Loading...
006-064 Sample of drywell systemHERITAGE SURVEYS, INC~ Professional Surveyors and Engineers 241 College Hwy & Clark St, POBox 1 Southampton, Massachusetts 01073-0001 Bruce A. Coombs, President Professional Surveyor, MA, CT & VT E-mail: bruce@heritagesurveys.com Telephone (413) 527-3600 Facsimile (413) 527-8280 Website: heritagesurveys. com July 29,2015 City of Northampton Department of Public Works Attn: Douglas S. McDonald 125 Locust Street Northampton, MA 01060 RE: Beaver Brook Estates Chestnut Street Extension & Evergreen Road Northampton, MA HSI Job #3923-121106 Dear Mr. McDonald, On behalf of our client Patrick J. Melnik, we are filing an As-built Basin Plan, dated July 29, 2015 that shows modifications made to Basins IP and 3P, as well as the construction of Basins 2P -4P (basin combined), 5P and 6P and revised Drainage Calculations reflecting the current as-built data. The As-Built Stormwater Management System Drainage Calculations contains two (2) tables entitled "As- built Stormwater System vs Proposed Construction Drainage System Summary" and "Basin Volume Summary Table" which demonstrate that the modifications made to Basin #1 & 3, as well as the other basins on the site meet or exceeds the original approved design. The overall volume provided with the As-built Basins exceeds the originally proposed design and the peak discharges for the 2, 10 and 100 year storm event have been reduced from the originally proposed design. Five (5) concrete dry wells with cast iron catch basin covers have also been installed as shown on the approved plans. Three (3) dry wells have been installed in front of unit's #2-5; two (2) dry wells were installed on either side of unit #8. The dry wells are not connected into the roadway drainage system. The concrete dry wells were supplied by Arrow Concrete Products product number AC-D-250 H and were installed in stone. The detail sheet of the dry well is attached. Other dry wells will be installed for the units that have already been constructed. If you have any question regarding the above information please contact this office. Sincerely, \ ~'f .1J~ Richard P. Weisse, P.E. cc: Patrick J. Melnik (bye-mail) Carolyn Misch, Northampton Office of Planning & Sustainability (bye-mail) Louis Hasbrouck, Northampton Building Commissioner (bye-mail) AC·DRYWELL HEXAGON 560 COllEGE HIGHWAY GRANBY, CONNECTICUT 06035 (203) 653-5063 A PROD # A B C D AC-O-2S0 H 2'-10" 2'-1" 5'-8" 5'-0" AC-O-750 H 4'-0" 3'-2" 6'-6" 5'-8" AC-O-1000 H 6'-5" 5'-7" 6'-6" 5'-0" D ~ ~ 5 " t:91JIt§ ~m l:S Iala QJ 3" ];jmm mN~ 11l m 151 t§l f§! § ro §!1 g} tiirilfiJ §l§J§ 5l~ro /2l&riJ § §.§ Efl§:\ID 0mcg §§l§1 m ~~ ~l2iCE §§1§l gJ §;lID CSt!i~ t§J[§'J1§1 ii'lg\~ caJ:!jJ:a § t§:I t§l m§J~ ~ C DESIGN NOTES 1. Concrete -4000 p.s.i., 28 days 2. Reinforcement -steel wire mesh 6" x 6", 10 gao and #3 RR BAR t ! I !