Addendum No 3Proj. No. 011215 Enabling Neilson September 6, 2016 Renovations Smith College, Northampton, MA ADDENDUM No. 3 1 of 7 To: General Bidders This addendum consists of 7 pages and 1 attachment. General Contractors are responsible for distributing this addendum to their sub-bidders and suppliers. Indicate receipt of this addendum in the appropriate place on the bid form. The bid documents dated August 1, 2016 are amended as follows: SPECIFICATIONS: ADD3.1: SECTION 01230 ALTERNATES: Add the following paragraphs: 3.4 SCHEDULE OF ALLOWANCES A. Carpeting: Carry an allowance of $56.00 per square yard for material only. Include installation costs including adhesives and accessories as part of base bid. B. Plaster repair: Carry allowances for plaster repair beyond required cutting and patching for miscellaneous plaster repairs at 146 Elm and 21 Henshaw as follows: 1. 146 Elm: Lump Sum of $5,000. 2. 21 Henshaw: Lump Sum of $5,000. ADD3.2: SECTION 012900 PAYMENT PROCEDURES: Add the following sub- paragraph to 1.5.F: 3. Include retainage of 5% for all amounts completed and stored to date for each billing cycle. ADD3.3: SECTION 081113 HOLLOW METAL DOORS AND FRAMES; 2.3.A MANUFACTURERS: Delete in their entirety sub-paragraphs 1 & 2 from list of acceptable manufacturers. Ceco and Curries do not have products that comply with specified requirements. ADD3.4: SECTION 085200 WOOD WINDOWS: Add paragraph 2.6.G as follows: G. Sash Limiters: Provide sash limiters for all double hung replacement windows with sills within 24 inches of the floor on windows located above the first floor unless sash is noted to be fixed. Proj. No. 011215 Enabling Neilson September 6, 2016 Renovations Smith College, Northampton, MA ADDENDUM No. 3 2 of 7 ADD3.5: SECTION 230000 HVAC, Paragraph 2.25 Automatic Temperature Controls, Item B add the following: 1. Each building shall have a single Mitsubishi microprocessor controller for control of all VRF ductless split heat pump systems from a single location within the building. Controls for the Henshaw D building shall be microprocessor based DDC control for all existing and new HVAC equipment except as noted otherwise. DDC controls at Henshaw D shall be provided for all HVAC equipment, including ERVs, AHU-1, existing hot water baseboard radiation, heating hot water pumps, etc. Control of Henshaw D mechanical room ventilation is not required to be via DDC controls. The existing steam control valves for steam to hot water heat exchangers shall remain in place. Under the base bid, all temperature controls are local to each building. Under the temperature controls Alternate, the Mitsubishi controller and the DDC system shall communicate using BACNET protocol with the campus temperature control system, enabling remote monitoring and remote control of all Mitsubishi and DDC system controlled equipment in Henshaw D. ADD3.6: SECTION 321216 ASPHALT PAVING: Delete paragraph 1.4.B in its entirety. No imprinted asphalt required. DRAWINGS: ARCHITECTURAL: ADD3.7: Volume B; Dwg A6.1B: Add the following note: “Note: All existing wood ceilings and exposed rafters to remain. No finish required”. ADD3.8: Volume C; Dwg A1.1C: Add the following note to the second floor plan: “Note: All existing wood ceilings and exposed rafters to remain. No finish required”. Proj. No. 011215 Enabling Neilson September 6, 2016 Renovations Smith College, Northampton, MA ADDENDUM No. 3 3 of 7 ADD3.9: Volume D; Dwg A2.1D: Add the following note: “Exterior Painting includes all new siding and trim and the north and south elevations from grade up to the projecting second floor overhang.” ADD3.10 Volume D; Dwg A6.1.D: Add the following note: “Note: All existing wood ceilings and exposed rafters to remain. No finish required.” ADD3.11 Volume E; Drawing L1.0E: Add the following note to the stone wall detail: “Provide local schist or what is commonly referred to as ‘Goshen stone’ for drylaid stone wall. ADD3.12 Volume E; Dwg A1.0E: Add the following note to insulation notes: “Where knee walls are noted in finish schedule install pourable foam insulation in rafter bays. Contractors Option: Remove existing plaster, install closed cell spay foam and install 1/2 inch gypsum board on strapping.” ADD3.13 Volume E; Dwg A1.1E: Add the window tags “R3” to the two windows located in Reception 104 that face onto the porch. ADD3.14 Volume E; Dwg A1.1E; Window Schedule: Add the following comments: “1. Window C – operable awning window. 2. Window D – fix sash in place. 3. Window R9 – fix sash in place.” ADD3.15 Volume E: Dwg A1.1E; Finish Schedule: Add the following note: “Rooms 201, 200C1, 200T1 and 200T2 have 4’-0” knee walls and sloping wall surface up to an 8’-0” ceiling height.” ADD3.16 Volume E: Dwg A1.1E; Finish Schedule: Add the following note: “Paint existing wallcovering and stippled plaster finish on walls in Room 204.” ADD3.17 Volume H: Dwg A1.0H: Add the following note to the basement plan: “Interior painting limited to new drywall at stair.” ADD 3.18 Volume H: Dwg A1.0H: Add the following note to insulation notes: Proj. No. 011215 Enabling Neilson September 6, 2016 Renovations Smith College, Northampton, MA ADDENDUM No. 3 4 of 7 “Where knee walls are noted in finish schedule install pourable foam insulation in rafter bays. Contractors Option: Remove existing plaster, install closed cell spay foam and install 1/2 inch gypsum board on strapping.” ADD3.19 Volume H: Dwg A1.1H: Add the following note to the first and second floor plan: “Strip existing wall covering and prep walls for finish painting.” PLUMBING: ADD3.20 Volume B: Dwg P1.0B: Add the following note: “Cutting of existing concrete slab and excavation for new sanitary piping and venting noted on this plan shall be by the G.C. Location of existing underslab piping is based upon original drawings. Significant deviations in location of existing conditions will be subject to compensation under contract provisions for Changes Orders.” ADD3.21 Volume C: Dwg P1.0B: Add the following note: “Cutting of existing concrete slab and excavation for new sanitary piping and venting noted on this plan shall be by the G.C. Location of existing underslab piping is based upon original drawings. Significant deviations in location of existing conditions will be subject to compensation under contract provisions for Changes Orders.” ADD3.22 Volume D: Dwg P1.0B: Add the following note: “Cutting of existing concrete slab and excavation for new sanitary piping and venting noted on this plan shall be by the G.C. Location of existing underslab piping is based upon original drawings. Significant deviations in location of existing conditions will be subject to compensation under contract provisions for Changes Orders.” HVAC: ADD 3.23 Volume B: Drawing HD1.1B; ADD NOTES: 1. Existing hot water baseboard radiation and convectors shall remain throughout the building. Controls shall be interlocked to prohibit Proj. No. 011215 Enabling Neilson September 6, 2016 Renovations Smith College, Northampton, MA ADDENDUM No. 3 5 of 7 operation of heat pump system in cooling mode when the baseboard radiation heating system is in operation. 2. Remove bath exhaust fans. Bath exhaust ductwork shall remain for re-use with new exhaust fans. 3. Remove kitchen range exhaust ductwork and dryer vent. ADD 3.24 Drawing HD1.1C; ADD NOTES: 1. Existing hot water baseboard radiation shall remain throughout the building. Controls shall be interlocked to prohibit operation of heat pump system in cooling mode when the baseboard radiation heating system is in operation. 2. Remove bath exhaust fans. Bath exhaust ductwork shall remain for re-use with new exhaust fans. 3. Remove kitchen range exhaust ductwork. ADD3.25 Drawing H1.2D; ADD NOTE: “Hot water coil HC-2, mounted in ERV-2 supply ductwork shall provide 5,000 Btu/hour heating, based on 230 cfm, EAT 55 deg F, EWT 170 deg F, 0.5 gpm, 0.1” w.g. maximum APD, 3 ft. max WPD. Provide modulating hot water valve and supply duct mounted temperature sensor. Provide 3/4” hot water supply and return piping from existing piping in basement mechanical room to HC-2. Provide 1-1/4” hot water supply and return piping from existing basement mechanical room to heating hot water coil in AHU-1.” ADD 3.26 Drawing H1.1D ADD NOTE: “The VRF heat pump system served by CU-2/CU-3 is a heat recovery system. Provide two branch circuit controllers, to serve the indoor units at each end of the building. Three refrigerant lines are required between CU-2/CU-3 and the branch circuit controllers. Each individual indoor unit shall be on its own zone from the branch circuit controller, with two dedicated refrigerant lines for each indoor unit extending from the branch circuit controller to the indoor unit.” Proj. No. 011215 Enabling Neilson September 6, 2016 Renovations Smith College, Northampton, MA ADDENDUM No. 3 6 of 7 ADD 3.27: Drawing H1.2D; ADD NOTE: “DS-1 and DS-2 shown in AHU-1 ductwork are duct silencers. Duct silencer DS- 3 is to be located at the return duct transition/elbow from 26”x12” to 12”x48”. Refer to the attached duct silencer schedule.” ADD 3.28: Drawing HD1.1D; ADD NOTES: 1. Remove hot water baseboard radiation shown hatched. Cap piping at main. 2. Remove bath exhaust fans and associated ductwork. 3. Remove kitchen range exhaust ductwork. ADD 3.29 Drawing H1.1E; ADD NOTE: “The existing 1-pipe steam boiler heating system serving the building shall remain. Remove the two (2) steam radiators on the 3rd floor (not shown on drawings), along with the riser pipes up to the third floor radiators. Cap piping at main. At new Vestibule 100V, relocate the existing 1-pipe steam radiator to the wall behind the door.” ADD 3.30 Drawing H1.0H; ADD NOTES: 1. Heating Hot Water Pump P-1 shall be equal to Taco 00e Series with integral variable speed drive, Circulator Pump model VR1816-HYI- 4C2A00, 8 gpm, 10 ft. head, 120/1/60. Set to operate in constant pressure mode. 2. Condensate Pump CP-1 shall be equal to Little Giant low profile type, model VCC-20ULS, 120/1/60. Discharge to be piped with 1/2” CPVC or rigid PVC to discharge to sewer via indirect waste. Proj. No. 011215 Enabling Neilson September 6, 2016 Renovations Smith College, Northampton, MA ADDENDUM No. 3 7 of 7 ADD 3.31 Drawing H1.0H; ADD NOTE: 1. Demolition Note: This contractor shall remove the existing steam boiler, steam radiators throughout the building, and associated steam piping in its entirety. End of Addendum No. 3