38A-074 (3) 155 GROVE ST BP-2018-1366
GIs 4: COMMONWEALTH OF MASSACHUSETTS
Map-.Block:38A-074 CITY OF NORTHAMPTON
Lot:-001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS
Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A)
Category, she BUILDING PERMIT
Permit BP-2018-1366
Project# JS-2018-002424
Est Cost:
Fee: $30.00 PERMISSION IS HEREBY GRANTED TO:
Const. Class: Contractor. License:
Use croup: Homeowner as Contractor_
Lot Size(so.e.): 16335.00 Owner: April Cannon&Karen Foster
zonine:URB(100)/ Applicant: April Cannon & Karen Foster
AT. 155 GROVE ST
ApplicantAddress: Phone: Insurance:
155 Grove St (413) 537-9760 0
NORTHAMPTONMA01060 ISSUED ON:6/2112018 0:00:00
TO PERFORM THE FOLLOWING WORK 8X12 SHED
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter:
Footings:
Rough: Rough: House# Foundation:
Driveway Final:
Final: Final:
Rough Frame:
Gas: Fire Department Fireplace/Chimney:
Rough: Oil: Insulation:
Final: Smoke: Final:
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REGULATIONS.
Certificate of Occupancy Shumate:
FeeTvpe: Date Paid: Amount:
Building 6/21/20180:00:00 $30.00
212 Main Street,Phone(413)587-1240,Fax:(413)587-1272
Louis Hasbrouck—Building Commissioner
File 4 BP-2018-1366
APPLICANT/CONTACT PERSON April C:::non&Karen Fos-er
ADDRESS/PHONE 155 Grove St NORTI RAMPTON (413)537-9760 i)
PROPERTY LOCATION 155 GROVE ST
MAP 38A PARCEL 074 001 ZONE URB('00/
THIS SEC TION F_OP-OF171CIAL USE ONLY:
PERMIT APPLICATION CHECKLIST
ENCLOSED REQUIRED DATE
ZONING FORM FILLED OUT if _. _
Fee Paid
Building Permit Filled out
Fee Paid
TvueofConstruction: 8X12 SHED
New Construction
Non Structural interior renovations
Addition to Existing
Accessory Structure
Building Plans Included:
Owner/Statement or License
3 sets of Plans/Plot Plan
THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON
IN#6RMATION PRESENTED:
1{' Approved Additional permits required(see below)
PLANNING BOARD PERMIT REQUIRED UNDER:§
Intermediate ProjecC Site Plan AND/OR Special Permit With Site Plan
Major Project: Site Plan AND/OR Special Permit With Site Plan
ZONING BOARD PERMIT REQUIRED UNDER:§
Finding Special Permit Variance'
Received&Recorded at Registry of Deeds Proof Enclosed
Other Permits Required:
Curb Cut from DPW Water Availability Sewer Availability
Septic Approval Board of Health Well Water Potability Board of Health
Permit from Conservation Commission Permit from CB Architecture Committee
Permit from Elm Street Commission Permit DPW Stoma Water Management
Deemm�olilition Delay
Signature o wilding Official Date
Now: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning
requirements and obtain all required permits from Board of Health,Conservation Commission,Department
of public works and other applicable permit granting authorities.
r Variances are granted only to those applicants who meet the strict standards of MGL 40A.Contact Office of
Planning&Development for more information.
City of Northampton
Massachusetts
REGDEPARTMENT OF BUILDING INSPECTIONS r
212 Main Strttt . Municipal Building ZJ y
NorNaa,ton, !R 01060
JUN 2 0'
OEPNOF ORTRAMPTO 1ldA0W60 S -3 Ci
ACCESSORY STRUCTURE PERMIT APPLICATION
(For hNstanding structures leas Man 200 sq.R.r at least 5 feet from any ether structure)
PLEASE TYPE OR PRINT ALL INFORMATION
1. Name of Applicant:_._ y
Address:��� &f`04 5t.5t. __ Telephone: 1I � / 7640
2. Owner of Property: Ar1I Gy%1-
Address:_. S QIM C Telephone:
3. Status of Applicant: Owner1_Contractor 1�
4. Structure Location:_j.11 s1�(aLll.
Parcel ID:Zoning Map# Parcel# District(s)--
(TO
iistrict(s) _(TO BE FILLED IN BY THE BUILDING DEPARTMENT)
S. Use of Propert<9or Two Family: Multifamily:__ Commercial:
6. Description of Proposed Structure:
One Story Sh"under 200 sq.ft.: Fmestandin Deek untler 200 sq.H.,less than 30"above grade:
SIZE OF STRUCTURE: f f
Other(describe):.
T. Attached Plans:Sketch Plan✓ Site Plan' Plot Plan
8. Does the site contain a brook, body of water or wetlands?NO ✓ DON'T KNOW YES_
IF YES! Has a permit been,or need to be,obtained from the Conservation Commission?
Needs to be obtained__,Obtainetl ,Date issued________
CONTINUIED ON NEXT PAGE
9. ALL_INF
This column to be fill"In by
the Buildinly Department
Edeling Proposed Required by Zoning
Lot size . 38 0.Cf C
Frontage WA WA N/A
Front: O
Setbacks: Side: y /
Rear.
Height p
% Open Space:
(Lros
(Lot eminae bN9 and /y� Gd • A^
Weed rid • f SD%
10.Certification: 1 hereby cerfNy that the Information contained herein In true and accurate to
the best of my knowledge.
DATE Ie I APPLICANTS SIGMATURS---4q;Oa_
NOTE: Issuance of a permit does not relieve an applicant's burden to comply with all zoning requirements
and obtain all required permits from the Conservation Commission,Department of Public Works and other
applicable permit granting authorities
Imp-
co
vL
S
y