Loading...
24A-188 (4) 41 JACKSON ST BP-2019-0165 GIS#: COMMONWEALTH OF MASSACHUSETTS Map.Block:24A- 188 CITY OF NORTHAMPTON Lot-001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Categorv: SOLAR ELECTRIC SYSTEM BUILDING PERMIT Permit# BP-2019-0165 Project# JS-2019-000276 Est Cost$29000.00 Fee,$75.00 PERMISSION IS HEREBY GRANTED TO. Const Class: Contractor: License: Use Group: PIONEER VALLEY PHOTOVOLTAICS 111266 Lot Size(sp. fit: 10802.88 Owner: BELURBALAH Zoning:URB(99)I Applicant: PIONEER VALLEY PHOTOVOLTAICS AT: 41 JACKSON ST Applicant Address: Phone. Insurance: 311 WELLS ST- SUITE B (413) 772-8788 Workers Compensation GREENFIELDMA01301 ISSUED ON.8/W2018 0:00:00 TO PERFORM THE FOLLOWING WORK.INSTALL ROOF-MOUNTED RACK SYSTEM FOR SOLAR PV SYSTEM 19 PANELS 6.84KW POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occuoancv Sienature• FeeTYpe: Date Paid: Amount: Building 8/9/2018 0:00:00 $75.00 212 Main Street,Phone(413)587-1240,Fax:(413)587-1272 Louis Hasbrouck—Building Commissioner RECEIVED 30 lar - 8 2018 CDepadmentuse only i of N rtha pton srabi6.olPamliC - -d2 TOF DunnING Bei111i1tTliba a enl Curb CulfDdveway Pwmt c�THq•a��TON.M at SCMN3apSC AvMIatl Ky Room 100 welemrveq AvaXabllpy Northampton, MA 01060 Two gob of Strumwl Para phone 413-587-1240 Fax 413-587-1272 Piettafte Plein Other Spwtry ' APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH AONE OR TWO FAMILY DWELLING SECTION 1-SITE INFORMATION ,Qj/� (. _L C/ S' 1.1 Property Address: This db sen to be completed by office Map�44 Lot / M Unk 41 JACKSON ST, NORTHAMPTON, MA 01060 Zone Overlay Dlabict Elm St Dlaldc{_ CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: Balali Panduranga Belur and Pallavi Hall 41 Jackson St., Northampton,MA 01060 Name(Pnrrl) Current Mai ing Address: (678)982 4282 See attachment (A) Telephone Signature 2.2 Authorized bent Pioneer Valley Photovoltaics 311 Wells St.Greenfield,MA 01301 Name(Print) Dument Mailing Address: / • 413-772-8788 Signat� Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by Permit applicant 1. Building $11,600 (a)Building Permit Fee 2. Electrical $17,400 (b)Eegmated Tool Costof Constrution frwn 6 3. Plumbing Building Permit Fee p 4. Mechanical(HVAC) 5.Fire Protection 6. Total=H +2+3+4+5) $29,008 j Check Number This Seaton For Official Use Only Oats Building Permit Number: Issuetl: Q / �t S" alure: ✓/ 9/�// Bu1NkgC isucaeognspeclar,of Buildings Date buildingpermits @ pvsquared.coop EMAIL ADDRESS (REQUIRED; EITHER HOMEOWNER OR CONTRACTOR) Section 4. ZONING All Information Most Be Completed.Permit Can Be Denied nue To Incomplete Information Existing Proposed Required by Zoning TNa column lobe allcd in by Building Dpaemmt Lot Size Frontage Setbacks Front Side L: R: L: R: Rear Building Height Bldg.Square Footage Open Space Footage % (Lm ama minus bldg&paved hin #of Parking Spaces Fill: volume&Lrcxrion A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO O DONT KNOW 0 YES O IF YES,date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO O DONT KNOW O YES O IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water or wetlands? NO © DONT KNOW O YES O IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained O Obtained O , Date Issued: C. Do any signs exist on the property? YES O NO O IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES O NO O IF YES, describe size, type and location: E. Will the construction activity disturb(clearing,grading,excavation,or filling)over t acre or is it part of a common plan that will disturb over 1 acre? YES O NO O IF YES,then a Northampton Shorn Water Management Permit from the DPW is required. SECTION 5-DESCRIPTION OF PROPOSED WORK(check all II bl 1 New House ❑ Addition ❑ Replacement WlrMows Alferation(a) ❑ Roofing ❑ Or Doom 1] Accessory Bldg. ❑ Demolition ❑ New Signs [01 Decks IO Siding[EI) OMer[Gll Brief DesCnptionof Proposed Inslalletion u[roof nwunled mckioksyslem fur mlar PV synem on sonfh-Wing aN east-GMg roofs. Worts: Alteration of existing bedroom`Yes_No Adding new bedroom Yes No Attached Narrative Renovating unfinished basement _Yes No Plans Attached Roll -Sheet get.If New house and or addhlon to existing houslna.Complete the followlna: a. Use of building:One Family Twe Family Other b. Number of moms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new constmction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form agached? h. Type of construction i. Is construction within 100 fl.of wegands?_Yes _No. Is construction within 100 yr. floodplain_Yes_No j. Depth of basement or cellar floor below finished grade K Will building conform to the Building and Zoning regulations? Yes_No. _ I. Septic Tank_ CitySewer_ Pnvale well_ City water Supply SECTION]a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMR Balaji Panduranga Belur i, ,as Owner of the subtest property PV Squared (Pioneer Valley Photovoltaics) hereby authortze to act on my behaff,in all matters relative to work authorized by this building permit application. See Attachment A See Attachment A signature of Owner Data i PV Squared as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are free and accurate,to the best of my knowledge and belief. Signed under the pains and penahies of perjury. Philippe Rigollaud Print Name !& 8/2/18 Signature W OwnerlAgant Del e SECTION S-CONSTRUCTION SERVICES 8.1 I-leenaed Construalon Suprvisor Not Applicable ❑ Name of Uganse Helder. Daniel Gomez Gonzalez License Number 43 Hatfield St, Northampton, MA 01060 CS-111266 Mdrese Expiration Date 03/14/2021 SignaWre ( T elephone 413-772-8788 r liRwlaferod Home lmprovemant C.on6aClar - Not Applicable ❑ Pioneer Valley Photovoltaics Cooperative Company Name Registration Number 311 Wells Street, Suite B, Greenfield, MA, 01301 140077 Address Expiration Date 413-772-8788 Telephone 09/15/2019 SEC nON 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.D.L c.153,§35C(S): Workers Compensation Insurance affidavit must be completed and submitted with this application.Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... No...... ❑ ATTACHMENTA AUTHORIZATION TO PROCEED AND SERVE AS AUTHORIZED AGENT I hereby agree to the Project as set out above,and I agree to pay the contract price according to the Terms of Payment I further agree to the Terms and Conditions attached hereto as a part of this Proposal and Agreement. I hereby authorize Pioneer Valley PhotoVohairs Cooperative to proceed with the above-referenced Project kt accordance with this Agreemem.I further authorize Pioneer Valley PhotoVoltakz Cooperative,or its designated representative to obtain required permits for this project on behalf of the Owner.I will allow arty photographs or videos of this project to be used by Pioneer Valley PhotoVoltaics Cooperative for marketing purposes.A check for the First Payment Is enclosed and I am returning this Agreement within 21 days of the Proposal date. $()LFyt 9FLU(L 16-�Jn1 -201$ Printed Name DMe 1v1 Signature Title �1 3f"1cSo0 STr Naarvti t?ia,4, MA-01060 naym.imap..meniemoOtas r 7WO aware.-w Mous Commonwealth of Massachusetts Division of professional Licensure Board of Building Regulations and Standards ',r;re 5lri� IGn $llpc-rv.sur CS-111266 Expires 0304/2021 DANIEL GOMEZ40NZAL9Z 43 HATFIELD STREET NORTHAMPTON MA 81988 Commissioner Office of Consumer Affairs and Business Regasation One AShUurlon PIRCe - Smle t3?t Boston. Massachusetts 02108 iiome Improvement Contractor RegistraUon n1Nt c iLL5i Ji• wl''�iF yi 4h lb b t".bi! F '=P�Id AO �IiM f nC �l fid PN(1 FA�Ri� fr:4tl'kC'f�f 1([9- d IVpE tlC� II�Y.ea.CrnLio�tlalr. f..Ai 6k LLd nJ �,.y.tpLOn CAI � n_mC�M1 E <nn L.�q m pn. 10 $.pit _llB Not valid wanooc S;Bnatw, ._ _. ACO M CERTIFICATE OF LIABILITY INSURANCE 0103201 Ill THIS CERTIFICATE IS ISSUED ASA MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.NIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: H Me cartiflcata holder Is an ADDITIONAL INSURED,Me policy(les)must have ADDITIONAL INSURED provisions or de endorsed. N SUBROGATION IS WANED,Subject to Me terms and conditma of the policy,certain policies may require an endorsement A statement on this cerdflcate does not confer rights ho Me cerdfiute holder in lieu of Such andomementim. PRODUCER R E.TATI Linde POweIS We0Oer 8 Grinnell ONE (x1315890111 IAC,xol' (4131501iAC81 S Norm King Street ADDRESS: trPOYms@WeUSermalarnnelli INSUREWS)AFFglI COVERAGE NAICe Naminnp10n MA 01060 INWRERA: HDI GIOhaI Ins.CO'En¢rgi INSURED INSURER e: MF,Uc Energi ROneer Vd l¢y P11010V011al[s COODerdliVe In[. INSURER C'. mil Ins GO Of HannaverrEnergi ARn Kim Pinkhram INSURFR O'. 311 Wells Street Suite INSURER E: Greenfield MA 01301 INSURER F: COVERAGES CERTIFICATE NUMBER: Master Exp l-2019 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW NAVE BEEN ISSUED TO THE INSURED WVAEO ABOVE FOR THE POLICY PERIOD INDICATED NOTWITHSTANDING ANY REQUIREMENT TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUEO OR Edey PERTAIN THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS EXCLUSIONS AND CONDITIONS OF SUCH POLICIES LIMITS SHOWN MAY HAVE BEEN REDUCED By PAID C W 61S I AAR POLICY ME DUR LTR TYPE OF IH SURANCE Tri NUMBER RNMERYWYI IkWND tYNS CGIMERCIAL GENERAL WBILEY FAGM1 OCCVRRENCE 5 1000000 CLXUEDraDE ®OCCUR PREMIDEE v]M 51000.30 MEOEXPr4,I,sRN ret S Excluded A EGGCRW02412118 01 B1,2a10 DID'201D PER60Rari WJORY S 1000000 GCHL.fOGPEG ATc INITapFUE9 PER G=_1i IDIFF011 5 2000.000 PDuc ❑jE° ❑LD1 PRDoucrs-cO.FCFF1C s ?000 WO OTRE0. AUTOMOBILELIAMLI" rzaa[igemsi L_LmvT S 1000.000 4N1A.00 BOD.YINJURYIPYfilll $ A DAFFY x:Y SCTOsuiEO EAGCRW0241218 01/0112018 0101,2019 BDDI.YlrUURY1Pn3nLAm.I 5 HIRED N.Y NFD OPERI D>'AAGE s AVTOSONLV 4J OBONLV IPera[oil Underinsured mmons181 S 20000 uaBREMFLIAB mxBR ESc�"o&IFEFNCF s 3000 ago B BODIES,L1N3 1111EPEE 18EFXM1E60157 01,0112018 OtN12019 ADOREGATE 53000.NO DIED I j 3ETENnON 5 I S WORMERS COMPENSATION AND EMPLOYERS'LIABILITY BID EORN A WVIIED E'OR^rA71,1,FEXECOT1F Yx EL EACH ACCICExz 51000,000 a IF, EFF lrEiBER ExcmoeD= ❑ x1A EWGCR00D2x12118 OVOt Ra18 01/OL'2018 muniani NN1 EL CISE4E EA EMPLOYEE S 1403'030 Wsi Ire 1 000 No S[ seWl'ION OF O'ERATIONSceow EL DISEASE-POLICY Wdr` S COmmeraal PrOpeM Business PHS Properly SO 750000 C CPR18EP801 011014015 01,0112019 Installamn $350000 DESCRIPTION OF OPERATpRS i LOCATIONS IY£HICLES IACORD 101.ANNURFU arl serval mry pe S.R.R man Face a nismireen CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF INE ABOVE DE SCRIBED POLICIES BE GN ELLED BEFORE INE EXPWATON DATE THEREOF,NOTICE WILL BE DELNERED IN EUgRi Of In Trdnfe ACCORDANCE WITH TIE POLICY PROW SIONS. AUTHORI2EDREPRESENTATIVE ]y�� 1)lb_ -z) ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 26(2016103) The ACORD name and logo aro registered marks Of ACORD The Commonwealth of Massachusetts Department of Industrial Accidents 1 Congress Street,Suite 100 Boston, MA 02114-2017 www.mass.gouldia IVRorkers'Compensation Insurance Affidavit:Builders/Contractors/Flectricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. Applicant Information Please Print Lcuibly Name (Business/OrganiunionAndividuAr Pioneer Valley PhotoVoltaics Cooperative Inc. DBA PV Squared Solar Address:311 Wells Street, SueeB City/State/Zip:Greenfield MA 01301 Phone #:413-772-8788 Are you im employer. check me appropriate box: Type of project(required): 1.01 am a employer with 48_employees(fun and/or pan-time)' 7. ❑New construction 2,n I am a sure proprietor ar partnership and have no employers working for ate in B. ❑Remodeling any mgaoity.IN.workercomp.insurance overfed 9. ❑Demolition 3.❑I nm a homeowner doing all work myself,[No workers'compinsurance nequimd. ' 4.F1on I am n hwns m wner and will be hiring commetoiconduct all work ua my property. i will 1 D❑Building addition ensure that an convectors either have workers'comp tea ion insurance or are sale 11.❑Electrical repairs or additions proprichas with no employees. 12. Plumbing repairs or additions 5v I an a general crmrarm,and I have hired the sub contractors listed on the attached sheet, compimmauce' 13.❑ On Rf[Cpair9 These subcontractorsrave employers end havewmkers' - 8.❑We are a andwe h and its mploye have o vocked theiroright c exemption per MGL e 14.❑� Other Solar PV 152.§1(4),and we have no employees.INo workers'comR imumnce repuired.l IL -Any applicant that checks box#1 mast also 011 out the section below showing their workers'compensation policy information. I Homeowners who submit this amdavit Indicating they are doing all work and then here outside coneraaors must submit anew affidavit indicating such. tConnamms that crack this box most anached an additional sheet showing the cane,of the subcontractors and state whether in not those entities have employees. if the sub contractors have employees they must provide their workens comp.policy number. I am an employer amt is providing workers'compensation imurance for my employees. Below is the policy and job.site information. Insurance Company Name:HDI Global Insurance Co/Energi Policy#or Self-ins.Lia#:EWGCR0002412118 Expiration Date:12131/2018 Job Site Address:41 Jackson St City/State/Zip:Northampton, MA 01060 Attach a copy ofthe workers'compensation policy declaration page(showing the policy number and expiration date} Failure to secure coverage as required under MGL c. 152,§25A is a criminal violation punishable by a fine up to$1,500.00 and/or one-year imprisonment.as well as civil penalties in the farm of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify,under thepains and penalties of perjury that the information provided above is true and correct Signature' /19 Data 8/2/18 Phone#:413-772-8788 Official use only. Do not write in this area,to be completed by city or town official City or Town: PermitfLicense# Issuing Authority(circle one): 1. Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: BELUR,41 JACKSON ST, NORTHAMPTON, MA 01060 PV ARRAY ON EAST ROOF PV ARRAY ON SOUTH ROOF _'s��_ Owner: BALM PANDURANGA BELUR —=– r Address: JACKSON ST, NORTHAMPTON,MA 01060 Phone: 678.982.4282 •;:d.•:' «ales-----r v e-mail: bobalu@gmaiLcom System Size: 6.84 kW-DC EAST. ., „y;, PV Array: SunPower SPR-X22-360-D-AC(19 total), all in portrait SOUTH: 1 row of 6 modules at top with 1 ^^ row of 3 modules in the middle split by - soum skylight&2 single modules at bottom either side of skylight SOLAR ARRAY LAYOUT EAST:1 row of 6 modules at top split in middle with 1 single each side at bottom ` outside ( Mounding: SunPower lnvisiMount Rails on L-feet on Quickl oot bases Roof Structure: SOUTH:2x6 nom rafters @16"oc EAST: 2x6 nom rafters @21"oc See PE letter with SK-1 drawing. Roofing Material: SOUTH:asphalt shingles over EAST ROOF AT LEFT ON FRONT OF HOUSE&SOUTH plywood Sheathing ROOF ABOVE TRIPLE WINDOWS ON REAR ADDITION EAST: asphalt Shingles over board sheathing 'Ina#F/�;'clo Jd Construction En ine Tnf h.Construction Solutions ✓ enng, PLC 436 Campbell Street iN9B@NaIyE7�9ec'F' White River Junction, VT 05001 ons°"samEngineenng w 60&903-9798 J419,2018 Ms.Jeannine Haendiges Pioneer Valley PhotoVoltaics Cooperative,Inc. 311 Wells Street,Suite B Greenfield, MA 01301 Re: Belur Residence,Northampton,MA PV Squared Project No.12096 NIECE Project No.18-001 T-137 Dear Ms.Haendiges, At your request New England Construction Engineering,PLC(NECE)has reviewed the information that Pioneer Valley Photovoltaics Cooperative,Inc.(PV Squared)provided on the roof and supporting structure of the of the Belur residence,at 41 Jackson Street,in Northampton,MA.The purpose of this review was to provide an opinion as to the structure's ability to support a proposed rooftop mounted photovoltaic(PV)array.The information that you provided is attached to this letter for reference. You are proposing to mount PV panels the house roof..The house is a two-story wood framed residence. The house consists of the main house,which is a two-story cape,and an addition to the east.The addition is a single-story.The addition roof intersects the main house roof with valleys. The main house measures approximately 24x30'.The roof has a 36-degree pitch.The roof is supported by 2x6 rafters at 21"O.C.spacing.These rafters span approximately 12'on the horizontal.There are knee walls approximately 6'from the walls.The second-floor joists resist the outward end reactions of the rafters on the walls.The roof appears to have solid board sheathing.The roof has asphalt shingles. The east addition measures approximately 16'x30'.The roof has a 23-degree pitch and is framed over the main house roof at the valleys.The addition roof is supported by 2x6 rafters at 16"O.C.These rafters span approximately 15'on the horizontal.The roof has a plywood deck and asphalt shingles.The south side of the roof has a vaulted ceiling below.The vaulted ceiling is framed with spaced 3x10s. Analysis included controlling gravity loads(dead and snow loads).In considering snow load,both balanced and unbalanced snow load conditions are considered.Lateral loads(wind and seismic)are excluded from this analysis. Recommendations: The east addition rafters are overstressed under design snow load conditions. In order to reinforce these rafters,I recommend installing 2x6 rafter ties on each rafter pair,approximately 18"below the peak. Details of this Installation,including fastening schedule,are provided in the attached EastAddition Roof Reinforcement Sketch. PV Sauar� HoN'�pa3e�'"• c eon han RuH4;E action GnNI ceMeA Based on the ement sketc Based on the information that you Provided,i conclude that,once the above fo��'� b,the li I base this opinion on the following assumptions'e In installed in the east addition roof as shown on the attached EostAdditid, Roof �tl than the exist B house roof will support the proposed PV Array. assume that,owing to their smooth surface,the PV panels wiolishedS the 3xa10 cel beams resist the asphalt shingles.I also assume that the east addition ceiling j to slide off the outward end reaction of the rafters on the walls.I assume that the snow will be allowed roof unobstructed.I further assume that that the PV panels will be installed parallel to the roof, eliminating any additional wind load.The ground snow bad(Pg)for Northampton is 46 psf.According to information that you have provided,the proposed PV panels weigh approximately 2.6 psf. In summary,based on the information that you provided,once the east roof is reinforced as shown on the attached East Mormon Roof Reinjorcem"t Sketch,the roof will support proposed PV array. Thank you for the opportunity to assist with this project If we can be of further assistance,please contact Jonathan Rugg at NECE. txarawy,�e Sincerely, 5t9B2 '+ athan ftugg�P.E'�t�'�� ?9j � t / New England Construction Engineering,PLC. 1800 Attachments: East Addition Roof Reinforcement Sketch -Building information PROJECT INFORMATION: IN $AU4o# • Owner: Balap Panduranga 4 �^�� Belur and Pallavi Bandalli • Address: 41 Jackson Street +��/�S. Northampton, MA 01060 �'• • •^` • Phone: 678-982-4282 rvsppared Solar m wells street,Sola a Greenfield.MA 01301 • Email bpbalu@gmaiLeom design@Mquareatoop 413-nzE7ae • System Size: 6.84 kW Toa: Belur • Modules: SunPower SPR-360-X22-D-AC • Rail: SunPower lnvisimount SITE 41 Jackson Street • Bases: Ecofasten Quikfoot rrnnhampan.Ma 01060 • Snow Load: 4O lbs rzEnslorvs. • Wind Speed: 117 mph ROOF STRUCTURE: • South:22°2x6 rafters @ 16" O.C. • East:36°2x6 rafters @ 21"O.C. ROOF MATERIAL: Asphalt shingles PROJECT NOTES: 1. Framing location to be verified on site. Site Plan 2. Slide rail assembly as needed to avoid •• rvn wale Interfering with splices or bases. 3. Unless otherwise noted bases are staggered and spaced at 48"O.C. TITLE. Site Plan 4. Additional or alternative bases may be used to meet actual roof conditions. BILL OF MATERIALS C/T PART MAKE MODEL conn: 12096 BY 1G 50 Base Ecofasten Quikfoot onTe 71231201e 14 Rail SunPower lnvisimount $GlE'. Asfiown 2 Rail Splice SunPower lnvisimount SIZE: 85 xa W 20 Midclamp SunPower lnvisimount 36 Endclamp SunPower lnvisimount A-01 19 Module SunPower SPR-X22-360-D-AC (Sheet1 of 2) Array to be -k Roof 168" -a'- 311 weir sweet wee centered on rafter - creeneeld,MA 01301 and roughly equal -k— Array 1225/4" —}- design@pe t uared.000p distance from ridge. 413 772 6768 03: Belur _ sin 41 fack5on Street NDObampfOn,MA 01060 2x6 rafters PEAS10145: @ 21 O.C. Array to be centered on rafter allowing room for skylight. @1 ba OeC -T Roof 295" M O 0 yI O kp N K Q TITLE'. Array Layout ,r— Array 122%4' T : Array to be Use blocking or Roof 195' rDNa12096 mirror of decking attachments By 1G Northern array at edges as needed. DATE: 7123a01 Clamp Torque: 85 in-lbs 50kic 1M"'1'-0- L-Foot Torque: 375 in-lbs SIZE e.5 x11• Max Span: 48"on South-facing roof 72"on East-facing roof A-02_O Max Cantilever: 1/3 adjacent span A e.g 32"span=10-2/3"cantilever Module Size: 61-5/16"x 41-3/16"x 1-13/16"(46mm) (Spee 2oro lr SunPower 60D ♦ Residential AC Module Design-Driven Advantages !n maclule aesthetics and efficiency Unmatched module relladiiTy' SERIES No electrolytic capadm s 75Sea rcont corer .rd Proouc P:ar arty r "S sir It e d 'haeecor-plian: Maximize Value for Roof NS_ rcin f o rctf, olir strlrg bre n, oonrnize oerfenrarxe ofeadd rune.,. Expand Deployment Options Complex roofs and partial shading sma,l systems Optimize System and Installation Efficiency System expantlaBdlry SurPr r t - dc!o esx,r ,fr. .:da.I ft,,"inowe Simplify&Speed Installation r.. , t. t r c F.ncb a Pr microntener el a; 11, 1 n- I S.el Dt to Ac rr . , n l , 2 >i doubclo kngA. mrnectdrs Je�on flex kl yonSAe anO of Ste rP fl -I1,foluse ,If Sudor,,­ln,si 10 cot'a'e[he Sun Powe red F)( ng„_ng process ;.coir r ,r, IS-, ',"I I wer r,C"Sod_I sero e Dula, saes: Fe er ns rallatior steps than competing In ca L =sinoo s or If Iti_,uve IS VII n o ,V ­1 dei men_o. ,ysmns c'mnzive mmmlw onmg ,), r v<nthe o I, ecf , r re YdusW Component of Complete System Buil for use mof,Su-Poweru'InNsiMcunt"" and NeSuns.wer dhddtohrg system(PVS5a Grid Supoort Utility- nteractive Smart Inverter Supelor system rerc➢ity at a...thetic-s cn ';o. ) t �cocule I'UL e � 1rl eU'_ ILI'. ',A , It J,, ,,],Fri n<rt retr fit_d, I01 /pl AC mood it; tll:mmp i,fnr.,11)ti- Ca lria R Jd Ph,scI 'onJ enui d ndr-eh J1 Jprcfl IS Pi efomirg omrr it S,,,P PV1'x ,or ter „ aI Mffre sunpower.com 411 SunPower .0DModule r I — — 59 5 CO C L JJ t V ] l 1 oc oux I I or -- or � loV Ar J 2 NJ buV i "BV 1S3 1 20.. ._o8V - oItorz _ aov 1 ,34 o Va V cn:'or or '40 rut ,COR V 91 .1 J0 Woo, cult 240 V 21 F f �8 ]asv E,Erre V. e E KU I+4 e Irl ,te ,e r,uor ro SPR 822350-0 AC r 1 'n I- ;c I or A I, 3n�' I r :mUE1 I ,A -- yr in 03 r 11 1 1. .� i I in ,, 3 I It Ir _ L. Rzotl St .Lr. E_ Ir eI ._, "are0 mt xi 1 p,� I .. -fling rr P:.ipoI J C n o _.. . ] In�Oi �� la(16,1:d s-or ral ,I 1 ] A ; r,,,,,) Jl', .1. F . .n or C, .n I o �n C ._rete 141 O VE 6906 or _17 ',ok r I dEL -.' I P uro,, Ir moi'. '. rt _ . ,, 2sl ro,l ]r me d.._ III . c55o (,i I, r �� I E tF,]] or to A nor Nrc I rs< t r31 1 oC L l I s^ II P b. � C •` r •• - rel '.d d , 'on.. a or it II i _.. l H2 A nl i E- ummm �mm _ y rc tr w M�o a. �0 r� • ••.. _.. o.m. ry a.o, r. a �m.a ,yyM1N�TPY ii Residential • Simple and Fast Installation megrated¢oonie:o-rail grounding > nre-assembled mid and end damps ne,neing,mid la p nfor easy placemen[ J cl t.p rti J h to l ate co, ce-t over n- r"Odb2 -na,l e rpe me on led alsullre in 2703 Lsted integrated grounding Flexible Design Add�esses nmrIv all sloped render ,1 roots Design in landscape and poinalt Rads enable easy obstacle management Customer-Preferred Aesthetics _. #1 module and fit nerurt ng aestoetics a den n dans rysrem aesthceR Elegant Simplicity Premium,low-profile design larmanodredcomoonents SunFowerInvis.MounP"' s a Son Power-designed Eicher mid canes and end clamps rail-ba sed mounting system. The l nisi Mount system a no capper,Flush rads addresses res dential slotted roofs and combines faster Part of Superior System installation time, design Fexib ltv, and superior aesthetics. e., tr'r use .ower JC aid et -.,oU The Invl dMor,nt product was soeefically envisioned and 3est-in-crass se tem reLzbtFy ata e'de:lu Comm r. ewithsunPowermodilesarrd engineered to pair with SunPower modules. Tne res.tlorg mcnlmdrgaep system-leve'approach will ampllfythe aesthetic and installation benefits or both homeowners and 'nsrallers. sunpower.cond M SunPower InvislMouni'"^ I Residential Mounting System ,:m Cory F numa�es e> r "bu^.Como �^r�F.ars 'lo�oe Ooc o.m�s 1, S,V0,,Wds A,!Cemf,3tionS Munt Syst r Je 5a'ool iAZ; hmenr Fri zreV ra•i(.=c SUNP WER , - QIJIkFOOt PRODUCT GUIDE '. Exploded Produ,t V,ew/B.O.M.- 1 Installat on Instructions - 2 Cut Sheets-3 , - Specifications-4 i ; dot ili 1 zA S A CA " r oQa EcoFasten Solar' >{� ( QuikFoot—Product Guide Exploded Product View bill otfllr ale 1 4� 1 .h Materials Needed for Assembly 1. Item No. Description of Material/Part Quantity 1 QuikFoot Base Plate 1 6 2 Fastener(Length to be determined) 2 1 3 QuikFoot Flashing 1 4 EPDM Washer i 5 L-102-3"Bracket*(other options available) 1 4 6 5/16"EPDM Bonded 18.8 SS Washer 1 1 7 3/8"Stainless Steel Hex Nut 1 1I 3 Required Tools i, Vi i �r 1 1 Y ' a - .77 877859394] EwFasten Soler All eententprobeded under copyigM.All dghls reserved 1010904 tt Y •? /1 ) E[uFazlen Sdar paOutls Bre prreeu by the Urowip U.SPens &Ill 522B2B,15J700B2&Ill Ill B2B.Ill 713B2B.146299 Do 8 209914 B2 a 245454 J2 8 2)2174 By 8225`U2 y 1 � ii QuikFoot- Product Guide G][Sheetc:QF-AL--Base ;1 2X -" .33in 8.38mm 1 to E o � E � E W N N Pro N I 1 .SOin I — t a 38.10mm E 3/8"-16 Stud E c -- P E E nr y QF-L : 1 ,75' ay1 F tl]]859 99E7 Ecal'asseen Solar All adarent druatered under dopyraht rights reserved 214 31 EmF leiSola�piotl,ck repmisietl by he bllomoy 111 Paenis.81515[YB2 0.153700fl2P18139B 393H281667 '92014fi 299 B2 8 209914 92 0 245 454 B20Z]21]45[tl/G'1555/02 J . _ \/ \\ a . Product r w r m v: . . . . . . . . . . . �. . . . \/\,\ � �®e <2 o+ . c . , > ! j 22 mml : \ ,z> � .©: � y : gw ; a m _ \ a .7 \ a j z� y{ .. . . . . . . . . . _a_. ,4° , nd,r2_ . . . . --- a.: _ av._ ,_ _ ` t k a �k jP QuikFoot– Product Guide Curt Sheets: Bfacke t OpChrs-'_,CL 10 1-3 t ' t If '� i L6 SERRATIONS 4 114 Y T f 1r 1 1 1/16 — - -e+ R'oM 2X R.01 §T 4 q 60,00- + Dols_ Q1/B,• s 31s 002 6 " 7/8'X820 DETAILA t5 + f SCALE 3:1 7fPs 1k } fy r, 77-854 {9 7 EWFWtoSdsrAll,,MW reel tlorw ulpy 90/_All rghts fesec,ied .0/09114 i ( ft.fon Solar pmO cseeP4tedeJ by d,e fMmmngU82.",3 Vill fll,t9ill81R N_c(flPtfY8I4Eid3'+P SMIi9la£IISaA5454 H29Pz.`14 k32R2."+`+�� '#1 1 a 1 2: 3 t # a = QuikFoot- Product Guide she +l etioio PART 1 -cFni A SUM3 MARY 1Sub it TA A. L 14f WORK INCLUDES A. Submit manufacturer's written specifca[ions. 8. Base plate is 6000 series aluminum with one t 1. QuikFoot base plate attachment bracket that B. Submit standard product cut sheets. PEM Type Press-In Stud 18.8 SS. h Ql attaces directly to the roof deck. r.r C Submit instaproduct specific load to C app5cFasteners tion and compatible with pull out ague roof 2. Provide appropriate bracket and fasteners d iCdtiOn and meets specified a out VdUeS °II D. Submit product specific load test data,showing PP P 0 { for the .of system. ultimate and allowable load values Seeci9c to as shown in load test data. = 3 E. RELATED SECTIONS the roof deck specified for the project D. Counter flashing is.032gauge aluminum em- 1.Section 076M Flashing and Sheet Metal bossed to accept shape of stainless steel base 2.Section 075W'.Plectra IA Q UA LITV ASS U R AN CE plate 3.Division 1:Administrative and Procedural Installer to be experienced in the Installation of Requirements specified roofngmaterial for no less than 5 years in 23 FINISH 4.Division)Thermal and Moisture Protection the area of the project. 12 SYSTEM DESCRIPTION A. Bracht is mill finish aluminum @ 1` 0. SYSTEM DESCRIPTION COMPONENTS tS DELIVERY/STORAGE/HANDLING B. Baseflashing-Black-kynar painted #: ) : Inspect material upon delivery.Notify manufacturer C 1. QuikFoot system consists ofaluminum C bracket and base plate with(1)stainless steel within 24 hours of any missing or defective items. PART 3-EXECUTION stud,(1)stainless steel nut.(1)EPDM washer Keep material dry,covered,and off the ground until ul ari bonded stai Ideas steel and EPDM installed. 3.1 EXAMINATION washer. A. Su bstrateI ns pea structure on wh ich brackets 7� 2. Fasteners PAR[ 2- PRCIDUCTS are to be nstalled and verify that it will with 1. A.To be of metal compatible with QuikFoot stand " bracket. 2.1 MANUGACTJREP. any additional loading that may be incurred. B.Fasteners should be selected for compah EcoFasten Solar" ibiliry with the roof deck 289 Harrel Street,Morrisville,VT 05661 B. Notify General Contractor of any deficiencies `r C.Fastener strength should exceed or be (877)859-3947 before installing EcoFasten Solar brackets. equal to that of the allowable load of the ecofastensolarcom hQ C Verify that roofing material has been Installed system.See test data at 2.2 MATERIALS correctly prior to installing solar attachment www.ecofastensodar.com t 3. Sealant(if required by roof manufacturer) A. Attachment Bracket brackets. t to be roof manufactures roved. 6000 Series Aluminum(choose one) PP 3 INSTAICompl_LATI ON 4. Aluminum counterflashing1.CP-SQ-Slotted A. Complywith architectural drawings and project S. Aluminum attachment bracket 2.F-111-A engineers recommendations for location of 3.P-3-CSK system.Comply with Manufacturer's written in IR f B. DESIGN REQUIREMENTS: 4.SCL-101-3 stallation instructions for installation and layout. 1. Bracket spacing to be recommended by 5.L-102-3" + ( �.a project engineer. 6.L-102-6" c fq f ta- 2. Install a minimum of two fasteners per 7.Z-101 r j tr } base plate. 8.Comp Slide 14 ` t 3. It is important to design new structures or 8.Custom asses they nwit withstand ndretaintructures retained sure that they can withstand reta netl loads_ � 1 114 _ __. .. .. ai78593947EwFBet ala All ulowngUSPtent prokeread der oredght, 8151522B2l rightseserven 1FI39S9/14 <I EcofaS en aNerp�Mu pm eGeL Oy rM1e rdl yang VS.P' eL-e1515P a28,151Teo 62918+058 a26,166T11 a291e5p9e aeBYW 91d FY1aL<$Q5G H2 a'P 21t<62a225`62 Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 INSTALLATION CREW OPERATING POLICY This policy applies to all PV Squared employees in Massachusetts, but is particularly directed at those involved in the installation of solar electric and other renewable energy systems (licensed electrician, learner/apprentice electrician, licensed constructor supervisor, supervised carpenter and laborer). When engaged in this work as an employee of PV Squared on a PV Squared project site, activities of PV Squared employees are covered under the General Liability Insurance maintained by the Cooperative. It is the intent of this policy to provide clarity to installation situations where the applicable codes and regulations are unclear, ambiguous, or silent. It is possible that a municipal building or electrical inspector could interpret the codes and regulations in a manner that differs from what appears here. But this policy sets out, in writing, how the cooperative interprets legal work requirements and unclear details. It is an internal consensus working model, intended to be revised and improved from time to time. As a general matter, a city's or town's Building Commissioner is charged with enforcing the State Building Code, Plumbing and Gas Code, Electrical Code and Architectural Access Code. The commissioner addresses concerns about the safety, accessibility and security of construction of homes and businesses. The commissioner also enforces zoning bylaws. In accordance with Massachusetts General Law, employees of the cooperative who perform electrical tasks and activities must hold a Massachusettsjourneymen's electrician license or be under the direct supervision of such licensed personnel. These tasks and activities include installing electrical wiring, conduits, apparatus, devices, fixtures or other appliances for carrying or using the electricity associated with Renewable Energy Generators (electrically active solar photovoltaic modules, wind turbine-generators, hydroelectric generators, etc.). In no circumstances shall the Massachusetts licensedjourneymen have more than one learner or apprentice working with him/her or under his/her supervision. Mounting structures come in a variety of configurations and have differing functional and physical characteristics. A structural component or assembly becomes associated with electrical work as the Renewable Energy Generator is electrically bonded to the mounting structure. Unless otherwise noted in M.G.L. c.143 §§3 through §§60 inclusive, all structural work defined as follows shall not be required to be performed by a Massachusetts licensed journeymen electrician: • Structural improvements • Elements of a Renewable Energy Generator's support structure that fall under a building permit (e.g., assembly of top-of-pole mounting structure on steel pole with concrete foundation prior to execution of any required electrical bonding of the support structure and associated renewable energy generator (solar electric module) to the support structure Policy #9 Installation Crew Operating Policy Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 • Roof-top mounting support structures including but not limited to posts, stand-offs, flashings, feet, and mounting rails • Operation of heavy equipment involved in moving, hoisting, digging and other tasks • Earth work, excavation and concrete work • Manual labor involved in moving loading and unloading of equipment • Moving, hoisting, and attaching an electrically bonded panel assembly (defined as one or more assembled and electrically bonded solar electric modules) to an existing structural support designed to host the panel assembly. Note however that construction of a panel assembly is an electrical task due to the required electrical bonding activities. Repair and Servicing of Installed Equipment Repair or replacement of an electrically bonded and/or energized renewable energy generator (e.g., installed solar electric panel) will be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician. Replacement of an installed inverter must be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician, if the work requires removal of AC and/or DC conduit and associated wiring that originates outside of the installed inverter (e.g., removal of external AC conduit and wiring between the inverter and point of interconnection with the on-site electrical service). Note that this activity may require a wiring permit in some local jurisdictions. This requirement also applies to the servicing of an installed inverter that involves replacement or repair of components and wiring internal to the pre-manufacturer inverter (i.e., factory installed components that were originally shipped with the inverter) even though such activity may not require a wiring permit. Replacement of an installed inverter may also be performed by a qualified technician who may or may not be a licensed electrician or properly supervised learner or apprentice working with a licensed electrician if the inverter is of a "plug and play" design. Such a qualified technician can also performed other tasks that include installation and servicing inverter-based performance monitoring systems (e.g., replacing internal communication cards, making "plug and play" ethernet connections, etc.), assuming these activities do not require creation of a new AC power source circuit to operate the communication system(s). Policy # 9 Installation Crew Operating Policy 5Ou4 � a� 3 PV Squared Solar)wwwp✓squaredcoop Phone:413-777-87881 Froc 413-771-8668 z 311 Wells St,Ste.B j Greenfield,MA 01301 MA Elec.Lic.A13764 IMA HIC 140077 Dear Town Inspections Officials, Please see our enclosed applications to permit a Solar Photovoltaic System in your jurisdiction. As you are likely aware, PV Squared is a worker-owned-cooperative B-Corp, employing 40+ people in Greenfield. We have installed thousands of PV Systems out of our Greenfield, MA Headquarters since 2002. PV Squared is committed to complying with all Commonwealth laws and regulations. Our worksite guidelines are created with the intention of exceeding all safety, electrical, and building requirements as defined by their respective jurisdictional entities. This includes the work of people from multiple disciplines, including electrical engineering, structural engineering, civil engineering, electricians, construction supervisors, roofers, and their associated helpers. We are a company that values training and education. We make certain that every individual is qualified for the roles and responsibilities that they assume. It is our policy to pay for the employees travel and training time and cost of the education, including CSL and journeyman and Master Electrician classes. As an electrical contractor we are furthermore guided by the January 30, 2009 Massachusetts Board of State Examiners of Electricians (BSEE)judgements, and rulings that have followed.We pay strict adherence to these mandates and all electrical work is conducted by an electrician and an electrician's apprentice in a 1:1 ratio. We also understand that non-electrical tasks associated with a Solar installation can be completed by non-electrical workers, such as CSLs and others. I have attached our installation policy for your review, as well as a list of example non-electrical tasks. Should you have any questions or concerns regarding this policy or delineation of work, please let us know. We are a learning organization that is always trying to improve on what we do. Respectfully, Adam Thurrell Operations Manager a INSTALL 2x6 RARER TIE ON EACH RARER PAR INGE REOUIREO AT GABLE END OR INTERSECTING VALLEY. IF 6"i RARER TIES i0 RARER WITH M WITH MIN. (9) GRK RSS STRUCTURAL SCREWS . 2x5 iE \NG 1^ EY,IST NG Ck6 -SLS 1Ac:TEO BE,,I IA (SPACEp� EE EAST ADDITION ROOF REINFORCEMENT DETAIL « SCALE: NONE SK-1 PV SQUARED U SCA `W`W LFNONE 12096;BELUR RESIDENCE L: ]/16 2010 ' PREID FOR: 41 JACKSON STREET,NORTHAMPTON,MA CA . eersi �` 1-107—1871171 PREPARED BY: EAST ADDITION ROOF REINFORCEMENT SKETCH NEW ENGLAND CONSTRUCTION ENGINEERING.PLC - W .NEWENGIANDCONSTRUCTIONENGINEERING.COM