9 Beaver Brook Loop 2017-08-29Xata
House
Lot 28
Beaver Brooke Estates
Leeds, MA 01053
Project Address:
Project Name:
Tanya Dragan +
Constantine Voyevidka
253-228-5356
c.voyevidka@gmail.com
tanyadragan@hotmail.com
Owners:
Nelson Geis
70 Chestnut Ave
Leeds, MA 01053
413-559-1334
nelsongeis@gmail.com
Designer:
1)Permit Set 8/28/2017
Issue:
August 28, 2017
Date:
Sheet Title:
Scale:
Scale:
A-01A-01A-01A-01
Plot Plan
NTS
Chestnut Ave
Extension
Beaver Brook Loop
Lot 28
Sheet Index
A-01 Cover
A-02 Site Plan
A-03 Foundation
A-04 First Floor Plan
A-05 Second Floor Plan
A-06 Loft Plan
A-07 Roof Plan
A-08 Elevation - East
A-09 Elevation - South
A-10 Elevation - West
A-11 Elevation - North
A-12 Window Schedule
A-13 Sections
A-14 Sections
A-15 Wall Section
S-1 Framing - 1st Floor Framing Plan
S-2 Framing - 2nd Floor Framing Plan
S-3 Framing - Loft Framing Plan
S-4 Framing - Roof Framing Plan
N
Cover
NTS
Xata
House
Lot 28
Beaver Brooke Estates
Leeds, MA 01053
Project Address:
Project Name:
Tanya Dragan +
Constantine Voyevidka
253-228-5356
c.voyevidka@gmail.com
tanyadragan@hotmail.com
Owners:
Nelson Geis
70 Chestnut Ave
Leeds, MA 01053
413-559-1334
nelsongeis@gmail.com
Designer:
1)Permit Set 8/28/2017
Issue:
August 28, 2017
Date:
Sheet Title:
Scale:
Scale:
A-03A-03A-03A-0352'-0"24'-0"
32'-0"
8'-0"6'-6"27'-6"
24'-0"11'-6"40'-6"2'-8"3'-4"3'-0"2'-8"
18'-6"17'-0"8"8"10"8"
2'-6"15'-6"2'-6"4'-10"
4'-6"4'-6"14'-8"8" GRADE BEAM2'-6"2'-6"8"10"10"
8"8"8"5'-8"6'-8"6'-8"T.W. 87"
T.F. 10"
WINDOW
16" X 32"T.W. 95"
T.W. 97"
T.F. 40"
3' x 5'
SHOWER PAN
EL - 95"
6'-8"7'-0"VANITY DRAIN
TOILET DRAIN 1'-6 1/2"EL. 97"
5" CONCRETE FLOOR W/ WIRE & HEAT
EL. 97"
5" CONCRETE FLOOR W/ WIRE & HEAT
EL. 13"
4" CONCRETE FLOOR
T.W. 97"
T.F. 40"
T.W. 86"
8" GRADE BEAM 24"NO HEAT
10"48"48"36"24"
NO HEAT NO HEAT13'-7"PRE-CAST BULKHEAD STAIRS
SHEA #A
51-1/2" x 60" x 60"
51 - 1/2"
N
FOUNDATION
PLAN
1/4" = 1'-0"
A-03
Xata
House
Lot 28
Beaver Brooke Estates
Leeds, MA 01053
Project Address:
Project Name:
Tanya Dragan +
Constantine Voyevidka
253-228-5356
c.voyevidka@gmail.com
tanyadragan@hotmail.com
Owners:
Nelson Geis
70 Chestnut Ave
Leeds, MA 01053
413-559-1334
nelsongeis@gmail.com
Designer:
1)Permit Set 8/28/2017
Issue:
August 28, 2017
Date:
Sheet Title:
Scale:
Scale:
A-04A-04A-04A-04
In-Law Suite/
Playroom
24'-3" x 16'-0"
Mudroom/
Entry8-3" x 6'-2"Laundry
10'-3" x 10'-2"
D
W
Utility7'-3" x 6'-2"
WC
Gallery4'-5" x 15'-2"
8'-1"5'-0"4'-0"DW
6'-0"
Living Room
22'-10" x 13'-3"
Dining Room
Kitchen
N
3'-2"3'-4"52'-0"24'-0"
UP
14'-1"
32'-4"
24'-0"
Bathroom10'-0" x 7'-0"
Elec. Panel
Bilco Bulkhead to Basement
2'-0"17'-0"27'-6"6'-6"5'-0"
4'-0"8'-0"5'-5"2'-6"14'-6"5'-6"
3'-0"7'-6"13'-4"10'-10"10'-0"10'-0"2'-10"
3'-0"
20'-6"
1'-6"20'-0"11'-0"4'-6"
5'-0"
transom above
transom above
6'-4"
01
01
02
03
0405
06
02
03 0709
10
12 13
04
15 16 17
05
06
07
08
09
Finished Square Footage
Sq Ft
Main Area 1,330
In Law 480
Second Floor 1,283
Total 3,093
Garage 960
14
06
08
11
FIRST FLOOR
PLAN
1/4" = 1'-0"
A-04
Xata
House
Lot 28
Beaver Brooke Estates
Leeds, MA 01053
Project Address:
Project Name:
Tanya Dragan +
Constantine Voyevidka
253-228-5356
c.voyevidka@gmail.com
tanyadragan@hotmail.com
Owners:
Nelson Geis
70 Chestnut Ave
Leeds, MA 01053
413-559-1334
nelsongeis@gmail.com
Designer:
1)Permit Set 8/28/2017
Issue:
August 28, 2017
Date:
Sheet Title:
Scale:
Scale:
A-05A-05A-05A-05
Master
Bedroom
9'-2" x 15'-2"
Walk In
Closet7'-0" x 8'-0"
Office
5'-6" x 15'-2"
Master
Bath10'-4" x 9'-6"
Boy's
Bath7'-4" x 9'-6"
Study
Hall
6'-0" x 15'-10"
Bedroom 1
9'-10" x 10'-0"
Bedroom 2
9'-10" x 10'-0"
Roof
Below
Deck
Below
Roof
Below
4'-5"
Dining
Below
Linen Closet
30" Door 2'-0"3'-1"24'-4"1'-10"3'-3"3'-0"3'-0"4'-3"2'-0"
DN
18
10
20
22
24
11
21
26
28
31
12
13
14
15
32
33 34 35
N
19
23
25
27
29
30
SECOND FLOOR
1/4" = 1'-0"
A-05
Xata
House
Lot 28
Beaver Brooke Estates
Leeds, MA 01053
Project Address:
Project Name:
Tanya Dragan +
Constantine Voyevidka
253-228-5356
c.voyevidka@gmail.com
tanyadragan@hotmail.com
Owners:
Nelson Geis
70 Chestnut Ave
Leeds, MA 01053
413-559-1334
nelsongeis@gmail.com
Designer:
1)Permit Set 8/28/2017
Issue:
August 28, 2017
Date:
Sheet Title:
Scale:
Scale:
A-06A-06A-06A-06
Nap Loft
Utility
Attic
Utility/ Storage
Attic
Study Hall
Below
Bedroom
Below
Office
Below
DN
36
11
37
21
38
N
ATTIC PLAN
1/4" = 1'-0"
A-06
Xata
House
Lot 28
Beaver Brooke Estates
Leeds, MA 01053
Project Address:
Project Name:
Tanya Dragan +
Constantine Voyevidka
253-228-5356
c.voyevidka@gmail.com
tanyadragan@hotmail.com
Owners:
Nelson Geis
70 Chestnut Ave
Leeds, MA 01053
413-559-1334
nelsongeis@gmail.com
Designer:
1)Permit Set 8/28/2017
Issue:
August 28, 2017
Date:
Sheet Title:
Scale:
Scale:
A-07A-07A-07A-0754'-7"26'-6"2/12 PITCH
ON THIS PORTION OF THE ROOF
4/12 PITCH
ON MAIN ROOF
2'-10"1'-6"1'-6"28'-8"2'-6"7'-0"24'-0"2'-10"
29'-8"
N
ROOF PLAN
1/4" = 1'-0"
A-07
Xata
House
Lot 28
Beaver Brooke Estates
Leeds, MA 01053
Project Address:
Project Name:
Tanya Dragan +
Constantine Voyevidka
253-228-5356
c.voyevidka@gmail.com
tanyadragan@hotmail.com
Owners:
Nelson Geis
70 Chestnut Ave
Leeds, MA 01053
413-559-1334
nelsongeis@gmail.com
Designer:
1)Permit Set 8/28/2017
Issue:
August 28, 2017
Date:
Sheet Title:
Scale:
Scale:
A-08A-08A-08A-0827'-11"1 East Elevation
Scale: 1/4" = 1'-0"
0'-0" a.f.f.
First Floor10'-0"9'-0"7'-5"10'-0" top of sub floor
Second Floor
19'-0" top of sub floor
Loft
Stained or sealed cedar
ship lap siding
Stucco or
EIFS Siding, TBD 01
01
02
21 18192023
363738
03
22
ELEVATION
EAST
1/4" = 1'-0"
A-08
Xata
House
Lot 28
Beaver Brooke Estates
Leeds, MA 01053
Project Address:
Project Name:
Tanya Dragan +
Constantine Voyevidka
253-228-5356
c.voyevidka@gmail.com
tanyadragan@hotmail.com
Owners:
Nelson Geis
70 Chestnut Ave
Leeds, MA 01053
413-559-1334
nelsongeis@gmail.com
Designer:
1)Permit Set 8/28/2017
Issue:
August 28, 2017
Date:
Sheet Title:
Scale:
Scale:
A-09A-09A-09A-09
2 South Elevation
Scale: 1/4" = 1'-0"
0'-0" a.f.f.
First Floor
10'-0" top of sub floor
Second Floor
19'-0" top of sub floor
Loft
12
4
Stucco or Eifs Siding, TBD
Stained or sealed cedar
ship lap siding
Control joint in siding as required
04
05
03
07
09
25 24
08
ELEVATION
SOUTH
1/4" = 1'-0"
A-09
Xata
House
Lot 28
Beaver Brooke Estates
Leeds, MA 01053
Project Address:
Project Name:
Tanya Dragan +
Constantine Voyevidka
253-228-5356
c.voyevidka@gmail.com
tanyadragan@hotmail.com
Owners:
Nelson Geis
70 Chestnut Ave
Leeds, MA 01053
413-559-1334
nelsongeis@gmail.com
Designer:
1)Permit Set 8/28/2017
Issue:
August 28, 2017
Date:
Sheet Title:
Scale:
Scale:
A-10A-10A-10A-10
2 West Elevation
Scale: 1/4" = 1'-0"
0'-0" a.f.f.
First Floor
10'-0" top of sub floor
Second Floor
19'-0" top of sub floor
Loft
Stained or sealed
cedar
ship lap siding
Stucco or EIFS siding
TBD
12
2
Standing Seam
Metal Roof, TYP.
06
02
10
04
26
28
3132
11
27
2930
ELEVATION
WEST
1/4" = 1'-0"
Xata
House
Lot 28
Beaver Brooke Estates
Leeds, MA 01053
Project Address:
Project Name:
Tanya Dragan +
Constantine Voyevidka
253-228-5356
c.voyevidka@gmail.com
tanyadragan@hotmail.com
Owners:
Nelson Geis
70 Chestnut Ave
Leeds, MA 01053
413-559-1334
nelsongeis@gmail.com
Designer:
1)Permit Set 8/28/2017
Issue:
August 28, 2017
Date:
Sheet Title:
Scale:
Scale:
A-11A-11A-11A-11
1 North Elevation
Scale: 1/4" = 1'-0"
0'-0" a.f.f.
First Floor
10'-0" top of sub floor
Second Floor
19'-0" top of sub floor
Loft
Stucco or EIFS Siding, TBD
Stained or sealed
cedar
ship lap siding
12
4
1213
15
1617
333435
14
ELEVATION
NORTH
1/4" = 1'-0"
Xata
House
Lot 28
Beaver Brooke Estates
Leeds, MA 01053
Project Address:
Project Name:
Tanya Dragan +
Constantine Voyevidka
253-228-5356
c.voyevidka@gmail.com
tanyadragan@hotmail.com
Owners:
Nelson Geis
70 Chestnut Ave
Leeds, MA 01053
413-559-1334
nelsongeis@gmail.com
Designer:
1)Permit Set 8/28/2017
Issue:
August 28, 2017
Date:
Sheet Title:
Scale:
Scale:
A-12A-12A-12A-12
Window Schedule
Window
Position
Location Type Rough Dimensions Operation Color Notes Vendor
Width Height
01 WC 2'-6"2'-6"Tilt Turn Black/Brown exterior White interior Paragon - Rehau Euro Design
02 Dining Room 6'-0"6'-0"Tilt Turn mulled with fixed units Black/Brown exterior White interior Paragon - Rehau Euro Design
03 Stair 2'-6"8'-0"Fixed units mulled together Black/Brown exterior White interior Paragon - Rehau Euro Design
04 Living Room 2'-8"9'-0"Tilt Turn mulled with fixed units Black/Brown exterior White interior Paragon - Rehau Euro Design
05 Living Room 10'-0"9'-0"Tilt Turn mulled With fixed units Black/Brown exterior White interior Paragon - Rehau Euro Design
06 Living Room 10'-0"9'-0"Tilt Turn mulled With fixed units Black/Brown exterior White interior Paragon - Rehau Euro Design
07 In Law Suite 9'-0"9'-0"Tilt Turn mulled with door and fixed unit Black/Brown exterior White interior (duplicated on Door Schedule)Paragon - Rehau Euro Design
08 In Law Suite 6'-0"2'-0"Fixed unit Black/Brown exterior White interior Paragon - Rehau Euro Design
09 In Law Suite 2'-0"6'-0"Tilt Turn mulled With fixed unit Black/Brown exterior White interior Paragon - Rehau Euro Design
10 In Law Suite 4'-0"6'-0"Tilt Turn mulled With fixed unit Black/Brown exterior White interior Paragon - Rehau Euro Design
11 In Law Suite 2'-0"6'-0"Tilt Turn Black/Brown exterior White interior Paragon - Rehau Euro Design
12 In Law Suite 2'-0"4'-0"Tilt Turn Black/Brown exterior White interior Paragon - Rehau Euro Design
13 In Law Suite 2'-0"4'-0"Tilt Turn Black/Brown exterior White interior Paragon - Rehau Euro Design
14 In Law Suite Bath 2'-6"2'-6"Tilt Turn Black/Brown exterior White interior Paragon - Rehau Euro Design
15 Mudroom 2'-6"2'-6"Tilt Turn Black/Brown exterior White interior Paragon - Rehau Euro Design
16 Mudroom 2'-8"9'-0"Tilt Turn mulled with fixed unit Black/Brown exterior White interior Paragon - Rehau Euro Design
17 Laundry 8'-0"2'-6"Tilt Turn mulled with fixed unit Black/Brown exterior White interior Paragon - Rehau Euro Design
18 Office 8'-0"2'-6"Tilt Turn mulled with fixed unit Black/Brown exterior White interior Paragon - Rehau Euro Design
19 Hall 8'-0"2'-6"Tilt Turn mulled with fixed unit Black/Brown exterior White interior Paragon - Rehau Euro Design
20 Hall 6'-0"6'-0"Tilt Turn mulled with fixed units Black/Brown exterior White interior Paragon - Rehau Euro Design
21 Hall 2'-6"14'-4"Fixed units mulled together Black/Brown exterior White interior Paragon - Rehau Euro Design
22 Bedroom 2 2'-6"6'-0"Tilt Turn mulled with fixed unit Black/Brown exterior White interior Paragon - Rehau Euro Design
23 Bedroom 2 5'-6"2'-6"Fixed unit Black/Brown exterior White interior Paragon - Rehau Euro Design
24 Bedroom 2 8'-0"2'-6"Tilt Turn mulled with fixed units Black/Brown exterior White interior Paragon - Rehau Euro Design
25 Bedroom 1 8'-0"2'-6"Tilt Turn mulled with fixed units Black/Brown exterior White interior Paragon - Rehau Euro Design
26 Bedroom 1 5'-6"2'-6"Fixed unit Black/Brown exterior White interior Paragon - Rehau Euro Design
27 Bedroom 1 2'-6"6'-0"Tilt Turn mulled with fixed unit Black/Brown exterior White interior Paragon - Rehau Euro Design
28 Study Hall 2'-6"2'-6"Tilt Turn Black/Brown exterior White interior Paragon - Rehau Euro Design
29 Study Hall 5'-4"2'-6"Fixed unit Black/Brown exterior White interior Paragon - Rehau Euro Design
30 Study Hall 2'-6"2'-6"Tilt Turn Black/Brown exterior White interior Paragon - Rehau Euro Design
31 Master Bath 6'-0"2'-6"Tilt Turn Black/Brown exterior White interior Paragon - Rehau Euro Design
32 Master Bedroom 8'-0"2'-6"Tilt Turn mulled with fixed unit Black/Brown exterior White interior Paragon - Rehau Euro Design
33 Master Bedroom 8'-0"2'-6"Tilt Turn mulled with fixed unit Black/Brown exterior White interior Paragon - Rehau Euro Design
34 Master Bedroom 2'-6"2'-6"Tilt Turn Black/Brown exterior White interior Paragon - Rehau Euro Design
35 Office 2'-6"6'-8"Tilt Turn mulled with fixed unit Black/Brown exterior White interior Paragon - Rehau Euro Design
36 Nap Loft 8'-0"2'-6"Tilt Turn mulled with fixed unit Black/Brown exterior White interior Paragon - Rehau Euro Design
37 Hall Transom 6'-0"2'-6"Fixed unit Black/Brown exterior White interior Paragon - Rehau Euro Design
38 Nerf Loft 8'-0"2'-6"Tilt Turn mulled with fixed unit Black/Brown exterior White interior Paragon - Rehau Euro Design
2'-6"2'-6"6'-0"4'-0"2'-0"
6'-0"4'-0"2'-0"6'-0"2'-0"4'-0"
6'-0"2'-0"4'-0"2'-6"6'-8"2'-6"4'-2"2'-6"8'-0"6'-0"2'-0"14'-4"2'-6"2'-6"3'-10"2'-0"6'-0"9'-0"2'-8"6'-6"2'-5"9'-0"3'-4"2'-4"
1'-0"
2'-0"1'-4"
10'-0"2'-0"2'-0"4'-6"3'-0"9'-0"1'-6"2'-0"
1'-0"
2'-6"3'-0"
10'-0"1'-10"2'-0"2'-4"3'-0"9'-0"2'-0"3'-4"2'-10"2'-10"
9'-0"
3'-0"6'-10"2'-0"6'-0"4'-0"2'-6"2'-0"6'-0"4'-0"2'-0"4'-0"4'-0"6'-0"4'-0"2'-0"2'-6"2'-6"
8'-0"2'-6"6'-0"
5'-6"2'-6"5'-4"2'-6"2'-0"6'-0"
A B C D E F G
H I
J
K L M N
O P
Q
R
S
Window Schedule
NTS
A-12
Xata
House
Lot 28
Beaver Brooke Estates
Leeds, MA 01053
Project Address:
Project Name:
Tanya Dragan +
Constantine Voyevidka
253-228-5356
c.voyevidka@gmail.com
tanyadragan@hotmail.com
Owners:
Nelson Geis
70 Chestnut Ave
Leeds, MA 01053
413-559-1334
nelsongeis@gmail.com
Designer:
1)Permit Set 8/28/2017
Issue:
August 28, 2017
Date:
Sheet Title:
Scale:
Scale:
A-13A-13A-13A-139'-0"1'-0"8'-0"8'-0"2'-0"16'-2"8'-7"1'-0"9'-0"7"7'-7"3'-5"Dropped ceiling to allow for
mechanical chase
from North to South
Half wall on Study Hall
side only
SECTION 1
NTS
Xata
House
Lot 28
Beaver Brooke Estates
Leeds, MA 01053
Project Address:
Project Name:
Tanya Dragan +
Constantine Voyevidka
253-228-5356
c.voyevidka@gmail.com
tanyadragan@hotmail.com
Owners:
Nelson Geis
70 Chestnut Ave
Leeds, MA 01053
413-559-1334
nelsongeis@gmail.com
Designer:
1)Permit Set 8/28/2017
Issue:
August 28, 2017
Date:
Sheet Title:
Scale:
Scale:
A-14A-14A-14A-148'-0"11'-8"4'-2"2'-6"9'-0"7'-0"4'-1"6'-7"Wall continues to ceiling only on bedroom side 7"7'-0"9'-0"1'-6"9'-0"1'-0"8'-0"7"SECTIONS 2
1/4" = 1'-0"
Sum vertical load capacitiesSHIPPING INFORMATION:
DESIGNED BY:
Doug Hodgins
JOB: Xata
Neil Homstead/XataWest Hatfield Ma.21 West St.rk Miles Inc.Scale: 1/4" = 1'NOTES:SHEET NUMBER: 1
foundation
LAYOUT
FINAL
N/AN/A
ISSUE:DATE:
N/A
N/A
07/24/17
DESCRIPTION:
FINAL
N/A
N/A
Leeds Ma.
Lot 28 Bever Brook Estate See Boise literature for joistvertical load capacity.See Boise literature for joist blockingbirdsmouth cut in bottom D2X2N2X1ST FLOOR FRAMING PLAN2X R ------- Floor Framing Material ------- Type Qty. Product Length ------ ---- ------- ------ R1 1 Spruce-Pine-Fir #2 2 x 8 16' 0" J1 13 v v 12' 0" R2 5 v v 12' 0" R3 2 v v 3' 0" Total length: 238' 0" ------- Beam & Ledger Material ------- Type Qty. Product Length ------ ---- ------- ------ G1 2 Spruce-Pine-Fir #2 2 x 8 4' 0" Total length: 8' 0"All product names are trademarks of their respective owners SO BU HROOVITITHUHHLS 23RThis layout has been created using the information from the plan provided, and/or verbal informationfrom the general contractor. r.k Miles assumes no responsibility for this layout ifaltered during construction or any of the structural members shown are not supplied by r.k. MilesIt is the responsibility of the building contractor / owner to install and / or oversee the installationof all the engineered wood components to assure compliance with the manufacturers specifications.If anychanges are made to this project after the completion of our layout contact RK Miles immediately DESIGN ASSUMPTIONS ==================== Loads: T/C Live: 40 psf B/C Live: 0 psf T/C Dead: 10 psf B/C Dead: 0 psf Load Case: Live Deflection Criteria: L/360 Live L/240 Total Building Code: IBC/IRC (Allowable Stress De Design assumes continuous lateral bracing for both edges.R1R2R2R2R2R2R3R3J116" ocG12 plyH1
Sum vertical load capacitiestotal vertical load capacity.of Boise joist & rimboard forSHIPPING INFORMATION:
DESIGNED BY:
Doug Hodgins
JOB: Xata
Neil Homstead/XataWest Hatfield Ma.21 West St.rk Miles Inc.Scale: 1/4" = 1'NOTES:SHEET NUMBER: 1
1st walls
LAYOUT
FINAL
N/AN/A
ISSUE:DATE:
N/A
N/A
07/24/17
DESCRIPTION:
FINAL
N/A
N/A
Leeds Ma.
Lot 28 Bever Brook Estate See Boise literature for joistvertical load capacity.See Boise literature for joist blocking(stacked over wall below)Load bearing wall aboveSee Boise literature forvertical load capacity.BCI Joist Blocking®birdsmouth cut in bottom D2X2ND FLOOR FRAMING PLAN2X1S2X R ------- Floor Framing Material ------- Type Qty. Product Length ------ ---- ------- ------ R1 1 Spruce-Pine-Fir #2 2 x 4 16' 0" R2 1 v v 12' 0" J1 20 v v 7' 0" R3 2 v v 7' 0" Total length: 182' 0" R4 1 1" X 11 7/8" RIM BOARD 25' 8" R5 1 v v 23' 9-1/4" R6 1 v v 3' 6" Total length: 52'11-1/4" J2 2 11-7/8" AJS 20 26' 0" J3 19 v v 24' 0" R7 1 v v 24' 0" J4 5 v v 16' 0" J5 9 v v 14' 0" R8 1 v v 14' 0" J6 6 v v 12' 0" R9 1 v v 12' 0" R10 1 v v 3' 0" Total length: 839' 0" R12 3 1" x 11-7/8" RIM BOARD 12' 0" R13 1 v v 11' 6-1/4" R14 1 v v 11' 2-1/4" R15 1 v v 2' 5" Total length: 61' 1-1/2" RXX (R/L) 11-7/8" AJS 20 2' 0" Total length: 2' 0" RXX (R/L) 1" x 11-7/8" RIM BOARD 3' 0" Total length: 3' 0" ------- Beam & Ledger Material ------- Type Qty. Product Length ------ ---- ------- ------ B11 2 Spruce-Pine-Fir #2 2 x 10 20' 0" B12 2 v v 7' 0" Total length: 54' 0" G4 1 1-3/4x11-7/8 VERSA-LAM 2.0 310 7' 0" G5 2 v v 5' 0" G6 2 v v 5' 0" G7 2 v v 16' 0" G8 2 v v 12' 0" G9 1 v v 12' 0" G10 1 v v 12' 0" G13 2 v v 6' 0" G17 2 v v 12' 0" G18 2 v v 12' 0" G24 2 v v 24' 0" Total length: 215' 0" ------- Header Material ------- Type Qty. Product Length ------ ---- ------- ------ B1 2 Spruce-Pine-Fir #2 2 x 10 7' 0" Total length: 14' 0" B2 2 1-3/4x11-7/8 VERSA-LAM 2.0 310 12' 0" Total length: 24' 0" B3 2 Spruce-Pine-Fir #2 2 x 10 10' 0" Total length: 20' 0" B14 2 1-3/4x9-1/2 VERSA-LAM 2.0 3100 12' 0" B15 2 v v 6' 0" Total length: 36' 0" B16 2 Spruce-Pine-Fir #2 2 x 10 4' 0" Total length: 8' 0" ------- Post Material ------- Type Qty. Product Length ------ ---- ------- ------ P1 6 Column by others 8' 1-1/8" Total length: 48' 6-3/4" ------- Miscellaneous Materials ------- Type Qty. Product Length ------ ---- ------- ------ XXX (R/L) 11-7/8" AJS 20 46' 0" Total length: 46' 0"All product names are trademarks of their respective owners SOBU HROOVITITHUHHLS 23RThis layout has been created using the information from the plan provided, and/or verbal informationfrom the general contractor. r.k Miles assumes no responsibility for this layout ifaltered during construction or any of the structural members shown are not supplied by r.k. MilesIt is the responsibility of the building contractor / owner to install and / or oversee the installationof all the engineered wood components to assure compliance with the manufacturers specifications.If anychanges are made to this project after the completion of our layout contact RK Miles immediately ------------- Connector List -------------ID# Qty Model Number Note Carrying mbr fasteners (top/face) Carried mbr fasteners (hip/jack) Skew Slope Top Detail----------------------------------------------------------------------------------------------------------------------------------------------------------------------------H1 2 HUS1.81/10 S 30 10dx1.5" 10 10d C15111B.pdfH2 20 LUS24 4 10d 2 10d C15076A.pdfH3 4 LSSUH310 WS 18 16d 12 10dx1.5" C15095.pdfH4 32 ITS2.56/11.88 S 2 10dx1.5" 2 Teardrops 4 10dx1.5" C15118X.pdf---------------------------------------------------------------------------------------------------------------------------------------------------------------------------- S -- Not in Inventory -- Special Order W -- Web Stiffeners required DESIGN ASSUMPTIONS ==================== Loads: T/C Live: 40 psf B/C Live: 0 psf T/C Dead: 10 psf B/C Dead: 0 psf Load Case: Live Deflection Criteria: L/360 Live L/240 Total Building Code: IBC/IRC (Allowable Stress De Design assumes continuous lateral bracing for both edges.1956lbs2317lbs6205lbs1261lbs3088lbs1257lbsRXXRXXR15R14R13R12R12R12RXXR10R9R8R7R6R5R4R3R3R2R1J616" ocJ616" ocJ516" ocJ516" ocJ516" ocJ416" ocJ416" ocJ316" ocJ216" ocJ116" ocB162 plyB152 plyB142 plyB32 plyB22 plyB12 plyB122 plyB112 plyG242 plyG182 plyG172 plyG132 plyG101 plyG91 plyG82 plyG72 plyG62 plyG52 plyG41 plyH1H1H4H4H4H4H4H4H4H4H3H2 CEILING FRAMING PLAN
Sum vertical load capacitiesSHIPPING INFORMATION:
DESIGNED BY:
Doug Hodgins
JOB: Xata
Neil Homstead/XataWest Hatfield Ma.21 West St.rk Miles Inc.Scale: 1/4" = 1'NOTES:SHEET NUMBER: 1
2nd walls
LAYOUT
FINAL
N/AN/A
ISSUE:DATE:
N/A
N/A
07/06/17
DESCRIPTION:
FINAL
N/A
N/A
Leeds Ma.
Lot 28 Bever Brook Estate See Boise literature for joistvertical load capacity.See Boise literature for joist blockingbirdsmouth cut in bottom D2X2N2X1S2X ROOF FRAMING PLAN ------- Floor Framing Material ------- Type Qty. Product Length ------ ---- ------- ------ R1 1 Spruce-Pine-Fir #2 2 x 6 28' 0" R2 2 v v 14' 0" J1 11 v v 8' 0" R4 3 v v 8' 0" Total length: 168' 0" R5 3 1" X 9-1/2" RIMBOARD 23'10" R6 1 v v 10' 2-1/2" R7 1 v v 7' 7-3/4" R8 1 v v 5'11-1/2" Total length: 95' 3-3/4" J2 14 9-1/2" AJS 20 24' 0" R9 3 v v 24' 0" R10 1 v v 12' 0" J3 1 v v 8' 0" R11 1 v v 6' 0" Total length: 434' 0" R13 1 11-7/8" AJS 25 10' 0" Total length: 10' 0" R17 2 1" x 9-1/2" RIM BOARD 10' 9-1/2" R18 1 v v 10' 4-3/4" R19 1 v v 2' 9" Total length: 34' 8-3/4" RXX (R/L) 1-3/4x7-1/4 VERSA-LAM 2.0 3100 2' 0" Total length: 2' 0" ------- Roof Framing Material ------- Type Qty. Product Length ------ ---- ------- ------ R3 14 Spruce-Pine-Fir #2 2 x 6 8' 0" Total length: 112' 0" R12 14 11-7/8" AJS 25 18' 0" R14 1 v v 8' 0" Total length: 260' 0" R15 1 1-3/4x7-1/4 VERSA-LAM 2.0 3100 26' 0" Total length: 26' 0" ------- Header Material ------- Type Qty. Product Length ------ ---- ------- ------ B1 2 Spruce-Pine-Fir #2 2 x 10 10' 0" B2 2 v v 10' 0" B3 2 v v 10' 0" B4 2 v v 10' 0" B5 2 v v 10' 0" B6 2 v v 10' 0" B7 2 v v 10' 0" B8 2 v v 12' 0" Total length: 164' 0" B9 2 1-3/4x9-1/2 VERSA-LAM 2.0 3100 7' 0" Total length: 14' 0" B10 2 Spruce-Pine-Fir #2 2 x 10 7' 0" Total length: 14' 0" ------- Post Material ------- Type Qty. Product Length ------ ---- ------- ------ P1 2 Column by others 8' 1-1/8" Total length: 16' 2-1/4" ------- Miscellaneous Materials ------- Type Qty. Product Length ------ ---- ------- ------ XXX (R/L) Spruce-Pine-Fir #2 2 x 6 26' 0" Total length: 26' 0" XXX (R/L) 9-1/2" AJS 20 26' 0" Total length: 26' 0" XXX (R/L) 11-7/8" AJS 25 24' 0" Total length: 24' 0"All product names are trademarks of their respective owners SOBU HROOVITITHUHHLS 23RThis layout has been created using the information from the plan provided, and/or verbal informationfrom the general contractor. r.k Miles assumes no responsibility for this layout ifaltered during construction or any of the structural members shown are not supplied by r.k. MilesIt is the responsibility of the building contractor / owner to install and / or oversee the installationof all the engineered wood components to assure compliance with the manufacturers specifications.If anychanges are made to this project after the completion of our layout contact RK Miles immediately CEILING FRAMING PLAN DESIGN ASSUMPTIONS ==================== Loads: T/C Live: 35 psf B/C Live: 0 psf T/C Dead: 10 psf B/C Dead: 0 psf Load Case: Snow Deflection Criteria: L/360 Live L/240 Total Building Code: IBC/IRC (Allowable Stress De Design assumes continuous lateral bracing for both edges.R1R2R2R4R4R4R5R5R5R6R7R8R9R9R9R10R11R13RXXR17R17R18R19R3R12R14R15J116" ocJ216" ocJ216" ocJ3 1" ocP1P1B12 plyB22 plyB32 plyB42 plyB52 plyB62 plyB72 plyB82 plyB92 plyB102 ply
Sum vertical load capacitiesSHIPPING INFORMATION:
DESIGNED BY:
Doug Hodgins
JOB: Xata
Neil Homstead/XataWest Hatfield Ma.21 West St.rk Miles Inc.Scale: 1/4" = 1'NOTES:SHEET NUMBER: 1
upper roof
LAYOUT
FINAL
N/AN/A
ISSUE:DATE:
N/A
N/A
07/24/17
DESCRIPTION:
FINAL
N/A
N/A
Leeds Ma.
Lot 28 Bever Brook Estate See Boise literature for joistvertical load capacity.See Boise literature for joist blockingbirdsmouth cut in bottomBCI® series.correspondingThickness perBacker block.for ventilation.Holes cutBCI® blocking2x block2'-6" horiz.2x6 one side for 240 PLF max.2x4 one side for 135 PLF max.4'-0" horiz.at 6" o.c.10d nails D2X2N2X1S2X ROOF FRAMING PLAN ------- Roof Framing Material ------- Type Qty. Product Length ------ ---- ------- ------ R1 25 16" AJS 25 26' 0" Total length: 650' 0" ------- Header Material ------- Type Qty. Product Length ------ ---- ------- ------ B1 2 1-3/4x9-1/2 VERSA-LAM 2.0 3100 10' 0" B2 2 v v 10' 0" Total length: 40' 0" B3 2 Spruce-Pine-Fir #2 2 x 10 7' 0" Total length: 14' 0" ------- Miscellaneous Materials ------- Type Qty. Product Length ------ ---- ------- ------ X1 4 16" AJS 25 11'10-1/4" XXX (R/L) v v 46' 0" XXX (R/L) v v 90' 0" Total length: 183' 5"All product names are trademarks of their respective owners SO BU HEADER & BEAM LAYOUTROOVITITHUHHLS 23RThis layout has been created using the information from the plan provided, and/or verbal informationfrom the general contractor. r.k Miles assumes no responsibility for this layout ifaltered during construction or any of the structural members shown are not supplied by r.k. MilesIt is the responsibility of the building contractor / owner to install and / or oversee the installationof all the engineered wood components to assure compliance with the manufacturers specifications.If anychanges are made to this project after the completion of our layout contact RK Miles immediately DESIGN ASSUMPTIONS ==================== Loads: T/C Live: 35 psf B/C Live: 0 psf T/C Dead: 10 psf B/C Dead: 0 psf Load Case: Snow Deflection Criteria: L/360 Live L/240 Total Building Code: IBC/IRC (Allowable Stress De Design assumes continuous lateral bracing for both edges.XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXR1B12 plyB22 plyB32 ply