Loading...
Addendum No 1Proj. No. 011215 Enabling Neilson August 23, 2016 Renovations Smith College, Northampton, MA ADDENDUM No. 1 1 of 2 To: General Bidders This addendum consists of 2 pages and 6 attachments. General Contractors are responsible for distributing this addendum to their sub-bidders and suppliers. Indicate receipt of this addendum in the appropriate place on the bid form. The bid documents dated August 1, 2016 are amended as follows: Instructions to Bidders: ADD 1.1: Paragraph 1.1F: Change the time and date for receipt of proposals to read “Friday, September 9, 2016 no later than 2pm.” SPECIFICATIONS: ADD 1.2: SECTION 011000 – SUMMARY -1.5 WORK PHASES ADD 1.2.a: Add the following sentence to paragraph A.1 to read: “Unless site is ready to turn over to the Owner, work areas on site shall be reduced to allow the Owner to access to Elm Street at 146 Elm and access to Henshaw Avenue at 21 Henshaw for snow removal equipment during winter months. Actual dates to be determined. ADD 1.2.b: Change paragraph A.2 to read: “Substantial completion for 146 Elm will be negotiated with the General Contractor based upon work schedule. DRAWINGS: Architectural: ADD1.3: Volume B: Remove DWG D1.1D and insert attachment DWG D1.1B. Plumbing: ADD1.4: Volume B: Insert attachment DWG P2.0B. ADD1.5: Volume C: Insert attachment DWG P2.0C. Proj. No. 011215 Enabling Neilson August 23, 2016 Renovations Smith College, Northampton, MA ADDENDUM No. 1 2 of 2 ADD1.6: Volume D: Insert attachment DWG P2.0D. ADD1.7: Volume E: Insert attachment DWG P2.0E. ADD1.8: Volume H: Insert attachment DWG P2.0H. End of Addendum No. 1