DAWES EGRESS 2017-01-13110 Pulpit Hill RoadAmherst, Ma 01002 413-549-5799Fax: 413-549-7918www.facdarchitects.comDAWES HOUSESMITH COLLEGE8 BEDFORD TERRACENORTHAMPTON, MAREVISIONS:
DATENUMBER
APRIL 6, 2017
FIRST FLOOR
PLAN
A-1.1
PROGRESS
PRINT
NOT FOR
CONSTRUCTION
PROGRESS PRINT NOT FOR CONSTRUCTIONHOME COMMUNITY PLANETFITCH ARCHITECTURE& COMMUNITY DESIGN110 Pulpit Hill RoadAmherst, Ma 01002 413-549-5799Fax: 413-549-7918www.facdarchitects.comDAWES HOUSESMITH COLLEGE8 BEDFORD TERRACENORTHAMPTON, MAREVISIONS:
DATENUMBER
APRIL 6, 2017
FIRST FLOOR
PLAN
A-1.1
PROGRESS
PRINT
NOT FOR
CONSTRUCTION
PROGRESS PRINT NOT FOR CONSTRUCTIONHOME COMMUNITY PLANETFITCH ARCHITECTURE& COMMUNITY DESIGN9'-10.5"
29'-11"
ELECTRIC LINES ENTER
BUILDING THIS CORNER
APPROX LOCATION OF
UTILITY POLE - CONFIRM
UP
EXISTING HOT TABLE
TO REMAIN
EXISTING SERVICE TABLETO REMAIN
DINING A
107
DINING B
108
KITCHENETTE
111
WOMEN'S
ACCESSIBLE
TOILET
110
COMMERCIAL
KITCHEN
101
EXPANDED
COMMERICIAL
KITCHEN
102
MEN'S
ACCESSIBLE
TOILET
104
MOP
105
SERVERY106
UNISEX
ACCESSIBLE
TOILET
114
WOMEN'S
TOILET
113
STAFF
TOILET
112
CENTRAL
HALL
109
BACK
HALL
103
DININGENTRY
EXISTING
YARD DRAIN183.42
183.73
EXISTINGBEAMS ABOVE
186.23
EXISTING SERVICE TABLE
TO REMAIN
CASEDOPENING
EXISTING
REF TO
REMAIN
EXISTING
REF TO
REMAIN
CLOSETCLOSET
SOFFIT ABOVE
TRASH ENCLOSURE
APPROX.
OPENING
AT CEILING
BOXED BEAM
CEILING IS OPEN ALL
THE WAY TO THIRD
FLOOR CEILING
UP
117
100C1
EXISTING
EXIT SIGN
FE
PS
116
EXISTING
COLUMNS, TYP
EXISTING
DOWNSPOUT
CONNECTED TO
UNDERGROUND
DRAINAGE SYSTEM
EXISTING
DOWNSPOUT
CONNECTED TO
UNDERGROUND
DRAINAGE SYSTEM
100S1
3,628 TOTAL SF - FIRST FLOOR
4848 SF FOOTPRINT INCLUDING PORCHES
6'-11 3/4"
LARGE SPRINKLER
RISER1-LIFT-ALT1
1-17-ALT1
EXTERIOR
EGRESS STAIR
UP
REPAIR CEILING
DAMAGE
TRIM PULLED FROM WALL
OPEN CAVITY AND REPAIR
WATER DAMAGE
ADD NEW HANDRAIL
WITH EXTENSIONS
EXISTING
DOWNSPOUT,
CONNECTED TO
UNDERGROUND
DRAINAGLE
SYSTEM, TYP.
-FUTURE LIFT TO SECOND FLOOR
-DEMO WALL FOR NEW DOOR
LOCATION AND LIFT
-RELOCATE DOOR
-REMOVE RADIATOR
-RELOCATE FIRE EXTINGUISHER
PIPE
EXISTING
BEAM
ABOVE
DROPPED
CEILING
EXISTING SLOPED WALKWAY
DN
EXISTING SLOPED WALKWAY
UP
UP
H/S
POSSIBLE
LOCATION
OF POST
FROM
ABOVE
FIRST FLOOR PLAN
Scale: 1/4" = 1'-0"2 FIRST FLOOR
WITH FUTURE LIFT TO SECOND FLOOR
E2-09
E2-07A
E2-11
E2-11-C
E2-02
E2-03
E2-07
E2-10-C
E2-10
E2-01
E2-08-C
DN
UP
NEW HANDRAILS
BIG PIPE
3'-6"1'-6"7'-1 1/2" +/-3'-6"1'-6"
9'-4"
7'-10.5"
CONSIDER DEMOING
PROBLEMATIC ROOF & BAY
206
207
209
200T1
2-LIFT-ALT1
2-08-ALT1
2-T2
UP
CONTROLS2-T1
2-00
2-J1
OUT
9'-4"
9'-4"
9'-4"
7'-10.5"
WALL BULGE
FIREPLACE W/
NICE MANTEL
1,734 SF NOT INCLUDING TOILETS
210 sf +/- BATHROOMS CONVERTED TO OFFICE USE
2880 SF +/- / 100 GROSS = 29 OCCUPANTS
3,014 TOTAL SF - SECOND FLOOR
FIXED WINDOW
FOR DAYLIGHTING?
2-00-X
ROTATE OR
REPLACE
RADIATOR
MAILBOXES ABOVE
COUNTER
TRASH/ RECYCLING
2-J2
EXISTING SOFFIT
RECYCLING
PARTITION WALL
(NOT FIXED)
REMOVE FLOOR UNDERLAYMENT
REPAIR OR REPLACE FLOOR
SHEATHING BELOW AS NEEDED
EXISTING ACCESS PANEL,
NEW LADDER
IS THERE A
CHASE HERE?
DN TO GRADE
200S1
200S4
200C1
207A
208
210
211
204
205
200C3
201
202
203
200T2
200C2
200J1
200J2
H/S
H/S
-FUTURE LIFT FIRST TO SECOND FLOOR
-DEMO WALL FOR NEW DOOR
LOCATION AND LIFT
-RELOCATE DOOR TO ROOM
POST ASSUMED AT CORNER
H/S
200S2
PROBABLE STRUCTURAL BEAM @
CHANGE IN ROOF STRUCTURE
8'-1"
FILL IN WINDOW
NEXT TO STAIR
REPAIR WINDOW
TIME CLOCKS FOR
EXHAUST FANS
SECOND FLOOR PLAN
Scale: 1/4" = 1'-0"2 110 Pulpit Hill RoadAmherst, Ma 01002 413-549-5799Fax: 413-549-7918www.facdarchitects.comDAWES HOUSESMITH COLLEGE8 BEDFORD TERRACENORTHAMPTON, MAREVISIONS:
DATENUMBER
APRIL 6, 2017
SECOND FLOOR
PLAN
A-1.2
PROGRESS
PRINT
NOT FOR
CONSTRUCTION
PROGRESS PRINT NOT FOR CONSTRUCTIONHOME COMMUNITY PLANETFITCH ARCHITECTURE& COMMUNITY DESIGN110 Pulpit Hill RoadAmherst, Ma 01002 413-549-5799Fax: 413-549-7918www.facdarchitects.comDAWES HOUSESMITH COLLEGE8 BEDFORD TERRACENORTHAMPTON, MAREVISIONS:
DATENUMBER
APRIL 6, 2017
SECOND FLOOR
PLAN
A-1.2
PROGRESS
PRINT
NOT FOR
CONSTRUCTION
PROGRESS PRINT NOT FOR CONSTRUCTIONHOME COMMUNITY PLANETFITCH ARCHITECTURE& COMMUNITY DESIGNSECOND FLOOR
E3-05E3-06
E3-S3
DN
3-A
3-C
E3-06-C
E3-03-C2
E3-03-C1
E3-04-C13-B 3-B
8'-8.5"
8'-7.5"
7'-6.5"
2'-11"
2'-11"
7'-6.5"
5'-9"8'-7.5"
LINE OF FIRST
FLOOR EXTERIOR
WALL BELOW
E3-04E3-03
REPLACE
TRANSLUCENT
SASHES @
FORMER
BATHROOM
NICER WINDOW TO
REFLECT GREATER
VISIBILITY
E3-J2LINE OF BREAK
IN CEILING
1636 INTERIOR SF
/ 100 GROSS =
1,831 TOTAL SF
3-S2
3-J3
DN
NEW STAIR FROM
3RD TO 2ND LEVELS,
IN NARROW GABLE
CONFIRM
HEADROOM FOR
PRECISE LOCATION
DEMO EXISTING
CHIMNEY 300T1
DN
E3-05-C
E3-01
8'-7.5"5'-9"8'-7.5"CONTROLS3-T1
3-J1
301
300C1
302
300C2
300J2
300J1
305306
303
304300J3
REPLACE WITH SHORTER WINDOW
ROOF "WELL" BELOW WINDOWS
H/S
REPAIR CEILING AT BASE OF VALLEY
300S3
NEW HANDRAILS
FE
THIRD FLOOR PLAN
Scale: 1/4" = 1'-0"1 110 Pulpit Hill RoadAmherst, Ma 01002 413-549-5799Fax: 413-549-7918www.facdarchitects.comDAWES HOUSESMITH COLLEGE8 BEDFORD TERRACENORTHAMPTON, MAREVISIONS:
DATENUMBER
APRIL 6, 2017
THIRD FLOOR
PLAN
A-1.3
PROGRESS
PRINT
NOT FOR
CONSTRUCTION
PROGRESS PRINT NOT FOR CONSTRUCTIONHOME COMMUNITY PLANETFITCH ARCHITECTURE& COMMUNITY DESIGN110 Pulpit Hill RoadAmherst, Ma 01002 413-549-5799Fax: 413-549-7918www.facdarchitects.comDAWES HOUSESMITH COLLEGE8 BEDFORD TERRACENORTHAMPTON, MAREVISIONS:
DATENUMBER
APRIL 6, 2017
THIRD FLOOR
PLAN
A-1.3
PROGRESS
PRINT
NOT FOR
CONSTRUCTION
PROGRESS PRINT NOT FOR CONSTRUCTIONHOME COMMUNITY PLANETFITCH ARCHITECTURE& COMMUNITY DESIGNTHIRD FLOOR