Loading...
31C-046 (15) 73 VILLAGE HILL RD-UNIT E I-S BP-2019-0023 GIS#: COMMONWEALTH OF MASSACHUSETTS Map.Block:31C-046 CITY OF NORTHAMPTON Lot:- PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL 042A) Categmv: SOLAR ELECTRIC SYSTEM BUILDING PERMIT Permit# BP-2019-0023 Proiect# JS-2019-000007 Est. Cost $14886.00 Fee: $75.00 PERMISSIONIS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Group: PIONEER VALLEY PHOTOVOLTAICS 106329 Lot Size(sp.ft.): Owner: BLACKMAN GREG&MARIE Zoning: Applicant: PIONEER VALLEY PHOTOVOLTAICS AT. 73 VILLAGE HILL RD - UNIT E1-S Applicant Address: Phone: Insurance: 311 WELLS ST - SUITE B (413) 772-8788 GREEN FIELDMA01301 ISSUED ON:7/3/20I8 0:00.00 TO PERFORM THE FOLLOWING WORK:ROOF MOUNTED SOLAR, 8 PANELS, 2.56 KW POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY HE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy sianature: FeeType: Date Paid: Amount: Building 7/3/2018 0:00:00 $75.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner Mar- Department use only Cit,of Northampton Status of Permit JUL - 2 2018 Sul ding Department Curb CuVDnveway Pang 2 Main Street Sewer/Septic Availability Room 100 WaterMell AinIleblllly DEPT DP BUILDING,INSPEcmOWrth ampton, MA 01060 Two Sets of Structural Plans NORTHAMPTON,NA00115-5 7-1240 Fax 413-587-1272 PlotfSits Plans Other Specify APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILYDWELLING SECTION 1 -SITE INFORMATION 6 P- [q JA" 1.1 Property Address'. This section to be completed by office U 73 Village Hill Rd. Unit E1-S Northampton, MA Map Lot nit Zone Overlay District Elm SL District CS District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: Greg and Marie Blackman 73 Village Hill Rd.EI-S Northampton,MA 01060 Name(PnM) Current Mailing Address'. 413-265-1801 See attachment (A) Telephone Signature 2.2 Authorized Agent: Pioneer Valley Photovoltaics Cooperative,LLC 311 Wells Street,Suite B,Greenfield,MA,01301 Name(Pnnt) Current Mailing Address: 46: 413-772-8788 Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed bnnitapplicant 1. Building $14,886 (a)Building Permit Fee 2. Electrical (b)Estimated Total Cost of Construction from 6 3. Plumbing Building Permit Fee 4. Mechanical(HVAC) 5. Fire Protection 6. Total=(1 +2+3+4+5) $14,886 Check Number 4TT� This Section For Official Use Only Date Building Permit Number: Issued: 1y Signature: Building Commissioner/Inspector of Buildings Date Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning ` •' Tms column to be filler in by Budding Deparmtent Lot Size Frontage Setbacks Front Side L: R: L: R:, Rear Building Height Bldg.Square Footage Open Space Footage (Lot arra minus bldg&Paved I arun #ol'Parking Spaces Fill: volume&I.ocatian A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO O DONT KNOW O YES O IF YES, date issued:. IF YES: Was the permit recorded at the Registry of Deeds? NO O DONT KNOW O YES O IF YES: enter Book Page. and/or Document# B. Does the site contain a brook, body of water or wetlands? NO O DONT KNOW O YES O IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained O Obtained © , Date Issued: C. Do any signs exist on the property? YES O NO 0 IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES © NO O IF YES, describe size, type and location: E. Will the construction activity disturb(clearing,grading,excavation,or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES O NO O IF YES,then a Northampton Storm Water Management Permit from the DPW is required. SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House ❑ Addition ❑ Replacement Windows Alteration(s) ❑ Roonng Or Doors 0 Accessory Bldg. ❑ Demolition s 10 Siding 101 Other[tal Brief Description of Proposed Work: ^o(emlmowMpM1ob-wlYii mowing ryemmlm whrpnds^n SouJifaaing rmforNoeM1 lyngemiE�ildlrg. Alteration of existing bedroom_Yes X No Adding new bedroom Yes X No Attached Narrative Renovating unfinished basement Yes x No Plans Attached Roll -Sheet Ba. If New house and or addition to existina housing.complete the following: a. Use of building: One Family Two Family Other b. Number of rooms in each family unit: Number of Bathrooms C. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? I, Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? In. Type of construction i. Is construction within 100 ftof wetlands? Yes _No. Is construction within 100 yr. floodplain_Yes_No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No. Septic Tank_ City Sewer_ Private well_ City water Supply SECTION Is•OWNER AUTHORIZATION•TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT Marie Blackman as Owner of the subject property hereby authorize Philippe Rigollaud to act on my behalf, in all matters relative to work authorized by this building permit application. See attachment (A) Signature of Owner Date Philippe Rigollaud ,as Qw /Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of pedury. PHILIPPE RIGOLLAUD Print Name D4/25/2016 Signature of e t Date SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor. Not Applicable 0 No.of Lieemae Holder: Maya Fulford CS-106329 License Number 159 Clark Drive Guilford VT 05301 03/14/2020 Address Expiration Date 413-772-8788 Signature Telephone 9 Fheighttered Nome lmprm emem Contractor: Not Applicable 0 Pioneer Valley Photovoltaics Cooperative LLC 140077 Company Name Registration Number 311 Wells Street, Suite B Greenfield MA 01301 09/15/2019 Address Expiration Bate Telephone 413-772-6766 SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.162,§28C(81) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... O+ No...... 0 11. - Home Owner Exemption The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,Provided that the owner sets as supervisor.CMR 780, Sixth Edition Section 108.3.5.1* Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or fans structures.A person who constructs more than one home in a two-year d shall not be considered a homeowner Such"homeowner'shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the building Permit As acting Construction Supervisor your presence on thejob site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers' Compensation) and Chapter 153(Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you maybe liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner'certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances, State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature City of Northampton 212 Main Street, Northampton, MA 01060 Solid Waste Disposal Affidavit In accordance of the provisions of MGL c 40, S54, I acknowledge that as a condition of the building permit all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL c 111, S 150A. Address of the work: 73 Village Hill Rd. 1S Northampton, MA The debris will be transported by: PV Squared The debris will be received by: Alternative Recycling Systems Building permit number. Name of Permit Applicant1 Date, Signature of Permit Applicant AUTHORIZATION TO PROCEED AND SERVE AS AUTHORIZED AGENT I hereby agree to the Project as set out above,and 1 agree to pay the contract price according to the Terms of Payment. I further agree to the Terms and Conditions attached hereto as a part of this Proposal and Agreement. I hereby authorize Pioneer Valley PhotoVoltaics Cooperative to proceed with the above-referenced Project in accordance with this Agreement.I further authorize Pioneer Valley PhotoVoltaics Cooperative,or its designated representative,to obtain required permits for this project on behalf of the Owner. I will allow any photographs or videos of this project to be used by Pioneer Valley PhotuVohalas Cooperative for marketing purposes. A check for the First Payment is enclosed and I am returning this Agreement within 21 days of the Proposal date. Pn� ame Date Signature �Y. Title Proposal agd Agreement p 00013593 Page 6 of 12 Greg BlackmanApril6 2018 PROJECT INFORMATION: ga�V.4A • Owner: Greg&Marie Blackman Residential Building Northern Garage • Address: 73 Village Hill Rd,Unit El-S \\��IIFY"// �4 `�ef Northampton, Ma 01060 - • Phone: (413)265-1801 w SRvned S.I.r 311W<RselaM • Email: greg.blackman@comcast.net G.eenrein MA013.a m3o1 - designdppsqua OSwp • System Size: 2.88 kW 413-108: Blackman n2-8'788 • Modules: SunPower X22-360-D-AC _ • Rail: Ironridge XR100 • Bases: EcoFasten Quikfoot SFE: nneege Sm Rd.WKEls • Snow Load: 40 Has Array to be on Reserved for nomnmpinn.Ma D.D.R • Wind Speed: 117 mph Western half of other unit. REA51O"5: ROOF STRUCTURE: Northern garage. 23°Trusses @ 24"O.C. ROOF MATERIAL: Asphalt shingles PROJECT NOTES: 1. Framing location to beverified on site. 2. Slide rail assembly as needed to avoid interfering with splices or bases. 3. Unless otherwise noted bases are staggered and spaced at 48"O.C. A Site Plan Southern Garage 4. Additional or alternative bases may be used to meet actual roof conditions. TRE: Site Plan BILL OF MATERIALS roes: 1204 CR PART MAKE MODEL ev: IG DATE: 6/1812018 24 Base EcoFasten Quikfoot SCALE: A55hoNT 4 Rail Ironridge 1 T XR100 BLK(to be cut in half) SIZE 8.5-01. 24 Middamp Ironridge X12100 UFO clamp BLK 16 Endclamp Ironridge XR1000FOstopper BLK A-01 8 Module SunPower X22-360-D-AC (5Me11 of 2) t .9 }' Roof 220"Overall .r �s��•f -}- 110"Available for Unit -k- w SDeet s fte a 311 Welh SbeeC SO131 13}2" -}-�-k-- Array 823/e" —a'—k- 13}'z" e,«meld Mno13o1 3n Space reserved for &M,,dO rsRumA7RBared, -_ E7-N unit array. l} JOB: Blackman I _ j SM: 73 WNge HIR Rd Unk El No�thampmn,Ml 01 ow RMSIONS: N Q i 1 N O O K Q (1 17' TmE: Array Layout 3" -Feet above rail at Use docking or BDW ,eow ottom of array only. decking attachments BY: re Array to be centered in Below rail otherwise. at edges as needed. DATE: 6/18MIR space reserved for Unit E-2 s.M ane-Vo' But 85'x11' Clamp Torque: 80 in-lbs L-Foot Torque: 250 in-lbs Max Span: 64" A-OZ Max Cantilever: 21" Module Size: 61-5/16"x 41-3/16"x 1-13/16"(46mm) 5hea2 or 2) �i R RITE T. IT - _ 413 2 430 � s tv r_L I - WRIGHT L fI BUILDERS �r - i I v «...�...A�. 4 PRICING GET M ZT r i Horn 3 r< �- -_ f'ItEOR tea RLIV I UETOp' ' v s r o , � v -r I Ic 'I & m I �m a m9 mai o; -._lea 9. uo mmm — no I a , — — — — Upp Rtlg FI ISE iG g VII® ge HII Rtl NOM pi MAA P Belchertown, LLC ,2,3115 i IF IP Products Company y - FrC.rIlnt a .. 15040859JRG m .rrre mx ,Upper Ridge Flats East/Garages 1504M59JRG CJ01 DIAGONAL HIP GIRDER .WFxxIp,.4m _ lo:ssh5]apsaN:lt+sm'ar_aNe:sl_K-':`WaiiT'i.'oL°b'Ica] '4i'�CAll7x4:P° "an�tr$'db'v"w'C�li 38] 38] Scale=1 10 3 3.54 1] 2 5 B1 1 6 4 4x4= aw 7.L iin ceL reL mel Po rtc �w yv np ryLl ! n« X2. .L CWe6BCARn%=7 MNv)m _ mD4 me IP eag uea/e1gM w 38]w.calx. CWPo 46LM 5F1`Xo.3 BCTCWFD Rg-Aq&nary epYW 11111 xeeq. Cw. M1+e1 211117 P IW D1-15iM�n,Mml�epoY MV Mnxx�0.t]1 MU LgM..1610.0 pJ�11F lry ' Mn 4manvryL 9l,Mxv0.0 1G1 FM¢B 10.1-Mv.Cunp.Mu.Ten.Nkwe EO(q w W arupvn+nmewn. 11 m`rva .IM1 Wnu urlMmtaa NebW mNve+pv m1M" r rx. E ..on'. w4. meee;Mreve ro.«eo.mce si."rrzl r.,bewnMe.me.euM1,rre .a Massa anreenmm.Lrmaw sI] L:luM7� ,pvrz.x cal lmei I"W:Wm[w oa 1"pp•ss.0 Pl s,enep;pl-O.O W,,t mL-l.tsmmca I I 1, 11 p F.N*E.r: elC Ixmxa�wnbw nwa Wen emwreem�ubewDt. sl TFuwv W Ww eepn.alw veelerelrm rzmFe wW 41301a1arxm LLmam�wlMem2.IplanaeMep mrrmnanxn.ennmer Ne me. ]Nj TmawemM®WWnvppnm n a OOvgl�WsnemWpoq Na�bWe�xmeb u�nen�Wgarry Maki NabYxeabrrmrrYiom.II Ie1M reywMtilryalge M1>nmin�Nimnw FYtt Wnb a®umlwtlwxe Ix�mn. e)pmvrr.aaNeawnneeon ryy dnenl muuw m l I iB wcamWretm Fupnnpmlelaeemq p•p x-lel. epTFeuek E®pM In emNmueMvv NOxlr2rratlorel BrYSIq wY wam2ttt.1 N ralararwf ArWm].HSDiR 1. 11]ANiw Xn NeneeegMbremwlry mrcenlrpMbalolEOMlreeW s4.tOeMbulee nexrrtl pnW mE eti penaparu ekn0ue eoXom CAON.nmmnmrMNeN 111'%v«4a Wp�o-nv i.emre Fveh'MeRlx wglMymWNrss uW IelNeneXaleeW eeryr M1Muw CISE14 slaWe2 OF UHN 4 p I1x�flF96 m I/ Jv �O FSCISIEM1%/ m aUNnt(� m nm Frne naneLemmm m..a eLr lm. ..�.v.wee eR nxe.mwnx np asae.nen...n..u. ne xemw nN r•.�. wm v w�.e wm o w. au vw n � mw p v o ...w.a w+ ^a w•.nm.w .pv...yy+l ..w x4 3 N2�323LSI,p�I�'p all W/ 111118161Li+351a1(L--Y819)11_L51a1Ll—Iwll� Iw1Z_(5101w551011,(eLZYL IwK•iL wll,G 219111»1.11.1 WILD-Kv./. w. Wwwn.., of W3tlJ [ OL�24Y s11-11 z w NeOt 11W9.wmwwµ9 511•am wlwtl 541+anal�qu.1 IwauyN wu5•wap(1 waww 181maa1m fO H> _ Iepgrv.dwvwNlvl.NmPwWwlwaavm�wwsd�awvMgw wew waYwwzl wendLL wv uvopsleswa'ppi we.9 sYpuv ur,opys(pwdoapa®am Lwdnvwwaeympgwdgnw MnuPwmuaua�vTw(gvwmltt ryq�o.z4aapwatllauvMyma[oPuawuq.ntl dwwwwtlNalemyulwVnE..wawuad�Nwwwa pwuw•~,uv.XwLL w•Iww�wnwPwY tdlSll NaP eauwnd Wl woypoI wgellfe9 84111 KK31®ImVMwm vI 1aY9+ww.VOOKwwdmnnwlmwl owNw LYV R9 wa�9.wl�uyl'1.Nw VYMI[M9�9 8944 btl34¢M114rc1a.)mVw•uvnalwEtalw.YN.w�+4 yDzuwyµ�w wppyp uweawTTdaao FuulawVL gxry9ugewVaLn Po1 wW RY'da11.n WV Lw uwP WvdWwaagN oama.nXw+i 0.q NUVwaW.NN Wwrvuangp(p gsrwK.F1 pu ayvw�l+w.ww ww]iwme•weugamW wudwM '.mw.�wwwrwiwgE wwwwwHs0i0uwwN wwwawmey..w aq wu4rouw wa+NwwLIs1 eRYI rci¢quAdm.lvlwMw�nn Polww ww�u�wovpp mueq gm�wlw(wwiW pluow�1��>w 4.uwak� • ^'w^. 9.N WWauwypp0'o1 e�W w.TPUNWem0yu111 OMw[oJa aWw Tw N4 '. wWw�.wawa a.Rp Fle wamaµpwa.vleL;P9 aw�iw W�wPon�auwueuva wwiw eLMuvLlwwll ojy"euamwplaw0 wM� Nnwwn el P•%a+e evq nua%4wlm. ala wa z 14n-er�MYed 9dz3'.IIza.Na'J ZNwapulWluW[yL9Ytlal�ppwa�a d099•eda'.Po-[3JStl l�lll6 '/uomwxpleaue awai pyryw gpWIUP MNl It 1.10]ePaap]py1.9ryJa �qunq'.4.aaLe4FX Wawa YNnMYwII+WMI StliMYJ'psPw'Bdrdaell ua 9K•VIaeO'9•W]9'JW 5•lO'll WMI sv[339tl pWAIt Nw wglYdpypm+p wq anV weowun Ip aLryd'wwn(alasa]pvm vww.wy Iw rreew W woV n o.Iw Ppna:W Iiow PvW Mnrolepmw wPomn.�NUN ropp 'i Wuarcya�i-eK�uvaw®wm+�wm�uV>e��a uup e�gw([y1[YN W1 vW wvlaNwwuwgm mo Mx 9 Mm�slfi muN8521�L�io(Spiw[���1ss21i�ise3vc�L�gz185211z�Y[es(esrc�2—(n1's[�sulllo�n l�pi 3 1'4WYn-KPn'R &18.YreML1KPo.�1[9�Lxw11•iZK'iCX[tw[tl%i/ttt-SSLL'1(95R➢[1995'1lw1eL'm['KSR�149Lxtt��LiL�4�x•,ZM�ISgs'L[9VLOC•R55'1lBL'WCKSZ atlW]i IWMIa-1904 KL(m'-V19 TL10[Y•B91K/Yf[em(LVZm'CC-l9 NL wwuvy..po.a apap10R�2� aK�[(W�eugro]remq'191098awf (YL SVBSK¢L'IN�VSXtKw9�T 18]VK1•x1'p�Vrcz-¢upn vry Fiz9vwl PtOPo6K4'114¢aw•I PCMYpVRK IwW SHtlloxJ9 39V p•'+�B 1 9tl3NL0 e lµb yaulp Polu+Mtl ww w uwMwpwq�epayna��awWewemlunprvw �jpl 3e1dy1Z dtla9¢ �1 SXpYG9 %LL 9Rt. hmW Oo2WIWOZWVW 0'04 �'M [�91,¢o- N�ry +m5�w9 4t1 1py -... warvn R• yrv���� ryR+nw w^�r]y i uqe Iw9 i1 4v9 Dose ou0e VOK rot 1 �4� EdNS 9Zlf 9Zlf 9Zlf BLIP 9Zlf 9Zlf 9Zlf 9Zlf 9Llf —'" =1-1 =bxb —'I'— xb 9 r lei]cd169 BZl 49 9x 9Z1f 9Zlf — =9115 BZIf 9ZV le!]atlS r =WE LL OL 69 bL e9 L8 sl 9999 y9 E9 LL L9 Z961 09 6L LZ 69 99 LL L9 99 99 —9x2 L Z4 Z L b b E b 15 S LL bxb cis s e ga 9Z9 s ,sxb bs s OL6 96 I Mb q bxb bxb 8 C 9 O bxb WE II WE ZLL=M-S =9-9 24009 Po1A fe bN 50iNa AOM9NIxu390NC0VN90111 oeq ppL1 Dos eat L ei �'d' �yaIsK 'a wm'.n 319tlEJ L09 sa6efeE)Ose3 slejj a6pia)atldN b � m�J21f6S80bOSL 1550040859J 70 JRG 1 ',JACK-CLOSED 68 1 Uppwer Ridge Flals EasUGarages Io:slwircosaP:irveovar �rvms IZf13c 'dY.'yl'd'r'�<AER4e�otg4ti 9%AVq=PMY6E4f+' zQa SWIe=1 10 e 3 5 00 12 z Tl et 1 5 2x4= 4 (m�rJc�p.1 wnwc- m roa roere .cu Pw cMwL zO4 cw cr"'u .o.w z .va Mrw tem« w P v ow ml d F N. a Iso w.�a,00L 115 .eo .r ecc n'� v.n m ze >vva zw w Pep m®vw res B—K o ww 10°o cM.leczPwmmJm w.IX.iM w.gY.nE n•.x vawewMe.zoa.wn.. .clwlm ae�P ua'.i w.cwPn AeamYne�:w5b er1oo4o<gaore. PBnaw, (eel imNc v�prmwdl.P-xmxmaa uugnu-1wlLc n..•d(w of m.cr.z-nam ul.am¢c 151 Z�tllra�nscE I�1o[ngr:�CaL��S(Kr BCo�6 roar�4iRaf+t 1�4p B.argmee:lnWFPOIWeee)eN LC E1erM31mne:enXYwr Y.me yne.pm]:C<br memYn eM bvei MIFPsa�veuvn eMrm.wmG SI IL:1PscEgiraP¢IP(mollW.bm:Wr le 111 PYe wt-1.15).PP55.0 W(W—M Mw Pna,o Pi(nnlwlana.-wrra wL-115Pw ott•1.151:u•wnll;up0',PewhE.p.;w1� O U.1Nm<Menvrwt nne o-.r G ,Wr W eemrw Er9ry flu wuulN.pu XrvenMMmMeb�mmpwEebge lemma wbbmwXmn minmyry 1( er LmaM6am�XinlM npenudgaNe4Gub11a�rwreue gYeeYumvmumrornne Mvn. ]IlleoueXn Mn eeeenslM a 100PIX%andwq Ne bcf mmunennrMN anY�er NabY. Bl Tkam�ry��a�mawm�i<wMMeolFWl�in0wmre BI utl<ry meeeNs]]u.lmeN e�arW�W!1.1aNngIFNRb10-10L �I s.xMXXpkndaebyngamne;'�Iren.nw Mblryrrmalxim w]bvre'maruNM�eM X�®p!aX'rsT�a Y aM gYlpnelaaruebnOme BMem CMN,mnamntxtin be eM XWlet. Lu10 cs•tRl%IeMaa H OF JVHNM � PHCSLLY y 6'M1 �Im �O I`�,151 EPEO?�h I �kINI,EeN I «a m�rr.r. .a• M .e 1 - r_r,M - - Upper Ritlge Flats EasVGarages 15040859JRG T01 COMMON 16 1 _ _ •v"•NPio°"• _ _ - -- Io:slu6xKOSEn3irv9war arvexsr�w'9�foft«'S�g�Y4S'CVF"$uffi67S�8'd�AlilSk9ilv��f' u.vr -Hae Ul 1e-0-0 zsao ]860 s1-108 '1-1PH f0Oo &0.0 &0-0 1MU 1-168' Scale=1:65 2 500 FIT 4x611 s 5x6' 54, 6 4x4 C 4x4 15 6 0 15 2 W2 W2 2 e .1 9 14 11 13 18 12 19 11 20 10 5x8= 6x6= axe= exfi= 5xe= 1004 19-00 2860 36pq 1P0.0 BM B60 1064 _ waoas f sxabia _ Pw osu rzoxn s a. , xmWnl 0 sppmP6 cs 6m� Vino ttnRa IW.9mm ) BG n Nly b1M1 A Pwvrm pv' MaxgN..� ) •� w 181vu TC MNP faap mnvrvoprf eE mepy opPwwxs apr.fr�. a w er fooAo<poarM. B62, wEw1Pwgntlp ]f3,YfS Wl 16.¢TpO. ryrxy SNAG]//10.)d SbvMp E4up Irvin na�Pl.e.3nAryP)d•bNw drq lvaoYf% bt(rGL v.-12- 111MeL P-.l7 % 6 w)Mv<m x-SnS0.c f 0,enen0.c x9 Mv.Lmp.Mn.➢n,.NMm EO ry)v Yanup.nn Nomr. ' i wmp.411". 1.evbmmmlem Mw�'N i re�ie of jw(O.f3f1T1ruieperM 'o.c 1xrdvlpuw'v 2).61131.11 el i wr O�elnwu e.reg.vMrggrxy-arz9pmi. I T WM:FSCF1M;fOM1rpr;rcp•S.Opf BLEL-SOpt A-Nn:cyll:Fap B.argwe:MVIFPs pvv.revel vtl UFmNplmn:unnprarptvne Nxnpr�:u fer rraryanvm MusMNfRsyrvawanvMm:LrMer wgaepp Laf.�w I)iGL'IdcE f 6:Po•55A PI rprauM owl:Pn4.)PI PYI rwf rrmm9:Cvgv/x;4 p B.aaNaM 5+p.:Lf-f f %UMeruemwI,d toremm —.M mr0 eq,. %ilu wn nn pen Jr3nal b peevr el m n mq Na Me q f P.0 pf w 3A]1Nee M top pM d 53J pJ en warMaa norrmrrounnf HA alm Ne Nsw mm . ]1N a1,pn pmE nNfe Wmrpwnenf¢Rnrveorry AAanel eM eamnwnWwa M1n Ne reepaWtXryofpo MnovvrornvrnepW axn to el Te into An bnaetlar+ffwvin.n Pl pdmm Nml Nenn mrwnanemrvllA MdAer Neth, %Pmr4L rrepivnlW¢nmgvr rye drertl ertwm bverypW.epxNdvM1Nuwg 1 W pu{ilf pyYnlel nug1rM13.1)f,e•fll. f m rm e�..m enM.ee r,...mx.,w.f n f ne 3pw IperenelrN aMwM cm.e. owl.m r.f.r.rrr,e.lwmm uuvlPl f. n,,M wr rrn bin anq..e w.�,olw�rrrml,eme m.e rvf xw.oA m..e 5o m win pm1.e.ex ne prr.N.m.f r wrw pexw elorrp nr.awom cpm..,..rvnl wv N..p fA6^Nrlpf plppudprxvxna I.!'Mmpor xwmmy mwelna wer.Ilr..reryv9 anlaepnafwenoa. Ln1sRl surme OF AS hM \y o .aF;I F. I M�roNxS E� N wua i'%., Oftmr o1 Consumer Pffairs and 1,rlslnosF H(1(n l r;Iinn Onc hshliulloo Plaut-, - sulc 1301 6oslon, Mas3aa fxentis C`<1(it Home Improvcmcnt Co Nrac:or Rccu'i illioli uuutlIvn!tly rllol oval;tdcs couv -- s v.a cn uio;�- Cso.�:�;on t>J IbUI� J' : 1'el IIbSI SU01 !. fJJTuI"('i l' 1h� 0'9G' 'W[1:1 011 1 1 +i nOPl it 'LOV.- If.VN1 V4C11)Y Nfg61�eYCn vuliC tU�lOCu9u01p II VCCI + pelvtlp lmn tlau Ilmul`nlu(M1 lc 11-. . ( •z(��ypLt. 01. .z 11 / 11 u'6cyu r1, 1 9u[men 1<0:.;] fA V. - ... '.O G.�k Fina 4il� p 11-1 Not v21147 111ho"t s1gn2lme Commonwealth of Massachusetts ®f Division of Professional Licensure Board of Building Regulations and Standards Constr{lCtr{ ilpfrvisor �t CS-106329r. �ires: 03l14/202o MAYA FULFORD 168 CLARK 601VE C GIULFORD VT�0301 ` 01W.00 W.1 10 Commissioner The Commonwealth of Massachusetts Department oflndustrial Accidents a I Congress Street,Suite 100 ra Boston, MA 02114-2017 www.mass.gov/dia R'orkers'Compensation Iwas rance Affidavit: Builders/Contractors/Electricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. Aonliernt Information Please Print lasiflily Name (BusinesstOiganinaiandndividual)I Pioneer Valley Photovoltaics Cooperative Inc. DBA PV Squared Solar Address:311 Wells Street, SuiteB City/State/Zip:Greenfield MA 01301 Phone# 413-772-8788 Are you an continuer Check the apprenticing box: Type of project(required) L�! lemacmploycr with 4B nnployces(fill and'ot pan-timcl--' - — 7. ❑New construction 2F1 I can a sole preprint orpari and have roongloycev winding mrinoin H. ❑Remodeling any rev ily.[No workers Ampasurae myui,,d] I M I on a honacwnor doing all work rAch Naeorkes crop i surnrecosoired]' 9. ❑Demolition 4.❑1 oma honmowncrandwill behiring mnmeoam wndua all work en my routinely I will 10 ❑Building addition nuourconan all Amraaors cimo-have workers'coinprneation iNnranacotan rola ILE]Electrical repairs or additions pnpdcmrs wiih no cnployca. 12.❑Plumbing repairs or additions 5 r I am ageneral aineandlhavehiredthe siccontractors coon the auatlmd shcot om . 13.❑Roofrepairs Thesubntmrsrs containers bge mx mployes and have workers mp.lnsumnce. 6.❑waare acomol'wehall.its arwi have [No..exercised their light tear pranper MGLe. 14.❑J Othcr Solar PV 152.00),and we have uO entloyecs.[No workers'comp.inwtuncc requiredd 'Any applicant hat checks box#I a eat also fill Out the section below,showing thour workers'compensation policy refn nonce 'Hurecowilers who submit this offidave indicating they all doing all work and then tire onside euntmcmn moa submit a new affidavitlndievend,saeh. tContmaors that check this box must aVaehed an additional,beet zbnwing the nanm or sub contractors and sate whether c net those chilies hart employes. [fine sub-conoanms have enpluyeca dreg mus provide their workcn'cont.policy trader. 1 am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name HDI Global Insurance Co/Energi Policy 4 or Self-ins. Linc.4.EWGCR0002412118 _ Expiration Date:01/01/2019 ' Job Site Address: 73 Village Hill Rd. City,'Stdc'z p:Northampton, MA 01060 .Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Folare to secure coverage as required under MGL c. 152,§25A is a criminal violation punishable by a fine up to S 1,500.00 and/or one-year imprisonment,as well as civil penalties in the form oft STOP WORK ORDER and a fine crop to 5250.00 it day against the violator. A copy offlus statement may be forwarded to the Office of investigations crfthe DIA for insurance coverage verification. I do hereby cern/under the pains and penalties t f perjury that the information provided above is true and correct. Scrawny Date. 6/20/2018 Phone#:413-772-8788 Official --- Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector fi.Other Contact Person: Phone#: More than 22% Efficiency High Performance & Excellent Durability Idea l for roofs where space is at a premium or where future expans'.on might be needed. X Maximum Performance SERIES Designee to de Iver the most energy in demanding real-world renditions,In partia' shade and hot rooftop ter r peraR✓es''^ Premier Technology Engineered with the newest and most powerful sroasaeo plastron technology,X-Series brings unmatched power and performance to your home. Highest Efficiency Generate more energy per square foot X Series residential pane's convert bore sin int t to Blear r ty by q'od-F r8 3850 Tore oower per panel'arta son,more energy per spode foct Duel 25 sears Highest Energy Productionwatt Produce more energy per rated watt Maxeon"'Solar cells:Fundamentally better Tign ycao-on-, performance delivers 81Or,hole ere'gy on nett watt' erglneered for performancedesigned for J,blliy- l his advantage Increases cdertirne,prod.cog E 1 N mo, csrgy over the nut 25 years to meet ya.rr needs. Engineered for Peace of Mind Designed to deliver consistent,trouble-free 21% energy See r a very long life(,Fee.'° Designed for Durability _ The Su bower Maxeon Solar Cell is the only cel _ bouton a solid copper touodation.Virtually impery ous to the corros on and r�ackingthat degrade conventional panels/ --- Same excellent durability as E-Sed es parels #1 Rank in Fraunhofer durability testi l 100%power maintained In Atlas 25e t comprehensive du,ability testJ° _ .t Sur-Power Offers The Best Crordbirsd Bowe,And Prodtcl Ilarr I Try Power Vv,ranty 'roduct War ranty F i , . No'e ,,,I arsec Tower 955,for fust 5years. Comb"er Farm or IPrtl=detect 3year cT�eage -L.eey', no year 25 11 It Includes Tanrl replacer, tcosts` SFR-X22-360 ___ Slardard Tests° Utt/03 fType 21ire oar ng),IFC 61215,IEC 6"730 Nrm'n,I PowE';l"") 360 W Qua lty C_e_rts 509001:2008,Iso 14001 2004 Po to _ra _ _-7777 _ ro4i ao F5.01 iSA51SOL TOO/, eadfree LIeTH Avg eLf flll, 22291 'KCo^tP:once "IF1`.-163,V"TC,se Bated oti,,PP) _.. _ 60.6V _ sr nab ry -d,In frond e fel gible for LEED -Ltsl - Hated Current(mPp) 5.9,11 A_ l ammonia Te,I _ 'E(62It6 _ C; Cc Vh tdge.IT, — W1 DesertTest 10t1o9/FVSr 2036J111143 Test IFC6 70 ('T,TLLrn seEet Ma St R.g. Co v D_&100C T F_C PI T st Laos,:,l-Ind d C g,dation +ee 1002 Jr ra sc _ _ 1SA A,aab'eGdr 11 IJVJgTCEC Lo.,,,r re 1p =(. 0399x/ - Vo g (, et_ 674 m/r Q e T p.oc. MAr'CC E' peraWlE 19 G o+185 F( o Ct ,35 faaaesst 1 I&(,Srrm d u emr_mlot_.2 LpL23-n a ..I.,.1t _ r,,i,. Aw. .,I Ir InI Appeaan _ C/ss a— _ o d L, Mo oCSt CIddeP fe Ill 1 11 1 6 ' T Ip d CYa,, IT, bIII O t PP ed anti I ec e,[11 r 1 A I I I I I 1 .,I o,x 1 65 MC4t { [ W in II (18Ckg Md. Load VI,vl 62 test IMI Ps, OS x'12 ror, &wLk I dr 1 rl a 5 2Tc 00oP-.611 kg ,r i.;11...1 Irame FC ". black od NghostA Aa If �. _ 46 mm 1558 mn B 8ln] Fool ll(rr LI t 1046 mm ^ a 141 in] n. I L... ,. ,.Ill tl, T, i,u ei,.....e. c I I I IRONRIDGE XR100 Rail See Descri tion / Length Rail Section Properties Property Value Total Cross-Sectional Area 0.582 in' .66 Section Modulus (X-axis) 0.297 in' .46 Moment of Inertia (X-ax8) 0.390 in' Moment of Inedia (Y-mis 0.085 in Torsional Constant 0.214 in' Polar Moment of Inertia 0.126 in 1 99 APPROVED MATERIALS: 2,44 6005-T6. 6005A-T61, 6105-T5, 6N01-T6 2.34 (34,000 PSI YIELD STRENGTH MINIMUM) 58 1.25 Clear Pad Black Part Description/Length Material Weghi Number Number XR-100 132A XR-100.1325 XRI00, Rai1132"I 1 Feet) 7.50 lb,. XR-100.168A XR-100.1685 XRI00, Rai1168" 14 Feet 6000.Series 9.55Ibs. XR-100-204A XR-100.204B XRI00, Rail 204"(17 Feet) Aluminum 1160 Ill. vtt IRONRIDGE XR100 Bonded Splice XR-100 RAIL 12.0 1 XR-100-SPLC-BD KIT, XR100 BONDED SPLICE � 2 1) Splice, XR100, Mill 12" long 2) Screw, Self Drilling 24 63 1.93 .31 T 0.42 IS 93 #12-14 TYPE"B"THREAD Property Value Property Value Material 6000 Series Aluminum Material 300 Series Stainless Steel Finish Mill Finish I Clear vi 0 � I/ F Q u I RFOO t PRODUCT GUIDE Exploded Product V'ew/6.O.M. - '. Installation Inst-uctions - Z �— Cut Sheets - 3 r , Specifications - 4 71 0. CLl 0. L LUo a oc" EcoFasten Solar` QuikFoot— Product Guide Exploded Procc tVle,,v Bill oF^da terms I Materials Needed for Assembly I , 7 Item No. Description of Material/Part Quantity I ® 1 QuikFoot Base Plate 1 6 2 Fastener(Length to be determined) 2 3 QuikFoot Flashing 1 ( ' S 4 EPDM Washer 1 O- 5 L-102-3"Bracket*(other options available) 1 y,/ Q 6 5/16"EPDM Bonded 18.8 SS Washer 1 7 1 3/8"Stainless Steel Hex Nut 1 Required Tools 1 4 ar 87]-859-3947 EcoFasten Solar`All content protected under copynght All rights reserved 10109/14 t t EmPartep Solar products are pmrected by the lollowinq U B.Parana 8.151 522 62 8.151700 B2 8,let]98 B2 8.186713 B2 8,146 299 32 8 209.914 B2 8 245 454 B2 6 272174 B2 8 225 557 32 i - . QuikFool Product Guide Cut Sheets: QF AL-Base 51 2X 0 Min [8.38mm] I' 1 4 � yyI GSi Vill h E N W 1 .son, 38.1 Omm] 3/$"-16 Stud C ° C C E AA� Jq E E V v`, P M P Y V t� QF-M : 1 .5" Q 1 .75» 871-859-3947 EOFa5len Solar All content pmtedad untler mpynght.All nghls reseroad.10109114 3Y E-Feoten Solar pmOutlFl are prob detl by Pe rollowing LL5.Pal nts 8.151522B28 153100 B21 161,3981328.166]1;3 62 8.14F,299 B2 8,209 914 61 8.295,454 821212. .1]4132 B.22y.95]B2 QuikFoot- Product Guide -u-5,ees QFL-8`.2 1, t R.38in [9.53mm] .032in ® � 0.81 MM l 12.00in ]304.80mm] , V1 3.00n Q [ 76.20mm] QD d�Q 50in 8.00h 12.70mm] 1 203.20mm] 877-859-3947 Eco Fasten Solar All content protected under copynght.All rights reserved.10109114 32 EmFae[en Solar oroduc6 are plo ectrtl by the following U.S.Patents 8.151522 B2 8.151]80 S2 8,181398 62 8.166 713 B2 8.146 299 B2 8 209 914 B2 8 245454 B2 8 272.174 B2 6 225.557 B2 1 QuikFoot— Product Guide Cul She=s: Bracket Options -SCL-101-3 IS! T----._ f it 3/8" a 46 SERRATIONS ICA � T y ♦�. U — Rl/16" 1 7/8" 3/4., 1/16' -7 R.00S R.O10 2X R.OI 4 4 O 60.00° Q 0 3/8' .002+.0061/8" ���� ✓ 0 7/8" X 820 DETAILA SCALE 3:1 877859-3947 EcoFasten Solar'All content protected under copyright.All rights reserved 10109/14 37 EcoFasten Soar pocucta are protected by the following U S.Patents.8.151522 B2 8153 700 Be 8181 398 B2 8.166 713 B2 9.146 299 62 8 209 914 B2 8 245454 B2 0,272.174 B2 8 225 557 B2 L I Yf QuikFoot— Product Guide peci`icationc L, t PA FT 1 -C=NERAL 1 fAMARV 13 SUBMI-TA. A. WORK INCLUDES A. Submit manufacturers written specifications. B. Base plate is ss In series aluminum with one 1 QuikFoot base plate attachment bracket thatuctPEM Type Press In Stud 18.8 SS. B. Submit standard instructions. sheets. attaches directly to the roof deck C Submit installation instructions C Fasteners to be compatible with chosen roof Z. Provide appropriate bracket and fasteners A Submit product specific load test data,showing application P ® a lication and meets specified pull out values for the roof system- as shown in load test data IS and allowable load values specific to B. RELATED SECTIONS 7 the roof deck specified for the project. D. Counter Flashing is.032 gauge aluminum t Section 07600.Flashing and Sheet Metal bossed to accept shape of stainless steel base l ,. 2.Section 07500 Roofing 14 QUALITY ASSGRAh:CE plate t 3.Division Administrative and Procedural Installer to be experienced in the installation of Requirementsspecified roofing material for no less than 5 years In 3 PINISH a1 4.D- 5 oN:Thermal and Moisture Protection specified area of the project. STEfo DES1nln 'aC A. Bracket is mill finish aluminum v A. COMPONENTS. 1.S 1ELI4ERY/STORAGc/HAVDLINC B Base flashing-Black-kynar painted 1. QuikFoot system consists ofaluminum Inspect material upon delivery.Notify manufacturer rrr� \lll bracket and base plate with N)stainless steel within 24 hours orally missing or defective items. Pl% - EXECUTION stud.(1)stainless steel nut,(1)EPI washer Keep material dry,covered,and off the ground until �-y instilled- , AMINATION and(1)bonded stainless steel and EPDM washer. A Substrate:Inspect structure on which brackets V/J PART2 PRODUC?S 2. Fasteners areto be installedandverlfythatltwillwith - stan AbrracckeL metal compatlblewlth QuikFoot r;.t. .ACTURE" - anyadditional lcadingthat maybe incurred. ^'. B.Fastenersshould be selected for compan EcoFasten Solar® tblliry with the roof deck. 289 Harrel Street Morrisville,VT 05661 B- Notify General Contractor of any deficiencies Q C Fastener strength should exceed or be (877)859-3947 before installing EcoFasten Solar brackets. equal to that of the allowable load of the wvwv.ecofastensolarcom system. See test data at C Verify that roofing material has been installed lei 1 wwvuecofastensolarcom 22 ?ARTERIALS correctly prior to installing solar attachment 3. Sealant(if required by roof manufacturer): A. Attachment Bracket brackets. to be roof manufacturer approved. 6000 Series Aluminum(choose one) Q 4- Aluminum counter-flashing 1.CP-SQ-Slotted - _ N 5- Aluminum attachment bracket 2. F-111-A A plyComply withthOarchitectural drawings and project 3.P-3-CSK engineer's rely with anionsforre;written in w B. DESIGN REQUIREMENTS: 4.SCL-101-3 system.Comply installation writtlayou 1. Bracket spacing to be recommended by 5. L-102-3" stallanon Instructions for installanonand layout. project engineer. 6.L-102-6" 2. Install a minimum oftwo fasteners per 7.Z-101 base plate. 8 Comp Slide 3. It is important to design new structures or 8.Custom assess existing structures to make sure that they can withstand retained loads 877-859-3947 EcoFasten Solar'All content protected under copyright.All rights reserved.10109114 41 EcrFasren Solar pmtluds are protetlea by the following V.6.Patents 8.151.522 82 8,153,790 B2 0.161398 Be 0,166,713 B28.146,299 82 9,209,914 82 8.245 454 82 0,272.174 82 8,225 557 B2 Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 INSTALLATION CREW OPERATING POLICY This policy applies to all PV Squared employees in Massachusetts, but is particularly directed at those involved in the installation of solar electric and other renewable energy systems (licensed electrician, learner/apprentice electrician, licensed constructor supervisor, supervised carpenter and laborer). When engaged in this work as an employee of PV Squared on a PV Squared project site, activities of PV Squared employees are covered under the General Liability Insurance maintained by the Cooperative. It is the intent of this policy to provide clarity to installation situations where the applicable codes and regulations are unclear, ambiguous, or silent. It is possible that a municipal building or electrical inspector could interpret the codes and regulations in a manner that differs from what appears here. But this policy sets out, in writing, how the cooperative interprets legal work requirements and unclear details. It is an internal consensus working model, intended to be revised and.improved from time to time. As a general matter, a city's or town's Building Commissioner is charged with enforcing the State Building Code, Plumbing and Gas Code, Electrical Code and Architectural Access Code. The commissioner addresses concerns about the safety, accessibility and security of construction of homes and businesses. The commissioner also enforces zoning bylaws. In accordance with Massachusetts General Law, employees of the cooperative who perform electrical tasks and activities must hold a Massachusetts journeymen's electrician license or be under the direct supervision of such licensed personnel. These tasks and activities include installing electrical wiring, conduits, apparatus, devices, fixtures or other appliances for carrying or using the electricity associated with Renewable Energy Generators (electrically active solar photovoltaic modules, wind turbine-generators, hydroelectric generators, etc.). In no circumstances shall the Massachusetts licensed journeymen have more than one learner or apprentice working with him/her or under his/her supervision. Mounting structures come in a variety of configurations and have differing functional and physical characteristics. A structural component or assembly becomes associated with electrical work as the Renewable Energy Generator is electrically bonded to the mounting structure. Unless otherwise noted in M.G.L. c.143 5§3 through 5§60 inclusive, all structural work defined as follows shall not be required to be performed by a Massachusetts licensed journeymen electrician: • Structural improvements • Elements of a Renewable Energy Generator's support structure that fall under a building permit (e.g., assembly of top-of-pole mounting structure on steel pole with concrete foundation prior to execution of any required electrical bonding of the support structure and associated renewable energy generator (solar electric module) to the support structure Policy # 9 Installation Crew Operating Policy Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 • Roof-top mounting support structures including but not limited to posts, stand-offs, flashings, feet, and mounting rails • Operation of heavy equipment involved in moving, hoisting, digging and other tasks • Earth work, excavation and concrete work • Manual labor involved in moving loading and unloading of equipment • Moving, hoisting, and attaching an electrically bonded panel assembly (defined as one or more assembled and electrically.bonded solar electric modules) to an existing structural support designed to host the panel assembly. Note however that construction of a panel assembly is an electrical task due to the required electrical bonding activities. Repair and Servicing of Installed Equipment Repair or replacement of an electrically bonded and/or energized renewable energy generator (e.g., installed solar electric panel) will be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician. Replacement of an installed inverter must be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician, if the work requires removal of AC and/or DC conduit and associated wiring that originates outside of the installed inverter (e.g., removal of external AC conduit and wiring between the inverter and point of interconnection with the on-site electrical service). Note that this activity may require a wiring permit in some local jurisdictions. This requirement also applies to the servicing of an installed inverter that involves replacement or repair of components and wiring internal to the pre-manufacturer inverter (i.e., factory installed components that were originally shipped with the inverter) even though such activity may not require a wiring permit. Replacement of an installed inverter may also be performed by a qualified technician who may or may not be a licensed electrician or properly supervised learner or apprentice working with a licensed electrician if the inverter is of a "plug and play" design. Such a qualified technician can also performed other tasks that include installation and servicing inverter-based performance monitoring systems (e.g., replacing internal communication cards, making "plug and play" ethernet connections, etc.), assuming these activities do not require creation of a new AC power source circuit to operate the communication system(s). Policy # 9 Installation Crew Operating Policy 56Uq A R@o PV Squared Solar)www.p✓squaredcoop Phone:413-777-8788 j Fax.413-772-8668 311 Welk St.,Ste.B j Greenfield,MA 01301 �O„� �o✓ MA Elec.Lic A13764)MA HIC 140077 Dear Town Inspections Officials, Please see our enclosed applications to permit a Solar Photovoltaic System in your jurisdiction. As you are likely aware, PV Squared is a worker-owned-cooperative B-Corp, employing 40+ people in Greenfield. We have installed thousands of PV Systems out of our Greenfield, MA Headquarters since 2002. PV Squared is committed to complying with all Commonwealth laws and regulations. Our worksite guidelines are created with the intention of exceeding all safety, electrical,and building requirements as defined bytheir respective jurisdictional entities. This includes the work of people from multiple disciplines, including electrical engineering, structural engineering, civil engineering,electricians, construction supervisors, roofers, and their associated helpers. We are a company that values training and education. We make certain that every individual is qualified for the roles and responsibilities thatthey assume. It is our policy to pay for the employees travel and training time and cost of the education, including CSL and Journeyman and Master Electrician classes. As an electrical contractor we are furthermore guided by the January 30, 2009 Massachusetts Board of State Examiners of Electricians (BSEE)judgements, and rulings that have followed.We pay strict adherence to these mandates and all electrical work is conducted by an electrician and an electrician's apprentice in a 1:1 ratio. We also understand that non-electrical tasks associated with a Solar installation can be completed by non-electrical workers, such as CSLs and others. I have attached our installation policy for your review, as well as a list of example non-electrical tasks. Should you have any questions or concerns regarding this policy or delineation of work, please let us know. We are a learning organization that is always trying to improve on what we do. Respectfully, Adam Thurrell Operations Manager The Commonwealth ofMassaehuseus Department oflndustrialAccidents 1 Congress Street,Suite 100 Boston,MA 02114-2017 www.mass.gooldia UTWearkers'Compenseation insurance Affidavit:Builders/Contractors/Electricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. Applicant information Please Print Leeibly Name (Business/Organlzatiomindividual)I Pioneer Valley PhotoVoltaics Cooperative Inc. DBA PV Squared Solar Address:311 Wells Street, SuiteB City/State/Zip:Greenfield MA 01301 Phone#:413-772-8788 Are you an employer?Check rhe apprapat..haa: Type of project(required): I.j]l um a employ w,, 48 employom'(full aa&rr pat-Iliac)." 7. New construction 3.n lam asolepmpndororParmenM1ip andhave wemployees working fie—ein S.Remodeling aaY anPaairy.lNoworkeri comp.waurite- nxiered.7 II work Yse m If I No workers'come. mmnc d 9. ❑Demolition 1 am a homeowner doing a Pin a regoue .] 4.�1 as a homemvter msd will be hiring cmmwcrorr ro wndud elFvorkaamy pmpeny_ I cull 10 O Boildivg addition um mal nn aonunnars eimar nave Workers'e.,easmkw invmww.mamsole 11.0 Electrical repairs or additions proprietors wilt no employees. 12.❑Plumbing repairs or additions 5.j]I am a ycneml wmmewr and l have hired the subcommcmrs loved on the arched sheet ];. Roof repairs nxae,bl ywitme ots have employees and voeworkers'wap.iaaumace 6.0weareaw - 14.QOlher Solar PV momtehand. omaw nave exemiseV mossrightofativew,n Per Met,c. 152,tl(a),anJ wa M1ave m employees.[No wohare comp.insureow regnired.l 'Any applicant amt checks box kl muss also fill out the section below showing their wm4ms'eompeowtion policy Information. r Homeowners who submit iia andaNt iadwating they aro dowg all work and den hue outside you nomas,must submit a new amdam it indicating such. tl7maracmm that dmeek this bar must atsel od an additional sheet show.,the name of me sub-earvaetms and slate whether or not dense encs es Imve employees. Ifine nub-.asetora have employees,dry must provide Meir wwken'comp_polity mm olsw I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name:HDI Global Insurance Co/Energi Policy#or Self-ins.Lic. P.EWGCR0002412118 Expiration Date:01/01/2019 Job Site Address: 73 Village Hill Rd. City/Slate/Zip:Northampton, MA 01060 Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Faille to secure coverage as required under MGL c. 152, g25A is a criminal violation punishable by a fine up to$1,500.00 and/or ovo-year imparvenament,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pains and penalties of perjury that the information provided above is true and correct Sienamre Date. 6/20/2018 Phone#:413-772-8788 Oficial use only. Do out write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone N: