Loading...
39-041 (6) 23 ATWOOD DR BP-2019-0037 GIs#: COMMONWEALTH OF MASSACHUSETTS Map:Block:39-041 CITY OF NORTHAMPTON Lot:-001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category:renovation BUILDING PERMIT Permit# BP-2019-0037 Project# JS-2017-001642 Est.Cost: $700000.00 Fee: $400.00 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor., License: Use Group: DEVELOPMENT ASSOCIATES 075752 Lot Size(sq.ft. : 2� 17800.00 Owner: ATWOOD DRIVE LLC Zoning: GB Applicant. DEVELOPMENT ASSOCIATES AT. 23 ATWOOD DR Applicant Address: Phone: Insurance: P O BOX 528 (413)789-3720 WC AGAWAMMA01001 ISSUED ON.9/26/2018 0:00:00 TO PERFORM THE FOLLOWING WORK.-INTERIOR FIT OUT FOR NORTHAMPTON FAMILY PROBATE COURT POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 9/26/2018 0:00:00 $400.00 212 Main Street,Phone(413)587-1240,Fax:(413)587-1272 Louis Hasbrouck—Building Commissioner File#BP-2019-0037e i +;UFp R APPLICANT/CONTACT PERSON DEVELOPMENT ASSOCIATES ADDRESS/PHONE P O BOX 528 AGAWAM (413)789-3720 s P PROPERTY LOCATION 23 ATWOOD DR MAP 39 PARCEL 041 001 ZONE GB THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION-CHECKLIST ENCLO REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Buildina Permit Filled out Fee Paid Typeof Construction: INTERIOR FIT OUT FOR NORTHAMPTON FAMILY PROBATE COURT New Construction Non Structural interior renovations Addition to Existing Accesso1y Structure Building Plans Included: Owner/Statement or License 075752 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INF,QRMATION PRESENTED: Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management Demolition Delay 9218 Signature of Building Official Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. R E C E I V ED Version 1.7 Commercial Building Pcnnit May 15,2000 Department use only UL - 6 2018 City of Northampton Status of Permit: Building Department Curb Cut/Driveway Permit 212 Main Street Sewer/Septic Availability DEPT OF BUILDING INSPECTIONS Room 100 WaterMell Availability NOI tTHAMPTON.MA 01060 Northampton, MA 01060 Two Sets of Structural Plans phone 413-587-1240 Fax 413-587-1272 Plot/Site Plans Other Specify APPLICATION TO CONSTRUCT, REPAIR,RENOVATE,CHANGE THE USE OR OCCUPANCY OF,OR DEMOLISH ANY BUILDING OTHER THAN A ONE OR TWO FAMILY DWELLING 6P 14-37 SECTION 1 -SITE INFORMATION 1.1 Property Address: This section to be completed by office Atwood Drive Map 3q Lot Unit 4 / Northampton,MA 01060 Zone Overlay District Elm St.District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: Northwood Development,LLC P.O. Box 528 Name(Print) Susan O'Leary Mulhern,Managing Partner Current Mailing Address: Agawam, MA 01001 Signatu — Telephone 413-789-3720 2.2 Authorized Agent: Travis P.Ward as agent for er P.O.Box 528 Name(Print) Current Mailing Address: Agawam,MA 01001 Signature Telephone 413-789-3720 SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by permit applicant 1. Building $700,000.00 (a)Building Permit Fee 2. Electrical (b)Estimated Total Cost of Construction from 6 3. Plumbing Building Permit Fee 4. Mechanical(HVAC) 40- 5.Fire Protection 6. Total=0 +2+3+4+5) $700,000.00 Check Number This Section For Official Use Only Building Permit Number Date Issued Signature: Building Commissioner/Inspector of Buildings Date _. .,. ? 1 .. ...__..._a ._. S 1 d '';s'; J�)+a � Y 1 1 .``.. � { I '~ ' h� Versionl.7 Commercial Building Permit May 15,2000 SECTION 4-CONSTRUCTION SERVICES FOR PROJECTS LESS THAN 35,000 CUBIC FEET OF ENCLOSED SPACE Interior Alterations ❑ Existing Wall Signs ❑ Demolition❑ Repairs❑ Additions ❑ Accessory Building❑ Exterior Alteration ❑ Existing Ground Sign❑ New Signs❑ Roofing❑ Change of Use❑ Other❑ Brief Description Enter n brief descriptiZf- ozd ere. ,,/ ) Of Proposed Work: r► r1,01-descriptio 1Ji'/ /Vd�� SECTION 5-USE GROUP AND CONSTRUCTION TYPE fes' USE GROUP(Check as applicable) CONSTRUCTION TYPE A Assembly ❑ A-1 ❑ A-2 ❑ A-3 ❑ 1A ❑ A-4 ❑ A-5 ❑ 1B ❑ B Business ❑ 2A E Educational ❑ 2B F Factory ❑ F-1 ❑ F-2 ❑ 2C ❑ H High Hazard ❑ 3A ❑ Institutional ❑ 1-1 ❑ 1-2 ❑ 1-3 ❑ 3B ❑ M Mercantile ❑ 4 ❑ R Residential ❑ R-1 ❑ R-2 ❑ R-3 ❑ 5A ❑ S Storage ❑ S-1 ❑ S-2 ❑ 5B ❑ U Utility ❑ Specify: M Mixed Use ❑ Specify:F S Special Use ❑ Specify:% -- — —�—�--------- _--�� COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATIONS,ADDITIONS AND/OR CHANGE IN USE Existing Use Group: —.__.__ ___—___ _—_.__._._.._._...____..-_) Proposed Use Group: Existing Hazard Index 780 CMR 34): _ --- _ — Proposed Hazard Index 780 CMR 34): SECTION 6 BUILDING HEIGHT AND AREA BUILDING AREA EXISTING PROPOSED NEW CONSTRUCTION OFFICE USE ONLY Floor Area per Floor(sf) st 1.c 2nd 7' 2 !........... _.__.__._.._..._....._._.._._.._....._.__. 3rd ! 3rd 4" C--------__ i -- ---'---- '-- -'- -- ----- Total Area(sf) Total Proposed New Construction.-(§A- Total Height(ft) ,7Total Height ft r--- ---- 7. .Water Supply(M.G.L.c.40,§54) 7.1 Flood_Zone_Information: 7.3 Sewage Disposal System: Public ❑ Private ❑ ZoneOutside Flood 2one❑ Municipal ❑ On site disposal system❑ i Version 1.7 Commercial Building Permit May 15,2000 8. NORTHAMPTON ZONING Existing Proposed Required by Zoning This column to be rilled in by Building Department LotSize -_-- _. - .._...__.---.-_._ I__—_—_._ _.__--� I_—_—•�-._—^� Frontager---- Setbacks Front `___i f Side R:= L:I__.__.j R:I. Rear --- ,_-_BBuilding Height r------ Bldg. ldg.Square Footage -- % --! Open Space Footage _ % (Lot area minus bldg&paved parking) #of Parkine Spaces C----� Fill: (volume&Location) ---.__._..._._._._._........-----_-_ -------._.-_-------------..11_..._--_.--____—_..—i A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO 0 DONT KNOW ® YES 0 IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO Q DONT KNOW Q YES Q - IF YES: enter Book A Paged — and/or Document#F B. Does the site contain a brook, body of water or wetlands? NO O DONT KNOW Q YES Q IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained O Obtained © , Date Issued: l -] C. Do any signs exist on the property? YES OX NO IF YES, describe size, type and location: ( Former Clarion sign-east end of property D. Are there any proposed changes to or additions of signs intended for the property? YES 0 NO ®X IF YES, describe size, type and location: Not at this time E. Will the construction activity disturb(clearing,grading,excavation,or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES 0 NO Q IF YES,then a Northampton Storm Water Management Permit from the DPW is required. Jul 0418,M02p Brittany 17159520957 p.2 To: Page 3 of 3 2018-07-03 23:11:31 (GMT) 1 71 595 209 57 Frcm: Brittany Mielke Versionl.7 Commercial Building Permit May 15.2000 SECTION 9-PROFESSIONAL DESIGN AND CONSTRUCTION SERVICES-FOR BUILDINGS AND STRUCTURES SUBJECT TO CONSTRUCTION CONTROL PURSUANT TO 760 CMR 116(CONTAINING MORE THAN 35,000 C.F.OF ENCLOSED SPACE) 9.1 Registered Amhited. 8emard M_Schenkelberg - Not Applicable D ----`- --_ -� 6542 - I One Monarch Place,Suite 2540,Vrield,MA 01144 — —� Registration Number Address X09 PtjQ. WA 4REGM11FA4. - `� 152 D)662.2001 Telephhonone ^1 E<plratiera r Deto a-_.__.._ - ._..._ a Sign a 9.2 Reglstemd ProhnWoral EAglrmr(s): i Name - - ----- - - - - Area ofResponsibtdy -- - r I Address Registration Number SignaAra Telephone Erptradon Date - -- Name- ----- - -- -- - -------- - - Area of Respanelbgay -- Address -- ------ -- -- - Re&Wbn Number Stgnalure Telephone Expira6on Date Name Area of Respansibady Address Registration Number Stgrmwra �Te- one-- Ex0ratlon Date - Name Area of Respansliitty Address Registration Number Signature I 7elq h Expoagat Date 9.0 General Contractor Development Assoc�tes �_- ---_+ � Not Applicable❑ Company Name: —--- - - ---- _ LTravis P.ward ResponslbleInCharge ofConstructbn 200 Silver St.,Suite 201,Agawam,MA 02001 — — Addreas (413)789-372(1 _I Slgnahue Telephone Versionl.7 Commercial Building Permit May IS,2000 SECTION 10-STRUCTURAL PEER REVIEW(780 CMR 110.11) Independent Structural Engineering Structural Peer Review Required Yes Q No SECTION 11 -OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT Northwood Development, LLC/Susan O'Leary Mulhern, Managing Partner I, , as Owner of the subject property hereby authorize Travis P.Ward to act on my behalf, in al atters relative to wor authorized by this building permit application. June 29,2018 Si a of Owner Date Travis P.Ward as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the_pains..and-penalties of perjury. Travis P.Ward,as ag for ner Print Na • June 29,2018 Signature 6f Owner/Agent Date SECTION 12-CONSTRUCTION SERVICES 10.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder: Travis P.Ward CS-075752 License Number 32 Columbia Drive eedi Hills,MA 01030 May 19,2019 Addrs Expiration Date (413)789-3720 Signaturtt Telephone SECTION 13-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,g 25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes (2) No Q City of Northampton 212 Main Street, Northampton, MA 01060 Solid Waste Disposal Affidavit In accordance of the provisions of MGL c 40, S54, I acknowledge that as a condition of the building permit all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL c 111, S 150A. Address of the work: 15 Atwood Drive The debris will be transported by: USA Hauling The debris will be received by: USA Hauling Building permit number: Name of Permit Applicant Northwood Dev ent,LLC June 29,2018 , Date Signature of Permit Applicant '\ The Commonwealth of Massachusetts Department of Industrial Accidents a 1 Congress Street,Suite 100 Boston,MA 02114-2017 www mass.gov/dia Workers'Compensation Insurance Affidavit:Builders/Contractors/Electricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. Applicant Information Please Print Legibly Name(Business/Organization/Individual): Development Associates Address: 200 Silver St.,Suite 201,P.O.Box 528 City/State/Zip: Agawam,MA 01001 Phone#: (413)789-3720 Are you an employer?Check the appropriate box: Type of project(required): 1.1@ 1 am a employer with 5 employees(full and/or part-time).* 7. ®New construction 2.n 1 am a sole proprietor or partnership and have no employees working for me in 8. ❑Remodeling any capacity.[No workers'comp.insurance required.] 9. El Demolition 3.❑1 am a homeowner doing all work myself.[No workers'comp.insurance required.]t 10[]Building addition 4.[—]l am a homeowner and will be hiring contractors to conduct all work on my property. 1 will ensure that all contractors either have workers'compensation insurance or are sole I I.❑Electrical repairs or additions proprietors with no employees. 12.E]Plumbing repairs or additions 5.a 1 am a general contractor and I have hired the sub-contractors listed on the attached sheet. 13.� p Roof repairs These sub-contractors have employees and have workers'comp.insurance.: 6Q We are a corporation and its officers have exercised their right of exemption per MGL c. 14.[:]Other 152,§1(4),and we have no employees.[No workers'comp.insurance required.] 'Any applicant that checks box#I must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. tContractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: Great American Insurance Company Policy#or Self-ins.Lic.#: WC 1130018 02 Expiration Date: 04/13/19 Job Site Address: 15 Atwood Drive City/State/Zip:Northampton,MA 01060 Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under MGL c. 152,§25A is a criminal violation punishable by a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify and a pa' s and penalties of perjury that the information provided above is true and correct. Si nature: f� Date: June 29,2018 Phone#: (413)789-3720 Official use only. Do not write In this area,to be completed by city or town officiaL City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: City of Northampton _ Massachusetts DEDARTMaaYZ OP AUrLDING XNSFECTIONS 7 212 Main Street • Municipal Building Northanspton, HA 01060 `^a INSPECTOR Louis Hasbrouck Fax:413-587-1272 Chuck Miller Building Commissioner Phone:413-567-1240 Assistant Commissioner CONSTRUCTION CONTROL DOCUMENT (For profeaeeional Engineers/Architects responsible for Entire Project) Project Title; !CL1" TM _C& Date: Project Location: lam' iyrlvelierp jam._ Map: Parcel,,_Zone: Scope of Project: -5V M-21;12 4 !® AV_ In accordance with the Eighth edit.on assachusetts State Building Code,780 CMR Section 107.6; I, CMass. Registration# CT Being a registered professional Engineer/Architect hereby CERTIFIES that 1 have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: A0CJJ1rWPA 1- 0-Wel I 1 ENTIRE PROJECT 5r .PC. 4rV19k QR 9y s7/egS For the above named project and that to the best of my knowledge,such plans,computations and specifications meet the applicable provisions of the Massachusetts State Building Code,all acceptable engineering practices and all applicable Laws for the proposed project. Furthermore, I understand and AGREE that I shall perform the necessary professional services to determine that the above mentioned portions of the work proceed in accordance with the documents approved for the building permit and shall be responsible for the following as specified in Section 107.6.2.2' 1. Review of shop drawings,samples and other submittals of the contractor as required by the construction documents as submitted for the building permit, and approval for the conformance to the design concept. 2. Review and approval of the quality control procedures for all code-required controlled materials, 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine, in general, if the work is being performed In a matter consistent with the construction documents, I shall submit periodically, in a form acceptable to the building official,o'progress report together with pertinent comments. Upon completion of the work, l shall submit to the building official a final report as to the satisfactory completion and readiness of the project for occupancy. \A OF M4S. Slgna4 and Seal of Registered Pr esslonal �y�,,.'•'� 6CHfN��•.,•3% sz Z'� O GDay of l/`�� 20 °° #6542 S�AED AA Initial Construction Control Document Z To be submitted with the building permit application by a Registered Design Professional �7 for work per the 91h edition of the Y 'rr Massachusetts State Building Code, 780 CMR, Section 107 Project Title: Massachusetts Trial Court—Atwood Building 3 Date: September 7,2018 Property Address: 15 Atwood Drive,Northampton,MA Project: Check(x)one or both as applicable: New construction X Existing Construction Project description: Interior renovations to the first floor and second floor levels for the new trial court and related support office spaces. I Robert J. Figuerido MA Registration Number: 29029 Expiration date: June 30, 2020,am a registered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning': Architectural Structural Mechanical Fire Protection X Electrical X Other: Fire alarm for the above named project and that to the best of my knowledge, information,and belief such plans,computations and specifications meet the applicable provisions of the Massachusetts State Building Code,(780 CMR),and accepted engineering practices for the proposed project. I understand and agree that I(or my designee)shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official, l shall submit field/progress reports(see item 3.)together with pertinent comments, in a form acceptable to the building official. Upon completion of the work, I shall submit to the building official a `Final Construction Control Document'. TH OF Enter in the space to the right a"wet"or O�y�oBE S electronic signature and seal: RTi y FIGUERIDO ELECTRICAL No.29029 Phone number: 508.757.7793 Email: bobf@shepherdengineeringinc.com ��'i�s��tSTER� ��`<• aA Building Official Use Only Building Official Name: Permit No.: Date: Note 1.Indicate with an`x'project design plans,computations and specifications that you prepared or directly supervised.If`other'is chosen, provide a description. Version 06 I 1 2013 SHEPHERD ENGINEERING, INC. 1308 GRAFTON STREET• WORCESTER,MA 01604•(508)757 7793 •FAX: (508)753 2309 Massachusetts Trial Court—Atwood Building 3 September 7,2018 First Floor and Partial Second Floor 15 Atwood Drive Northampton, MA 780 CMR 907.1.1 - Fire Protection Construction Documents ��,Z9OF,�s o� ROBERT 1. a. Basis(methodology)of design o FIGUERIDO R, Z_5 ELECTRICAL -i Section 1 -Building Description No-29029 o•29029 ti Use Group Business`B"; 1-4(Cell Area) �•FSG�gTER�� F�4 Three story—66,123 sq-ft N Construction type IIB Tier 1 Construction Documents for the fire protection systems—fire alarm and signaling devices are designed and submitted by Shepherd Engineering, Inc., which will serve as the Engineer of Record for the design pertaining this project. Shepherd Engineering, Inc. will be responsible for reviewing Tier 2 shop drawings provided by the installing contractor prior to the application for the installation permit. Tier 2 documents shall include all installation drawings for the new fire alarm, system calculations and system operation/programming sequence as required by 780 CMR 901.2 and related NFPA standards. Shepherd Engineering, Inc. will be responsible for reviewing the final Tier 3 record documents including as-built, test and inspection records and record of completion prior to the request for final acceptance of the system design. Section 2 -Applicable Laws,Regulations and Standards 0 780 CMR 9th Edition Massachusetts State Building Code. o NFPA72-2013 edition standards. o Sections of M.G.L. 148—Fire Prevention. o Sections of 527 CMR—Fire Prevention Regulations. o Approved local by-laws or ordinances—Section 2-08 Alarm Systems. o Northampton Fire Department Fire Alarm Rules and Regulations o Northampton Fire Department Final Occupancy Documentation Requirements o Northampton Fire Department Graphic Elements Requirements Section 3 -Design Responsibility for Fire Protection Systems Shepherd Engineering, Inc. 1308 Grafton Street Worcester, MA 01604 (508)757-7793 Robert J. Figuerido MA PE# 29029 Massachusetts Trial Court-Atwood Drive—Building 3 Page 1 i i SHEPHERD ENGINEERING, INC. 1308 GRAFTON STREET- WORCESTER,MA 01604-(508)757 7793 -FAX: (508)753 2309 Section 4-Fire Protection Systems Being_Installed Installation of new addressable monitored fire alarm devices to protect the entire first floor and partial second floor of the existing three story office facility in its entirety. The system shall be wired — Class X wired (Class A, style 6) for both initiating and notification appliance circuits. All wiring shall be fire alarm rated MC-FPLP style cable. The building will be fully sprinklered utilizing a wet system. Devices shall be installed to meet the requirements of ADA/AAB and NFPA-72 (2013). Section 5 -Features Used in the Design Methodology Building occupants will be notified of an alarm condition through the use of audio/visual units, individually, by space. Upon completion of the fire alarm system, the manufacturer or a factory trained technician shall test the system devices as outlined in NFPA 72 - 2013, edition and 780 CMR, 9th edition, Massachusetts State Building Code, Chapter 9 as required. In addition, all alarms and trouble conditions will sound at the fire alarm control panel until acknowledged and reset. Section 6- Special Consideration and Description 1. b. Sequence of Operation Section 1: Upon the activation of a manual pull station,system smoke detector, system heat detector or a sprinkler flow wet switch, the following shall occur: a. The alarm LED and audible signal on the fire alarm panel shall flash and the panel shall display the device in alarm. b. The CPU shall record the alarm event and provide the device name,type and location on the Alphanumeric Display. C. All fire alarm horn/strobe notification devices throughout the entire facility shall be activated. d. The LCD annunciator located in the front entrance vestibule shall display the device name,type and location of the device. e. The elevator will recall to the scheduled floor. f. All air handling unit shall be shutdown. g. The exterior strobe shall flash. h. Fire department shall be notified via the Approved Monitoring System as adopted by the Town of Northampton. Upon the activation of a sprinkler system tamper switch,the following shall occur: a. Trouble shall be annunciated on the fire alarm panel requiring acknowledgement and investigation. The U.L.approved central monitoring station shall receive transmission that a sprinkler tamper is in alarm. The alarm condition will not be transmitted to the fire department. The electric bell for the sprinkler must ring on flow only regardless of the Massachusetts Trial Court-Atwood Drive— Building 3 Page 2 SHEPHERD ENGINEERING INC. 1308 GRAFTON STREET•WORCESTER,MA 01604•(508)757 7793 •FAX: (508)753 2309 condition of the fire alarm panel. b. Actuate common supervisory signal indicator. c. Actuate common supervisory signal. d. Display/print change status. e. Activation of the tamper switches shall initiate a supervisory signal per 780 CMR-903. Upon the activation of a duct smoke detector,the following shall occur: a. All fire alarm visuals within the building of alarm shall be activated. b. All fire alarm horns within the building of alarm shall be activated. C. HVAC units shall be shutdown as required. b. Smoke detectors shall have alarm verification. C. Northampton Fire Department will be notified via the approved monitoring system supporting the facility. Upon the activation of a carbon monoxide detector,the following shall occur: a. Trouble shall be annunciated on the fire alarm panel requiring acknowledgement and investigation. The alarm condition will be transmitted as a supervisory signal per the definitions of alarm signals in NFPA 72-2013. Upon the activation of an elevator recall smoke detector,the following shall occur: a. The alarm LED and audible signal on the fire alarm panel shall flash and the panel shall display the device in alarm. b. The CPU shall record the alarm event and provide the device name,type and location on the Alphanumeric Display. C. All fire alarm horn/strobe notification devices throughout the entire facility shall be activated. d. The LCD annunciator on the second floor shall display the device name, type and location of the device. e. All air handling unit shall be shutdown. f. The exterior strobe shall flash. g. Fire department shall be notified via the U.L. Approved Monitoring Station. h. A signal shall be sent to the elevator controller to relocate the elevator per the following: If the alarmed detector is on any floor other than the first floor, the elevator cab shall be recalled to the first floor. => If the alarmed detector is on the first floor, the elevator cab shall be recalled to the second floor or as determined by the local authority having jurisdiction. The alarm activation of the elevator machine room smoke detector shall cause the elevator cab to be recalled to the second floor or as determined by the local authority having jurisdiction. 2. Building and site access— 3. Fire hydrants— Massachusetts Trial Court-Atwood Drive—Building 3 Page 3 �I SHEPHERD ENGINEERING, INC. 1308 GRAFTON STREET• WORCESTER,MA 01604•(508)757 7793 •FAX: (508)753 2309 4. Type/description and design layout of the automatic sprinkler system— 5. Automatic sprinkler systems control equipment— 6. Type/description and design layout of the automatic standpipe system— 7. Standpipe hose valves— 8. Fire department siamese connections— 9. Type/description and design layout of the fire protective signaling system Project includes installation of new double action manual pull stations to be installed at the egress doors and entrance to stairwells throughout the common areas egressing the building. ADA compliant audio/visual appliances. The audible/visual notification appliances shall meet the requirements of ADA. The audible appliances shall have a sound level at least 15 dBA above the average ambient sound level or 5 dBA above the maximum sound level having a duration of at least 60 seconds, whichever is greater, measured 5 feet above the floor. All audible/visual notification appliances shall be mounted 80 inches above the finished floor to the bottom of the devices. Audible/visual and visual notification appliances located on the ceiling, shall be rated for the application and allow for a 360 degree visual. Visual only devices will be installed within the toilet rooms. Photo-electric smoke detectors in common corridors outside of the cell areas, storage rooms. Existing within the elevator machine room, elevator lobby's, stairwells, main electric room and above the fire alarm control panel and remote notification appliance circuit panels. Each device shall be labeled with the address device. Duct smoke detectors will be installed within the rooftop air handler units, remote test switch controls will be located in accordance with the Town of Northampton Fire Department requirements. Labeling of the roof top units and related duct smoke detectors shall be clear and easily decipherable "chain of labeling". The labeling shall have the same address throughout and identify the associated air handling unit. Each label shall indicate the specific location of the detector. Labels shall be at the following locations. • On the fire alarm panel display when in alarm • On the remote test indicator. • On the ceiling grid(if applicable) • On the detector cover. • The AHU shall also be clearly labeled on the units regardless of smoke detectors. Remote beacon located on the exterior of the facility - existing. Fire fighters key box located on the exterior of the facility adjacent to the main entrance - existing. Each key located within the key box are to be clearly labeled. Keys are to be included on one key ring. The fire alarm panel batteries are Massachusetts Trial Court-Atwood Drive—Building 3 Page 4 SHEPHERD ENGINEERING, INC. 1308 GRAFTON STREET- WORCESTER,MA 01604-(508)757 7793 -FAX: (508)753 2309 to be labeled with the date of installation. 10. Fire protective signaling system control equipment and remote annunciator location The existing main fire alarm signaling control equipment will be located in the main vestibule 101. "Call fire department prior to any work at (413) 587-1032" shall be labeled inside of the fire alarm control panel. 11. Type/description and design layout of the smoke control or exhaust system— 12. Smoke control system control equipment location— 13. Building life safety system feature integrated into fire protective signaling system See 9. & 10. 14. Type/description and design layout for the fire extinguishing systems— 15. Fire extinguishing system control equipment location— 16. Fire protection system room location- 17. Fire protection systems alarm/supervisory signal transmission method and location The existing fire alarm control panel is capable of multiple 24VDC-power outputs. All auxiliary manual controls are supervised so that all switches must be returned to the normal automatic position to clear system trouble. Each independently supervised circuit shall include discrete panel readout to indicate disarrangement conditions per circuit. The incoming power to the system shall be supervised so that any power failure must be audibly and visually indicated at the control panel. A green "power on" LED shall be displayed continuously while incoming power is present. The System Expansion Modules shall be electrically supervised for module placement. Should a module become disconnected from the controls, the system trouble indicator must illuminate and audible trouble signal must sound. The system shall contain multiple supervised signaling line circuits. The alarm activation of any initiation circuit shall not prevent the subsequent alarm operation of any other initiation circuit. There shall be independently supervised and independently fused indicating appliance circuits for alarm horns and flashing alarm lamps. Disarrangement conditions of any circuit shall not affect the operation of other circuits. The system shall have provisions for disabling and enabling all circuits individually for maintenance or testing purposes. 18. Testing Criteria to be used for final system acceptance The general contractor has overall responsibility for setting up and coordinating all acceptance testing with authorities having jurisdiction. All testing will be in accordance with NFPA Massachusetts Trial Court-Atwood Drive—Building 3 Page 5 SHEPHERD ENGINEERING, INC . 1308 GRAFTON STREET• WORCESTER,MA 01604•(508)757 7793 •FAX: (508)753 2309 requirements, the Massachusetts State Building Code, 9th Edition, the NFPA National Electrical Code,and the contract specifications. The completed system will be subject to the final test and acceptance, UL certification and periodic inspection and testing, and the Massachusetts State Building Code, NFPA 72 and all authorities having jurisdiction as follows: • The test shall be conducted by a UL certified testing company. Each and every device within the area of renovation shall be functionally tested. • Upon function test of each device, the corresponding programmed event sequences shall be verified. Subsequent events shall include occupant notification, system annunciation, elevator recall, HVAC control sequences, door release,and Proprietary Station reporting. • Proper visual notification shall be verified. • Audible sound pressure levels shall be measured and recorded. • Fault conditions shall be simulated and verified as to their proper reporting and system response. These shall include loss of AC power, and wiring faults of each and every circuit. • A complete report demonstrating the activation and subsequent acknowledgement of each activation shall be generated. The final system acceptance test shall be conducted by the holder of the test contract, and witnessed by the local authority having jurisdiction. Upon successful test and acceptance, a final report and certificate of compliance shall be issued by the testing company. Testing and inspection shall be conducted by the testing company of record as described and in accordance with NFPA 72. In addition to device testing, maintenance(sensitivity)reports shall be generated directly from the system during each quarterly test. These reports shall include a complete listing of each analog device in the system, their corresponding programmed sensitivity setting, and their current sensitivity level and the number of times each device has entered alarm verification mode. Section 2—Equipment and Tools FIRE ALARM SYSTEM The Electrical Contractor shall provide all tools necessary to complete the successful testing of the Fire Alarm systems. END OF NARRATIVE Massachusetts Trial Court-Atwood Drive—Building 3 Page 6 17W., COMcheck Software Version 4.0.8.1 Interior Lighting Compliance Certificate Project Information Energy Code: 2015 IECC Project Title: Build Out For MA Trial Court Project Type: New Construction Construction Site: Owner/Agent: Designer/Contractor: 15 Atwood Dr. Shepherd Engineering Inc. Northampton, MA 1308 Grafton Street Worcester, MA 01604 Additional Efficiency Package(s) 5087577793 Unspecified Allowed Interior Lighting Power A B C D Area Category Floor Area Allowed Allowed Watts (ft2) Watts/ft2 (B X C) 1-Court House 23640 1.01 23876 Total Allowed Watts= 23876 Proposed Interior Lighting Power A B C D E Fixture ID : Description/Lamp/Wattage Per Lamp I Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. 1-Court House LED 1:A:LED Other Fixture Unit 36W: 1 160 33 5216 LED 2:AE: LED Other Fixture Unit 36W: 1 26 33 848 LED 3:AEO:LED Other Fixture Unit 36W: 1 5 33 163 LED 4: B: LED Other Fixture Unit 36W: 1 5 29 147 LED 5:BE:LED Other Fixture Unit 36W: 1 8 29 235 LED 6:BEO:LED Other Fixture Unit 36W: 1 4 29 118 LED 7:C: LED Other Fixture Unit 28W: 1 20 28 552 LED 8:D: LED Other Fixture Unit 46W: 1 1 41 41 LED 9:G: LED Other Fixture Unit 40W: 1 4 38 152 LED 10: H:LED Other Fixture Unit 36W: 1 34 35 1190 Total Proposed Watts= 8661 Interior Lighting PASSES: Design 64% better than code Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting design represented in is cu n s consistent with the building plans, specifications, and other calculations submitted with this plicatio T prop inte ' ghting systems have been design d to meet the 2015 IECC requirements in CO eck Versio nd to ply w' an applicable m da ry requi men li ed ' t Inspec ' n Checklist. ame-Title Signat Date C/ zEflf?X l- Project Title: Build Out For MA Trial Court Report date: 09/11/1 Data filename: C:\Users\Robert\Documents\COMcheck\Northampton Courthouse 9.11.2018.cck Page 1 of COMcheck Software Version 4.0.8.1 Inspection Checklist Energy Code: 2015 IECC Requirements: 0.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section ------- # Plan Review mplies? Comments/Assumptions & Re .ID _ C103.2 Plans,specifications, and/or Complies [PR4]1 calculations provide all information ❑Does Not with which compliance can be determined for the interior lighting ❑Not Observable and electrical systems and equipment ❑Not Applicable and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations, wattage of bulbs and ballasts,transformers and control devices. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Build Out For MA Trial Court Report date: 09/11/18 , Data filename: C:\Users\Robert\Documents\COMcheck\Northampton Courthouse_9.11.2018.cck Page 2 of Section # Rough-in Electrical Inspection Com lies? Comments/Assumptions & Re .ID ------------------------ -- C405.2.1 Lighting controls installed to uniforml Complies [EL15]1 reduce the lighting load by at least ❑Does Not 50%. ❑Not Observable ❑N plicable C405.2.1 Occupancy sensors installed in OComplies [EL18]1 required spaces. ❑Does Not ❑Not Observable ❑Not Applicable C405.2.1, Independent lighting controls installed omplies C405.2.2. per approved lighting plans and all ❑Does Not 3 manual controls readily accessible and [EL23]2 visible to occupants. [:]Not Observable ❑Not Applicable C405.2.2. Automatic controls to shut off all ❑Complies 1 building lighting installed in all ❑Does Not [EL22]2 buildings. ❑Not Observable �Vot Applicable C405.2.3 Daylight zones provided with ❑Complies [EL16]2 individual controls that control the []Does Not lights independent of general area []Notlighting. Not Observable ---- — --- ----- Not Applicable ----------- ------ ------ -- -- -------- --- C405.2.3, Primary sidelighted areas are ❑Complies C405.2.3. equipped with required lighting ❑Does Not 1, controls. [ Not Observable C405.2.3. oI 2 Not Applicable [EL20]1 —- — --- - - - ___ --- ------ -----_ ------- C405.23, -----C405.2.3, Enclosed spaces with daylight area ❑Complies C405.2.3. under skylights and rooftop monitors ❑Does Not 1, are equipped with required lighting C405.2.3. controls. ❑Not Observable 3 JZINot Applicable [EL21]1 C405.2.4 Separate lighting control devices for Momplies [EL4]1 specific uses installed per approved ❑Does Not lighting plans. ❑Not Observable ❑Not Applicable C405.2.4 Additional interior lighting power omplies [EL8]1 allowed for special functions per the ❑Does Not approved lighting plans and is automatically controlled and ❑Not Observable separated from general lighting. ❑Not Applicable C405.3 Exit signs do not exceed 5 watts per omplies [EL6]1 face. ❑Does Not ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 low Impact(Tier 3) Project Title: Build Out For MA Trial Court Report date: 09/11/18 Data filename: C:\Users\Robert\Documents\COMcheck\Northampton Courthouse_9.11.2018.cck Page 3 ofT i Section # Final Inspection Complies? Comments/Assumptions & R_eq.ID _ _ _ _ C303.3, Furnished O&M instructions for ❑Complies C408.2.5. systems and equipment to the ❑Does Not PJM fie IVI,;Hl 7?400 2 building owner or designated [FI17]3 representative. ❑Not Observable❑ 6V— ,' 10/Zv�eGrNot Applicable �—S/1/y/ C405.4.1 Interior installed lamp and fixture ❑Complies See the Interior Lighting fixture schedule for values. [FI18]1 lighting power is consistent with what ❑Does Not is shown on the approved lighting ❑Not Observable plans, demonstrating proposed watts are less than or equal to allowed ❑Not Applicable watts. C408.2.5. Furnished as-built drawings for ❑Complies 1 electric power systems within 90 days ❑Does Not G► [FI16]3 of system acceptance. ❑Not Observable ❑Not Applicable C408.3 Lighting systems have been tested to ❑Complies [FI3311 ensure proper calibration, adjustment, ❑Does Not 4^ programming, and operation. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 IHigh Impact(Tier 1) T2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Build Out For MA Trial Court Report date: 09/11/18 Data filename: C:\Users\Robert\Documents\COMcheck\Northampton Courthouse_9.11.2018.cck Page 4 of