Loading...
18C-064 (2) 179 PROSPECT AVE BP-2018-1353 GIS s: COMMONWEALTH OF MASSACHUSETTS Map:Block: I SC-064 CITY OF NORTHAMPTON Lot-001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Bulldlng DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL 042A) Category: WINDOW WELLS BUILDING PERMIT Permits BP-2018-1353 Projects JS-2018-002408 Est Cost:$2000.00 Fee:$65.00 PERMISSION IS HEREBY GRANTED TO: Const Class: Contractor: License: Use Group: Homeowner as Contractor_ Lot Size(sq. ft.): 10977.12 Owner: JEWELL MARK Zoning:URB(100)/ Applicant: JEWELL MARK AT. 179 PROSPECT AVE ApplicantAddress: /1 Phone: Insurance: QST 179 /?VSIEC� (4011965-9590 (1 NORTHAMPTON MA01 060 ISSUED ON:6/78/2018 0:00:00 TO PERFORM THE FOLLOWING WORK:EXCAVATE, CUT FOUNDATION, INSTALL EGRESS WELL WINDOW, BACKFILL WITH GRAVEUDIRT POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House ft Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy signature: FeeTvpe: Date Paid: Amount: Building 6/18/2018 0:00:00 $65.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner City of Northampton Building Department f 212 Main Street s r Room 100 lebi'dy 5�6�� k' Northampton., MA 01060 rr ` ra1f� phone 413-587-1240 Fax 413-587-1272 ' ; APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWOFAMILYDWELLING SECTION 1 -SITE INFORMATION 80' / d( -1 ,355 1.1 Property Address: 1-19 ,p Pcos 2O+ Ove-Q This section to be completed by office 1 P Map 4a Lot Unit Zone Overlay District Elm SL District CB District SECTION 2-PROPERTY OWNERSHIPIAUTHORIZED AGENT 2.1 Owner of Record: (Y)A(LY C. Q LL n5 Pcp Q✓t Name(Pnnl) Current MailingQkddress' Nol 9Lc-9c96 Telephone Signature 2.2 Authorized Agent: Name(Pont) Current Mailing Address: Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by ermit applicant 1. Building *00 (a)Building Permit Fee 2. Electrical �A (b)Estimated Total Cost of Construction from 6 3. Plumbing n/A Building Permit Fee �5. 0 .` 4. Mechanical(HVAC) WA V 5. Fire Protection //rr 6. Total=(1 +2+3+4+5) $%rdoo Check Number This Section For Official Use Only Permit Number: Date Building Issued: Signature: 61,81i 8 Building Commissionedinspector of Buildings Data (no,( k tj_jrjl a 7;"N.;1 -cam Ar EMAIL ADDRESS (REQUIRED; EITHER HOMEOWNER OR CONTRACTOR) Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This columo w be filled in by Buildivg Depazwevt Lot Size Frontage Setbacks Front Side L:—`-_. R:__.."._. L: R:..__ Rear --- Building Height --- --- "---- Bldg. Square Footage ----' % -- Open Space Footage __— % -� (Lot area minus bldg&paved dcog) 9 of'Parking Spaces -- - Fill'. (volume&Lavepov) A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO O DONT KNOW O YES IF YES, date issued:. IF YES: Was the permit recorded at the Registry of Deeds? NO © DON'T KNOW O YES O IF YES: enter Book '.� '.. Page and/or Document N' B. Does the site contain a brook, body of water or wetlands? NO O DONT KNOW © YES IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained O Obtained © , Date Issued: .. tea; C. DO any signs exist on the property? YES ® NO IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES O NO IF YES, describe size, type and location: E. Will the construction activity disturb(clearing,grading,excavation,or filing)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES O NO O IF YES,then a Northampton Storm Water Management Permit from the DPW is required. SECTION b DESCRIPTION OF PROPOSED WORK(check all applicable) New House ❑ Addition ❑ Replacement Windows Alteration(s) Roofing Or Doors 1:3 Accessory Bldg. ❑ Demolition ❑ New Signs [p] Decks [O Siding[C3] Other[07 Brief Descripoomd WorkaN yi SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder: License Number Address Expiration Data Signature Telephone 9.Registered Home ioorowmi Contractor. Not Applicable ❑ Company Name Registration Number Address Expiration Date Telephone SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(l Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affitlavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... ❑ No_.... ❑ City of Northampton 212 Main Street, Northampton, MA 01060 Solid Waste Disposal Affidavit In accordance of the provisions of MGL c 40, S54, I acknowledge that as a condition of the building permit all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL c 111, S 150A. Address of the work: 111 &, rrl Ave. The debris will be transported by: matk 3eLJ( The debris will be received by: ur. Building permit number: Name of Permit Applicaantf11Aq-x c 31=1 e I L Date Signature of Permit Applicant City of Northampton Massachusetts G C DEPARTMENT OF EDIDDING INSPECTIONS 212 Main Street . icipalBuilding aoitham n, W. 01060 .y� AFFIDAVIT Home Improvement Contractor Law Supplement to Permit Application The Office of Consumer Affairs and Business Regulation ("OCABR")regulates the registration of contractors and subcontractors performing improvements or renovations on detached one to four family homes. Prior to performing work on such homes,a contractor must be registered as a Home Improvement Contractor('H1C"). M.G.L. Chapter 142A requires that the "reconstruction, alteration, renovation, repair, modernization, conversion, improvement, removal, demolition, or construction of an addition to any pre-existing owner-occupied building containing at least one but not more than four dwelling units....or to structures which are adjacent to such residence or building"be done by registered contractors. Note.If the homeowner has contracted with a corporation or LLC,that entity must be registered. Type of Work: Est. Cost: Address of Work: Date of Permit Application: I hereby certify that, Registration is not required for the following reason(s): _Work excluded by law(explain): Job under$1,000.00 ,,C,�Owoer obtaining own permit(explain): _Building not owner-occupied Other(specify): OWNERS OBTAINING THEIR OWN PERMIT OR ENTERING INTO CONTRACTS WITH UNREGISTERED CONTRACTORS OR SUBCONTRACTORS FOR APPLICABLE HOME IMPROVEMENT WORK ARE NOT ELIGIBLE FOR AND DO NOT HAVE ACCESS TO THE ARBITRATION PROGRAM OR GUARANTY FUND UNDER M.G.L.Chapter 142A.SUCH OWNERS ALSO ASSUME THE RESPONSIBILITES FOR ALL WORK PERFORMED UNDER THE BUILDING PERMIT.SEE NEXT PAGE FOR MORE INFORMATION. Signed under the penalties of perjury: I hereby apply for a building permit as the agent of the owner: Date Contractor Name HIC Registration No. OR: Notwithstanding the above notice, I hereby apply for a building pe . s the owner of the above property: 6-f-IS Dateweer Signa e City of Northampton "J G Massachusetts c ( Y DEPARTMENT OF BGILIJING INSPECTIONS 212 anis Street Municipal Building Northampton, IW 01060 Massachusetts Residential Building Code Section 11025.1.2 Homeowner: Person (s) who own a parcel of land on which he/she resides or intends to reside, on which there is, or is intended to be, a one or two family dwelling, attached or detached structures accessory to such use and/ or farm structures. A person who constructs more than one home in a two-year period shall not be considered a homeowner. Section 110.R5.1.3.1 Any homeowner performing work for which a building permit is required shall be exempt from the licensing provisions of 780 CMR 110.R5, provided that if a homeowner engages a person(s) for hire to do such work,then such homeowner shall act as supervisor. Such homeowner shall submit to the Building Official, on a form acceptable to the Building Official, that he/she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time, during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152 (Workers' Compensation) and Chapter 153 (Liability of Employers to Employees for injuries not resulting in Death) of the Massachusetts General Laws Annotated, you may be liable for person(s) you hire to perform work for you under this permit. The Commonwealth of Massachusetts Department of Industrial Accidents 1 Congress Street,Suite 100 Boston,lYL4 02114-20177 www.mass.gov/dia TWorkers'Compensation Insurance Affidavit:Builders/Contrastors/EleMricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. Applicant Information Please Print Legibly Nme (Business/OrgmaatioNindividual): (AAOk ap p j( Address: 1 '7 \ eCi s ft � Asir, City/State/Zip: Aitirlhame rn A alo&d Phone#: '10/ 9Gs-9S 90 Are you an employer?Check the appropriate bus: Type of project(required): 1.�l am a employer with employees(mu aM/orpmt-time) 7. ❑New construction 2.❑I am a sole pmpdetmor paM by and have no employees woddag for me re S. ❑Remodeling y=opacity.Mo workm'comp.meuran. mluitN.] 9. El Demolition 3®\lma homeowner dow u work No workers'comPismvicere9red.]• 4,F-1 I am a homeowner meoer mad will be homing commonness to coadmt all work on my property. I will 10 E] Building addition ®methat au comncmrs timer have worketscomwsmaon mammas or are sole 11.❑Electrical repairs or additions pmpmm�rs withno employees. 12.❑Plumbing repairs or additions 5,M 1 sm a general contractor and I have hued the sub-commarms based on the attached sheet, 13.DRoof repairs These sub-contractors have employees and have workers'comp.assmau 6.❑We are a corporation and its oft ave have exercised mew right of exemption per MGL c. 14.❑Other 152,§1(4),and we have ao employees.[No workers'comp.assurance on,mod.] 'Aay a micam that checks box WI must also fill out the section below showing men workers'compensation policy infia.u. t Homeoemers who.aabmi[this affidavit Ia tionals they are doing all work and then hue outside co urae m most submit a new affidavit inthcamg such, lContracmrs mat check this box most attached an mddiYonel sheet showing the name ofine subcontractors and sate whether or not those entities have employees. If the subcoumemrs have employees,they mus[provide the. workers'comp.policy amnbm. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: Policy#or Self-ins.Lic.#: Expiration Date: Job Site Address: City/State/Zip: Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under MGL c. 152,§25A is a criminal violation punishable by a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. Ido hereby certify under the pains and pe es of perjury that the information provided above is true and correct Signature ��O Date Phone - ` -Lel /C1.1-9579a Official use only. Do not write in this area,to be completed by city or town ofjiciat City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.Cityrfown Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: Information and Instructions Massachusetts General Laws chapter 152 requires all employers to provide workers'compensation for their employees. Pursuant to this statute,an employee is defined as`...every person in the service of another under any contract of hire, express or implied,oral or written." An employer is defined as"an individual,partnership,association,corporation or other legal entity,or any two or more of the foregoing engaged in ajoint enterprise,and including the legal representatives of a deceased employer,or the receiver or trustee of m individual,partnership,association or other legal entity,employing employees. However the owner of a dwelling house having not more than three apartments and who resides therein,or the occupant of the dwelling house of another who employs persons to do maintenance,construction or repair work on such dwelling house or on the grounds or building appurtenant thereto shal I not because of such employment be deemed to be an employer." MGL chapter 152,§25C(6)also states that"every state or local licensing agency shall withhold the issuance or renewal of a license or permit to operate a business or to construct buildings in the commonwealth for any applicant who has not produced acceptable evidence of compliance with the insurance coverage required." Additionally,MGL chapter 152,§25C(7)states"Neither the commonwealth nor any of its political subdivisions shall enter into any contract for the performance of public work until acceptable evidence of compliance with the insurance requirements of this chapter have been presented to the contracting authority." Applicants Please fill out the workers'compensation affidavit completely,by checking the boxes that apply to your situation and,if necessary,supply sub-contractor(s)turrets),address(es)and phone numbers)along with their certificate(s)of insurance. Limited Liability Companies(LLC)or Limited Liability Partnerships(LLP)with no employees other than the members or partners,are not required to carry workers'compensation insurance. If an LLC or LLP does have employees,a policy is required. Be advised that this affidavit may be submitted to the Department of Industrial Accidents far confirmation of insurance coverage. Also be sure to sign and date the affidavit. The affidavit should be renamed to the city or town that the application for the permit or license is being requested,not the Department of Industrial Accidents. Should you have any questions regarding the law or if you are required to obtain a workers' compensation policy,please call the Department at the number listed below. Self-insured companies should enter their self-insurance license number on the appropriate line. City or Town Officials Please be sure that the affidavit is complete and printed legibly. The Department has provided a space at the bottom of the affidavit for you to fill out in the event the Office of Investigations has to contact you regarding the applicant. Please be sure to fill in the permit/license number which will be used as a reference number. In addition,an applicant that must submit multiple permit/license applications in any given year,need only submit one affidavit indicating current policy information(if necessary)and under"Job Site Address"the applicant should write"all locations in_(city or town)."A copy of the affidavit that has been officially stamped or marked by the city or town may be provided to the applicant as proof that a valid affidavit is on file for future permits or licenses. A new affidavit must be filled out each year. Where a home owner or citizen is obtaining a license or permit not related to any business or commercial venture (i.e.a dog license or permit to burn leaves etc.)said person is NOT required to complete this affidavit. The Department's address,telephone and fax number: The Commonwealth of Massachusetts Department of Industrial Accidents 1 Congress Street, Suite 100 Bosnia MA 02114-2017 Tel. #617-727-4900 ext 7406 or 1-877-NMSSAFE Fax# 617-727-7749 Revised 02-23-15 www.mass.gov/dia .t v F 3 Y 6/1312018 r ,Iic Block Windom for Basements Safe Egress with Style • • • 2015IRCCode (844) 4634737 all Compliant (8,1,l)4634737 Item#or Keywords 4 Shop By Product Home a Egress Windom x Acrylic Block In-Swing Window Complete Egress Kits In-Swing Acrylic Block Windows for Egress In-Swing Egress Kits Window Wells ReatlANdta a Review Egress Wintlows - Select Options'. Well Covers B Grates �� -Choose- Basement Windows mop ACcessores, c� ?i awmiry: Non-Egress Window Wells rta� ;1 l �` Y Newsletter Signup f Enter email address FAI+ '_ 29'wx •41gn 4p No. �`�a45'H g hinge Lel 2015 IRC Cade RecelVewed �w shown i Compliant mop� Installation instructions ■c: 'll,,, @a a Pmducl Specs PWEI% ! `�mr O as r3 Mandac mrs Waranty Acrylic Block In-Swing Specifications Window NanuM1ctual Hy'-de WIi 2912'o 3112' HeigI&3712' 45112' 6112' ar69112' MNerkes:Vinyl Frame with Amylle Blocks code Compliant Yes - Nobe.8'ways blocks Mat are l 112'tick. i. Production Time:Roughly 2 weeks. Description Stif Back II Egress Kit- inSwingAcinic Blmk Windows operate simAarly to a dm%making smergene,basement egress even easier.Made with a vinyl frame Galvanized mrryainirg 8'square Acrylic Bloch l'A'MIck,Mem wino.ere very along.yet 70%lighter Man regular glass block windows making installation a snap.These windows are also 33%mom energy @indent with a uVa1ue of 0.43-allowing in plenty of rental light while sell offering yon a degree of pmary,making them ideal for be lmans or bdhroorm "NOTE:man order,Neses choose the hinge side based on Me odentation of looking from inside Me rmm looking out. f INN You May Also Like 2066 Egress Kit- Sandstone Easy Egress Well for 2062 Egress Wei Eaey Egress Wellfor 2062 Egress Well- Stonewall Egress New construction- Sandstone New eonsWdion- create Well Miss Stocked Stone https:lAx ,egresswindms.mmlproducUAcrylic-Block-In-SMng43asementegress-windows 112 6/13/2016 Acrylic Block Windows for Basements I Sale Egress with Style Customer Reviews (3) III&he,to H.you,own review. GreaRl Everything was perfect,from Me begining to the end. SWIRL IN EGRESS WINDOW Rad an oW ide obstrucAon to window.I Inked he weeks for a awing In window like this and could not find one anywhere.Finally after 20 he of searMirg online fount this company.Great cualo nerserncs.Feet Shipping,Goo]Pack'mg,Wmdav Works Pe Req Wndowwasgreatx sgoMandseamtobemadeto Iasiverygwdwns4 dno Terms& y tlons Lr➢©LPrivacypolicPolicy Privacydi o erred us She Map wlbrtacTkl CommerooV3 hilps:/Www.egresswindows.mm/pmducVAcrylic-Block-In-Swing/basemenl-egms-windows 2/2 Installation Instructions For Casement Windows With MountingFin Includes all of the following series: LH1C5-8/ LH1CS-6 Top View III 1 �-� Inside 7 NOY:We stung/Y aso/n//re/M theuse ij n'i/x Afift UN, skid axWs!//panaas.sbhNin ASJMEI111-01.Naxxve, to roriallon in codes arW buiMing type{it k/eft Oto Ue e/W user(p oYfervnix the pxo rinsfa//anon alfhese hems. LEAVE THE BUBBLE WRAP ON! Before Installing your window,the bubble wrap may be peeled back for inspection,but please re suck the wrap to protect the blacks from scratches and cher damage until constructed is complete. Step 1 Measure to be sure the opening is 3/8"to 1/2"larger than the window sae both vertically antl bandero lly. *Though not necessary,you may wish to pre-dell the Installation holes In the In at this Lime. asice,sed the re wdhad hale v,Me mounrin lrn,as that,am nor nemssanllscOncrefc Step 2 It Is recommended that the screen be removed until construction is complete to avoid damage. This is done by slipping a Flat tool under the edge M the screen frame and pulling toward you, The scirden is a fiction fit and will pull straight out. Step 3 Apply a generous bead of silicone to the backsMe of the mounting Fla Use enough sllknne to sufficiently fill all voids between the fin and the wall sheathing. You may wish to place shims in the sill of the opening to help center the window In theopening. Step 4 Insert the window Into the opening from the outside. The window is labeled"Inside"and"outside',but if Nese labels have been removed,the latches and crank should always be to the inside of the building. Make sure the window is fifily cased and latched, Step 5 Using a level on the hide side,make sure the window is plumb In the opening. Step 6 Once the unit is plumb,Install#10 x is'screws in the hinge jamb 4"from the top and bottom. Re,checkfor plumb and read)est if necessary. Now Install screws every 8"in the HINGE]AMB ONLY working from the comer screws toward the center. Fastener ua files nestled In each side of frame to achieve 8"s tan Len aFrame M[mbar 10" 38" 2fi" 34" Q" 1 We 1 58" Ffib" 74" 1 82" 1 90" 98" Number of Fasteners J 2 1 3 1 6 1 5 6 1 J 1 8 1 9 1 30 1 11 1 12 1 13 Step 1 Unlatch the window and,from the outside,move the latch side Iamb Up or down to create an equal gap at the top and bottom of the window between the frame and vent Install screws 4"from the top and bottom of the latch jamb. Sts,8 Operate the window in and out and latch and unlatch the window several rimes to be sure operation is smooth with no binding or dra in . If there is any proper,make adjustments now,if not,proddefil to step B. Note:All a0justments dill doxre xw//No adjustments are posailble once construction is com lets. Step 9 install screws In the latch jamb on in from the comer screws every W to the center of the jamb. Step 10 Now install screws 4"from the corners on the head and sill,Nen eve 8"toward the center of the frame member. Step 11 Remove excess chicane"squence out from around the In and Inspect for holes or voids. Use ski to fill any voids. If ceared,a foam insulation can be applied to the interior gap between the window and wall framing. If applied, this must be site NON E"V I A OYNG T V PE FOAM. Step 12 Since Mese windows are typically used in rooms with high moisture,is;bathrooms,It Is recommended that the interior gap between the window and wall framing also be speed with silicone and tooled so as not to Interfere with the Installation of wallboard,the or trim. Step 13 Once all construction is complete,remove the bubble wrap from the inside and outside of the window. If necessary,clean the blocks with a mild detergent and warm water using a soft doth. Then reinstall the screen by aligning it with the'inade of the window frame and pressing A Into the opening. Failure to follow these procedures will void any and all warranties. so an AmesburyTruth'company Selecting the Proper Size StakWEO Egress Window Well STEP 1: auik ing Measure and calculate dimension A Line Wlndw well side minis must as shown in the detail on the right avtwN4 inches above grade least, based on the site's grade conditions Grade must be sloped away ham well.Downspout meal oleo be and foundation height dlmeted awry ham the wen. e. STEP 2: Window Determine the required window well Egress height by performing this simple G"oens'on 0 Window Calculation: Measure from top efwindow 5111 Well to grade level Required Window Well Height I System =Dimension A + 7-1/2" {jam--s{— use ala^dean heaarairri �� to or AS 9teflC M"Maximum T ,s, r least 12"in From the first column in the table width around all from floor to window below,select the closest height that aides of the wan. wil lomeet egress �. Fill to depth of will meet the site conditions. code meulremew, ., burn footing. STEP 3: 'wells can be installed lower Once the height has been + 'y%:/�v�j than the recommended 3-f12' ..'s. . mM1elp meet grade conditions determined, read across and select the number of modules required for Tie rock fill into your site condition. perimeter drain If available StakWEL"STANDARD SIZES AND MODEL NUMBERS Keyhole on Projection Optional Modules Height Width Center from Dome Note: StakWEL Dimension Fnl,ndatmn Coyer Window Wells cannot stkwl 1 module=21" 54" 58" 40-1/4" stkwl-C be used with 60" wide stkwl 2modules-36-3/8" 54" 58" 40-1/4" stkwl-C windows stkwl 3 modules=51-3/4" 54' 58' 40-1/4" stkwl-C StakWEL modules are designed stkwl 4 modules-67-1/8" 54" 58' 40-1/4" stkwl-C for use on 36" and 48' windows only(See Scapei stkwl 5 modules=82-1/2" 54" 58" 40-1/4" stkwl-C model for 60" window stkwl 6 modules=97-7/8 54" 58" 40-1/4" stkwl-C installations). BILCO Egress Window Wells satisfy International Building Code requirements for �I Emergency Escape and Rescue Openings per section R310. 619/D Egress Window Permit Drawing (179 Prospect Ave) N 100' 26' xisting shed- installed in 2018. c Garage Deck 12' Permit # BP-2018-1029 Q' 60' 14' U 0 Existing basement o window to be converted o` into 29.5" x 45.5" egress window and well. Proposed window is 103' 2015 IRC Code Compliant. Existing 30" x 12" basement windows Blackberry Lane Property/Project Info: lo Address: 179 Prospect Ave Owner: Mark C. Jewell Contact# =401-965-9590 Map:Block: 18C- 064 Lot: -001 NOT TO SCALE