Loading...
30 Henshaw OLD-Tilly Hall - 30 Henshaw Ave - New RestroomsExhaustPanasonic VF-10VLSE 100 CFM Whisper Green Fan Light or EqualCeilingVanity on the same switchHallwayLav 1Lav 212AAInfill CMU wallTilly HallNew Accessible Restrooms11/22/2016$$DemolitionRemove (2) storm windows & save for reuseRemove (2) existing windows and wall beneath to prep for new doorsRemove existing basement entry door to allow heat flow from basementRemove existing exterior stairwell door, patch CMU & paint.Remove existing basement window to allow heat flow from basementRemove existing surface mounted conduit and lightingRemove (2) existing steam radiatorsScopeNew construction is to include a 2 x 10 framed floor with R19 fiberglass insulation. The CMUwall is to receive a layer of 2” rigid foam board with ¾” strapping and 5/8” GWB. PVC beadboard wainscoting will be installed to 48” above finished floor at all walls with PVC cap andbase. A FRP bathroom partition wall will serve as the divider between the mop sink and therest of the bathroom. The attic is to receive blown in cellulose insulation. The floor is to receivecommercial quality sheet goods with heat welded seams. (2) new doors are to be installed inexisting window openings after demolished per plan. (2) New electric baseboard heaters are tobe installed per plans. Fixtures and hardware per plans. Add alternate: provide for new carpeting in the hallway outside the new bathrooms.2" rigid insulation with 3/4" furring and GWBCeiling - Blown in cellulose insulation