONIFinalSIGNED OFF BSMT - CROSS CONN, GREASE SYSTEM,
DISHWASHER, 10 AREA DRAINS,
INTERCEPTOR, 5 KIT SINK, 2 LAVS,MOP
SINK, 2 TOILETS, WTR HTR, 1ST FLOOR -
DRINKING FOUNTAIN, 24 KIT SINKS, 25
LAVS, 23 SHOWER STALLS, MOP SINK,
25 TOILETS, SHAMPOO SINK, 2ND
FLOOR - TUB, 2 ARE
units 0-1611/9/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Plumbing Nov-10-2015
PV(100)/S
PARTIAL COMPLY
J J BAFARO INC (508) 757-74294.
Larry EldridgeFinalSIGNED OFF BSMT - CROSS CONN, GREASE SYSTEM,
DISHWASHER, 10 AREA DRAINS,
INTERCEPTOR, 5 KIT SINK, 2 LAVS,MOP
SINK, 2 TOILETS, WTR HTR, 1ST FLOOR -
DRINKING FOUNTAIN, 24 KIT SINKS, 25
LAVS, 23 SHOWER STALLS, MOP SINK,
25 TOILETS, SHAMPOO SINK, 2ND
FLOOR - TUB, 2 ARE
units 201,202,203,204,205,206,207,209,210,211,212,225,217,218,219,220,222,221,224,226 227,22911/10/2015
Page 12 of 18GeoTMS® 2016 Des Lauriers Municipal Solutions, Inc.
Block Lot Address (Work Location)Map
Permit Type
Subdivision (Builder's Lot)Permit No
Date / Time Requested
Zoning
Inspection Status
Contractor (Phone #)
InspectorType of InspectionPermit Status Work Description
Permit Inspections Listing Report
by Permit No
District
CommentDate Inspected Date Signed Off
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Plumbing
PP-2015-0306
Nov-24-2015
PV(100)/S
PASSED
J J BAFARO INC (508) 757-74295.
Larry Eldridgepartial finalSIGNED OFF BSMT - CROSS CONN, GREASE SYSTEM,
DISHWASHER, 10 AREA DRAINS,
INTERCEPTOR, 5 KIT SINK, 2 LAVS,MOP
SINK, 2 TOILETS, WTR HTR, 1ST FLOOR -
DRINKING FOUNTAIN, 24 KIT SINKS, 25
LAVS, 23 SHOWER STALLS, MOP SINK,
25 TOILETS, SHAMPOO SINK, 2ND
FLOOR - TUB, 2 ARE
third and second floor see back of permit for locations11/24/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Plumbing Nov-12-2015
PV(100)/S
FAILED
J J BAFARO INC (508) 757-74296.
Larry Eldridgepartial finalSIGNED OFF BSMT - CROSS CONN, GREASE SYSTEM,
DISHWASHER, 10 AREA DRAINS,
INTERCEPTOR, 5 KIT SINK, 2 LAVS,MOP
SINK, 2 TOILETS, WTR HTR, 1ST FLOOR -
DRINKING FOUNTAIN, 24 KIT SINKS, 25
LAVS, 23 SHOWER STALLS, MOP SINK,
25 TOILETS, SHAMPOO SINK, 2ND
FLOOR - TUB, 2 ARE
RAN OUT OF HOT WATER AFTER 5 UNITS11/12/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Plumbing Nov-12-2015
PV(100)/S
FAILED
J J BAFARO INC (508) 757-74297.
Larry Eldridgepartial finalSIGNED OFF BSMT - CROSS CONN, GREASE SYSTEM,
DISHWASHER, 10 AREA DRAINS,
INTERCEPTOR, 5 KIT SINK, 2 LAVS,MOP
SINK, 2 TOILETS, WTR HTR, 1ST FLOOR -
DRINKING FOUNTAIN, 24 KIT SINKS, 25
LAVS, 23 SHOWER STALLS, MOP SINK,
25 TOILETS, SHAMPOO SINK, 2ND
FLOOR - TUB, 2 ARE
NOT READY11/12/2015
Page 13 of 18GeoTMS® 2016 Des Lauriers Municipal Solutions, Inc.
Block Lot Address (Work Location)Map
Permit Type
Subdivision (Builder's Lot)Permit No
Date / Time Requested
Zoning
Inspection Status
Contractor (Phone #)
InspectorType of InspectionPermit Status Work Description
Permit Inspections Listing Report
by Permit No
District
CommentDate Inspected Date Signed Off
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Plumbing
PP-2015-0306
Nov-13-2015
PV(100)/S
PASSED
J J BAFARO INC (508) 757-74298.
Larry Eldridgepartial finalSIGNED OFF BSMT - CROSS CONN, GREASE SYSTEM,
DISHWASHER, 10 AREA DRAINS,
INTERCEPTOR, 5 KIT SINK, 2 LAVS,MOP
SINK, 2 TOILETS, WTR HTR, 1ST FLOOR -
DRINKING FOUNTAIN, 24 KIT SINKS, 25
LAVS, 23 SHOWER STALLS, MOP SINK,
25 TOILETS, SHAMPOO SINK, 2ND
FLOOR - TUB, 2 ARE
rooms 115, 117,122,123,103,105,107,wpool tub, 2 public baths11/13/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Plumbing Sep-24-2015
PV(100)/S
PASSED
J J BAFARO INC (508) 757-74299.
Larry EldridgePartial RoughSIGNED OFF BSMT - CROSS CONN, GREASE SYSTEM,
DISHWASHER, 10 AREA DRAINS,
INTERCEPTOR, 5 KIT SINK, 2 LAVS,MOP
SINK, 2 TOILETS, WTR HTR, 1ST FLOOR -
DRINKING FOUNTAIN, 24 KIT SINKS, 25
LAVS, 23 SHOWER STALLS, MOP SINK,
25 TOILETS, SHAMPOO SINK, 2ND
FLOOR - TUB, 2 ARE
third floor 0-16 walls rough plumbing9/24/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Plumbing Oct-01-2015
PV(100)/S
PASSED
J J BAFARO INC (508) 757-742910.
Larry EldridgePartial RoughSIGNED OFF BSMT - CROSS CONN, GREASE SYSTEM,
DISHWASHER, 10 AREA DRAINS,
INTERCEPTOR, 5 KIT SINK, 2 LAVS,MOP
SINK, 2 TOILETS, WTR HTR, 1ST FLOOR -
DRINKING FOUNTAIN, 24 KIT SINKS, 25
LAVS, 23 SHOWER STALLS, MOP SINK,
25 TOILETS, SHAMPOO SINK, 2ND
FLOOR - TUB, 2 ARE
16-28, third floor10/1/2015
Page 14 of 18GeoTMS® 2016 Des Lauriers Municipal Solutions, Inc.
Block Lot Address (Work Location)Map
Permit Type
Subdivision (Builder's Lot)Permit No
Date / Time Requested
Zoning
Inspection Status
Contractor (Phone #)
InspectorType of InspectionPermit Status Work Description
Permit Inspections Listing Report
by Permit No
District
CommentDate Inspected Date Signed Off
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Plumbing
PP-2015-0306
Aug-25-2015
PV(100)/S
PASSED
J J BAFARO INC (508) 757-742911.
Larry EldridgePartial RoughSIGNED OFF BSMT - CROSS CONN, GREASE SYSTEM,
DISHWASHER, 10 AREA DRAINS,
INTERCEPTOR, 5 KIT SINK, 2 LAVS,MOP
SINK, 2 TOILETS, WTR HTR, 1ST FLOOR -
DRINKING FOUNTAIN, 24 KIT SINKS, 25
LAVS, 23 SHOWER STALLS, MOP SINK,
25 TOILETS, SHAMPOO SINK, 2ND
FLOOR - TUB, 2 ARE
0-16,4-16, atof, first and second flor,basement 004, 006. need expansion joints for pvc piping8/25/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Plumbing Sep-02-2015
PV(100)/S
PASSED
J J BAFARO INC (508) 757-742912.
Larry EldridgePartial RoughSIGNED OFF BSMT - CROSS CONN, GREASE SYSTEM,
DISHWASHER, 10 AREA DRAINS,
INTERCEPTOR, 5 KIT SINK, 2 LAVS,MOP
SINK, 2 TOILETS, WTR HTR, 1ST FLOOR -
DRINKING FOUNTAIN, 24 KIT SINKS, 25
LAVS, 23 SHOWER STALLS, MOP SINK,
25 TOILETS, SHAMPOO SINK, 2ND
FLOOR - TUB, 2 ARE
first floor 16-28 , a-h9/2/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Plumbing Sep-16-2015
PV(100)/S
PASSED
J J BAFARO INC (508) 757-742913.
Larry EldridgePartial RoughSIGNED OFF BSMT - CROSS CONN, GREASE SYSTEM,
DISHWASHER, 10 AREA DRAINS,
INTERCEPTOR, 5 KIT SINK, 2 LAVS,MOP
SINK, 2 TOILETS, WTR HTR, 1ST FLOOR -
DRINKING FOUNTAIN, 24 KIT SINKS, 25
LAVS, 23 SHOWER STALLS, MOP SINK,
25 TOILETS, SHAMPOO SINK, 2ND
FLOOR - TUB, 2 ARE
16-28, 0-16, 2229/16/2015
Page 15 of 18GeoTMS® 2016 Des Lauriers Municipal Solutions, Inc.
Block Lot Address (Work Location)Map
Permit Type
Subdivision (Builder's Lot)Permit No
Date / Time Requested
Zoning
Inspection Status
Contractor (Phone #)
InspectorType of InspectionPermit Status Work Description
Permit Inspections Listing Report
by Permit No
District
CommentDate Inspected Date Signed Off
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Plumbing
PP-2015-0306
Mar-23-2015
PV(100)/S
PARTIAL COMPLY
J J BAFARO INC (508) 757-742914.
Larry EldridgeUNDERGROUNDSIGNED OFF BSMT - CROSS CONN, GREASE SYSTEM,
DISHWASHER, 10 AREA DRAINS,
INTERCEPTOR, 5 KIT SINK, 2 LAVS,MOP
SINK, 2 TOILETS, WTR HTR, 1ST FLOOR -
DRINKING FOUNTAIN, 24 KIT SINKS, 25
LAVS, 23 SHOWER STALLS, MOP SINK,
25 TOILETS, SHAMPOO SINK, 2ND
FLOOR - TUB, 2 ARE
floor drains for the mechanical and fire protection room , tank tie in3/23/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Plumbing May-08-2015
PV(100)/S
PARTIAL COMPLY
J J BAFARO INC (508) 757-742915.
Larry EldridgeUNDERGROUNDSIGNED OFF BSMT - CROSS CONN, GREASE SYSTEM,
DISHWASHER, 10 AREA DRAINS,
INTERCEPTOR, 5 KIT SINK, 2 LAVS,MOP
SINK, 2 TOILETS, WTR HTR, 1ST FLOOR -
DRINKING FOUNTAIN, 24 KIT SINKS, 25
LAVS, 23 SHOWER STALLS, MOP SINK,
25 TOILETS, SHAMPOO SINK, 2ND
FLOOR - TUB, 2 ARE
rooms 136,134,132,130,128,126,122,124,118,1205/8/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Plumbing Apr-17-2015
PV(100)/S
PARTIAL COMPLY
J J BAFARO INC (508) 757-742916.
Larry EldridgeUNDERGROUNDSIGNED OFF BSMT - CROSS CONN, GREASE SYSTEM,
DISHWASHER, 10 AREA DRAINS,
INTERCEPTOR, 5 KIT SINK, 2 LAVS,MOP
SINK, 2 TOILETS, WTR HTR, 1ST FLOOR -
DRINKING FOUNTAIN, 24 KIT SINKS, 25
LAVS, 23 SHOWER STALLS, MOP SINK,
25 TOILETS, SHAMPOO SINK, 2ND
FLOOR - TUB, 2 ARE
roof drainage line partial4/17/2015
Page 16 of 18GeoTMS® 2016 Des Lauriers Municipal Solutions, Inc.
Block Lot Address (Work Location)Map
Permit Type
Subdivision (Builder's Lot)Permit No
Date / Time Requested
Zoning
Inspection Status
Contractor (Phone #)
InspectorType of InspectionPermit Status Work Description
Permit Inspections Listing Report
by Permit No
District
CommentDate Inspected Date Signed Off
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Plumbing
PP-2015-0306
Mar-11-2015
PV(100)/S
PARTIAL COMPLY
J J BAFARO INC (508) 757-742917.
Larry EldridgeUNDERGROUNDSIGNED OFF BSMT - CROSS CONN, GREASE SYSTEM,
DISHWASHER, 10 AREA DRAINS,
INTERCEPTOR, 5 KIT SINK, 2 LAVS,MOP
SINK, 2 TOILETS, WTR HTR, 1ST FLOOR -
DRINKING FOUNTAIN, 24 KIT SINKS, 25
LAVS, 23 SHOWER STALLS, MOP SINK,
25 TOILETS, SHAMPOO SINK, 2ND
FLOOR - TUB, 2 ARE
rooms 04, 02, 06, 0123/11/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Plumbing Mar-13-2015
PV(100)/S
PASSED
J J BAFARO INC (508) 757-742918.
Mark WendolowskiUNDERGROUNDSIGNED OFF BSMT - CROSS CONN, GREASE SYSTEM,
DISHWASHER, 10 AREA DRAINS,
INTERCEPTOR, 5 KIT SINK, 2 LAVS,MOP
SINK, 2 TOILETS, WTR HTR, 1ST FLOOR -
DRINKING FOUNTAIN, 24 KIT SINKS, 25
LAVS, 23 SHOWER STALLS, MOP SINK,
25 TOILETS, SHAMPOO SINK, 2ND
FLOOR - TUB, 2 ARE
grease trap & kitchen area3/13/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
Plumbing Apr-21-2015
PV(100)/S
PARTIAL COMPLY
J J BAFARO INC (508) 757-742919.
Larry EldridgeUNDERGROUNDSIGNED OFF BSMT - CROSS CONN, GREASE SYSTEM,
DISHWASHER, 10 AREA DRAINS,
INTERCEPTOR, 5 KIT SINK, 2 LAVS,MOP
SINK, 2 TOILETS, WTR HTR, 1ST FLOOR -
DRINKING FOUNTAIN, 24 KIT SINKS, 25
LAVS, 23 SHOWER STALLS, MOP SINK,
25 TOILETS, SHAMPOO SINK, 2ND
FLOOR - TUB, 2 ARE
rooms 143,144,146,148,149,150,1424/21/2015
Permit No ( PP-2015-0306 ) TOTAL INSPECTIONS:19
Permit No ( PP-2015-0306 ) TOTAL FEES:$4,010.00
Page 17 of 18GeoTMS® 2016 Des Lauriers Municipal Solutions, Inc.
Block Lot Address (Work Location)Map
Permit Type
Subdivision (Builder's Lot)Permit No
Date / Time Requested
Zoning
Inspection Status
Contractor (Phone #)
InspectorType of InspectionPermit Status Work Description
Permit Inspections Listing Report
by Permit No
District
CommentDate Inspected Date Signed Off
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
SHEETMETAL
SM-2015-0031
Aug-05-2015
PV(100)/S
FULL COMPLY
J J BAFARO INC (508) 757-74291.
Charles MillerROUGHAPPROVED INSTALL HVAC SYS & KITCHEN
EXHAUST
main truncs at all levels8/5/2015
38A 110 001 50 VILLAGE HILL RD (50 VILLAGE
HILL RD - CHRISTOPHER HEIGHTS)
SHEETMETAL Sep-10-2015
PV(100)/S
FULL COMPLY
J J BAFARO INC (508) 757-74292.
Charles MillerROUGHAPPROVED INSTALL HVAC SYS & KITCHEN
EXHAUST
main drops and kitchen exhaust9/10/2015
Permit No ( SM-2015-0031 ) TOTAL INSPECTIONS:2
Permit No ( SM-2015-0031 ) TOTAL FEES:$50.00
81
GRAND TOTAL FEES: $28,928.00
GRAND TOTAL INSPECTIONS:
Page 18 of 18GeoTMS® 2016 Des Lauriers Municipal Solutions, Inc.