Loading...
Chapter 34 review Henshaw D Archimetrics Design Studio 53 South Union Street, Plainfield, MA 01070 Peter Lapointe, Architect 413-634-0091 archimetricsdesign@verizon.net September 15, 2016 Louis Hasbrouck, Building Commissioner City of Northampton Northampton, MA 01060 RE: Enabling Neilson – 5 Building Renovations CHAPTER 34 REVIEW Henshaw D – 10 Henshaw Avenue 1st Floor 2640sf 2nd floor 3024 sf Existing Use R-2 Proposed Use B Construction Type 5B – Fully sprinkled Overview: Henshaw D is an existing multifamily 4 town house unit constructed in the 1970’s being converted to a technology classroom and media production studio with support facilities including six faculty offices. The four units will be connected into a single facility with two means of egress from each floor. The change in occupancy classification requires compliance with IEBC Chapter 9 as follows: 903 through 906 require compliance with Section 912. 907: The existing floor framing (2x12 joists) is adequate for office loading (50 psf) as defined in IBC Table 1607.1. Snow and wind loads are unchanged and no seismic upgrades are required. Structural modifications include removal of part of the second floor in one unit to provide a two story space to accommodate sets and lighting for the production studio. 908: Electrical service upgrades, rewiring and new devices and LED lighting upgrades are proposed throughout the building. 909: Heating, ventilating and A/C upgrades are proposed throughout the building. Archimetrics Design Studio 53 South Union Street, Plainfield, MA 01070 Peter Lapointe, Architect 413-634-0091 archimetricsdesign@verizon.net 910: Plumbing facilities for both sexes, drinking fountains and service sinks are being provided for each unit floor consistent with plumbing code requirements for the new occupancy. 911: Light and ventilation requirements for new construction are met by proposed exterior changes to doors and windows. 912.1.1: Compliance with Chapter 8 will be discussed by Section following the Chapter 9 review. 912.4: The Change in Occupancy reduces the Means of Egress Hazard Index from 3 to 4 requiring compliance with 912.4.2. The egress capacity meets requirements for new construction and modifications to the existing open risers, handrails and guards are proposed. Open riser will be eliminated and new closure panels will be added to the open railing system. 912.5 & 6: The change of use to a lower hazard index deems the existing building height and area and exterior wall construction to be acceptable. 912.7.2: Stairways: Changes to the existing open stairways are not required since there is no increase in Egress Hazard Index. IBC Section 1022.1 exception 1 allows unenclosed stairways when the occupant load for the stair is less than 10. The existing stairways meet this requirement. 912.8: Accessibility requirements are met by proposed improvements to entrances and the addition of an accessible restroom. Proposed first floor changes include dimensional compliance for all doors. Public access and programs are all located on the first floor with second floor spaces dedicated to faculty and faculty support services. The sound booth and multi-purpose spaces on the second floor are proposed to be used only by faculty and staff. Chapter 8: The scope of alterations including structural changes and proposed exit and emergency lighting is consistent with the requirements of Chapter 8. The proposed fire alarm system and existing fire protection system exceed the requirements for new construction. Archimetrics Design Studio 53 South Union Street, Plainfield, MA 01070 Peter Lapointe, Architect 413-634-0091 archimetricsdesign@verizon.net Chapters 6 & 7: Existing construction and proposed construction without exception meet or exceed the requirements of these chapters for Repairs and Alterations. Respectfully submitted, Peter Lapointe