Loading...
4. Ridge Support Truss from Bob Leet 13'-6"3'-3"4'-19/16"16'-2 7/16"1'-97/8"4'- 5 3 / 1 6 " 2.0E 1.75" x 11.875" LVL. HHUS410 HANGER NREAR SIDE, U410 HANGER FARSIDE. FULLY NAILED w/ 10d x 1-1/2" NAILS MSTA36 CENTER AT PEAK, FULLY NAILED w/ 10d x 1-1/2" NAILS (2) MSTA36 CENTERED ON BUTT JOINT, BOTH SIDES. FULLY NAILED w/ 10d x 1-1/2" NAILS (NOTE: OFFSET STRAPS FAR SIDE) 2.0E 1.75" x 9.25" LVL. 13'-1" 2.0E 1.75" x 5.5" LVL. 2.0E 1.75" x 11.875" LVL. APPLY 3/4" PLYWOOD BOTH SIDES w/ 8d NAILS @ 3" o.c. ALL DIRECTIONS 6'-21/2"TRUSS ELEVATION McDONOUGH SINGLE FAMILY RESIDENCE LEEDS, MA REV. PROJECT NO. SCALE DES. BY DWN. BY DATE RTL RTL 12/17/15 X15004 DWG. NO.SK-1 3/8" = 1'-0" Structural & Civil Engineering N G I EN E I G R