Loading...
17A-065 (2) 263 BRIDGE RD BP-2019-0252 GIs#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 17A-065 CITY OF NORTHAMPTON Lot--001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGLLcc.1144/2�A) Cateeorv:CHIMNEY RELINE BUILDING PERMIT Permit# BP-2019-0252 Project# JS-2019-000405 Est.Cost:$4203.00 Fee,$65.00 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Groun: CORY MCGILL DBA DONE RIGHT CHIMNEY SERVICES 107658 Lot Size(sn.ft.): 14897.52 Owner: Su Su Min Auna Zoning: URB(1001/ Applicant. CORY MCGILL DBA DONE RIGHT CHIMNEY SERVICES AT: 263 BRIDGE RD Applicant Address: Phone: Insurance: PO BOX 1054 (413) 340-1399 WILLIAMSBURGMA01096 ISSUED ON.8130/2018 0:00:00 TO PERFORM THE FOLLOWING WORK INSTALL WOOD BURNING INSERT INTO FIREPLACE AND LINE CHIMNEY, ALSO LINE SEPARATE CHIMNEY WITH 316 TITANIUM STAINLESS STEEL LINER POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service. Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occuoancv Sienature: FeeTYpe: Date Paid: Amount: 2t2 Main Street,Phone(413)587-1240,Fax:(413)587-1272 Louis Hasbrouck-Building Commissioner File H BP-2019-0252 APPLICANT/CONTACT PERSON CORY MCGILL DBA DONE RIGHT CHIMNEY SERVICES ADDRESS/PHONE PO BOX 1054 WILLIAMSBURG (413)340-1399 PROPERTY LOCATION 263 BRIDGE RD MAP 17A PARCEL 065 001 ZONE URB(100)/ THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid / OCr In/ Building Permit Filled out Fee Paid TypeofConstruction: INSTALL WOOD BURNING INSERT INTO FIREPLACE AND LINE CFBMNEY ALSO LINE SEPARATE CHIMNEY WITH 316 TITANIUM STAINLESS STEEL LINER New Construction Non Structural interim renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 107655 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INF911MATION PRESENTED: Approved_Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project. Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed _Other Permits Required: _Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Strom Water Management Demolition Delay ,,/, L 8 az lB Signature of Building Official Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission, Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. City of NorthamptonWONE WDYWMWELLING Building Department212 Main StreetRoom 100Northampton, MA 01060phone 413-587-1240 Fax 413-587-1272 APPLICATION TO CON C A OR I/ SECTION I -SITE INFORMATIC D1 1.1 Property Address: U AUG 2018 LD This section to beeompleted by office 263 Bridge Road I M IP Lot �.n15 mL - Florence, Me 01062 Elecmo P umb'1q a n a 1. s:o,,l one.. no Overlay District Elm at District csolstridt SECTION 2-PROPERTY OWNFRSHIPIAUTHORIZ60 AGENT 2.1 Owner of Record: Su Su Min Aung 263 Bridge Road. Florence, Me 01062 Name(Print) Current Mailing Address'. 646-249-1850 Telephone Signature i 2.2 Authorized Agent: Cory McGill (Done Right Chimney) P.O. Box 1054. Williamsburg, Me 01096 Name(Print) Current Mailing Address: 413-340-1399 Signature 6v Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by permitapplicant 1. Building 4203.13 (a)Building Permit Fee 2. Electrical (b)Estimated Total Cost of Construction from 6 3. Plumbing Building Permit Fee ` 4. Mechanical (HVAC) `s/�J- OD 5. Fire Protection 6. Total=(1 +2+3+4+6) I 4203.13 Checl,.Number This Section For Official Use Only Date Building Permit Number. Issued: Signature: Building GommissionerMspector of Buildings Data DonerightchimneyserviceS (tD gmail.com EMAIL ADDRESS (REQUIRED; EITHER HOMEOWNER OR CONTRACTOR) SECTION fi-DESCRIPTION OF PROPOSED WORK Icheck all aonlicablel New House ❑ Addition ❑ Replacement Windows Alteration(s) Roofing Or Doo s ❑ Accessory Bldg. ❑ Demolition ❑ New Signs [O] Decks [[] Siding[[I] Other[EQ Brief Description of Proposed Work: To inial,woofeurr%lme"ir.firepteoe and line oimneg and to line chimney to oil burner with 3160anium attimleee steel liners Alteration of existing bedroom_Yes X No Adding new bedroom Yes X No Attached Narrative Renovating unfinished basement _Yes x No Plans Attached Rall -Sheet a. Use of building :One Famili Two Family Other It. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction 1. Is construction within 100 ft.of wetlands?_Yes _No. Is construction within 100 yr. Floodplain_Yes_No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No. I. Septic Tank_ City Sewer_ Privatewell City water Supply_ SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT I, Su Su Min Aung as Owner of the subject property hereby authorize Cory McGill (Done Right Chimney) to act on my behalf�'n aall�piteri�s relative to work authorized by this building permit appli ation. 1 V� Signature of Owner 7 Date I, Cory McGill as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. Cory McGill Print Name Signa ner/Agent �� Dale SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervlsor: Not Applicable 0 Name of License Holder: Cory McGill dba Done Right Chimney Services CS-107568 type U License Number P.O. Box 1054. Williamsburg, Me 01096 05124/2019 Address Expiration Data 413-340-1399 Signature Telephone Not Applicable ❑ Cory McGill dba Done Right Chimney Services 178722 Company Name Registration Number P.O. Box 1054. 05-13-2018 Address Expiration Dale Williamsburg Me 01096 Telephone 413-340-1399 SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT.)M.G.L.c.162,.§26C16)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... Of No...... ❑ City of Northampton Massachusetts �s DEPARTMENT OF BUILDING INSPECTIONS 212 main street •Municipal Building V Northampton, va 01060 Debris Disposal Affidavit In accordance of the provisions of MGL c 40, S54, I acknowledge that as a condition of the building permit all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL c 111, S 150A. The debris from construction work being performed at: 263 Bridge Road. Florence, Me 01062 (Please print house number and street name) Is to be disposed of at: Valley Recycling 234 Easthampton Rd. Northampton, MA 01060 (Please print name and location of facility) Or will be disposed of in a dumpster onsite rented or leased from: ( ompany Name and Address) gnature of Permit rApplicant or Owner Date If, for any reason, the debris will not be disposed of as indicated, the Applicant or Owner shall notify the Building Department as to the location where the debris will be disposed. CN The Commonwealth of Massachusetts Department of Industrial Accidents Office of Investigations 600 Washington Street Boston,MA 02111 US www.massgov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers ADDlicant Information Please Print Letdbly Name (Business/Orgmizatiowlndividual): Cory McGill dba Done Right Chimney Services Address: P.O. Boz 1054 City/State/Zip: Williamsburg, Me 01096 Phone#: 413-340-1399 Are you an employer?Check the appropriate box: Type of project(required): 1.❑ I am a employer with 4. ❑ I am a general contractor and 1 6. ❑New construction employees(full and/or part-time)? have hired the sub-contractors 2.® I am a sole proprietor or partner- listed on the attached sheet. t 7. ❑ Remodeling ship and have no employees These sub-contractors have 6. ❑ Demolition working for me in any capacity. workers' comp. insurance. 9. ❑ Building addition [No workers' comp.insurance 5. ❑ We are a corporation and its required.] officers have exercised their 10,E] Electrical repairs or additions 3.❑ I am a homeowner doing all work right of exemption per MGL I I.❑ Plumbing repairs or additions myself. [No workers' comp. a 152, §1(4),end we have no 12.❑ Roof repairs insurance required.]1 employees. [No workers' 13 [Z Other comp. insurance required.] -Any ii point tem ew,ks box MI must also fill out the wehon belowshowing their workers'compensation polio,information. I Homeowners who submit this atHdavit indicating th,ere doing in work and then hire onside contmetors most submit a new affidavit indicating such. :Coneactors tem check this box must attached u additional sheet showing the name ofthe subcontractors and their workers'wrappolity information. I am an employer that isproviding workers'compensation Insurance for my employees. Below is the policy and job site information. Insurance Company Name: Policy#or Self-ins.Lia#: Expiration Date: Job Site Address: 263 Bridge Road City/S dc/Zip: Florence, Me 01062 Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations ofthe DIA for insurance coverage verification. I do hereby certify under the pains and penalties of perjury that the information provided above is true and correct. Si nature: Date: L Pinnace- 1(11.340-199.9 Official use only. Do not write in this area,to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle one): 1.Board of health 2.Building Department 3.CityTown Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: ClassicTM 12400M Wood Fireplace Insert I � I r i.6 t dIF� Y 3 'Gp> ~.regency4ire.com Frena-ait ngal;#jttp://ow.ly/Zvzjy ManueleneFi ii 013:.http://owdy1Zvzjy Installer. Please complete the details on the back cover and leave this manual with the homeowner. Homeowner:Please keep these instructions for future reference. safety dec SAFETY LABEL FOR 12400M �bjs is a copy of Me label that accompanies your Regency Insert.of un,contents ban,bar Weprinted Regency �h being barred on.. , \ %% If ® \ � � • : \ �JE ¢ 'j \ � � , | f � � � \ lit ! / | � \ � | § � \� 4 , _m_, D 6 installation Regency Inserts are constructed with the high- CHIMNEY 7) Circulating air chambers (i.e. in a steel est quality materials and assembled underslrict fireplace liner or metal heal ciroulatop shall quality control procedures that insure years of SPECIFICATIONS not be blocked. trouble free and reliable performance. Before installing,check and clean yourchimney 6) Means must be provided for removal oflhe It a important that you read this manual tbor- system thoroughly.If in doubt about its cord, mixed to clean the chimney flue. oughly and fully understand the are instal- tion, seek professional advice.Your Regency lation and operating procedures. The more Insert is designed for installation into a masonry g) Inserts that project in front of the fireplace you understand the way your Regency Insert fireplace that is constructed in accordance with must be supplied with appropriate supporting operates,the more enjoyment you will expen- the requirements of-The Standard forChimi-mi. means, ence from knowing that your unit is operating Fireplaces,Vents,and Solid Fuel Burning AP at peek performance. pllenoW, N.F.PA. 211, the National Building 10)Installer must mechanical attach thesup- Code of Canada, or the applicable local code plied label to the Inside&me firebox ofthe requirements. fireplace into which the Insert Is installed. BEFORE INSTALLING YOURINSERT The appliance.when installed,wmust lcaleUi- rallygrounded inaccerdancewi[hlocalcodesor, fWARNING:aThis wood onlybeen and convert ed in the absence Oflocal Codes,with the National for use withawooe insert only and cannot be i) Please mad this entire manual before you ElectricalCode,ANSIINFPA70,orthe Canadian used for burning wood or TWpd fuels unless install and useyournewwood insert.Failure Electrical code,CSA C22.1. all anginal parts have been replaced,and the to follow instructions may result in property fireplace reapproved by the authority having damage,bodily injury or even death.Install Regency Inserts are designed to use either a jurisdiction,' and use only in accordance with manufectur. 5.5"(140mm)or 6"U 52mm)flue. er's installation and operating instructions. In order for a solid-fuel insert to be certified 2 Check our local buildin codes-Builein Requirements for Installing for use in factory-built fireplaces, me above y g g SOIIA-fuel Inserts In Factory-built informatlon mustbeclearly stated inNeinsfal- Inspection Department You may require lation manual and appropriate markings.Final a permit before installing your insert. Be Fireplaces. approval is contingent on the authority having aware that,coal codes and regulations may jurisdiction. override some items in the manual. 1) The insert must be tested and meet the requirements of UL 1482(U.S.)and cr ULC WARNING: Careless Installation Is the 5628(Canada)when tested in a masonry major cause of safety hazard. Cheek all fireplace built per ULC 5628. local building and safety codes before WOOD INSERT installation of unit. 2) The factorybuilt fireplace must be listed per SPECIFICATIONS UL 127 or ULC 5610. 3) Notify your home insurance company that you plan to install afireplace insert or hearth 3) Clearances obtained from the masonryfire- Your fireplace opening requires me following minimum sizes' heater. place testa ere also relevant for installation In factory-buih fireplaces. Height: 21.5" 4) Your fireplace insert is heavy and requires Width: 25" two or more people to move it safely. The 4) Installation must include a full height listed Depth: 17" insert Pan be badly damaged by mishan- chimney liner type HT requirements(2100 cling. degree F.) per UL 1777 (U.S.) or ULC . Two faceplates are available toseal ihefireplace S635(Canada) The liner must be securely 5) If your existing fireplace damper control attached to the insert flue collar and the opening: will become Inaccessible once you have chimney top. installed your Regency Insert,you should Standard Oversize 40"W x 30"H 48'W x 33'H either remove or secure 0 in me open poli- 5) Means must be provided to prevent room tion. air passage to the chimney cavity of the fireplace. This may be accomplished by 6) Inspect your fireplace and chimney prior sealing the damper area around the chimney to installing your insert to determine that it liner,or sealing the fireplace front. is free from cracks, loose mortar or other Important signs of damage, If repairs are required, 6) Alteration ofthefeeplace inanymannerisnot The blower to this appliance must be turned they should be completed before installing permitted with me following exceptions', yoff anytime me fuel door is opened. Prior W our Insert. Do not remove bricks or mortar from your masonry fireplace. a. external Mm pieces which do not aRect turning the blower back on,ensure mere are no the operation of the fireplace may be ambers near the blower which they have fallen 7) Do not connect the Insert to a chimney removed providing they can bestored anions hearth when thefuel doorwas opened. system servicing another appliance or on orwlninthefireplaceforreassembly Once the fuel door is closed,me blower may an air distribution duct. if me insert is removed. be turned back on It. the chimney damper may be removed to install the chimney liner. 6 Regency 12400M s s installation MASONRY AND FACTORY BUILT FIREPLACE CLEARANCES The minimum required clearances W combustible materials when installed into a masonry or factory built fireplace are listed bebw. Unit Adjacent Mantle•• Top Side Minimm uMinimum Minimum From Top of Side wall (to Top) Facing Facing HeHearth Hearth Side Unit (lo Side) (lo Top of URIC) (lo Side of URit) Extension* Thickness Extension' A B C 0 E F G H Medium 11.1280mm 20- at 12"(305mm) 8'(200mm) 18"(455mm) 1Wf3mm) 8"(203mm) 217(508mm) Flush Insert (12400( Side and Top facing is a maximum of 1.5-thick. Floor protection must be noncombustible,Ineula- 0ve material with an R value of 1.1 or greater. • Hearth thlakneav of0.5"with kvalue=0.84', r valw=0.6 or greater. .. B C '• Ammncombustibb mantel may ba Ineblbtl at a lower height If the framing Is made of metal etude covered citta a noncombustible, board. Max,mamie depth Is 10"(254mm). A p Thermal flomprotection is not required lithe units H raised 3.5'minimum(measured Mani bottom of Me stove).However,standard emberMomprobF tionls required.ltwill need tobeanoncombustibie matedal that covers 16' (406 mm)in Me US and 18"(450 mm)in Canadato the frontofthe unit and 8"(200 mm)to Me sides. + G If the unit is not raised, thermal floor protection F T required is i8'(450 mm)in the US and Canada. Clearance diagram for Installations All flow protection must be non-combustible(i.e., metals,brick,stone,mineral fiberboards,etc.)Any Minimum Hearth Extension for tM front organic materials(i.e.plastic,wood paper prod- (E)and sides(G)are measured from the ucts,etc.)are combustible and must net be used. The floor protectian specified incudes some form fuel door opening. of thermal designation such as R-value(thermal resistance)or k-factor(thermal conductivity). HOW TO DETERMINE IF ALTERNATE FLOOR PROTECTION MATERIALS ARE ACCEPTABLE The specifled floor protector should be 318" Step(b): DEFINITIONS (18mm) thick material with a K - factor of Calculate R of proposed system. Thermal conductance 0.84. 4"brick of C=1.25,therefore Rbrick=11C=111.25=0.80 C = Btu = W The proposed alternative is 4'(100mm)brick 118"mineral board of k=0.29,therefore with a C-factor of 1.25 over 118"(3mm)mineral Rmin.bd.=110.29 x 0.125=0.431 (hr)(ff')(°F) Ifni board with a K-factor of 0.29. Total R=Rbrick+Rmineral board= 0.8+0.491=1.231. Thermal contluctivity: Step(a): Use formula above to convert specification Step(c): k = (Btu)(mch) = W = Btu to R-value. Compare proposed system R of 1.231 to (hf)(M')CF) dri (hQ(fl)(°F) R=Ilk xT=110.84x.75=0.893. specfiedRof0.893.51nceproposedsyslem Thermalaniatence: R is greater than required, the system Is acceptable. R = (fBt(hr)(°F) _ (ni BW W 8 1 Regency 12400M INSTALLATION INSTRUCTIONS Phone:688-900-8106 rFax:888-392-4432 FOR BEST-Flex Models "L", "H", "S", & "E" Web'.www.Ne.EnglandChimneySupply.com Z ��� STAINLESS STEEL CHIMNEY LINERS 34 Commerce Street,Williston Vf 05495 A ��� BEST-Flex Models 66S99 Arfisr STAINLESS STEEL CHIMNEY LINERS 0! aappoaa BEST-Flex Modals"L"."W,-S",&"E"Stainless Steel Chimney Liners are manufactured by New England Supply Inc.Located In Williston,V9. The BEST-Flex lining system Is designed and UL listed to be installed inside masonry chimneys.BEST-Flex liners are used to vent the gases and by-products produced by appliances that burn oil,gas,or solid fuels. NI appliances require certain venting specifications and the liner Is not to be sized leas than specified in the appliance manufacturer's instructions.For the best overall refer to Ne appliance manufacturer's instructions to determine any special necessities for Nat speclfc appliance. The installer must contact the local building and fire code officials for a variety of reasons: • The installation may require Special inspection requirements. Building permits may be required before installation. • Compliance with local building codes.(Authorities with local jurisdiction such as Inspectors.Mumoce Building Departments,Fire Departments,and Fire Bureau's have precedence over national cotles). For proper results and operation use only materials or components specified in mese installation instructors. Using pans or materials not specified may result n arMeaireabk effects. The lining system safety,cede compliance,.,act,and pe szerm nce Mey be cempmrev ed it me installation ire recu ns ere not renewed BEST-Flex Stainless Steel Chimney Liners are tested and listed by Underwriters Laboratories. In the United States they are tested to UL 1779 and can be installed in NEW&EXISTING masonry chimneys. • In Canada they are tested to ULC 5635 and are to be installed in EXISTING masonry chimneys. PRODUCT INFORMATION FOR BEST-Flex CHIMNEY LINERS The BEST-Flex Stainless Steel Flexible Chimney liner is designed to reline existing chimneys or to be used as a liner in new construction. Manufactured with the highest quality,mill certified alloy.BEST-Flex Stainless Steel Flexible Chimney Liner has a high acid fighting capability. Listed by UL Laboreloriea 10 UL 1997 8 ULC 5635 etendarde for zero clearance InateNalion.BEST{bx can be usetl to venlwooQ wood pellet,coal,non- condensing gas and oil,making it the choice for yenning all standard efficiency installations.UL listed BEST-Flex Is available in 3"to IT diameters (13"above Is not listed)to covers wide range of requirements found in the field today. • The unique manufacturing systems used to make BEST-Flex utilizes a continuous stop of stainless steel,7-ply interlocked and created to produce a gas and water tight lining system of superior strength and durability.BEST-Flex can be curved to go around offsets in chimneys and win be factory waltzed To custom sizes to fit most any installation requirement Unless seeoified by the manufacturer the liner is not to be field ovalized. The corrugated construction allows for expansion&contraction during me heat-up&cool-dawn periods,which removes any stresses on the system. BEST-Flex can be insulated with either a vermiculite based poured insulation or with a foil-faced ceremic wool blanket to meet UL 1777&ULC 5635 standards for chimney exteriors with zero clearance to combustibles. BEST-Flex Stainless Steel Chimney Liner comes wN a Life Time Warranty for all fuels,with appliance efficiencies at 83 percent or lower, MATERIALS REQUIRED FOR BEST-Flex STAINLESS STEEL LINER INSTALLATION: Liner Model "L","H" "5',&"E" TT I Two peace or one piece tee TEC Tee Cap EA/EF-15° 90°elbow d4 0 C I I EC-Coupler Screws/Rivets 0 ' ' - OPTION OPTION B TP-Top Plate TPCC-Uner Cap OR A TC OR-Top Clamp TPC-Top Plate 8C-Storm Collar CL-Liner Cap(square/round) 0 INSULATION MATERIALS REQUIRED(if applicable) L12 Liner Insulation 1/2"Foil Faced Ceramic Wool Blanket LM Liner Mesh Prolective Wire Mesh Sleeve FT(2",3") Aluminum Foil Tape - LMC(large/small) Mesh Clamp BMIX BEST Mix too _ Phone:888-900-8106 Fax 888-392-4432 r Web:www.NewEnglandChimneySupply.com 34 Commerce Street,Williston VT 05495 1.)CHIMNEY PREPARATION S INITIAL INSPECTION Before any liner can be installed the existing chimney must meet proper construction and code requirements: The chimney must be between 1"high(min)and 100Jt(max)in height, The chimney must have a wall thickness of 4-inch min(nominal)solid masonry unit. The chimney must project at least 3-ft over the paint of roof penetration,and at least 2-ft higher than any point of any structure within a 10-ft radius. If the mass of the chimney is constructed within the structure a 2-in minimum,unobstructed air space,must surround the chimney mass to any combustible material.If the chimney is constructed on the outside of the structure, 1-fin of unobstructed airspace must be maintained between the chimney mass and all other combustible materials. When the chimney breaks the plane of a floor,ceiling,or other horizontal or vertical structure,Fire stops of a noncombustible material must be used. The installer must verify,the above wth all local 8 national codes as required. If the correct clearances cannot be verified due to regional factors the liner must be installed with a UL listed insulation material. Any appliance that burns a liquid fuel cannot be attached to a chimney liner made to vent a solid fuel burning appliance. Th.connection pipe be...the appliance and the choorm,liner most he.proper clearances to combatiblea. This can be determined by Me appliance manufacturer's installation instructions,the national building code,the local building code,or whichever factor takes precedence. The chimney must be cleaned Comprehensively to remove all deposits of soot,creosote,or glazed creosote before any liner is installed.A full inspection must be done to determine if the chimney Is structurally sound.If the existing system is found not to be in compliance with applicable building Gude and I or manufacturers installation instructions,the liner shall not be installed until appropriate steps have been taken in order to bring the chimney or vent into compliance with Ne applicable code and I or manufacturer's instructions. Note:Installing a lining system into an existing chimney or vent does not,in any way,upgrade the resulting relined system and make it suitable for any applications that require a vent or chimney of a higher temperature handling capability,an alternative fuel,or any other more sever service than Me original chimney or vent In which It is installed. wrevrcnmeceoss 2.)SIZING THE CORRECT CHIMNEY LINER DIAMETER Any healing appliance connected to the lining system must not °t"'" s" h ", have a flue outlet size larger than the Inner area at Its smallest ° a +.n h point unlike a qualified person has sized the liner to suit the µ.ph. appliance For siring a liner used for gas and oil burning appliances refer i- •- rmh toN,F.P.A 54 for gas and NYP.A 31 for oil.Also refer w the _ appliance manufacturers instructions.Liners that are incorrectly sized fair the appliance can lead to poor draft,excessive condensation,and creosote build-up inside the lining system. ewers.s°a+wwaunev«ad..«mnrm°*°•.+ Please call New England Supply Inc.should you have any . °:`es"d questions about sizing a liner. ^°" f� For sizing a liner used for solid fuel coming applianceathe cross section area of the liner shall not be less than the cross section w,am,•y�^�°w area of the appliance outlet collar.Unless specified by the appliance the cross section area of the flue M all not be more than ""' m m e° *•n• °`�tl•n• three(3)times the cross section area of the appliance outlet collar. �„1O'",,,„° ,,,,r—i can .—ex-1 Solid fuel burning fireplace liners should be a minimum of ane- twetth(1112)the square inches compared to Ne square inches of the fireplace opening.This one-twelfth(1112)number can q.„cs.,,.,„,",,..,,,e„,a„.,„eeew•!om.u. vary based on height of the chimney along with other calculating factors.Call New England Supply Inc.if you haveany quest ons. 3.)DETERMINE IF THE LINER SIZED INSTEP#2 WILL FIT INTO THE CHIMNEY ^" °'"m'°^^�'•'^ The BEST-Flax Stainless Steel Chimney Liner can be installed inside the existing flue tile or the flue life can be removed.It .®•d µ��"e°l":!^"'a..�.,m, is critical that Me correct size liner will actually fit into the flue. Chimney construction and flue offsets may change the physical ®,w„w m••u or point .°. size of Me interior of Me chimney.It Is best to test Ma smallestn;.,a�eµwm °.,• aro• pont of the chimney interior before trying to install the chimney "` h I °"'^' finer Lower a short piece of the correct size linerdown the '"^^' ,,,,• �. chimney tosee if It will fit through,or a liner guide cone if the via chimney Inner needs to be insulated extra space around the liner w•uwe m...r ! •cam mph is required.If a round liner configuration will not fit the liner can be •••o.m ma• formed into an oval shape to fit at the factory, However an oval "^ ^^° e.�.a+mr>••+w."u°tl4rvi..,a.m..nr`h liner will change Me cross section area and a larger liner may be needed.Please wit New England Supply Inc.with any quesllons. „" 4.)INSTALLING THE BEST-FLEX STAINLESS STEEL CHIMNEY LINER ,,.",..».,ro Thimbles must be In the proper location to maintain the required clearance to combustibles from the connector pipe to the appliance. The liner length Is determined by measuring from Me lowest Mlmble('d more Man one)to Me top of Me chimney.Add epproximalely Six(6)Inches to attach Me Grown and top hardware.Cut the liner to Me desired length, If a liner is not long enough a coupler may he used to join two pieces of liner.Atach Me Coupler to Me liner with the atlxed band,or stainless steel strews(Male end down when applicable). Attach the Tee Body to the liner wit Me affixed hand,or stainless steel screws.If the liner needs ro be Insulated with a ceramic wool blanket,install the blanket at this parol. Attach the Tee Cap to the Tee Body at tis point. Expand Me draw band on to Tee Snout completely,slide Me Tae Snout into the thimble with to draw band centered in Me flue.Lower the liner Phone:888-900-8106 Fax:688-392-4432 $ Web:www.NewEnglandChimney5uppiy.com 34 Commerce Street,Williston VT 05495 down Me top of the chimney,and slip the Tee Body through the draw Land an the Tee Snout.Y may have to rotate the liner to align the hole in the Tee Body with the Tee Snout.Once you have aligned the Tee tighten the draw band to secure the Tee Snout to the Tee Body. Use mortar second the assembled Tee Snout to form an airtight seal. • At Me tap of the chimney there are two options: OPTION A-use a Top Plate,Support Clamp,and Stott Collar to support and seal off the liner Top Assembly.Place the Top Plate around the liner and center them both on top of the chimney,secure them to the chimney top with masonry screws,silicone or mortar.Attach Me Support Camp around finer and secure. Push the support damp tight puts the Top Plate.Place the Storm Collar aruoM War and push down tight to the Support Clamp and secure.Place a bead of silicone around he top of the Storm Collar to seal.Install the Rain Cap on top of the liner and secure.Listed Rain Caps incorporating bird screens are necessary and/or required in some areas but may be susceptible to blockage through freezing moisture In areas of low ambient temperature. Consult an authority having jurisdiction. OPTION B-Use a Top Plate wl collar to support and seal off the liner Top Assemby,Place the Top Plate w/Collar around the liner and tighten the liner with Me draw band clamp attached inside the Top Plate cul Collar. Center them both on top of the chimney and severe them to the clormay top with masonry screws,sticere or mortar. Install the Rein Cap on top of Me Top Plate cul Collar and secure. Listed Rain Cape incorporating bird screens are necessary crater required in same areas but may be susceptible to blockage through freezing moistureit areas of low ambient temperature. Consult an authodry having ludsdinton. For Inspection and leaning purposes,wall penetrations shall not be installed deadly behind the heating appliance. 5.)INSTALLING BEST-FLEX STAINLESS STEEL LINER FOR A FIREPLACE No Tee Is used on the bottom of the liner when installing a liner for a fireplace application.The Tee is substituted with a Bottom Plate which Is used to seal the liner at the top of the fireplace smoke chamber.The Bottom Plate can be installed by reaching up through the damper opening or by dismantling the face of the fireplace near the tap of the smoke chamber • mets IlMg Bottom Plate through Damper. Altach the Bottom Plate to the finer with stain Islas steel week,dean Was steel screws,or a Speech Clamp below the Bottom Plate.Once the Bottom Plate is secured to the liner,pull the liner up and place the Bottom Plate on top of the smoke chamber. Hold the liner in place with a temporary support(2x4 a).Install top hardware by placing the Top Plate around the liner and center Mem both on top of the chimney,secure Mem to the chimney top with masonry screws,silicone or mortar.Attach the Support Clamp around liner and secure.Push the support clamp tight onto the Tap Plate.Place Me Storm Collar around liner and push dawn tight to the Support Clamp and secure.Place a bead of silicone around the top of the Storm Collar to seal.Install the Rain Cap on top of the liner and secure. • Installing Bottom Plate through Face of fireplace. This solution will require more work and masonry skills to rebuild the fireplace.Remove two to four bricks in either the face or the back of the fireplace at the level of the top of the smoke chamber.If the smoke chamber is built torridly there should be approximately eight inches of masonry to go through.Once this opening has been created slide the Bottom Plate into the hole over the top of the smoke chamber.Lower the liner down frem the top of the chimney and through the hole in the Bottom Plate.Secure the Bottom Plate to the Liner With chinless steal rivets,ctalidow steel cclewe,or place a Support Clamp on Me it.,shove Me Bottom Plate.This will prevent Me link,ham slipping down through the Bottom Plate until the top hardware has been installed.Install tap hardware by placing the Top Plate around the liner and center them both on top of the chimney,secure them to the chimney top with masonry screws,silicone or mortar.Attach the Support Clamp around liner and secure.Push the support clamp tight onto the Top Plate.Place Me Storm Collar around liner and push down tight to the Support Clamp and score.Place a bead of silicone around the top of Me Storm Collar to seal.Install the Rain Cap on top of the liner and secure.Seal hole in masonry smoke chamber With lake material. 6.)INSULATING BEST-FLEX STAINLESS STEEL CHIMNEY LINER Not all situations require the insulation of the chimney liner.The UL 1777 8 ULC 5635 Standard for installing stainless steel chimney liners requires insulation because Me non code conforming chimney has zero clearance to combustibles or some other aided.Therefore the UL 1777 8 ULC 5635 Standard is in place for fire protection,In the United States the definition of a code conforming chimney is one that meats Or exceeds the N.F.P.A.211 standard for construction of chimneys.This standard includes;proper clearances to combustibles,intact 519 fireclay flue liner or equivalent,minimum four inch(nominal)solid chimney with. ll chimney meets all Me requirements for a code conforming structure Me only reason to reline it would be for proper sizing and appliance performance. In the case of relining gas or oil fired appliances no insulation is required(recommended for high efficiency).Regardless of existing chimney conformance, insulating the chimney liner will improve the performance of the appliance that is connected to it The insulated liner will stay warmer and the flue will not cool as quickly which means less condensation.In wood burning appliances this will reduce the amount W creosote Mat will form In Me liner.In oil and gas burning applications the likelihood of condensation will be greatly reduced(especially on startup).While fire protection is Me main reason for insulating,insulating a liner (even if not required)will pay dividends by increasing performance and efficiency. Please Note:For the installed liner system to meet UL standards,all UL listed components used must be installed with proper clearances. THERE ARE TWO OPTIONS FOR INSULATING BEST.FLEX STAINLESS STEEL LINERS Option N1 -Insulating with BEST-Wrap BEST-Wrap needs to be installed around the liner before the liner Is installed into the chimney. BEST-Wrap is one hall Inch(112')thick,eight pound density,ceramic wool blanket with a three mil aluminum foil face.Aluminum tape,retractable We mesh,and mesh clamps will be needed to complete Me installation.BEST-Wrap is available in four widths,24"to fit liners 4'to 6'diameters,30'to fit 6.5'to 8-diameters.31 fit 9'to 10'diameters,and 48'to fit 11-to 14'diameters. In a code-conforming chimney no BEST-Wrap insulation is requiretl.The required operates between the liner and the interior wall of the masonry chimney is 1 inch.In a code-mnfonning chimney that must have the tiles removed a single one quarter inch BEST-Wrap is required.The required clearance between the insulation and Me interior of the masonry chimney is 0'inches. To install BEST-Wrap around the liner,open the blanket on a flat surface with the foil side down.Than the blanket length wise so that it will overlap approximately one inch(1')When wrapped around Me liner.Place the liner on the blanket and wrap around the liner.Apply Me fail tape to the entire length of the seam on the blanket.Out pieces of Toll tape approximately eight inches(8')long,and tape across the seam every foot(17).Place the liner into the retractable mesh seek.Using the mesh clamp,clamp the end of the liner just above the Tee Body.Expand the retractable mesh sock to the top of Me liner,continue to pull until mesh sod has humaded tightly around the liner,clamp mesh at the top and cut orf the excess mash.Install the liner as described in Me previous section Option 82-Insulating with Theodore Thermix Is poured into Me chimney around the liner after the liner is installed.Thermix Is premixed and water is just added to the mix at the time of 06 lJ WL—JPhone:888-900-81 Fax.888-392-443232 Web:www.NewEnglandChimneySupply.com 34 Commerce Street,Williston VT 05495 installation.To calculate the amount of Thermix needed to insulate around a liner please call New England Supply Inc.of go to the website. No minimum Mickneea of Thermix amunss a liner Installed in a code-conforming chimney le required.The awfulness clearance between the liner and the interior of the masonry chimney is X inches.In a non-code conforming chimney with zero clearance to combustibles,no flue liner,the minimum recommended thickness of BEST-Mix is One(1)inch.The required dearance between the insulation and the interior wall of the masonry chimney is Zero(0)inches.The minimum clearance to combustible from the exterior of the chimney Is Zero(P)Inches.Thermix is mixed with four to six gallons of water in a molar pan or wheelbarrow.When mixed wrathy the Thermix will have a sandy consistency with little or no water seepage when squeezed in your hand.Once mixed the Thermix is poured into the chimney around the liner.The liner should be vibrated during the pouring process to help Me BEST-Mix smile around the liner,Thermix should be filled into the cavity road the chimney is full to the of.Install the top hardware as described in previous section. A Thermix insulated BEST-Flex liner can be used immediately after the installation is complete.Curing of the Thermix will occur over an approximately 28 day period.Approximately 70%of Me curing process occurring in the first weak.Drying home of the BEST-Mis wit vary on the thickness of the mix and the absorption of moisture into the masonry chimney.Drying time will be accelerated by using the heating appliance. 7.)NOTICES For Canadian installations,the Installer must post a notice at the lundlon between the liner system&the appliance.Notice shall state Me limitations of the liner system in regards to fuel types,types of acceptable appliances,and a reminder to cheek fire Rain Cap for icing during low ambient temperatures. Notice shall also include date of installation.manufacturers name-New Engand Supply Incl,and the class of lining system"CLASS 3". 8.)OPERATION BEST-Flex liners(insulated with Thermix)used to vent a solid fuel burning appliance please be aware that:Solid fuel burning stoves can be used immediately after the installation Is complete.However the flue gas temperatures entering the line,should not exceed 500 degrees F.for a period of three weeks.A connector pipe flue gas thermometer will help monitor this temperature. Fireplaces can also be used immediately after the Installation is completed.A small to moderate sized fire should be maintained for approximately three hours.After Mis time a normal fire can be established. It Is Important Nat the operator not over Ore the appliance during Mese initial per oda. 9.)INSPECTION AND MAINTENANCE INSTRUCTIONS If you have any questions concaming inspection and maintenance of the BEST-Flex liner please contact New England Supply Inc. 34 Commerce St. Williston,VT 05495 (888)900.8108 • Inspection of the BEST-Flex liner should be done at minimum once per year by a chimney professional.Inspections longer than a 1 month time period from the date W installation should not occur.If the liner is used to vent a solid fuel burning appliance inspectors should be done at lana periods of every 2 months during the heating season.If soot or creosote accumulations have been found during inspedion and have reached a 1/4" or more Me liner should be cleaned.This inspedmn and cleaning should be owned out by a nationally cedified chimney sweep,or other qualified chimney professionals. Failure to Inspect and maintain the chimney system can result in poor performance,creosote build-up,moisture Issues, chimney fires,dangerous gas leakage into living spaces,and other undesirentae sRustlons. 10.)CREOSOTE FORMATION AND THE NEED FOR REMOVAL As woad bums slowly it produces bar and other organic vapors which combine with expelled moisture to forth creosote.The creosote vapors may condense an the Inside of Me chimney liner during dowbuming firing periods.This can result In creosote residue accumulating on Me chimney liner. When ignited,this creosote can make an incredibly hot fire up to 2100deg. It is necessary to get access to the top and/or bottom of Me chimney to properly inspect the liner To inspect the liner from me bottom remove the connector pipe from the appliance and the chimney.Use a flash light and minor to looks into liner upwards to visually inspect for soot and creosote deposits.If the chimney has offsets you may not be able to see all the through Me chimney.In this was it will be necessary to inspect me liner from both ends. If cleaning is required after inspedton,it is recommended to use a plastic bristle brush with the same size diameter as the Interior of the liner.Push the brash up from the bottom or down from the top using the appropriate number of extension odes for the height of Me chimney.When cleaning from Me Mp remove Me Rain Cap before maadteg Me brush into Me top of the liner. The Ram Cap can be removed by loosening the damp fastener and removing the Rain Cap from the Top Plate or from the Liner(depending on method of Installation). Common Certification label markings found on parts& BEST-Flex Models "L", "H", "So, & "E" �w�E.ti'nicamm materials to create the lining ="psi__ OF STAINLESS STEEL CHIMNEY LINERS system, _"-3�__ __ - -" � Best-Flex Installer Name ©_• f..�,i_G>aW��i•`a Company Address .., "a State Zip `O. '.'� a. Fir x Phone ©-'s� - "'a - -=O Date of Installation Revised 4)1)2D17