Loading...
INITIAL CONSTRUCTION CONTROL DOCUMENT - 3 County Fair_Elect_020513Trial Version 10_09_2012 Initial Construction Control Document To be submitted with the building permit application by a Registered Design Professional for work per the 8th edition of the Massachusetts State Building Code, 780 CMR, Section 107.6.2 Project Title: Date: Three County Fair Rooftop Solar 1-16-2013 Property Address: 54 Fair St., ( P.O. Box- 305) , Northampton, MA 01 Project: Check (x) one or both as applicable: Renovation to Existing Construction Project description: Installation of Photovoltaic Rooftop Solar System I, Allison Kimball, MA Registration Number: 49826 Expiration date: June 30, 2014, am a registered design professional,and hereby certify that I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning1: Entire Project Architectural Structural Mechanical Fire Protection X Electrical Other: for the above named project and that such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I (or my designee) shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. When required by the building official, I shall submit field/progress reports (see item 3.) together with pertinent comments, in a form acceptable to the building official. Upon completion of the work, I shall submit to the building official a ‘Final Construction Control Document’. Enter in the space to the right a “wet” or electronic signature and seal: Phone number: (732) 894-5061 Email: AKimball@kmbdg.com Building Official Use Only Building Official Name: Permit No.: Date: Note 1. Indicate with an ‘x’ project design plans, computations and specifications that you prepared or directly supervised. If ‘other’ is chosen, provide a description.