Loading...
2016.02.24_CSO_8 Atwood _Project Field Report _2 308 Main Street Greenfield, MA 01301 Tel: 413 / 773-5551 Fax: 413 / 773-5552 office@joneswhitsett.com Clinical and Support Options – First Floor Build-Out Project Field Report - 2 2/24/2016 Page 1 of 3 February 24, 2016 Project: CLINICAL AND SUPPORT OPTIONS – 8 ATWOOD DRIVE FIRST FLOOR BUILD-OUT Project No.: 1512 Prepared by: George Dole, JWA Site Visit Date: February 24, 2016 RE: PROJECT FIELD REPORT Report No.: 2 ___________________________________________________________________________________________________ Project Field Report Clinical and Support Options – First Floor Build-Out, I-91 Professional Center, 8 Atwood Drive, Northampton, MA Conducted: February 24, 2016 Attendees: Travis Ward (TW), Development Associates (DA); George Dole(GD), Jones Whitsett Architects (JWA) – Field Notes by GD, JWA Item No. Action Observations 2.03 01 Progress: All metal stud wall framing is completed. Rough data and electrical wiring is complete. Rough plumbing is complete. Mechanical ductwork and insulation installation is in place. Pilgrim Interiors are on site installing drywall. Door frames are on site. 2.06 02 Schedule: Drywall is scheduled to be completed by the end of Monday. The rest of the next week will be taping the drywall. Then ceiling grids will be installed and lighting and ductwork installation at the ceiling. Fire and life safety wiring will follow. . 2.03 03 Ceiling Heights: Dave from Pilgrim Interiors reviewed ceiling heights with TW and GD. Dave noted some mechanical equipment is at 9’-4’ above the finish floor, as a result the goal will be keep the ceiling as high as possible, should be able to attain 9’-0” above finish floor at all offices and open workspace. The existing exterior window heads are at +9’-4”. There will be drywall head return at each window head to transition from the window to the drop ceiling. This detail will match the typical finish at the upper floors of 8 Atwood. Typical drywall return at window head – 3rd floor of 8 Atwood 2. 04 Lighting: Light fixtures will have T-5 bulbs set in 2 x 4 ceiling light fixtures. 308 Main Street Greenfield, MA 01301 Tel: 413 / 773-5551 Fax: 413 / 773-5552 office@joneswhitsett.com Clinical and Support Options – First Floor Build-Out Project Field Report - 2 2/24/2016 Page 2 of 3 2. 05 Toilet #2 – Door Layout: Dave from Pilgrim, TW and GD reviewed the layout of the entry door to Toilet Room 110. The current metal stud framing will need to be adjusted. The chase around the plumbing clean-out at the north side will need to be reduced, and the door location will need to be moved toward the south, up to 12” to allow for accessible clearance within the restroom. Per AAB 521, the nose of the sink must be a minimum of 12” from the door opening (see attached drawing from AAB 521, 30.7.1) The General Contractor shall coordinate with the plumbing contractor to determine the specifications for the lavatory sink to be installed at Toilet Room #2 – 110, and move the door as far to the south as possible without infringing on the 12” clearance required per AAB 521. Existing layout of chase and door opening at Toilet #2 – Room 110 2.06 06 As-Builts: Terry C. is keeping updated As-Built drawings, detailing plumbing layouts, etc. as the work progresses. Copies to be available for Owner upon completion of project, for record storage. Ongoing. 2.06 07 Next Meetings: As needed. 308 Main Street Greenfield, MA 01301 Tel: 413 / 773-5551 Fax: 413 / 773-5552 office@joneswhitsett.com Clinical and Support Options – First Floor Build-Out Project Field Report - 2 2/24/2016 Page 3 of 3 View of drywall installation at Open Office 101, looking South Plumbing wall at Toilet Room #1, Room 115 cc email: Louis Hasbrouck, Building Commissioner, City of Northampton, Karin Jeffers, Joanne Jackson, CSO; Travis Ward, Terry Cripps, Development Associates, Margo Jones, Kristian Whitsett, George Dole, Jones Whitsett Architects