Loading...
Henshaw B CD's209.78208.332142072082092102112122097002210.36STA7002/MAG7740206.88EP7004 CTB70047741207.28CTB70047742206.54CTB7004 E7744207.49GW7761209.25LP7854210.96LP7745206.60UP206.16'207.30'207.97'211.36'210.29'209.48'209.99'7840206.16G/BIT7841207.30G/BIT7842207.97G/BIT7856211.36G7857210.29G7858209.48G7860209.99G7851209.47BUSH7852210.32BUSH7853210.50BUSH7765208.95DT SZ4/8" CHINESE CATALPA7778209.04DT SZ4/8" PINK FLOWERING DOGWD7855211.83DT SZ3/6" WINTER FLOWERING CHER7800211.02CL1/RAILING7801209.56CL1 E/RAILING7802209.70CL1/RAILING7803211.07CL1 E/RAILING7783208.70RET7000/BOT SLOPED STONE7784209.51RET7000/BOT SLOPED STONE7785209.86RET7000 E/BOT SLOPED STONE7786210.96RET7000/BOT SLOPED STONE7787210.83RET7000/BOT SLOPED STONE7788210.89RET7000/BOT SLOPED STONE7789210.96RET7000/BOT SLOPED STONE7760.1209.58R/EC7790210.68R/3" ELBOW VENT7588214.31BS70007589214.14BS70007590214.03BS7000 E7781208.61BS70157781.1209.16BS70157782209.41BS7015 E7845.9211.82BS70257846211.82BS70257847211.63BS70257730209.61EO7000 EC7001/STAIRS7731209.57EC7001 EP70107732209.61EC7001 E7794210.99EC7010/TOP STEPS7754209.67EC70117755209.62EC7011 EP7010 E7759209.55EC7011 EP70107760209.53EC7011 E/PERP TO BLDG7772209.79EC70117773209.72EC7011 EP7010 E7774209.76EC7011 EP70107775209.76EC7011 EO7011/BULK HD7777209.83EC7011 E7793209.57EP7010 EC7012/ STEPS7795211.16EC7012 E7798211.22EC70127799211.07EC7012/TOP STEP7804209.69EC7012 E EP70107728209.73EO7000/STAIRS7729209.59EO7000/STAIRS7730209.61EO7000 EC7001/STAIRS7757209.58EO70107758209.57EO70107775209.76EC7011 EO7011/BULK HD7776209.78EO7011 E7581214.19EP70017599214.19EP70017600213.02EP70017601212.02EP70017602211.68EP70017608211.02EP7001 PC7609211.10EP70017610211.07EP70017611210.94EP70017612210.74EP70017613210.57EP70017614210.52EP70017615210.50EP70017616210.57EP70017617210.75EP70017618210.93EP7001 PT C7582214.35EP7002 PC7583214.30EP70027584214.30EP7002 PT7585214.44EP7002EP7002 EP80007619214.47EP70037619.1214.36EP70037620214.12EP70037621212.99EP70037622211.81EP70037623211.36EP7003 PC7624211.17EP70037625210.89EP70037626210.54EP70037627210.28EP70037628210.11EP70037629209.98EP7003 PT7630209.59EP70037631209.58EP7003 E/AT STAIRS7632210.44EP70047633210.17EP70047634209.42EP70047736209.12EP70047737207.52EP70047738207.25EP70047739206.97EP70047740206.88EP7004 CTB70047743206.12EP7004 E7731209.57EC7001 EP70107733209.47EP7010 PC7734209.42EP70107735209.29EP7010 PT7746208.80EP70107747207.49EP70107748207.19EP70107749207.31EP70107750207.49EP70107751207.71EP70107752208.00EP70107753209.03EP70107755209.62EC7011 EP7010 E7759209.55EC7011 EP70107766209.15EP70107767208.41EP70107768208.04EP70107769208.38EP70107770208.75EP70107771208.87EP70107773209.72EC7011 EP7010 E7774209.76EC7011 EP70107779209.05EP70107780209.12EP70107791209.31EP70107792209.46EP70107793209.57EP7010 EC7012/ STEPS7804209.69EC7012 E EP70107805209.63EP70107817212.18EP70107818212.56EP70107819212.70EP7010 E7820212.64EP7010 PC7821212.63EP70107822212.53EP70107823212.52EP7010 PT7824211.88EP7010 PC7825211.54EP70107826211.30EP70107827211.29EP7010 PT7828211.20EP70107829210.56EP70107830209.53EP70107831209.22EP70107832208.82EP7010 WL70107835208.41WL7010 E EP70107809213.43EP7012 E7811213.46EP7012EP7002 EP80007861214.55EP80007862214.24EP8001 PC7863214.50EP80017864214.55EP8001 PT7762209.32BC70027763209.29BC70027764209.37BC70027843BC7002 NE7844208.75BC70027845211.56BC70027845.1211.56BC70027849212.92BC7002 E7859209.33BC80007756209.81THRESHOLD7796211.92THRESHOLD7810213.87THRESHOLD7850209.88THRESHOLD8" CHINESECATALPAREMOVE EXG8" DOGWOOD6" WINTERFLOWERINGCHERRYBUILDING BBIT. WALKBIT. WALKBUILDING#115209.32'209.29'209.37'208.75'211.56'211.56'212.92'FF=213.87'(104.00 ON BLDG PLANS)FF=209.88'(100.00' ON BLDG PLANS)BIT.SPRINKLERHOOKUPFF=211.92'(102.00 ON BLDG PLANS)CONC.31B‐196N/FTRUSTEES OF SMITH COLLEGE31B‐197N/FTRUSTEES OF SMITH COLLEGE31B‐195N/FTRUSTEES OF SMITH COLLEGE7797211.16PO/SPRINKLER HOOKUP7832208.82EP7010 WL70107833208.62WL7010 E7834208.23WL70107835208.41WL7010 E EP70107836209.23WL70107837208.85WL70107838208.26WL70107839207.28WL7010 E214.38211.8213' - 6"213.77212.65212.55212.38211.40211.50209.78208.25208.57207.5208208.17208208209209210210211211212212213SEE VOLUME DDWG L1.0D FORCONTINUATIONOF FENCE19' - 4"NO HEAVY EQUIPMENT ALLOWED BETWEEN WALK AND BUILDINGREMOVE EXGSHRUBSREMOVE EXGSHRUBSPROTECT EXG TREECOORD. ROOT PRUNINGBY COLLEGE PRIOR TODISTURBING SOIL FORWALK AND PARKING AREA207.5SEE VOLUME CDWG L1.0C FORCONTINUATIONOF FENCE6' - 0"6' - 0"2' - 0"1' - 0"MAXIMUM SPACINGMAXIMUM SPACINGPROVIDE EQUALLY SPACED SUPPORTS - SEE PLANS FOR LENGTH OF RAMPED WALKSFIRST UPRIGHT STARTS 1'-0" FROM TOP OR BOTTOM OF RAMPED WALK1' - 0"2' - 11"1' - 9"1 1/4" NOM SCH 40GALV RAILING PAINTEDBLACK1 1/2" NOMSCH 40SUPPORTROUND CAP3" RADTYPSET SUPPORTS INCONCRETE10"1' - 0"1' - 4"6"6"10"1' - 2"2' - 4"FORM CONC BASE w/ 10" SONOTUBETOOL CONCTO SLOPEAWAY FROMPIPE3/8" ROUND BARBRACKET1 1/4" NOM RAIL1 1/2" NOM SUPPORTROUND END CAPSUPPORTRAIL & EDGE OF PAVEMENTALIGN w/ STRIPEOF 2nd PARKING SPACE27' - 0"122.27°113.32°25' - 6"23' - 1"4' - 3"5' - 0"24' - 1"6' - 0"14' - 6"14' - 8"7' - 6"6' - 6"8"5' - 8"61.00°153.40°6.87°32.15°22.55°4 ' - 7 5 /8 " 7 ' - 1 0 7 /8 " 1 9 ' - 0 "11' - 6 7/8"11' - 0 7/8"4' - 3 3/8"SAWCUT EXG PAVEMENT156.88°147.58°26'-6" RADLOC 10'-5"4' - 0"9' - 4"2' - 0"2' - 0"3' - 0"22'-6" RADLOC 12'-7 1/2"22'-6" RADLOC 2'-8"19' - 4"RAMP13' - 6"RAMPLIST OF DRAWINGSVOLUME B10 HENSHAW AVENUEHENSHAW COMPLEXUNIT B(30 Sheets)L1.0BHenshaw B Site PlanD1.1BDemolition DrawingsA1.1BFirst Floor PlanA1.2BSecond Floor PlanA2.1BElevationsA5.1BTypical Basement Access DetailsA6.1BReflected Ceiling PlansA6.2BTypical Stair and Bath DetailsA6.3Typical DetailsFPD1.1BFire Protection DemolitionFP1.1BFirst Floor Fire ProtectionFP1.2BSecond Floor Fire ProtectionPD1.1BPlumbing Demolition PlansP1.0BBasement Floor Plumbing PlanP1.1BFirst Floor Plumbing PlanP1.2BSecond Floor PlumbingPlanP2.0BPlumbing Schedules & DetailsHD1.1BHVAC Demolition PlansH1.0BBasement HVAC PlanH1.1BFirst Floor HVAC PlanH1.2BSecond Floor HVAC PlanH2.0BHVAC Schedules & DetailsELD1.1BLighting Demolition Floor PlansEPD1.1BPower Demolition Floor PlansE1.0BBasement Electrical PlanEL1.1BFirst Floor Lighting PlanEP1.1BFirst Floor Power PlanEL1.2BSecond Floor Lighting PlanEP1.2BSecond Floor Power PlanE2.0BElectrical Legend & DetailsScaleProject No.DateDrawn byChecked byArchimetrics Design Studio53 South Union St, Plainfield, MA 01070Peter Lapointe, Architect ph 413-634-0091As indicated4/30/2003 2:51:59 AML1.0BSite Plan - Henshaw Unit B011215Smith College, Northampton, MAEnabling Neilson - Site ImprovementsAugust 1, 2016pel-No. Description Date 1" = 10'-0"1Site Plan @ Henshaw B & C 1/2" = 1'-0"2Railing Elevation @ Ramped Walks 1 1/2" = 1'-0"3Section through Handrail 1" = 10'-0"5Layout of walks @ Henshaw B UPUPUPUPDNDNDNDNREMOVE EXG SLIDING GLASSDOOR AND TRANSOMNEW WINDOW OPENINGREMOVE EXG SLIDING GLASSDOOR AND TRANSOMNEW WINDOW OPENINGREMOVE EXG SLIDING GLASSDOOR AND TRANSOMNEW WINDOW OPENINGREMOVEDOOR & FRAMEREMOVEEXG PTNSREMOVEDOOR & FRAMEREMOVEEXG PTNSREMOVEDOOR & FRAMEREMOVEEXG PTNSREMOVE EXGSTAIR TO 2nd FLOORREMOVE DOORINFILL OPGNEW OPGIN EXG DBL STUDPARTYWALLREMOVE DOORINFILL OPGGUT EXGBATHROOMNEW OPG INEXG BEARING WALLNEW WINDOW OPGNEW WINDOW OPGREPLACEEXG EXTERIORDOORS TYPREMOVE EXG GYPTO FACILITATE NEWPANEL REVERSEDFROM EXG LOCATIONREMOVE EXGVWC TYPREMOVE DOORMODIFY OPGFOR NEW WINDOWREPLACE EXGDOORREMOVE GYPREMOVE GYPREMOVE EXGVWC TYPREMOVEKITCHENCABINETS& COUNTERTOPSREMOVEKITCHENCABINETS& COUNTERTOPSREMOVEKITCHENCABINETS& COUNTERTOPSLIMIT OF CPTLIMIT RESILIENT FLOORLIMIT CPTLIMIT RESILIENT FLOORREMOVE CPTOVER RESILIENTFLOORLIMIT CPTLIMITRES. FLRREMOVE EXGVWC TYPREMOVE EXGCLOSET DOORSIN ALL ROOMSREMOVE WALL& VANITY INALL UNITSREMOVE TUB& ENCLOSUREIN ALL UNITSREMOVEEXG DOORGUT BATHNEW OPGIN EXG DBL STUDPARTY WALLREMOVEEXG WALLREMOVEEXG KITCHENREPLACEEXG FIXTURES& COUNTERTOPALL UNITSREMOVE EXGPTNREMOVE EXG SLIDINGGLASS DOORREMOVE EXG STAIRREMOVE DOORSINFILL OPGREMOVE EXGVWC TYPICALREPLACE EXGEXTERIOR DOORREMOVE CPT OVERRESILIENT FLOORIN BEDROOMS ANDHALL IN ALL UNITSREMOVE CPTOVER RES. FLRDEMOLITION NOTES1) EXISTING FLOOR FINISHES TO BE REMOVED BY G.C. ARELIMITED TO CARPET ON SLABS ON GRADE AND CARPETOVER RESILIENT FLOORING ON SECOND FLOOR.2) EXISTING RESILIENT FLOORS TO REMOVEDAS PART OF HAZARDOUS MATERIAL ABATEMENT.3) EXISTING MASTIC ON KITCHEN SINK CONTAINS ASBESTOSAND WILL BE REMOVED AS PART OF HAZARDOUS MATERIALABATEMENT. PLUMBING CONTRACTOR TO DISCONNECTSUPPLY AND WASTE PRIOR TO CONTAINMENT.4) SEE PLUMBING DRAWINGS FOR NEW UNDERSLAB PIPINGLOCATIONS FOR REQUIRED CUTTING AND REMOVAL OFEXISTING CONCRETE SLABS ON GRADE.ScaleProject No.DateDrawn byChecked byArchimetrics Design Studio53 South Union St, Plainfield, MA 01070Peter Lapointe, Architect ph 413-634-0091As indicated5/2/2003 8:19:26 AMD1.1BDemolition Plans12011518 Henshaw Ave, Northampton MAFaculty Offices @ Henshaw BAugust 1, 2016pel-No. Description Date 3/16" = 1'-0"1First Floor - Demolition 3/16" = 1'-0"2Second Floor - Demolition UPUPUPUPOffice101-B1Office104-B1Office105-B1Office103-B1Stair100ST1Lavatory100T1Housekeeping100HKCorridor100C19' - 0 1/2"13' - 5 1/4"1181199' - 8 1/4"12' - 0 1/2"13' - 5 1/4"112Office102-B1Conference106-B1Lavatory100T1Stair100ST1Conference101-B2Housekeeping100HKOffice102-B2Office103-B2Conference103-B3Stair100ST1Lavatory100T1Office101-B3Office102-B3Resource Room100RUnit B1Unit B2Unit B3AAAAAAAAAAAAAAA116121120110111113109115108106107x11x12101Housekeeping100HK1051031041221A1.1BData Closet100M11' - 6"1021171148' - 0 1/2"1' - 10"5' - 0"2' - 5"2' - 5"6"10"6' - 10"3' - 4"1' - 10 1/4"NEW ENCLOSUREOF EXG HATCHWAYALIGN WALLS w/ EXGFOUNDATION5' - 0"8' - 0"NEW 5" CONCSLAB w/ THICKENEDEDGE - MATCH FINFLOOR ELEV @ DOOR5' - 0"5' - 0"1' - 8"5' - 0"5' - 0"1' - 8"3A5.1Bw1w2w3w3w2w2w2w2w2w2w2w2w2bw1aA6.2B5PITCH 1"PITCH 1"PITCH 1"27' - 3"3' - 8"9' - 4 1/2"13' - 5 1/4"12' - 0 1/2"2' - 8"3' - 1 1/2"w4w2bw2aPVC WALLFINISH 2'-0" WIDE& UP 3'-0" EA WALL@ MOP SINK TYPw1w1w2w2w2b1' - 8"1' - 0"w2aNEW CHASEFOR MAKE-UPAIR DUCT TOMECH ROOMADD CLOSED RISERTO EXG TREADSA6.2B71/2" GYP ON2x4's @ 16"o.c.1/2" GYPON BLKG5' - 0"5/8" T1-11OVER TYVEK1/2" SHEATHING2x4's @ 16"o.c.3" CLOSED CELL FOAM1/2" GYP BD5/8" T1-11OVER TYVEK1/2" SHEATHING2x4's @ 16"o.c.1/2" GYP BD2x4's @ 16"o.c.3" SOUND BATTS(OMIT BATTS @ b)1/2" GYP BD1/2" GYP BD2x4's @ 16"o.c.1/2" GYP BD2x6's @ 16"o.c.3" SOUND BATTS(OMIT BATTS @ b)1/2" GYP BD2 LAYERS 5/8" GYP BD2x4's STAGGERED @ 16"o.c.2 LAYERS 5/8" GYP BD3" SOUND BATTSw1w2 & w2bw3w1aw2aw48"ScaleProject No.DateDrawn byChecked byArchimetrics Design Studio53 South Union St, Plainfield, MA 01070Peter Lapointe, Architect ph 413-634-0091As indicated4/29/2003 11:50:15 AMA1.1BFirst Floor Plan12011518 Henshaw Ave, Northampton MAFaculty Offices @ Henshaw BAugust 1, 2016pel-No. Description DateFirst Floor Room Finish ScheduleRoomNumberRoom Name Floor BaseWallsCeiling Height CommentsNESW100C1 Corridor CPT Tile Ex WD / WD PNT Ex VWC PNT Ex VWC PNT Ex VWC PNT GYP / Ex VWC PNT Ex GYP 8'-0"100HK Housekeeping VCT Ex WD / WD PNT Ex VWC PNT GYP PNT GYP / Ex VWC PNT GYP / Ex VWC PNT Ex GYP 8'-0" Room repeats in all three units100M1 Data Closet VCT WD PNT GYP PNT GYP PNT Ex VWC PNT GYP PNT GYP 5'-0"-8'-0"100R Resource Room CPT Tile Ex WD / WD PNT GYP /Ex VWC PNT GYP PNT Ex VWC PNT GYP / Ex VWC PNT Ex GYP 8'-0"100ST1 Stair CPT Tile/RT Ex WD / WD PNT GYP PNT GYP / Ex VWC PNT Ex VWC PNT GYP / Ex VWC PNT Ex GYP 8'-0" Room repeats in all three units100T1 Lavatory SV 4" VB PNT GYP /Ex VWC PNT GYP PNT Ex VWC PNT GYP / Ex VWC PNT Ex GYP 8'-0" Room repeats in all three units101-B1 Office CPT Tile Ex WD / WD PNT GYP /Ex VWC PNT GYP PNT GYP PNT Ex VWC PNT Ex GYP 8'-0"101-B2 Conference CPT Tile Ex WD / WD PNT GYP /Ex VWC PNT GYP PNT GYP PNT Ex VWC PNT Ex GYP 8'-0"101-B3 Office CPT Tile Ex WD / WD PNT GYP /Ex VWC PNT GYP PNT GYP PNT Ex VWC PNT Ex GYP 8'-0"102-B1 Office CPT Tile Ex WD / WD PNT GYP PNT GYP PNT GYP PNT GYP PNT Ex GYP 8'-0"102-B2 Office CPT Tile Ex WD / WD PNT GYP /Ex VWC PNT Ex VWC PNT GYP PNT Ex VWC PNT Ex GYP 8'-0"102-B3 Office CPT Tile Ex WD / WD PNT GYP /Ex VWC PNT Ex VWC PNT GYP PNT GYP PNT Ex GYP 8'-0"103-B1 Office CPT Tile Ex WD PNT Ex VWC PNT Ex VWC PNT Ex VWC PNT Ex VWC PNT Ex GYP 8'-0"103-B2 Office CPT Tile Ex WD / WD PNT GYP /Ex VWC PNT Ex VWC PNT GYP PNT GYP PNT Ex GYP 8'-0"103-B3 Conference CPT Tile Ex WD / WD PNT GYP /Ex VWC PNT Ex VWC PNT Ex VWC PNT GYP PNT Ex GYP 8'-0"104-B1 Office CPT Tile Ex WD PNT Ex VWC PNT Ex VWC PNT Ex VWC PNT Ex VWC PNT Ex GYP 8'-0"105-B1 Office CPT Tile Ex WD / WD PNT GYP /Ex VWC PNT Ex VWC PNT Ex VWC PNT GYP PNT Ex GYP 8'-0"106-B1 Conference CPT Tile Ex WD / WD PNT GYP /Ex VWC PNT Ex VWC PNT Ex VWC PNT GYP PNT Ex GYP 8'-0"Schedule of Existing First Floor Doors to RemainNo. Door TypeSizeFrameTypeHardwareSetCommentsWH Tx11 Ex 3' - 0" 6 '- 8" 1 3/4" Ex Exx12 Ex 3' - 0" 6 '- 8" 1 3/4" Ex ExFirst Floor Door ScheduleNo. Door TypeSizeFrameTypeFrameHardwareSetCommentsWH T101 GL 3' - 0" 6 '- 8" 1 3/4" VII FRP 1102 A 3' - 0" 6 '- 8" 1 3/4" I HM 5103 A 3' - 0" 6 '- 8" 1 3/4" I HM 3104 A 3' - 0" 6 '- 8" 1 3/4" I HM 3105 Ex 2' - 8" 6 '- 8" 1 3/4" IV Ex reverse Ex salvaged door & frame from Unit D106 GL 3' - 0" 6 '- 8" 1 3/4" VII FRP 2107 A 3' - 0" 6 '- 8" 1 3/4" I HM 1108 D 3' - 0" 6 '- 8" 1 3/4" I HM 3a109 GL 3' - 0" 6 '- 8" 1 3/4" VII FRP 1110 D 3' - 0" 6 '- 8" 1 3/4" I HM 3a111 Ex 2' - 8" 6 '- 8" 1 3/4" IV Ex reverse Ex salvaged door & frame from Unit D112 A 3' - 0" 6 '- 8" 1 3/4" I HM 3113 A 3' - 0" 6 '- 8" 1 3/4" I HM 3114 GV 2' - 8" 6 '- 8" 1 3/4" I HM 3115 A 3' - 0" 6 '- 8" 1 3/4" I HM 5116 GL 3' - 0" 6 '- 8" 1 3/4" VII FRP 1117 A 3' - 0" 6 '- 8" 1 3/4" I HM 5118 A 3' - 0" 6 '- 8" 1 3/4" I HM 3119 A 3' - 0" 6 '- 8" 1 3/4" I HM 3120 Ex 2' - 8" 6 '- 8" 1 3/4" IV Ex reverse Ex salvaged door & frame from Unit D121 D 3' - 0" 6 '- 8" 1 3/4" I HM 3a122 A 3' - 0" 6 '- 8" 1 3/4" V11 FRP 1 3/8" = 1'-0"1Section thru Data Closet 1 1/2" = 1'-0"2Wall Types DNDNDNDNOffice201-B2Office202-B2Office203-B3Office204-B3Office201-B3Office202-B3Office203-B2Office204-B2Stair200ST1Office203-B1Office204-B1Office205-B1Hall200C1Break Room200KOffice207-B1Stair200ST1Stair200ST1Lavatory200T1Lavatory200T1Office206-B1Housekeeping200HKHall200C2Lavatory200T1201x27x21x22x23x24204202x25203x31x32x33x34x35x44x43x42x41x45Office201-B1Office202-B1AAAA6.2B34A6.2B1A6.2B2REPLACE1x8 CAPSON STAIRw3w2w2bw212' - 0"11' - 10"11' - 10"ScaleProject No.DateDrawn byChecked byArchimetrics Design Studio53 South Union St, Plainfield, MA 01070Peter Lapointe, Architect ph 413-634-0091 1/4" = 1'-0"4/29/2003 11:51:12 AMA1.2BSecond Floor Plan12011518 Henshaw Ave, Northampton MAFaculty Offices @ Henshaw BAugust 1, 2016pel-No. Description DateSecond Floor Room Finish ScheduleRoomNumberRoomNameFloor BaseWalls CeilingCommentsN E S W Finish Height200C1 Hall CPT Tile WD PNT GYP PNT GYP PNT GYP PNT GYP PNT GYP 8'-0"200C2 Hall CPT Tile WD PNT GYP /Ex VWC PNT Ex VWC PNT GYP PNT Ex VWC Ex WD 15'-0"-21'-0"200HK Housekeeping VCT WD PNT GYP PNT GYP PNT GYP PNT GYP PNT GYP 8'-0"200K Break Room CPT Tile Ex WD / WD PNT Ex VWC PNT GYP PNT Ex VWC PNT Ex VWC Ex WD 8'-7"-16'-5"200ST1 Stair CPT Tile/RT Ex WD PNT Ex VWC PNT Ex VWC PNT Ex VWC PNT Ex VWC Ex WD 15'-0"-21'-0" Room repeats in all three units200T1 Lavatory SV 4" VB PNT GYP PNT GYP PNT GYP PNT GYP PNT GYP 8'-0" Room repeats in all three units201-B1 Office CPT Tile Ex WD PNT Ex VWC PNT Ex VWC PNT Ex VWC PNT Ex VWC Ex WD 8'-7"-16'-5"201-B2 Office CPT Tile Ex WD PNT Ex VWC PNT Ex VWC PNT Ex VWC PNT Ex VWC Ex WD 8'-7"-16'-5"201-B3 Office CPT Tile Ex WD PNT Ex VWC PNT Ex VWC PNT Ex VWC PNT Ex VWC Ex WD 8'-7"-16'-5"202-B1 Office CPT Tile Ex WD PNT Ex VWC PNT Ex VWC PNT Ex VWC PNT Ex VWC Ex WD 8'-7"-16'-5"202-B2 Office CPT Tile Ex WD PNT Ex VWC PNT Ex VWC PNT Ex VWC PNT Ex VWC Ex WD 8'-7"-16'-5"202-B3 Office CPT Tile Ex WD PNT Ex VWC PNT Ex VWC PNT Ex VWC PNT Ex VWC Ex WD 8'-7"-16'-5"203-B1 Office CPT Tile Ex WD PNT Ex VWC PNT Ex VWC PNT Ex VWC PNT Ex VWC Ex WD 8'-7"-16'-5"203-B2 Office CPT Tile Ex WD PNT Ex VWC PNT Ex VWC PNT Ex VWC PNT Ex VWC Ex WD 8'-7"-16'-5"203-B3 Office CPT Tile Ex WD PNT Ex VWC PNT Ex VWC PNT Ex VWC PNT Ex VWC Ex WD 8'-7"-16'-5"204-B1 Office CPT Tile Ex WD PNT Ex VWC PNT Ex VWC PNT GYP PNT GYP / Ex VWC Ex WD 8'-7"-16'-5"204-B2 Office CPT Tile Ex WD PNT Ex VWC PNT Ex VWC PNT Ex VWC PNT Ex VWC Ex WD 8'-7"-16'-5"204-B3 Office CPT Tile Ex WD PNT Ex VWC PNT Ex VWC PNT Ex VWC PNT Ex VWC Ex WD 8'-7"-16'-5"205-B1 Office CPT Tile Ex WD / WD PNT GYP PNT Ex VWC PNT Ex VWC PNT GYP Ex WD 8'-7"-16'-5"206-B1 Office CPT Tile Ex WD PNT Ex VWC PNT Ex VWC PNT Ex VWC PNT Ex VWC Ex WD 8'-7"-16'-5"207-B1 Office CPT Tile Ex WD PNT Ex VWC PNT Ex VWC PNT Ex VWC PNT Ex VWC Ex WD 8'-7"-16'-5"Second Floor Door ScheduleNo. Door TypeSizeFrameTypeFrameHardwareSetCommentsWHT201 Ex 2' - 8" 6 '- 8" 1 3/4" Ex Ex Ex202 A 3' - 0" 6 '- 8" 1 3/4" I HM 3203 GL 3' - 0" 6 '- 8" 1 3/4" VII FRP 2204 A 3' - 0" 6 '- 8" 1 3/4" I HM 3Schedule of Existing Second Floor Doors to RemainNo. Door TypeSizeFrameTypeHardwareSetCommentsWHTx21 Ex 2' - 8" 6 '- 8" 1 3/4" Ex Exx22 Ex 2' - 8" 6 '- 8" 1 3/4" Ex Exx23 Ex 2' - 8" 6 '- 8" 1 3/4" Ex Exx24 Ex 2' - 6" 6 '- 8" 1 3/4" Ex Exx25 Ex 2' - 8" 6 '- 8" 1 3/4" Ex Exx27 Ex 2' - 8" 6 '- 8" 1 3/4" Ex Exx31 Ex 2' - 8" 6 '- 8" 1 3/4" Ex Exx32 Ex 2' - 8" 6 '- 8" 1 3/4" Ex Exx33 Ex 2' - 6" 6 '- 8" 1 3/4" Ex Exx34 Ex 2' - 8" 6 '- 8" 1 3/4" Ex Exx35 Ex 2' - 8" 6 '- 8" 1 3/4" Ex Exx41 Ex 2' - 8" 6 '- 8" 1 3/4" Ex Exx42 Ex 2' - 8" 6 '- 8" 1 3/4" Ex Exx43 Ex 2' - 6" 6 '- 8" 1 3/4" Ex Exx44 Ex 2' - 8" 6 '- 8" 1 3/4" Ex Exx45 Ex 2' - 8" 6 '- 8" 1 3/4" Ex Ex First Floor100' - 0"Second Floor109' - 6"PATCH SIDINGAFTER STAIRIS REMOVEDNEW STAIRENCLOSURETO MECH RMFirst Floor100' - 0"Second Floor109' - 6"Level 1A102' - 0"Level 1B104' - 0"Level 2A111' - 6"Level 2B113' - 6"AAAAAAAAAAAANEW WINDOWS TYPINFILL SLIDING DOOROPENING TYP.First Floor100' - 0"Second Floor109' - 6"Level 1A102' - 0"Level 1B104' - 0"Level 2A111' - 6"Level 2B113' - 6"AAAAAAINFILL DOOROPGNEW ENCLOSUREFOR MECH ROOMACCESS STAIRNEW ASPHALTSHINGLE ROOFNEW LOUVERSEE MEP DWGS4' - 4"REPLACE1x8 CAPTRIMINFIL OPG& PATCH SIDINGLevel 1A102' - 0"Level 1B104' - 0"Level 2B113' - 6"4' - 8"NEW TRIM AROUNDMAKE UP AIR LOUVERSEE MEP DWGS FORSIZEREPLACE DAMAGEDSIDING UP 4'-0"INSTALL Z FLASHING@ PANEL JOINTREPLACE DAMAGED SIDINGUP 4'-0" (2 LOCATIONS THISSIDE)NEW 2x4 JACK STUD EA SIDE OF OPG3" CLOSED CELL FOAMREMOVE DRYWALL FROM NEARESTSTUD ON EITHER SIDE OF OPENINGUP TO 9 3/4" ABOVE R.O. HEIGHTTO ALLOW FOR INTERIOR FRAMING9 3/4"9"5/4X4 HEADCASINGHEAD FLASHINGADD BLOCKINGBETWEEN EXG STUDS1 3/4"x7 1/2" LVL1.9E HEADEREXTENDTO EXG STUDSCUT EXG GYP BD TOALLOW REMOVAL OF EXGSTUDCLOSED CELLFOAM5/4x4 JAMB & SILL CASINGw/ 5/8"x1/2" RABBET3/4"x2 1/2" CASING ALL AROUNDEXG STUDCUT BACKEXG PWDSIDING 3"CUT BACK EXGPWD SIDING 3 1/2"@ HEADHEADJAMB(SILL SIMILAR)Archimetrics Design Studio53 South Union Street Plainfield, MA 01070Peter Lapointe, Architect ph 413-634-0091ScaleProject No.DateDrawn byChecked by4/29/2003 11:42:00 PMAs indicatedA2.1BElevations18 Henshaw Ave, Northampton MAFaculty Offices @ Henshaw B120115August 1, 2016AuthorChecker 3/16" = 1'-0"1East 3/16" = 1'-0"2North 3/16" = 1'-0"3South 3/16" = 1'-0"4WestNo. Description DateWindow ScheduleType MarkRough OpeningManufacturer Model CommentsWidth HeightA 2' - 1" 4' - 0" Integrity ICA2547 (2W & 3W R.O. 2W = 4'-1" / 3W = 6'-1"EXTERIOR PAINTING:1) PAINT ALL NEW TRIM AND SIDING TO MATCH EXISTING2) PAINT ENTIRE WALL FROM INSIDE CORNER TO OUTSIDECORNER ON FIRST FLOOR FROM GRADE TO 2nd FLOOR OVERHANGON NORTH ELEVATIONS WHERE SLIDING DOORS ARE REMOVEDAND WINDOWS ADDED.3) PAINT ENTIRE WALL FROM INSIDE CORNER TO OUTSIDE CORNERON SOUTH ELEVATION FROM GRADE TO 2nd FLOOR OVERHANGWHERE STAIR IS REMOVED AND WINDOWS ADDED 1 1/2" = 1'-0"5New Window Detail 2A5.1BUNEXCAVATEDUNEXCAVATEDREMOVE EXGDOORNEW WOOD STEPSUP TO GRADEADD 8" CONCRETEON TOP OF EXG WALL#5 DOWEL12" LONG3A5.1BMech Room00M1First Floor100' - 0"Second Floor109' - 6"Basement94' - 2 1/2"3A5.1B6' - 8"NEW FLASHINGEXTEND 4" UPBEHIND EXG SIDINGASPHALT SHINGLE ROOFOVER 5/8" PWD ON 2x6RAFTERS @ 2'-0"o.c.8" CONC CURBDOWEL TO EXGWALLANCHOR BOLTS@ 4'-0"o.c.2x4 WALL w/5/8" T1-11 SIDING2x6 JOIST HANGERA5.1B41 1/2"First Floor100' - 0"Basement94' - 2 1/2"2A5.1BLevel 1A102' - 0"Level 2A111' - 6"6'-4" HEADROOM8 1/4"8 1/4"9 1/4"1' - 4"8"4"FIN GRADE5" CONC SLABON 11" COMPGRAVEL#4 BARTOP & BOTW1/4xw1.4 6x6 WWMFOLD MESHDOWN TO BOTBAR1/2" COMP FILLER@ BLDGTURN DOWN SLAB @ PERIMETERALL EXPOSED SIDES(4) 2x10 STRINGERS2x10 TREADREMOVE EXGDOOR2"CUT SIDING2" ABV ROOFTO ALLOW INSTALLATIONOF STEP FLASHING1x8 RAKE TRIMON 2x6DRIP EDGE1' - 0"ASPHALT SHINGLESOVER ICE & WATERON 5/8" SHEATHINGDRIP EDGE1x8 TRIMHARDIPANELSOFFIT (NON VENTED)TRIM RAKETRIM TO ALIGNw/ EAVE TRIMScaleProject No.DateDrawn byChecked byArchimetrics Design Studio53 South Union St, Plainfield, MA 01070Peter Lapointe, Architect ph 413-634-0091As indicated4/29/2003 11:43:37 PMA5.1BTypical Basement Access Details12011518 Henshaw Ave, Northampton MAFaculty Offices @ Henshaw BAugust 1, 2016pel-No. Description Date 1/4" = 1'-0"1Basement 1/2" = 1'-0"2Section thru Basement Access Enclosure 1/2" = 1'-0"3Section Basement Stairs 1" = 1'-0"4Eave DetailTYPICAL THICKENED EDGE@ ALL ENTRY SLABS NEW GYP CLOSUREUNDER STAIRPATCH CLGPATCH CLGPATCH CLGNEW GYP CLGATTACHED TOUNDERSIDE OFSTAIRNEW GYP CLGATTACHED TOUNDERSIDE OFSTAIRPATCH CLGALL CEILINGS ARE EXISTING GYPSUMCEILINGS ATTACHED TO COLD ROLLEDMETAL CHANNELS SUSPENDED 6 INCHES FROMUNDERSIDE OF 2x12 JOISTS.NEW PARTITIONS ATTACH TO EXISTINGCEILINGS UNLESS OTHERWISE NOTED.PATCH CLG WHERECHASE REMOVEDEXPOSED STRUCTURETYPICAL ALL ROOMSCLOSET CLGBELOW EXPOSEDSTRUCTURE TYPALL ROOMSScaleProject No.DateDrawn byChecked byArchimetrics Design Studio53 South Union St, Plainfield, MA 01070Peter Lapointe, Architect ph 413-634-0091 3/16" = 1'-0"4/29/2003 11:52:37 AMA6.1BReflected Ceiling Plans12011518 Henshaw Ave, Northampton MAFaculty Offices @ Henshaw BAugust 1, 2016pel-No. Description Date 3/16" = 1'-0"1First Floor 3/16" = 1'-0"2Second Floor 7' - 0"2' - 6"2' - 6"2' - 5 3/4"2' - 6"1' - 6"3' - 0"3' - 0"2' - 6"1' - 6"3' - 0"1"1"6"8"2' - 0"5' - 0"VIF1' - 11 3/4"2' - 6"TYP PVC WALLFINISH BOTHSIDES OF MOPSINK3" MOP HOLDERw/ SHELFTOILET PARTITIONREMOVE EXGMEDICINE CAB2' - 6"4' - 0"3' - 0"REPLACE EXG VANITYUSE EXG AS TEMPLATE18"x36" MIRRORSCALD GUARDON EXP PIPINGTYPICALACCESSIBLEVANITY20"x36"FRAMEDMIRROR42" GRAB BAR3' - 0"1x6 CHAIR RAILALL WALLSCENTER LIGHT FIXTUREON LAV 6'-8" ABV FIN FLOOR4" RB3' - 0 1/2"1' - 5 1/2"1 1/4"1 1/4"3 3/4"3 3/4"7' - 11 1/2"2 1/2"2 1/2"6' - 1"1' - 2"1' - 2"4 1/2"3/8" RESIN PANELATTACHED TO 1 1/2"x1 1/2"OAK BALUSTERS INSERTEDBETWEEN EXG SPACEDSTEEL BALUSTERSPANEL LENGTHPANEL LENGTH1" RADIUS @ ALLOUTSIDE CORNERSPANEL LENGTHEXG 1 1/2"x5 1/2"HANDRAILPanel Elevation @ 2nd FloorInterior BalustradeDetail @ FastenerNEW BALUSTEREXG METAL BALUSTER1/2" NEOPRENEWASHER EA SIDE1 5/8" HEATLOK3/8" RESINPANEL3 3/4"1' - 2"3 3/4"1 1/2" X 1 1/2" OAK BALUSTERNESTED BETWEEN EVERY OTHEREXG 3/4"x1" STEEL BALUSTERSEXG OAK RAILNEW 3/8 TRANSLUCENTRESIN PANEL ATTACHED TONESTED OAK BALUSTERS1/2" PLYWOODRISER2x BLOCKINGRIP TO STAIRANGLE2x BLOCKING1"1/2" GYP BD1 5/8" HEATLOK FASTENERw/ BLACK NEOPRENE WASHERSNUG FIT - DO NOT OVER TIGHTEN2"1"TYP2 1/2"CLOSEOFF UNDERSIDEOF STAIRScaleProject No.DateDrawn byChecked byArchimetrics Design Studio53 South Union St, Plainfield, MA 01070Peter Lapointe, Architect ph 413-634-0091As indicated5/11/2003 12:17:02 AMA6.2BTypical Bath and Stair Details12011518 Henshaw Ave, Northampton MAFaculty Offices @ Henshaw BAugust 1, 2016pel-No. Description Date 1/2" = 1'-0"1Break Room Cabinet Elevation 1/2" = 1'-0"2Elevation 1 - a 1/2" = 1'-0"3Typ 2nd Flr Toilet Partition Elevation 1/2" = 1'-0"4Typical 2nd Floor Lavatory Elevation 1/2" = 1'-0"5Typ Accessible Lavatory Elevation 1/2" = 1'-0"6Typical Stair Panel Elevations 1 1/2" = 1'-0"7Typical Closed Riser and Stair Panel Detail ABCDFGVExGLLOUVER @ GVT.I.G. @ GLTIG1/4' TEMPGLASSTEMPEREDINSULATINGGLASS(TIG)FLATPANELFLATPANEL3' - 6"2' - 9"5"11"5"5"5"5"5"11"5"1' - 9 1/2"9 1/2"11"1' - 9 1/2"9"SDL6"4"1 1/2"5"1' - 6 1/2"9"1' - 10"7 3/4"1"SOLID SURFACECOUNTER & BOWL3/4" LAMINATE FACEDFASCIA & END PANEL2' - 6"1"3/4"2' - 4 1/4"2' - 10"2' - 10"1' - 6 1/2"6 1/2"INSULATE EXPOSEDPIPES3/4" LAMINATE FACEDSHELF2" KDHOLLOWMETALFRAME3/4" WDFRAME w/1x5 CASINGEXG WDFRAME &CASING1/2"x1 3/4"DUTCHMAN LET INTO STRIKE SIDEOF FRAME10"MODIFY JAMBFOR NEW HINGESNEW 1x4CASING ONRELOCATEDDOOR & FRAME9"9"3' - 0"2x4 STUDNEW JAMBNEWSIDELIGHTMATCH DEPTHOF TOP & BOTSTILES w/ DOOREXG FRAME& CASINGTO REMAINNEW 1/2"THRESHOLDNEW WDJAMBS EASIDEMODIFY HEADFOR 1 3/4" DOORNEW 1/2"CASINGEXG FRAME& CASING2x4 STUDS19/32" T 1-11INFILL ABV DOOR@ EXG OPGSNEW FRPFRAMENEW 1/2"THRESHOLDNEW 1x4CASINGNEW WDFRAMENEW 1/2"THRESHOLDEXG EXTCASINGNEW 1x5INT CASINGTYPE ITYPE IITYPE IIITYPE IVTYPE VTYPE VITYPE VIITYPE VIII8"2' - 0"SIDELIGHT@ IaScaleProject No.DateDrawn byChecked byArchimetrics Design Studio53 South Union Street, Plainfield, MA 01070Peter Lapointe, Architect ph 413-634-0091As indicated4/30/2003 6:32:31 AMA6.3Typical Details011215Smith College, Northampton, MAEnabling Neilson - Site ImprovementsAugust 1, 2016pel-No. Description Date 3/8" = 1'-0"1Door Types 1 1/2" = 1'-0"2Typical Single Accessible Lavatory 3/8" = 1'-0"3Frame Types UPUPUPUPUPDNDNDNDNDNFIRST FLOOR FIRE PROTECTION - DEMOLITION PLANSCALE: 3/16" = 1'-0"SECOND FLOOR FIRE PROTECTION - DEMOLITION PLANSCALE: 3/16" = 1'-0"BASEMENT FIRE PROTECTION - DEMOLITION PLANSCALE: 3/16" = 1'-0"DEMOLITION NOTES:DISCONNECT AND REMOVE EXISTING SECTION OFSPRINKLER PIPING AS SHOWN11111111111111111111EXISTING 4"-UP TO PUMPERCONNECTION TO REMAINEXISTING 4"-UP TO REMAINEXISTING 4" OS&Y AND ALARMCHECK VALVE TO REMAINDISCONNECT AND REMOVEEXISTING GONG AND ASSOCIATEDPIPING AND DRAIN. CAP INBASEMENT BELOWEXISTING PUMPER CONNECTION TO REMAINScaleProject No.DateDrawn byChecked byArchimetrics Design Studio 53 South Union St, Plainfield, MA 01070 Peter Lapointe, Architect ph 413-634-0091 120115August 1, 2016No.DescriptionDate18 Henshaw Ave, Northampton MA Faculty Offices @ Henshaw B 3/16" = 1'-0"FPD1.1BFire Protection Demolition Floor Plans JPJGW UPUPUPUPFIRE PROTECTION FIRST FLOOR PLANSCALE: 1/4" = 1'-0"Office101-B1Office104-B1Office105-B1Office103-B1Stair100ST1Lavatory100T1Housekeeping100HKCorridor100C1Office102-B1Conference106-B1Lavatory100T1Stair100ST1Conference101-B2Housekeeping100HKOffice102-B2Office103-B2Conference103-B3Stair100ST1Lavatory100T1Office101-B3Office102-B3Resource Room100RUnit B1Unit B2Unit B3Housekeeping100HKData Closet200M1DRAWING NOTES:CONNECT NEW 1" TO EXISTING HERE1111111111111111"-UPScaleProject No.DateDrawn byChecked byArchimetrics Design Studio 53 South Union St, Plainfield, MA 01070 Peter Lapointe, Architect ph 413-634-0091 120115August 1, 2016No.DescriptionDate18 Henshaw Ave, Northampton MA Faculty Offices @ Henshaw B 1/4" = 1'-0"FP1.1BFire Protection First Floor PlanJGWJGW FIRE PROTECTION SECOND FLOOR PLANSCALE: 1/4" = 1'-0"DNDNDNDNDNOffice201-B2Office202-B2Office203-B3Office204-B3Office201-B3Office202-B3Office203-B2Office204-B2Stair200ST1Office203-B1Office204-B1Office205-B1Hall200C1Break Room200KOffice207-B1Stair200ST1Stair200ST1Lavatory200T1Lavatory200T2Office206-B1Housekeeping200HKHall200C2Lavatory200T1Office201-B1Office202-B1DRAWING NOTES:CONNECT NEW 1" TO EXISTING HERE111TYPICAL PENDANT HEAD PIPING DETAILNOT TO SCALEBRANCH LINEPIPE HANGERPROVIDE INVERTED "U" PIPECONNECTION EXTEND PIPE TOAVOID LIGHTS AND DIFFUSERSCEILING COVER PLATEPENDANT HEADFINISH CEILINGUPRIGHT HEADBRANCH LINETYPICAL UPRIGHT HEAD PIPING DETAILNOT TO SCALEBRANCH LINEPIPE HANGERFINISH WALLWALL COVER PLATESIDEWALL HEADTYPICAL SIDEWALL HEAD PIPING DETAILNOT TO SCALERECESSED PENDANT HEADEXISTING SPRINKLER PIPEFIRE PROTECTION LEGENDEXISTING SPRINKLER PIPE TO BE REMOVEDSPRINKLER PIPEEXISTING UPRIGHT HEADEXISTING PENDANT HEADEXISTING SIDEWALL HEADUPRIGHT HEADPENDANT HEADSIDEWALL HEADPIPE DOWNPIPE UPBACKFLOW PREVENTER ASSEMBLYVALVE WITH FLOW SWITCHFVALVE WITH TAMPER SWITCHTFIRE PROTECTION SYSTEM RISERFIRE DEPARTMENT CONNECTIONATTIC SPRINKLER HEADCONNECT TO EXISTINGSPRINKLER PIPE RISECONCEALED PENDANT HEADCLOW POINT DRAINPOST INDICATOR VALVEScaleProject No.DateDrawn byChecked byArchimetrics Design Studio 53 South Union St, Plainfield, MA 01070 Peter Lapointe, Architect ph 413-634-0091 120115August 1, 2016No.DescriptionDate18 Henshaw Ave, Northampton MA Faculty Offices @ Henshaw B 1/4" = 1'-0"FP1.2BFire Protection Second Floor PlanJGWJGW DNDNDNDNDNUPUPUPUPUPFIRST FLOOR PLUMBING - DEMOLITION PLANSCALE: 3/16" = 1'-0"SECOND FLOOR PLUMBING - DEMOLITION PLANSCALE: 3/16" = 1'-0"99887126101010DEMOLITION NOTES:REMOVE EXISTING TUB. EXISTING H&CW & WASTE PIPINGTO BE CONNECTED TO NEW FLOOR MOUNTED MOP SINK.REMOVE EXISTING WATER CLOSET AND LAVATORY.REMOVE EXISTING LAVATORY. REMOVE HW SUPPLY PIPINGBACK TO MAIN.REMOVE ALL FIXTURES & ASSOCIATED PIPING AT THISBATHROOM GROUP.REMOVE LAVATORY & ASSOCIATED PIPING.REMOVE ALL PIPING SERVING FIXTURES ABOVE. CAPSANITARY FLUSH WITH FIRST FLOOR.REWORK TUB DRAIN PIPING TO ACCOMMODATECONNECTION TO NEW MOP SINK.PIPING SERVING FIXTURES ABOVE TO REMAIN.EXISTING CW PIPING AND WALL HYDRANT TO REMAIN.EXISTING H&CW PIPING TO REMAIN.REMOVE SANITARY SERVING FIXTURE. CAP AT MAIN.REWORK TOILET PIPING TO ACCOMMODATE CONNECTIONTO NEW MOP SINK.12345678910353214214111181171112ScaleProject No.DateDrawn byChecked byArchimetrics Design Studio 53 South Union St, Plainfield, MA 01070 Peter Lapointe, Architect ph 413-634-0091 120115August 1, 2016No.DescriptionDate18 Henshaw Ave, Northampton MA Faculty Offices @ Henshaw B 3/16" = 1'-0"PD1.1BPlumbing Demolition Floor Plans JPJGW PLUMBING BASEMENT PLANSCALE: 1/4" = 1'-0"Mechanical Room00M1UNEXCAVATEDUNEXCAVATEDUNEXCAVATEDUNEXCAVATEDUNEXCAVATEDUNEXCAVATEDUNEXCAVATED12111111DRAWING NOTES:CAP SANITARY PIPING FLUSH WITH FLOOR.EXISTING PIPING AND EQUIPMENT IN MECHANICAL ROOMSHALL REMAIN.NEW 4" SANITARY PIPE UP TO FLOOR MOUNTED TOILET.NEW 2" SANITARY PIPE UP TO LAVATORY AND FOUNTAIN.CONNECT NEW 2" SANITARY TO EXISTING SANITARY HERE.CONNECT NEW 2" SANITARY TO EXISTING MAIN HERE.CONNECT NEW 2" VENT TO EXISTING HERE.2" VENT UP.234FCO3435543467888876ScaleProject No.DateDrawn byChecked byArchimetrics Design Studio 53 South Union St, Plainfield, MA 01070 Peter Lapointe, Architect ph 413-634-0091 120115August 1, 2016No.DescriptionDate18 Henshaw Ave, Northampton MA Faculty Offices @ Henshaw B 1/4" = 1'-0"P1.0BPlumbing Basement PlanJGWJGW UPUPUPUPPLUMBING FIRST FLOOR PLANSCALE: 1/4" = 1'-0"Office101-B1Office104-B1Office105-B1Office103-B1Stair100ST1Lavatory100T1Housekeeping100HKCorridor100C1Office102-B1Conference106-B1Lavatory100T1Stair100ST1Conference101-B2Housekeeping100HKOffice102-B2Office103-B2Conference103-B3Stair100ST1Lavatory100T1Office101-B3Office102-B3Resource Room100RUnit B1Unit B2Unit B3Housekeeping100HKData Closet200M1P-1AP-2P-2P-3P-3P-2P-3P-1A1DRAWING NOTES:CONNECT TO EXISTING CW PIPING HERE.CONNECT TO EXISTING HW PIPING HERE.CONNECT TO EXISTING H&CW PIPING HERE.NEW 1/2" H&CW DN. IN WALL TO FIXTURES.CONNECT TO EXISTING CW, WASTE & VENT IN WET WALL.234555233215444P-1AP-4AP-4AP-4AScaleProject No.DateDrawn byChecked byArchimetrics Design Studio 53 South Union St, Plainfield, MA 01070 Peter Lapointe, Architect ph 413-634-0091 120115August 1, 2016No.DescriptionDate18 Henshaw Ave, Northampton MA Faculty Offices @ Henshaw B 1/4" = 1'-0"P1.1BPlumbing First Floor PlanJGWJGW DNDNDNDNDNPLUMBING SECOND FLOOR PLANSCALE: 1/4" = 1'-0"Office201-B2Office202-B2Office203-B3Office204-B3Office201-B3Office202-B3Office203-B2Office204-B2Stair200ST1Office203-B1Office204-B1Office205-B1Hall200C1Break Room200KOffice207-B1Stair200ST1Stair200ST1Lavatory200T1Lavatory200T2Office206-B1Housekeeping200HKHall200C2Lavatory200T1Office201-B1Office202-B1P-4P-3P-3P-3P-1P-1P-1P-2P-2P-2P-5AP-41DRAWING NOTES:CONNECT TO EXISTING CW & SANITARY PIPING.CONNECT TO EXISTING H&CW AND WASTE PIPING.CONNECT TO EXISTING CW & WASTE PIPING.CONNECT TO EXISTING H&CW, WASTE & VENT IN WET WALL.234421222113322ScaleProject No.DateDrawn byChecked byArchimetrics Design Studio 53 South Union St, Plainfield, MA 01070 Peter Lapointe, Architect ph 413-634-0091 120115August 1, 2016No.DescriptionDate18 Henshaw Ave, Northampton MA Faculty Offices @ Henshaw B 1/4" = 1'-0"P1.2BPlumbing Second Floor PlanJGWJGW PLUMBING FIXTURE SCHEDULEFURNISHED AND INSTALLED BY THE PLUMBING CONTRACTOR U.N.O.NO.FIXTUREMFG.TYPE AND MODEL NO.TRIM NO.PIPE SIZESREMARKSTRAPWASTEVENTCWHWP-1WATER CLOSETTOTOCT705EN#01TMT1LN32#CP MANUALFLUSHOMETER, SC534COMMERCIAL SEAT4"4"2"1"-FLOOR MOUNT, FLUSH VALVEP-1AWATER CLOSETTOTOCT705ELN#01TMT1LN32#CP MANUALFLUSHOMETER, SC534COMMERCIAL SEAT4"4"2"1"-FLOOR MOUNT, FLUSH VALVE, ADAP-2INTEGRAL BOWLLAVATORY BY G.C.--AMERICAN STANDARDMONTERREY FAUCET 5502.1451-1/2"2"2"1/2"1/2"ADA COMPLIANT, 4" CENTER SET, 0.5 GPM, DUAL LEVER HANDLE FAUCET, WITHSYMMONS UNDER SINK MIXING VALVE, SUPPLIES AND LOOSE KEY ANGLE STOPS,GRID DRAINP-3MOP SINKMUSTEE24X24 63M63.600A, 65.600, 65.700, 65.3082"2"2"1/2"1/2"FLOOR MOUNT MOP SERVICE BASIN WITH FAUCET, VACUUM BREAKER, HOSE ANDHOSE HOLDER, AND MOP HANGER. SEAL FOR 2" WASTE CONNECTION.P-4WATER STATIONT & SB-1230-12-1-1/4"1-1/4"2"1/2"-WATER STATION WITH DRIP PAN AND 12" PUSHBACK GLASS FILLERP-4AWATER FOUNTAIN /GLASS FILLERELKAYWALL MOUNT ADAEDFP214FCLK1110 GLASS FILLER1-1/2"2"2"1/2"-STAINLESS STEEL FOUNTAIN, ADA COMPLIANT, GLASS FILLER PREPPED, WITHACCESSORY GLASS FILLERP-5AKITCHENETTE SINKELKAYLRAD1722ELKAY LK 2477CR1-1/2"2"2"1/2"1/2"STAINLESS STEEL, 4" CENTERS, 6" DEPTH, WITH T&S B-1210-01 DECK MOUNT 10"HIGH GLASS FILLERScaleProject No.DateDrawn byChecked byArchimetrics Design Studio 53 South Union St, Plainfield, MA 01070 Peter Lapointe, Architect ph 413-634-0091 120115August 1, 2016No.DescriptionDate18 Henshaw Ave, Northampton MA Faculty Offices @ Henshaw B NO SCALEP2.0BPlumbing SchedulesJGWJGW UPUPUPUPUPDNDNDNDNDNFIRST FLOOR HVAC - DEMOLITION PLANSCALE: 3/16" = 1'-0"SECOND FLOOR HVAC - DEMOLITION PLANSCALE: 3/16" = 1'-0"ScaleProject No.DateDrawn byChecked byArchimetrics Design Studio 53 South Union St, Plainfield, MA 01070 Peter Lapointe, Architect ph 413-634-0091 120115August 1, 2016No.DescriptionDate18 Henshaw Ave, Northampton MA Faculty Offices @ Henshaw B 3/16" = 1'-0"HD1.1BHvac Demolition Floor Plans JPJGW HVAC BASEMENT PLANSCALE: 1/4" = 1'-0"Mechanical Room00M1UNEXCAVATEDUNEXCAVATEDUNEXCAVATEDUNEXCAVATEDUNEXCAVATEDUNEXCAVATEDUNEXCAVATED12x12 LOUVER WITH120V M.O.D.EF3MM10x8 INSULATED DUCTUP WITH 120V M.O.D.TINSTALL LINE VOLTAGETHERMOSTAT IN PATH OFVENTILATION AIRFLOW, TOOPEN DAMPERS AND ENERGIZEFAN ABOVE 85 DEG F.ScaleProject No.DateDrawn byChecked byArchimetrics Design Studio 53 South Union St, Plainfield, MA 01070 Peter Lapointe, Architect ph 413-634-0091 120115August 1, 2016No.DescriptionDate18 Henshaw Ave, Northampton MA Faculty Offices @ Henshaw B 1/4" = 1'-0"H1.0BHvac Basement PlanJGWJGW UPUPUPUPHVAC FIRST FLOOR PLANSCALE: 1/4" = 1'-0"Office101-B1Office104-B1Office105-B1Office103-B1Stair100ST1Lavatory100T1Housekeeping100HKCorridor100C1Office102-B1Conference106-B1Lavatory100T1Stair100ST1Conference101-B2Housekeeping100HKOffice102-B2Office103-B2Conference103-B3Stair100ST1Lavatory100T1Office101-B3Office102-B3Resource Room100RUnit B1Unit B2Unit B3Housekeeping100HKData Closet200M1AC3AC6EF1EF2EF64"Ø DUCT TO TERMINATEAT 6"Ø WALL CAP INBOTTOM OF OVERHANGEF5AC17EF7EF8CU2CU1TTTAC2AC1TTAC5AC4TTAC16AC15TTAC19AC18TTAC21AC20TT1/4" L & 1/2" S DN.TO AC-1 & AC-2,1/2" CD1/4" L & 1/2" S UPTO AC-7 & AC-8,1/2" CD UP1/4" L & 1/2" S UPTO AC-11 & AC-12,1/2" CD UP1/4" L & 1/2" S DN.TO AC-4 & AC-5,1/2" CD1/4" L & 1/2" SUP TO AC-13,1/2" CD UP1/4" L & 1/2" S DN.TO AC-3, 1/2" CD1/4" L & 1/2" S DN.TO AC-6, 1/2" CD1/4" L & 1/2" S UP TOAC-9, 1/2" CD UP1/4" L & 1/2" S UP TOAC-10, 1/2" CD UP1/4" L & 1/2" S UP TOAC-14, 1/2" CD UP1/4" L & 1/2" S UPTO AC-22 & AC-23,1/2" CD UP1/4" L & 1/2" S UPTO AC-26 & AC-27,1/2" CD UP1/4" L & 1/2" S DN.TO AC-15 & AC-16,1/2" CD1/4" L & 1/2" S DN.TO AC-18 & AC-19,1/2" CD4"Ø DUCT TO TERMINATEAT 6"Ø WALL CAP INBOTTOM OF OVERHANG4"Ø DUCT TO TERMINATEAT 6"Ø WALL CAP INBOTTOM OF OVERHANG1/4" L & 1/2" S DN.TO AC-20 & AC-21,1/2" CD1/4" L & 1/2" S UPTO AC-28 & AC-29,1/2" CD UP1/4" L & 1/2" S UP TOAC-25, 1/2" CD UP1/4" L & 1/2" S DN.TO AC-17, 1/2" CDCOCOCOCO1" CD DN. TOMOP SINKCOCOCO1" CD DN. TOMOP SINKCOCOCOCOCO1" CD DN. TOMOP SINKCO4"Ø DUCT TO TERMINATEAT 6"Ø WALL CAP INBOTTOM OF OVERHANG4"Ø DUCT TO TERMINATEAT 6"Ø WALL CAP INBOTTOM OF OVERHANG4"Ø DUCT TO TERMINATEAT 6"Ø WALL CAP INBOTTOM OF OVERHANGScaleProject No.DateDrawn byChecked byArchimetrics Design Studio 53 South Union St, Plainfield, MA 01070 Peter Lapointe, Architect ph 413-634-0091 120115August 1, 2016No.DescriptionDate18 Henshaw Ave, Northampton MA Faculty Offices @ Henshaw B 1/4" = 1'-0"H1.1BHvac First Floor PlanJGWJGW HVAC SECOND FLOOR PLANSCALE: 1/4" = 1'-0"DNDNDNDNDNOffice201-B2Office202-B2Office203-B3Office204-B3Office201-B3Office202-B3Office203-B2Office204-B2Stair200ST1Office203-B1Office204-B1Office205-B1Hall200C1Break Room200KOffice207-B1Stair200ST1Stair200ST1Lavatory200T1Lavatory200T2Office206-B1Housekeeping200HKHall200C2Lavatory200T1Office201-B1Office202-B1CONNECT EF-3 ANDEF-4 TO EXISTING4" DIA. DUCTSEF3EF4AC14AC9AC8AC7CONNECT EF-9 ANDEF-10 TO EXISTING4" DIA. DUCTSEF9EF10AC251/4" L & 1/2" S,1/2" CD DN.TTTTTTTTTTAC29AC28TTAC24TAC13TAC10TT1/4" L & 1/2" S,1/2" CD DN.1/4" L & 1/2" S,1/2" CD DN.1/4" L & 1/2" S,1/2" CD DN.1/4" L & 1/2" S,1/2" CD DN.1/4" L & 1/2" S,1/2" CD DN.AC12AC111/4" L & 1/2" S,1/2" CD DN.1/4" L & 1/2" S,1/2" CD DN.AC23AC221/4" L & 1/2" S,1/2" CD DN.1/4" L & 1/2" S,1/2" CD DN.AC27AC261/4" L & 1/2" S,1/2" CD DN.1/4" L & 1/2" S,1/2" CD DN.1/4" L & 1/2" S,1/2" CD DN.1/4" L & 1/2" S,1/2" CD DN.1/4" L & 1/2" S,1/2" CD DN.1/4" L & 1/2" S,1/2" CD DN.ScaleProject No.DateDrawn byChecked byArchimetrics Design Studio 53 South Union St, Plainfield, MA 01070 Peter Lapointe, Architect ph 413-634-0091 120115August 1, 2016No.DescriptionDate18 Henshaw Ave, Northampton MA Faculty Offices @ Henshaw B 1/4" = 1'-0"H1.2BHvac Second Floor PlanJGWJGW VRF SYSTEM HEAT PUMP SCHEDULETAGMFR./MODELAMBIENTTEMP. (°F)NUMBER OFCOMPRESSORSNUMBER OFREFRIGERANTCIRCUITSNOMINAL CAPACITYREF. TYPEIEER/COPSERVESELECTRICALREMARKSCOOLINGHEATINGVOLTSPHASEMCAMOCPCU-1MITSUBISHI PUhY-P72TLMU-A951172,000 BTU/H80,000 BTU/HR-410A26.6/4.07INDOOR "AC" UNITS20832435CU-2MITSUBISHI PUhY-P72TLMU-A951172,000 BTU/H80,000 BTU/HR-410A26.6/4.07INDOOR "AC" UNITS20832435GENERAL NOTES:1. INSTALL PER MANUFACTURER'S COLD CLIMATE INSTRUCTIONS2. 5-YEAR COMPRESSOR WARRANTY3. INVERTER CONTROLLED COMPRESSORS4. PROVIDE EACH SYSTEM WITH A MITSUBISHI CENTRALIZED CONTROLLER5. UNITS SHALL OPERATE IN HEATING MODE TO AT LEAST -10 DEG F2CUOUTDOOR AIR INTAKEGRAVITY BACKDRAFT DAMPEROAIBDDFIRE DAMPERSUPPLY AIR DUCTRETURN AIR DUCTCEILING DIFFUSERWALL RETURN GRILLEBOTTOM RETURN REGISTER (12" AFF)CEILING EXHAUST GRILLEEXHAUST AIR DUCTBRRWRGCEGCDSADRADEADFDTHERMOSTAT OR TEMPERATURE SENSORSUPPLY, RETURN OR EXHAUST DUCTWORKAIR VOLUME DAMPERVDEXHAUST FANEFCO2 SENSOR, SELF-CALIBRATINGCCEILING RETURN GRILLECRGOUTDOOR AIR DUCTOADWALL SUPPLY GRILLEWSGVENTILATION LEVEL SELECTOR SWITCHWALL TIMER SWITCHCEILING TRANSFER REGISTERCTRSUPPLY DUCTWORK UPSUPPLY DUCTWORK DN.RETURN DUCTWORK UPRETURN DUCTWORK DN.EXHAUST DUCTWORK UPPIPE DOWNBALL VALVEGATE VALVEHOT WATER SUPPLY PIPINGHWSHWRPIPE UPCOOLING COIL CONDENSATE DRAINCDAUTOMATIC TEMPERATURE CONTROLATCMOTORIZED BACKDRAFT DAMPERMODMOTORIZED DAMPERMROOF TOP UNITRTUHOT WATER RETURN PIPINGDUCT SMOKE DETECTORDSHUMIDIFIERHREFRIGERANT SUCTION LIQUIDRSREFRIGERANT LIQUID PIPINGRLREFRIGERANT HOT GAS PIPINGHGGRAVITY VENTILATORGVCONDENSING UNITCUELECTRIC HUMIDIFIEREHSMOKE DAMPERSDCOMBINATION FIRE / SMOKE DAMPERFSDELECTRIC WALL HEATEREWHELECTRIC DUCT HEATEREDHSTUNDERCUT DOORSUPPLY AIRFLOW DIRECTIONRETURN/EXHAUST AIRFLOW DIRECTIONMARK TIME SWITCHHVAC LEGENDTSSWDPDIFFERENTIAL PRESSURE SENSORFLOOR SUPPLY GRILLEFSGFLOOR RETURN GRILLEFRG6. INDOOR UNITS SHALL BE MODEL PKFY WALL-MOUNT: PKFY-P06NBMU-E2 FOR ALL AC-X INDOOR UNITS7. FINAL PIPE SIZING PER MANUFACTURER8. RUN PIPING EXPOSED WITH ACCESSORY PIPE COVER "RACEWAY"EXHAUST FAN SCHEDULETAGMFGMODELCFME.S.P.DRIVESONESELECTRICALTYPESERVESWEIGHT(LBS)REMARKSWATTSVOLTSPHASEEF-1BROANXB50L500.3"ECM0.351201CEILINGHOUSEKEEPING14EF-2BROANXB50L500.3"ECM0.351201CEILINGHOUSEKEEPIING14EF-3/BATHBROANXB50L500.3"ECM0.351201CEILINGTOILET EXHAUST14EF-3/MECHCOOK90SQN17DEC3000.125"DIRECT-501201INLINEMECHANICAL ROOM90EF-4BROANXB50L500.3"ECM0.351201CEILINGTOILET EXHAUST14EF-5BROANXB50L500.3"ECM0.351201CEILINGTOILET EXHAUST14EF-6BROANXB50L500.3"ECM0.351201CEILINGTOILET EXHAUST14EF-7BROANXB50L500.3"ECM0.351201CEILINGTOILET EXHAUST14EF-8BROANXB50L500.3"ECM0.351201CEILINGHOUSEKEEPING14EF-9BROANXB50L500.3"ECM0.351201CEILINGTOILET EXHAUST14EF-10BROANXB50L500.3"ECM0.351201CEILINGTOILET EXHAUST14REMARKS:MOTOR MOUNTED SPEED CONTROLFAN/LIGHTWITH MODEL 843BL WALL CAPTIMECLOCK CONTROL PER ELECTRICAL DRAWINGS. LIGHT SWITCHED BY OCCUPANCY SWITCH BY ELECTRICAL CONTRACTOR.1234EF1123234424234234234234242424ScaleProject No.DateDrawn byChecked byArchimetrics Design Studio 53 South Union St, Plainfield, MA 01070 Peter Lapointe, Architect ph 413-634-0091 120115August 1, 2016No.DescriptionDate18 Henshaw Ave, Northampton MA Faculty Offices @ Henshaw B NO SCALEH2.0BHVAC SchedulesJGWJGW UPUPUPUPUPDNDNDNDNDNFIRST FLOOR LIGHTING - DEMOLITION PLANSCALE: 3/16" = 1'-0"SECOND FLOOR LIGHTING - DEMOLITION PLANSCALE: 3/16" = 1'-0"SSSS SSSSSSSSS SSSSSSSS SSOSSSSSSSSSSSSSSSSSS DEMOLITION KEY NOTES:REMOVE EXISTING LIGHTING FIXTURE & MAINTAIN SWITCH LEGWIRING TO SUPPORT NEW LIGHTING FIXTURE AT EXISTINGLOCATION.REMOVE EXISTING DEVICE, MAINTAIN EXISTING BRANCH CIRCUITWIRING FOR INSTALLATION OF NEW CONTROLS.REMOVE & REINSTALL IN SINGLE GANG OPENING12rererererererererererereererrerere221rerererere221SSrerererere221SSerer1re1rerereEFreEFreSSSSSSSSS rererererererereerrererere22rerererere221EFrererere2rerererererererererereEFrerererererererereerrererererererererererererererererereerrerererererererererererererererererererererererereSrerererere1332ScaleProject No.DateDrawn byChecked byArchimetrics Design Studio 53 South Union St, Plainfield, MA 01070 Peter Lapointe, Architect ph 413-634-0091 120115August 1, 2016No.DescriptionDate18 Henshaw Ave, Northampton MA Faculty Offices @ Henshaw B 3/16" = 1'-0"ELD1.1BLighting Demolition Floor Plans JPJGW UPUPUPUPUPDNDNDNDNDNFIRST FLOOR POWER - DEMOLITION PLANSCALE: 3/16" = 1'-0"SECOND FLOOR POWER - DEMOLITION PLANSCALE: 3/16" = 1'-0"JJJJBJFFFFBFFFFWPWPFFSSSSSSSSSSSSSSFSTCSTVTVTVSSSS TVTVTVTVTVTVTVTVSTVBSTVSSBSrererererererererereerreererrereerrereerererreererrererereerrerererererereererrereererreerreerreerreerreerrereerererrerereererrerereerrerererererererererererererererererererererererererererererererererererererererererererererererererererererererererererererererererererererererererererererererererererererererererererererererererererererererererererererererererererererererererererererereSTVrereererreerSSTVre rerereererreererTVrereererreSSTVrererereererreerSSTV rererereererreerDEMOLITION KEY NOTESREMOVE EXISTING PANELBOARD, RETAIN FEEDER CONDUCTORS AND BRANCH CIRCUIT CONDUCTORSNOT RENDERED OBSOLETE IN RENOVATION WORK., FOR REINSTALLATION INTO NEW EQUIPMENT.GENERAL NOTE: ALTERNATE #4EXISTING FIRE ALARM SYSTEM SHALL REMAIN UNDER THE BASE BID. IN THE BASE BID EXISTINGDEVICES AND WIRING EFFECTED BY REMOVAL OF WALLS SHALL BE RELOCATED OR SPLICED ANDCONTINUED AS REQUIRED TO MAINTAIN INTEGRITY OF EXISTING SYSTEM.ScaleProject No.DateDrawn byChecked byArchimetrics Design Studio 53 South Union St, Plainfield, MA 01070 Peter Lapointe, Architect ph 413-634-0091 120115August 1, 2016No.DescriptionDate18 Henshaw Ave, Northampton MA Faculty Offices @ Henshaw B 3/16" = 1'-0"EPD1.1BPower Demolition Floor Plans JPJGW ELECTRICAL BASEMENT PLANSCALE: 1/4" = 1'-0"Mechanical Room00M1UNEXCAVATEDUNEXCAVATEDUNEXCAVATEDUNEXCAVATEDUNEXCAVATEDUNEXCAVATEDUNEXCAVATEDPROVIDE 42-SPACE 400A-3ɸ SQUARE-DPANELBOARD 'MDP', WITH BREAKERS ASREQUIRED TO SUPPORT RELOCATED CIRCUITSAND NEW CIRCUITS, AS DESIGNATED.MDPGFI1COORDINATE RECEPTACLEOUTLET WITH LOCATION OFDATA EQUIPMENTPROVIDE NEW FIBER OPTIC DATA SERVICE TOBUILDING THOUGH EXISTING DUCT TO LOCALDISTRIBUTION NETWORK HUB. CONTINUE TOUPSTAIRS CLOSET PER COLLEGE STANDARDREMOVE EXISTING TAP BOX & MULT-IMETER ASSEMBLY.REMOVE EXISTING DISTRIBUTION PANELS AND PANEL FEEDERCONDUCTORS . PROVIDE 300A-3P 120/208V ELECTRICALSERVICE CONDUCTORS RUN IN EXISTING UNDERGROUNDCONDUIT TO EXISTING HENSHAW AREA TRANSFORMER.PROVIDE NEW TRANSFORMER BREAKER TO SUPPORT NEWMAIN DISTRIBUTION PANEL. MAINTAIN EXISTING BRANCHCIRCUITS TO REMAIN AND REINSTALL INTO NEW PANEL.AAASerREMOVE EXISTING LIGHTING FIXTURESFROM MECHANICAL ROOM. PROVIDE NEWFIXTURES & WIRING FROM EXISTINGBRANCH CIRCUIT & ROOM CONTROLS.EF1SMPP2-21TCRELCOATE EXISTING CIRCUITS NOTREMOVED IN RENOVATION INTO NEWPANELBOARD 'MDP'PROVIDE 7-DAY 2-POLE TIMECLOCKCONTROLLER, FOR CONTROL OF BUILDINGEXHAUST FAN SYSTEM, REFER TO DETAIL.MDP-14,16MDP-31INSTALL LINE VOLTAGETHERMOSTAT CONTROLLERTSMMD1PP2-20SMMD2PP2-20GFITSFSAIMTSAIMGENERAL NOTE: ALTERNATE #4EXISTING FIRE ALARM SYSTEM SHALL REMAIN, UNDER THE BASE BID. IN THE BASE BID, EXISTINGDEVICES AND WIRING EFFECTED BY REMOVAL OF WALLS SHALL BE RELOCATED OR SPLICED ANDCONTINUED AS REQUIRED TO MAINTAIN INTEGRITY OF EXISTING SYSTEM. IF ALTERNATE #4 ISACCEPTED PROVIDE FULL COMPLIANT FIRE ALARM SYSTEM AS DETAILED IN PLANS AND SPECIFICATION.ScaleProject No.DateDrawn byChecked byArchimetrics Design Studio 53 South Union St, Plainfield, MA 01070 Peter Lapointe, Architect ph 413-634-0091 120115August 1, 2016No.DescriptionDate18 Henshaw Ave, Northampton MA Faculty Offices @ Henshaw B 1/4" = 1'-0"E1.0BElectrical Basement Plan JPJGW UPUPUPUPLIGHTING FIRST FLOOR PLANSCALE: 1/4" = 1'-0"SOffice101-B1Office104-B1Office105-B1Office103-B1Stair100ST1Lavatory100T1Housekeeping100HKCorridor100C1Office102-B1Conf.106-B1Lavatory100T1Stair100ST1Conf.101-B2Housekeeping100HKOffice102-B2Office103-B2Conf.103-B3Stair100ST1Lavatory100T1Office101-B3Office102-B3Resource Room100RUnit B1Unit B2Unit B3Housekeeping100HKData Closet200M1S33CCCCCCCCEFEFWSOSOSOSOSOSOSOSerE3E3SOSODDDDVVHHHHS SRRRRRRRRSO3CCCCEFWSOSOSOSerE3SODDVHHS RRRRSOCCSOCCSOCCSOSODCCKEY NOTES:RELOCATE SWITCH CONDUCTORS FOR STAIR TO DEVICEPROVIDE NEW FIXTURE INSTALLED ON EXISTING BRANCHCIRCUIT/ SWITCH LEG WIRINGPROVIDE 2#12+#12G TO UNSWITCHED BRANCH CIRCUIT FEEDSERVING LIGHTING FIXTURES IN THIS AREA.BRANCH CIRCUIT WIRING TO LOCAL LIGHTING CONTROLSWITCH(ES) SHALL BE ROUTED THROUGH OCCUPANCY SENSORFOR MASTER ROOM CONTROL.RELOCATE OR SPLICE AND CONTINUE EXISTING BRANCHCIRCUIT HOME RUN TO NEW 20A-1P IN PANEL 'PP' TO SUPPORTINSTALLATION OF NEW DEVICES & FIXTURES AS NOTEDPROVIDE 2#12+#12G TO EACH EXTERIOR FIXTURE, CONTROLFROM PHOTOCELL CONTROLLER. PROVIDE CONSTANT BRANCHCIRCUIT WIRING TO EXTERIOR EMERGENCY EGRESS FIXTURES.PROVIDE 3#12+#12G RUN FROM BASEMENT TIMECLOCK FORCONTROL OF EXHAUST FANS AND ASSOCIATED ROOM LIGHTINGFIXTURE. INSTALL 2-P SERVICE SWITCH AT 6'AFF. REFER TOEXHAUST FAN WIRING DETAIL.123456JS31SOPPDDSO55LVLVLVSOSD S SOSO444SD DD DD PP1-1PP2-1PP3-1PP3-3PP4-1R26R26R26G6PC6PP4-3EWEWEWEWE2E2667EFS27S27EFS27EF227S272ER272ScaleProject No.DateDrawn byChecked byArchimetrics Design Studio 53 South Union St, Plainfield, MA 01070 Peter Lapointe, Architect ph 413-634-0091 120115August 1, 2016No.DescriptionDate18 Henshaw Ave, Northampton MA Faculty Offices @ Henshaw B 1/4" = 1'-0"EL1.1BLighting First Floor Plan JPJGW LIGHTING SECOND FLOOR PLANSCALE: 1/4" = 1'-0"DNDNDNDNDNEFV3SOSOHHHH1E3Office201-B2Office202-B2Office203-B3Office204-B3Office201-B3Office202-B3Office203-B2Office204-B2Stair200ST1Office203-B1Office204-B1Office205-B1Hall200C1Break Room200KOffice207-B1Stair200ST1Stair200ST1Lavatory200T1Lavatory200T2Office206-B1Housekeeping200HKHall200C2Lavatory200T1Office201-B1Office202-B1SSSOSOHHHHKVerer11KE332SOSOK2HHHHSO EFEFSSererV2K23SOSOHHHHK11211K2SOHHHH11E3SSSOSOHHHHKerer11KE332SOK2HHHHS O211SOKSOHHHHKEY NOTES:PROVIDE NEW DEVICE IN EXISTING LOCATION.PROVIDE NEW FIXTURE INSTALLED ON EXISTING BRANCHCIRCUIT/ SWITCH LEG WIRINGPROVIDE 2#12+#12G TO UNSWITCHED BRANCH CIRCUIT FEEDSERVING LIGHTING FIXTURES IN THIS AREA.CONSTANT BRANCH CIRCUIT WIRING TO LOCAL LIGHTINGCONTROL SWITCH(ES) SHALL BE ROUTED THROUGHOCCUPANCY SENSOR FOR MASTER ROOM CONTROL.RELOCATE OR SPLICE AND CONTINUE EXISTING BRANCHCIRCUIT HOME RUN TO NEW 20A-1P IN PANEL 'PP' TO SUPPORTINSTALLATION OF NEW DEVICES & FIXTURES AS NOTEDPROVIDE 2#12+#12G TO EACH EXTERIOR FIXTURE, CONTROLFROM PHOTOCELL CONTROLLER. PROVIDE CONSTANT BRANCHCIRCUIT WIRING TO EXTERIOR EMERGENCY EGRESS FIXTURES.PROVIDE 3#12+#12G RUN FROM BASEMENT TIMECLOCK FORCONTROL OF EXHAUST FANS AND ASSOCIATED ROOM LIGHTINGFIXTURE. INSTALL 2-P SERVICE SWITCH AT 6'AFF. REFER TOEXHAUST FAN WIRING DETAIL.123456KSO5555555DPP4-7R26EWE26PP4-5PP3-7PP3-5PP3-5PP2-5PP2-5PP2-75PP1-55PP1-5PP1-7577SO2S2SO2S2SO2S277EFSOS27ScaleProject No.DateDrawn byChecked byArchimetrics Design Studio 53 South Union St, Plainfield, MA 01070 Peter Lapointe, Architect ph 413-634-0091 120115August 1, 2016No.DescriptionDate18 Henshaw Ave, Northampton MA Faculty Offices @ Henshaw B 1/4" = 1'-0"EL1.2BLighting Second Floor Plan JPJGW UPUPUPUPOffice101-B1Office104-B1Office105-B1Office103-B1Stair100ST1Lavatory100T1Housekeeping100HKCorridor100C1Office102-B1Conference106-B1Lavatory100T1Stair100ST1Conference101-B2Housekeeping100HKOffice102-B2Office103-B2Conference103-B3Stair100ST1Lavatory100T1Office101-B3Office102-B3Resource Room100RUnit B1Unit B2Unit B3Housekeeping100HKData Closet200M1FFFFFFFFFFFFGFIGFIGFIGFIGFIWPWPKEY NOTES:PROVIDE NEW FEEDER CONDUCTORS ORIGINATING AT PANEL'MDP'. PROVIDE A 30-SPACE 100A-3ɸ SQUARE-D PANELBOARD'PP4', WITH BREAKERS AS REQUIRED TO SUPPORT RELOCATEDAND NEW CIRCUITS.PROVIDE 30-SPACE 100A-3ɸ SQUARE-D PANELBOARD 'PPx', WITHCIRCUIT BREAKERS AS REQUIRED TO SUPPORT RELOCATEDAND NEW CIRCUITS. RELOCATE, OR SPLICE AND CONTINUE, 4#6RUN IN 1"C TO SUPPORT PANEL.PROVIDE 2#14+#14G, A SINGLE BRANCH CIRCUIT LOOP TOSUPPORT ALL UNITS ORIGINATING AT 15A-1P BREAKER OF PANELINDICATED.1PP122PP41POWER FIRST FLOOR PLANSCALE: 1/4" = 1'-0"PP22PP32PP1-11PP1-13PP1-19PP1-17PP1-15PP2-11PP2-13PP2-15PP2-19PP2-21PP2-23PP2-17WPWPPP3-11PP3-13PP3-17PP3-15PP4-11PP4-13PP4-15PP4-17GFIAC3AC6AC5AC4AC2AC1CU1AC17AC16AC15AC19AC18AC21AC20CU2FACPJPP2-30MDP-13,15,173SM3S M3SMPP4S M3SMPP4PP3S M3SMPP3S M3SMPP2SM 3SMPP13SMPP23SMPP1WPWPGFIMDP-13,15,17WPWPGFIPP4-19RED BEACON INTERLOCK WITH ALARMFIRE ALARM SURFACE KNOX (KEY) BOXBLUE BEACON INTERLOCK WITH WATER FLOWKWPGFIGENERAL NOTE: ALTERNATE #4EXISTING FIRE ALARM SYSTEM SHALL REMAIN, UNDER THE BASE BID. IN THE BASE BID, EXISTINGDEVICES AND WIRING EFFECTED BY REMOVAL OF WALLS SHALL BE RELOCATED OR SPLICED ANDCONTINUED AS REQUIRED TO MAINTAIN INTEGRITY OF EXISTING SYSTEM. IF ALTERNATE #4 ISACCEPTED PROVIDE FULL COMPLIANT FIRE ALARM SYSTEM AS DETAILED IN PLANS AND SPECIFICATION.ScaleProject No.DateDrawn byChecked byArchimetrics Design Studio 53 South Union St, Plainfield, MA 01070 Peter Lapointe, Architect ph 413-634-0091 120115August 1, 2016No.DescriptionDate18 Henshaw Ave, Northampton MA Faculty Offices @ Henshaw B 1/4" = 1'-0"EP1.1BPower First Floor Plan JPJGW DNDNDNDNDNOffice201-B2Office202-B2Office203-B3Office204-B3Office201-B3Office202-B3Office203-B2Office204-B2StairOffice203-B1Office204-B1Office205-B1Hall200C1Break Room200KOffice207-B1Stair200ST1Stair200ST1Lavatory200T1Lavatory200T2Office206-B1Housekeeping200HKHall200C2Lavatory200T1Office201-B1Office202-B1ererererererererererererererererererererererererererererererererererererererererKEY NOTES:BLANKPROVIDE NEW DEVICE IN EXISTING LOCATION.PROVIDE 2#14+#14G, A SINGLE BRANCH CIRCUIT LOOP TO SUPPORTALL UNITS ORIGINATING AT 15A-1P BREAKER OF PANEL INDICATED.RELOCATE OR SPLICE AND CONTINUE EXISTING BRANCH CIRCUITHOME RUN TO NEW 20A-1P IN PANEL 'PP' TO SUPPORT INSTALLATIONOF EXISTING DEVICES AS NOTED12344444444444444GFIGFIGFIGFIGFIGFIGFIFFFFFPOWER SECOND FLOOR PLANSCALE: 1/4" = 1'-0"PP1-2PP1-4PP1-10PP1-8PP1-6PP2-6PP2-8PP2-2PP2-4PP2-10PP3-2PP3-4PP3-10PP3-8PP3-6PP4-8PP4-12PP4-10PP4-2PP4-4PP4-6WPWPWPWPS M3SMPP4S M3SMPP4AC14AC9AC12AC11AC8AC7AC10AC13AC25AC27AC26AC23AC22AC24AC29AC28S M3SMPP3S M3SMPP2SM3SMPP1 3SMPP33SMPP23SMPP1S M3PP3SM 3PP13SMPP2GENERAL NOTE: ALTERNATE #4EXISTING FIRE ALARM SYSTEM SHALL REMAIN, UNDER THE BASE BID. IN THE BASE BID, EXISTINGDEVICES AND WIRING EFFECTED BY REMOVAL OF WALLS SHALL BE RELOCATED OR SPLICED ANDCONTINUED AS REQUIRED TO MAINTAIN INTEGRITY OF EXISTING SYSTEM. IF ALTERNATE #4 ISACCEPTED PROVIDE FULL COMPLIANT FIRE ALARM SYSTEM AS DETAILED IN PLANS AND SPECIFICATION.ScaleProject No.DateDrawn byChecked byArchimetrics Design Studio 53 South Union St, Plainfield, MA 01070 Peter Lapointe, Architect ph 413-634-0091 120115August 1, 2016No.DescriptionDate18 Henshaw Ave, Northampton MA Faculty Offices @ Henshaw B 1/4" = 1'-0"EP1.2BPower Second Floor Plan JPJGW LUMINAIRE SCHEDULETYPEMANUFACTURERCATALOG NUMBERLAMPSVOLTAGEMOUNTINGDESCRIPTIONAMETALUXLIGHTING4SLSTP2040DD-120VAYC-CHAIN/SET2000 LUMEN4000K LED120PENDANT/SURFACE3"x3"x4' LINEAR ACRYLIC LENS(GENERAL/MECH AREAS)BMETALUXLIGHTING4WPLD4035C-HBAYC-CHAIN/SET-U4000 LUMEN3500K LED120PENDANT/SURFACE5"x2"x4' LINEAR ACRYLIC LENS(H/O & GENERAL LIGHTING)CEATONFAIL-SAFEHVSL8-4-LD4-2-LO-30-UNV-O-EDD-14000 LUMEN3000K LED120SURFACE(52W) 1'X4' SURFACE FIXTURE,ACRYLIC LENS 0-10V DIMC(8')EATONFAIL-SAFEHVSL8-8-LD4-2-LO-30-UNV-O-EDD-14000 LUMEN3000K LED120SURFACEEQUAL TO TYPE 'B' FOR 8'APPLICATIONSDMETALUXLIGHTINGFM-LED-12-WH-830-PR1000 LUMEN3000K LED120SURFACE(14W) 12" ROUND ACRYLICLENSED SURFACE FIXTUREEFPROVIDED BYOTHERSFIXTURE & WIRE INSTALL BYE.C., DUCT BY OTHER9W-900lm-2700KLED A-LAMP120RECESSED70CFM EXHAUST FAN & LIGHTCOMBO FIXTUREGPROGRESSLIGHTINGP5762-31(9W) 900 LUMEN3000K A19-LED120SURFACE1-LAMP BLACK EXTERIOR WALLLANTERN, SEEDED GLASSJLITHONIALIGHTINGFMMCL-18-840-PIR900 LUMEN3000K LED120SURFACE(14W) 18"L. ACRYLIC LENSEDFIXTURE W/OCC. SENSORKPHILLIPSLEDALITE7408-L-C-E-Q-N-04-7-1-E-W3400 LUMEN3000K LED120WALLMOUNT4'Lx6"X2" WHITE LINEAR WALLMOUNT FIXTURE 60U/40DHPHILLIPSLEDALITE7408-L-C-E-Q-N-08-7-1-E-W3400 LUMEN3000K LED120WALLMOUNTEQUAL TO 'K' FOR 8'APPLICATIONSNLITHONIALIGHTINGGRD-LLP-xxFT-MSL8-80CRI-30K-ID800LMF-20/80-MIN10-ZT-120-SCT-FT/12F-C110-MCSJ800 LUMEN/FT3000K LED120PENDANT(6W/FT) PENDANT LINEARDIRECT/INDIRECT FIXTURELENGTH PER PLAN, DIMMINGR*LITHONIALIGHTINGLCP-GSKT-UHOUSING ONLY120RECESSED6" NEW CONSTRUCTIONRECESSED HOUSINGR*LITHONIALIGHTINGL7XPR-GSKT-UHOUSING ONLY120RECESSED6" RETROFIT TYPE RECESSEDHOUSINGR*LITHONIALIGHTING60PA-LED-30K90CRI11W-600 LUMEN3000K LED120LIGHTENGINE6" OPEN LED MODULE LIGHTFOR RECESSED HOUSINGR2*LITHONIALIGHTING6BPMW-LED600 LUMEN3000K LED120LIGHTENGINE6" WET LOCATION TRIM, UTILIZETYPE R HOUSING.VSHAPERLIGHTING605-25-WP-L3/830-UNV-NA2000 LUMEN3000K LED120SURFACE(20W) 25"X6" VANITY FIXTUREBRUSH ALUM. W/ACRYLIC LENSWTEXASFLUORESCENTSSS-SES-FR-48L-F31W3100L-STMV-35K-WH3100 LUMEN3500K LED120SURFACE(31W) 4'x3"x2" CEILING MOUNTOPAL LENSED LINEAR FIXTUREESURE-LITESLIGHTINGLEMINTERGRAL LED120SURFACETWIN HEAD H/O EMERGENCYEGRESS FIXTURE W/BATTERYE1SURE LITESLIGHTINGLEM2INTERGRAL LED120SURFACETWIN HEAD H/O EGRESSFIXTURE W/ REMOTE BATTERYE2SURE LITESLIGHTINGLEM2-LEMRONO/LAMPS120SURFACEEGRESS BATTERY ONLY FORREMOTE EGRESS LIGHTSERSURE LITESLIGHTINGAPR2INTERGRAL LED4VDCSURFACEREMOTE TWIN HEAD EGRESSFIXTURE , FOR INDOORSEWSURE LITESLIGHTINGAPWR2INTERGRAL LED4VDCSURFACEREMOTE TWIN HEAD EGRESSFIXTURE , FOR EXTERIORXCOOPERLIGHTINGAPX7RINTERGRAL LED120SURFACEWHITE THERMOPLASTICMULTI-MT EXIT SIGN W/BATTERYSS3S4STSMLEGENDGFIWPGFISOPCSOSINGLE POLE SWITCHTHREE WAY SWITCHFOUR WAY SWITCHTIME SWITCHMOTOR SWITCH W/THERMAL OVERLOADCEILING OCCUPANCY SENSORWALL MOUNTED OCCUPANCY SENSORPHOTOCELLDUPLEX RECEPTACLEQUADRUPLEX RECEPTACLEGROUND FAULT RECEPTACLEWEATHER PROOF RECEPTACLESIMPLEX RECEPTACLEDUPLEX RECEPTACLE - ALTERNATE HEIGHTGROUND FAULT RECEPTACLE - ALTERNATEHEIGHTLMEMERGENCY LIGHTING MONITOR MODULECCONTACTORSDDIMMER SWITCHTCTIME CLOCKSPECIAL PURPOSE RECEPTACLEPPOCCUPANCY SENSOR POWER PACK/ RELAYTRDLCEILING SINGLE EXITWALL SINGLE EXITTRANSFORMERFUSED DISCONNECT SWITCHRELAYMOTOR208-120 PANELBOARDJUNCTION BOXDOOR LOCKHARDWIRE CONNECTIONVFDVARIABLE FREQUENCY DRIVE24" LED LIGHT FIXTUREWALL MOUNTED LIGHT FIXTURECEILING RECESSED LED LIGHT FIXTUREWALL WASH LIGHT FIXTURE48" LED LIGHT FIXTURE24"X24" LED LIGHT FIXTURE24"X48" LED LIGHT FIXTUREJLEGENDLIGHTING FIXTURE ON EMERGENCY SYSTEM96" LED LIGHT FIXTURECEILING MOUNTED LIGHT FIXTURETVWPINTERCOMCATV OUTLETWIRELESS ACCESS POINTFLOOR MOUNTED 2 DATA/1 VOICE OUTLETVOICE OUTLETIPAHCRKSPOWER ASSIST DOOR OPENERHANDICAP PUSHBUTTON STATIONCARD READERKEY SWITCHDBDOORBELLPBPUSHBUTTON80"TYPICAL FIREALARM AUDIO ANDVISUAL DEVICES48"TYPICAL FIREALARM MANUALPULL STATION60"TYPICAL FIREALARM CONTROLPANELS ANDANNUNCIATORSLCD DISPLAYFINISHED FLOOR48"TYPICAL WALLSWITCH46"TYPICALALTERNATEHEIGHTRECEPTACLETYPICALALTERNATEHEIGHT DATAOUTLET18"TYPICALRECEPTACLETYPICAL DATAOUTLETFINISHED CEILING8"TYPICAL WALLMOUNTED SMOKEDETECTION DEVICEFLOOR MOUNTED DUPLEX RECEPTACLECEILING MOUNTED DUPLEX RECEPTACLE2 DATA/1 VOICE OUTLETAAMPEREAFFABOVE FINISHED FLOORBSMT BASEMENTCCONDUITC/BCIRCUIT BREAKERCATVCABLE TVCIRCIRCUITCUCOPPERCUHCABINET UNIT HEATEREFEXHAUST FANEMEMERGENCYFFUSEDFAFIRE ALARMGFIGROUND FAULT CIRCUIT INTERRUPTERLVLOW VOLTAGE DEVICENLNIGHT LIGHTPPOLERLCRELOCATED BRANCH CIRCUITABBREVIATIONSRTUROOF TOP UNITSPSPARETVTELEVISIONULUNDERWRITERS LABORATORIES INCUPSUNINTERRUPTIBLE POWER SUPPLYWWATTWPWEATHERPROOFerEXISTING TO REMAINreREMOVE EXISTINGrrREMOVE & REINSTALL EXISTINGLIGHTING CONTROL NOTES:OCCUPANCY SENSORS SERVING OFFICE SPACES SHALLBE SET TO 10 MINUTE OPERATIONOCCUPANCY SENSORS SERVING BATHROOMS ANDCLOSETS SHALL BE SET TO 5 MINUTESOCCUPANCY SENSORS SERVING CIRCULATION SPACESAND CORRIDORS SHALL BE SET TO 20 MINUTES.STANDARD DEVICE MOUNTING HEIGHTSSCALE: NTSeFNOTE:PROVIDE ALL WIRING IN COMPLIANCE WITHMANUFACTURER'S RECOMMENDATIONSAND JOB SPECIFICATIONS.FIRE ALARM SYSTEM RISER DIAGRAMSCALE: NTSMDPPP1WIRING KEY NOTESRELOCATE EXISTINGCONDUCTORS INTO NEW PANEL4#1+#6G RUN IN 1-1/2"C4#300MCM+#2G RUN IN 3"C4#300MCM RUN IN EXISTINGCONDUITELECTRICAL DISTRIBUTION RISER DIAGRAMSCALE: NTS120/208V-3ɸ50A-MCB30-SPACE120/208V-3ɸ300A-MCB42-SPACE124311320A-3ɸMETERSOCKETMETER BYCOLLEGETO EXISTING SITETRANSFORMERPP2120/208V-3ɸ50A-MCB30-SPACEPP3120/208V-3ɸ50A-MCB30-SPACEPP4120/208V-3ɸ100A-MCB30-SPACE21PROVIDE #4 BARESTRANDED INTERSYSTEMBONDING BUSSPROVIDE #1/0 BARE STRANDEDTO WATER SERVICEPROVIDE #6 BARE STRANDEDTO (2) 8'X5/8" GROUND RODS3EXHAUST FAN WIRING DETAILSCALE: NTSEXHAUST FANEXHAUST FAN LIGHTVANITY LIGHT(WHERE REQUIRED)7-DAYTIMECLOCKAT MDPMDPTO ADDITIONAL EXHAUST FANSTO ADDITIONAL EXHAUST FAN LIGHTSTC2-POLE LOCAL E.F.SERVICE SWITCHOS2-POLE (OR 1-P) WALL MOUNTOCCUPANCY SENSOR SWITCH4ScaleProject No.DateDrawn byChecked byArchimetrics Design Studio 53 South Union St, Plainfield, MA 01070 Peter Lapointe, Architect ph 413-634-0091 120115August 1, 2016No.DescriptionDate18 Henshaw Ave, Northampton MA Faculty Offices @ Henshaw B 1/4" = 1'-0"E2.0BElectrical Legend and Details JPJGW