Loading...
29-010 mccutcheondevelopment Email Burts Bog - Re_ building permit.pdf Louis Hasbrouck <lhasbrouck@northamptonma.gov> Re: building permit 1 message Louis Hasbrouck <lhasbrouck@northamptonma.gov> Wed, Feb 14, 2018 at 9:16 AM To: jdsan@charter.net Cc: Carolyn Misch <cmisch@northamptonma.gov>, David Roberts <droberts@northamptonma.gov> Jack, There are a number of requirements for a building permit: The zoning approvals need to be in place. I'm not sure where the process is at but after the final approvals, there's a 20 day appeal period and any pre-building permit conditions need to be satisfied. Carolyn Misch may have information about that part of the process. Water, sewer and driveway permits from the DPW need to be in place before we issue a building permit. The DPW permits take a week or two. We need complete plans, including the preliminary energy conservation plans in hand. The plan review takes about a week. You can submit the building permit application (including the fee) at any point and we can review the plans any time but the zoning and DPW requirements must be met before we give you the permit. Louis Hasbrouck City of Northampton, Town of Williamsburg (413) 587-1240 On Feb 14, 2018 8:39 AM, <jdsan@charter.net> wrote: I am considering purchasing and building a home in Northamton's Burts Bog. I have house plans drawn up in completion with a few local licensed contractors quoting me prices. Both my bank and contractor need to be assured that I can secure a building permit immediately for a lot in the third phase of Burt's Bog to lock in the current favorable bank interest rates. Would you be so kind to e-mail me the response to these questions as soon as possible. Again, can I obtain a building permit for phase three immediately and when would we be allowed to begin building? My partner may have already e-mailed you, we are eager. Thank you for your quick response. Jack Zoning determination 29-010 2017-04-13.pdf File# MP-2017-0049 APPLICANT/CONTACT PERSON TOFINO ASSOC ADDRESS/PHONE 31 CAMPUS PLAZA DRIVE PROPERTY LOCATION BURTS PIT RD MAP 29 PARCEL 010 001 ZONE THIS SECTION FOR OFFICIAL USE ONLY: ZONING FORM FILLED OUT Fee Paid Building Permit Filled out Fee Paid PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ? p TypeofConstruction: TEN OPEN SPACE RESIDENTIAL BUILDING LOTS AND OVER 100 ACRES AS PROTECTED OPEN SPACE L /) () ;oJ,?11.A~" New Construction -~.r{,)'--' ~ Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/ Statement or License 3 sets of Plans/ Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION P~E§JINTED: __ Approved ___lL_Additional permits required (see below) PLANNING BOARD PERMIT REQUIRED UNDER: §, 3S O ~ IO ' [) J ScJ Intermediate Project : Site Plan AND/OR /Special Permit with Site Plan Major Project: Site Plan AND/OR Speci~l Permit with Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § _________ _ Finding, ____ _ Special Permit ____ _ Variance* ____ _ ___ Received & Recorded at Registry of Deeds Proof Enclosed. ____ _ ___ Other Permits Required: Curb Cut from DPW --- ___ Water Availability ___ Sewer Availability ___ Septic Approval Board of Health ____ Well Water Potability Board of Health 'T~P L6 t-t s-e srz Permit from Conservation Commission --___ Permit from CB Architecture Committee ___ Permit from Elm Street Commission ____ Permit DPW Storm Water Management ~ 1~Y Signature of Building Official Date I I Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health, Conservation Commission, Department of public works and other applicable permit granting authorities. * Variances are granted only to those applicants who meet the strict standarqs ofMGL 40A. Contact the Office of Planning & Development for more information. ') \·.---:r······ ' 1, ,I \t APR O 2017 /11 ~- ( 7- c/9 Please type or print all information and return this form to the Building Inspector's Office with the $30fUingfee (check or money order) payable to the City of Northampton 1. Name of Applicant: Northampton Planning and Sustainability Address: 210 Main St, c/o Director of Planning Northampton, MA 01060 Telephone: 413-587-1265 2. Owner of Property: Tofino Associates 3. 4. 5. 6. 7. Address:31 Campus Plaza Road, Hadley, MA 01035 Telephone: 4-'-1'""'3c...:-2=5'-=6---'-0=3=2'-'-1 ________ _ Status of Applicant: Owner ___ Contract Purchaser ~XX'-<--- Lessee ___ Other (explain) _____ _ Jo Lb ocation: 0 Burts Pit Road, 29-012~001 and abutting parcels Existing Use of Structure/Property:woodland Description of Proposed Use/Work/Project/Occupation: (Use additional sheets if necessary): Ten open space residential (cluster) building lots and over 100 acres as protected open space Attached Plans: Sketch Plan Site Plan Engineered/Surveyed Plans ,.,XX..,._ __ _ 8. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO'""'XX ____ _ DON'T KNOW ___ _ YES ___ _ IF YES, date issued: _______ _ IF YES: Was the permit recorded at the Registry of Deeds? NO ___ _ DON'T KNOW ___ _ YES ___ _ IF YES: enter Book ____ _ Page _____ and/or Document# ______ _ 9.Does the site contain a brook, body of water or wetlands? NO ..,XX:.:.---- DON'T KNOW __ _ YES IF YES, has a permit been or need to be obtained from the Conservation Commission? wetlands on the open space but not on lots Obtained ______ , date issued: _______ _ W:\Documents\FORMS\original\Building-lnspector\Zoning-Pennit-Application-passive.doc '3f0 TABU fAS6 .J 350 -JO, 0 S'f!JPA (Form Continues On Other Side) 8/4/2004 10. Do any signs exist on the property? , YES ___ _ NO NO IF YES, describe size, type and location: _________________________ _ Are there any proposed changes to or additions of signs intended for the property? YES~~-NO_NO~ IF YES, describe size, type and location: _________________________ _ 11. Will the construction activity disturb (clearing, grading, excavation, or filling) over 1 acre or is it part of a common plan of development that will disturb over 1 acre? YES~ NO IF YES, then a Northampton Storm Water Management Permit from the DPW is required. 12. ALL INFORMATION MUST BE COMPLETED, or PERMIT CAN BE DENIED DUE TO LACK OF INFORMATION This column reserved for use by the Building D epartment EXISTING PROPOSED REQUIRED BY ZONING Lot Size 10 lots=3.31 acres(see plans) 117 acres Frontage 505 plus lots 505' Setbacks Front nothing developed 30' min Side L: R: L: 15' R: 15' L: R: Rear setbacks from edsre of cluster Building Height nothing developed 25' Building Square Footage nothing developed 500 to 2,800 sq. feet per lot % Open Space: (lot area minus building & paved 100% 99% for overall project parking # of Parking Spaces 20 0 # of Loading Docks 0 0 Fill: / (volume & location) small historic piles none 13. Certification: I hereby certify that the information contained herein is true and accurate to the best of my knowledge. Date: April 11, 2017 Applicant's Signature-----------------NOTE: Issuance of a zoning permit does not relieve an applicant's burden to comply with all zoning requirements and obtain all required permits from the Board of Health, Conservation Commission, Historic and Architectural Boards, Department of Public Works and other applicable permit granting authorities. W:\Documents\FORMS\original\Building-Inspector\Zoning-Pennit-Application-passive.doc 8/4/2004