30C-063 110 CLEMENT ST BP-2018-1224
GIS 4: COMMONWEALTH OF MASSACHUSETTS
Map:Block:30C-063 CITY OF NORTHAMPTON
Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS
Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A)
Categorv7 SOLAR ELECTRIC SYSTEM BUILDING PERMIT
Permit# BP-2018-1224
Proiect# JS-2018-002187
Est Cost $24865.00
Fee: $75.00 PERMISSION IS HEREBY GRANTED TO:
Const. Class: Contractor: License:
Use Group: VALLEY SOLAR LLC 077279
Lot Size(sa.ft.): 43037.28 Owner: WALLER HAZEL M&MARC S WALLER
Zoning: SRH00)/ Applicant: VALLEY SOLAR LLC
AT: 110 CLEMENT ST
ApplicantAddress: Phone: Insurance:
PO BOX 60627 (413) 584-8844 WC
FLORENCEMA01062 ISSUED ON:5/21/2018 0:00:00
TO PERFORM THE FOLLOWING WORK 22 PANEL ROOF MOUNTED SOLAR ARRAY 7.15
KW
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter:
Footings:
Rough: Rough: House# Foundation:
Driveway Final:
Final: Final:
Rough Frame:
Gas: Fire Department Fireplace/Chimney:
Rough: Oil: Insulation:
Final: Smoke: Final:
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REGULATIONS.
Certificate of Occupancy Signature:
FeeType: Date Paid: Amount:
Building 5/21/20180:00:00 $75.00
212 Main Street,Phone(413)587-1240,Fax:(413)587-1272
Louis Hasbrouck—Building Commissioner
So(u r
Department use only
EDty of Northampton Status of Permit:
- ilding Department Curb Cut/Dnvevay Permit
12 Main Street Sewer/SepticAvailability
ail a Availability ROOM 100 Water/Well Availability
No ampton, MA 01060 Two Sets of Structural Plans
7-1240 Fax 413-587-1272 PlutfSde Plans
IIDnl11MtPTOtL MAp1pE0 Other Specify
APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING
SECTION i -SITE INFORMATION fir
1.1 Property Address: 1 This section to be complleettedd by,once
j 0 Oe` `` 1�1i'l,Gz SL ry Map�C Lot oce nit
N OCTH M4F UA TO� NObO Zone Overlay District
Elm St District Ce District
SECTION 2-PROPERTY OWNERSHIPIAUTHORIZED AGENT
2.1 Owner of Record:
. ,dpc S . A C e i io Oen n1-. E,.i-10 IhQmabD 1,wR Moto
Name(Print) Current Mailing Ll Ai�ess:{o
� Telephone 'l O DO o'-
S,g,dfure
2.2 Authorized Agent:
Valley Solar LLC PO Box 60627, Florence, MA 01062
Name(Pnnl) Current Mailing Address'.
� ` 413-584-8844
Signature Telephone
SECTION 3-ESTIMATED CONSTRUCTION COSTS
Item Estimated Cost(Dollars)to be Official Use Only
completed by pennit applicant
1. Building (a)Building Permit Fee
2. Electrical (b)Estimated Total Cost of
Consbuction from 6
3. Plumbing Building Permit Fee �}
4. Mechanical(HVAC) cp 7S 0l)
5.Fire Protection
6. Total=(1 +2+3+4+5) Check Number a7ol0
This Section For Official Use Only
Date
Building Permit Num Issued'
Signa re:
Buildi ommissicnerdnspecuv of Buildings Date
Ihasbrouck @ northamptonma.g0V
infoa�valle solar.solar
EMAIL ADDRESS (REQUIRED; CON CTO )
Section 4. ZONING All Information Must Be Completed.Permit Can Be Denied Due To Inc
Existing Proposed Requir by citing
This cala" title b +
Burden n ent iya
Lot Sizc
Frontage
Setbacks Front
Side L: R: L: R:
Rear
Building Height
Bldg.Square Footage
Open Space Footage
tint arca min-bldg k paved
arkin
#of Parking Spaces
Pill:
volumeat.,ra6on
A. Has a Special Permit/Variance/Finding ever been issued for/on the site?
NO O DONT KNOW O YES O
IF YES, date issued:
IF YES: Was the permit recorded at the Registry of Deeds?
NO O DONT KNOW O YES O
IF YES: enter Book Page and/or Document#
B. Does the site contain a brook, body of water or wetlands? NO O DONT KNOW O YES O
IF YES, has a permit been or need to be obtained from the Conservation Commission?
Needs to be obtained O Obtained O , Date Issued:
C. Do any signs exist on the property? YES O NO O
IF YES, describe size, type and location:
D. Are there any proposed changes to or additions of signs intended for the property? YES O NO O
IF YES, describe size, type and location:
E. Nil the construction activity disturb(clearing,grading,excavation,or filling)over 1 acre or is it part of a common plan
that will disturb over 1 acre? YES O NO O
IF YES,then a Northampton Storm Water Management Permit from the DPW is required.
SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicablel
New House ❑ Addition ❑ Replacement Windows Alterations) Q Reding Q
Or Doors D
Accessory Bldg. ❑ Demolition ❑ New Signs [O] DecksJE]lE] Siding [0] Other i>((solar
Brief Description of Proposed ren �(]Y] 1•n -.r {�� QYYCiwA • �(.� I S[Z�iI r l�r�W YG
Work', 111'n4r71IUA10(1 Q� eg o6�-F lllkl Y-
Alteration of existing bedroom_Yes_No Adding new bedroom YesNo
Attached Narrative Renovating unfinished basement Yes No
Plans Attached Roll -Sheet
sa:If New house and oraddttion to existina housing. conflWete the following:
a. Use of building : One Family Two Family Other
b. Number of rooms in each family unit: Number of Bathrooms
c. Is there a garage attached?
J. Proposed Square footage of new construction. Dimensions
e. Number of stories?
f. Method of heating? Fireplaces or Woodstoves Number of each
g. Energy Conservation Compliance. Masscheck Energy Compliance form attached?
h. Type of construction
1. Is construction within 100 fl.of wetlands?_Yes _No. Is construction within 100 yr. floodplain_Yes_No
j. Depth of basement or cellar floor below finished grade
k. Will building conform to the Building and Zoning regulations? Yes_No .
I. Septic Tank_ City Sewer Private well City water Supply
SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN
OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT
I, 0 QrG as Owner of the subject
property
hereby authorize Valley Solar LLC
to act on my behalf,in all matters relative to work authorized by this building permit poication.
J �r/a — r' /id-
Signa re of Owner Date
I, Valley Solar LLC as Dawar(Authorized
Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge
and belief.
Signed under the pains and penalties of perjury.
Print Name loc �y
\ igll�
Signature of Owner gent Date
SECTION 8-CONSTRUCTION SERVICES
8.1 Licensed Construction Supervisor: Not Applicable ❑
Name of License Holds
License Number
&cyn A SIWet>1' n CS- O'7r7a7q
AtltlressExpiratio
�g 7o m� 2D-„ 5c�uwgWMI1 filn Dale
olo rai n n Date 8
signator Telephone
A 4i3- 58u-�Sc�4
XReplaterod Home Im rovement Contnetor Not Applicable Cl
Company Name Registration Number
Valley Solar LLC 186338
Address Expiration Date
PO Box 60627, Florence, MA 01062 Telephone 413-584-8844 10/27/18
SECTION 10-WORKERS' COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25CS))
Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result
in the denial of the issuance of the building permit.
Signed Affidavit Attached Yes....... No...... ❑
The Commonwealth of Mass'achus'etts
- Departntentoffndtrstria/Accidents
'-I 1 Congress Street,Suite 700
-
Boston, RA 0211 4-2 01 7
- www.tna.ss.gov/dia
\lookers'Compensation Insurance Affidavit;Builders/Contractors/Electricians/Plumhers.
TO BE FILED WITH THE PERMITTING AIITHORITIC
Applicant Information Please Print Legibly
Name (Bnsincss/Organiza[imrdndiviayspl Valley Solar LLC
Address:340 Riverside Dr., PO Box 60627
City/State/Zip:Florence, MA 01062 phone #.413-584-8844
Arev amploy ^Cheah the approprlme hoe.
°On e
et Type of project(required)'
I.Q l ant a cmpla,aeah6 ampinyes lfulleadle,- b++cl7. E]New
W113lNCtIOn
20,arila,olepropr,,to,o,paiinctslitp and hnvc no canolaye,waii,ng mrncnr H. EjRorcdelmg
ary cal.[No wmkcn campnsamicc learned-7
3M l am a nano.no droop all o ork np'sdf[Nd,,orken onto-roust......... ] 9. Q Demo iuon
Q
4lan vl dmillb hint, tsolbl d 11 p Airy- Imi]l 10 Building addition
u a JII o e l I x ki 'c I c nan mran sole I LE]Blecn'ical repau's or additimu
propneersrvnn no anployces, 12.E]Plumbing repairs or additions
5IDca rob-onuactms baaed Fayeniadthea,Rmnlracmn Ilsmrt.'an«eluchal si¢el I3.0RnaRepai ,
roal Im• ren J,o)c annand Lav ,ouro' rs ,ii - .•.
6E]152 are acorpam,t y,J is alticy, re—d. Ian riehi ofarry aunpar bIGL o.
14.❑+ Other Solar
152 5 l Hl,vud ec have no cinyluyeo.Ma markers eolnp.imaunec r.9nneJ-1
v vpphcn dhai leak,max 7ln inw fill oro the on below ilei. re die are ompins, onpohq io
'Rn nm t wn Tw sc ni mniile n
`Hon mho aa ,lic,this eoffidaw.aled1ag thcyaeJa1nanllanik a.. d¢nhimoolsidc onvaa,bestsobmah,annodatiiinnmlvinit,%, .
;Co 11i rho croak this box nom mmahod an o l,,int shca shpu'mglhc nsnc con,sobin,r arto tied a1am.W¢thcr or oouhosc cnn+i�c have
anploycc . lime wb.0 xaorshave eutplopeax.Ihcym npiooduhaa workni wlnP.Vohcvnumba:
I am art employer that is Providing wurkere't aa.peusatinn insaraare for nm employees. Belmv is the tali,aad job site
lament
Insurance Company Name:Berkley Insurance
Policy N or Sd41ns.Le.p:MAARP301229 Eepiraliun Dam: 211/2019
Job Site Address: 110 Clement St City Smte/Zip'. Northam tP t)n,MA 01060
Attach a copy of the workers'compensation policv declaration page(showing the policy number and esph ation date).
Failure to secure coverage as I'equiled under MGL c 152.�25.A is a criminal vmlunco punishable by a fine up to S 1,500.00
anrl/ur ane-year imposonmem,as well as civil penalties in the farm of a STOP WORK ORDER and a fine of up to 5250.00 a
day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA fol'insurance
coverage verification.
I do hereby certify and I(�//��paiar and poo I ics o(perj the injontmtiom provided above is due arid c t.
S' time 215 f// Ii Date. Z/
Phone p
.413-58444
Official use only. Do not write in this oma,to be completed bF city at-torte+official
City or Town: Permib'License is
Issuing Authority(circle one):
1.Board of Health 2.Building Department 3.City/Ton'n Clerk 4.Electrical Inspector 5.Plumbing Inspector
6,Other
Contact Person: Phone k:
City of Northampton
' Massachusetts
a
I NEPABTDIENT OF BUILDING INSPECTIONS ,
212 Main Street aMunicipal Building 5 CD
Nortl,aep[on, MA 01060 lyh, {n\�
Debris Disposal Affidavit
In accordance of the provisions of MGL c 40, S54, I acknowledge that as a condition of the building
permit all debris resulting from the construction activity governed by this Building Permit shall be disposed
of in a properly licensed solid waste disposal facility, as defined by MGL c 111, S 150A.
The debris from construction work being performed at:
110 Clement St
(Please print house number and street name)
Is to be disposed of at:
Valley Recycling. (235 Easthampton Rd, MA 01060)
(Please print name and location of facility)
Or will be disposed of in a dumpster onsite rented or leased from:
Valley Solar. (POB 60627 MA 01062)
(Company Name and Address)
s4d1I :
Signa ure of Permit Applicant or Owner Date
If, for any reason, the debris will not be disposed of as indicated, the Applicant or Owner shall notify the
Building Department as to the location where the debris will be disposed.
i System Components,
wofMcUlcdPVSOI r5ystur, �t
E Pr,c, UHIiN[lien[
Roof Mount'SnapNm&Sedesl00 Marc Waller
$ Panels:(22)Panasonic 325 110 Clement St
a_ O
p Northampton,MA 01060
w
a o a
j Internal wall of Garage - - -- - --
{ (1)SolarEdge SE5000H-US
2 Revenue Grade Production Meter
Internal wall of House
Main Electrical Panel E
vExternal wall of House Eo o
( AC Disconnect Switch e`
Utility Meter
3
Exledng(EI w
B
New N)
3
t£ MAIN PAJ(E
�e
g 5
dg w
(1)SOLAREDGE SE5O00H-US(N)
BACK YARD 41
st PRODUCTION METER(N)
a =RONTYARD
v 4@ 30)PANASONIC 325W SOLAR PV PANELS(N)
UTILITY C)AC DISCONNEC
z pegs
if N N m
Valley (12)PANASONIC 325W SOLAR PV PANELS(N) >
s RS� lar. , E� p
0 0
� � W
o -
°, c
� r
o .1
I i
W
u1
Ll
IA
of
•q
Wf1
_ q m
1r
iY iu
Valle Solar,NLLC. TEu ME Mala aM ua.aim or
Y PLOT LINES sire nooaess na maaiam s� �.�.a
z4uv .nna.Me oiosz
441 Fu 4135M 020 ISYS7EM BIZETki
15
Vvk SOWnSolvr S O
Eauinment Schedule S p Conduit 8 Conductor Schedule Labellna Schedule ❑ 1.PV ARRAY(Series 100)
1.(1)#6 CU RACK BOND GEC.SOLID. IN FREE- 1.CAUTION!DC VOLTAGE Snap I-Rack MO00 DULE
AIR. 2.WARNING:PHOTOVOLTAIC POWER SOURCE ( SOLARPV MODULE ,6Voc 6P31so,M
2.(2)#10 CU PV WIRE.IN FREE-AIR. 3.PHOTOVOLTAIC SYSTEM DC DISCONNECT SWITCH 3.P Panasonic 325W.69.6VocrEdge c.Max System Size 600V
£ 3.(4)#10CUTHWN-2.(1)#10EGC.IN3/4"EMT Maximum System Voltage:48OVDC Shod Circuit Current:30 3.POWER (Outputtlgedc,15
(22)SolarEdge P400 Max Output 60vdd15adc
4.(3)#8 CU THWN-2.(1)#10 EGC.IN 3/4"EMT ADO 4 JUNCTION BO%(242-01104)
s 5.(3)#6 AL SER. 4.PHOTOVOLTAIC SYSTEM EQUIPPED WITH RAPID SnapNRack,Rail Mounted J Box with triple!ugs(on roof)
6.410 SEU. SHUTDOWN 5 DC COMBINER/DISCONNECT(SE5000H-US)
T.(1)#6 GO MAIN SERVICE GEC.STRAND. 5.SOLAR PV AC PRODUCTION METER Buih in to base of inverter =
€ 6.PHOTOVOLTAIC SYSTEM AC DISCONNECT Rated AC 6.Di INVERTER(SE5000H-US)
Output Current:25Aac Nominal Operating Voltage:240Vac SolarEdge 5.OkW wl built In REM
€ OCPD Calculations: T.WARNING BUSBAR IS ENERGIZED FROM 2 SOURCES: Max Input 480VtldMax ISC 45Atic.Max Output 6000Vacl2l Aac iY
UTILITY GRID AND PHOTOVOLTAIC SYSTEM 7.GENERATION METER(GE 1-210-) q s
Breakers sized according to continuous 8.WARNING!INVERTER OUTPUT CONNECTION DO NOT Revenue Grace Production Meter "�a
output current 1.25(NEC 210.19(A)(1)(a)). RELOCATE THIS OVERCURRENT DEVICE B AC DISCONNECT(DU222RB) £ o
BE 5000H-US Inverter Max Output=21A 9.SOLAR PV 50A.240VAC.Non-fused.3R.Bug Bolt grndlntr(adjacent to utility
a
1.25=26.25A 10.WARNING!UTILITY METER ENERGIZED BY 2 SOURCES meter at house) d �
9 MAIN SERVICE PANEL(HOMC30UC) $o
200A MAIN,200A BUS,30A 1201240 CB `
10 UTILITY METER(54482936) a '
g 120124OV,i PH,3W
t O�
Ti upJ
0 Q
j� O^limizars ywp J p
so-i3yr777. 10 D mniry w 0
8 ' �up
p6 0.
R
e I '-= �
moll
s I
1n1 xwn $ `
M tl I�srs J
Oplrr 3 p RGM JEhm
sm^g - 4 3
#t 2 s e oLL
to
4 lns��
y No¢�
Bn Valle 1 2 MAIN PANEL TO BE @^`
a Ks lar. UPGRADED TO 200AMPS a
eF �
/" L'inn F ) +ION 152 S. Broad St.
r r. g r� .-. r r: <F Lansdale, PA 19446
(21 5)361-8040
May 18, 2018
Valley Solar
340 Riverside Or
Northampton, MA 01062
RE: Waller Residence
110 Clement St, Northampton, MA 01060
Client Project#:456WAL
PFE Project*: 182412
On behalf of Valley Solar, Penn Fusion Engineering LLC WFE) performed a structural analysis of the roof at the above
referenced location.The purpose of our analysis was to determine if the existing roof system is structurally sufficient to
support the new photovoltaic moudles in addition to the code required design loads. Our analysis is based on the information
provided by Valley Solar and is isolated only to the areas where the modules are intended to be placed.
System Specifications:
Total System Size: 7.15 kW/DC
Panel Specs: (22) Panasonic-VBH N32 SSA16
Inverter Specs: (1)Solar Edgqe -SESOOOA-US
Racking System: Snap NRack-Series 100 UL
The modules are to be located on the following roof planes:
Mounting Rafter Rafter Horizontal Collar Collar Tie Sheathing Shingle Number of Ceiling
Plane Size Spacing Span Ties Spacing Type Shingle Layers Prof le
1 Truss 24" 24ft. Oin. N/A 0" COX 1/2" Asphalt
Shingles 1 Flat
2 Truss 24" 24ft.0m. N/A 0" COX 1/2" Asphalt 1 Flat
Shingles
The roof design has been analyzed in accordance with the 2015 International Residential Code and Massachusettes
Amendments 9th Edition with design loads as follows:
Ground Snow(Pg): 40 psf
Wind Speed (V)'. 120 mph
Mounting Plane 1
It has been determined by this office that the roof structure is adequate to support the new PV modules in addition t0 the
code required design loading.
Attach the module rail brackets to the roof with 5/16" lag bolts at 48 on center maximum. Provide a minimum of 2"of
penetration into the wood members.
Mounting Plane 2
It has been determined by this office that the roof structure is adequate to support the new PV modules in addition to the
code required design loading.
Attach the module rail brackets to the roof with 5/16" lag bolts at 48 on center maximum. Provide a minimum of 2"of
penetration into the wood members.
This office has determined that the installation of the PV System as specified above will meet the structural requirements of
the 2015 International Residential Code with Massachusettes Amendments 9th Edition and ASCE7-10 when installed in
accordance with the manufacture's instructions.
If you have any questions regarding this analysis, please feel free to contact us.
p Of Nq4,
Best Regards, SEP SqC
Penn Fusion Engineering LLC
M'YiEY: W'JEtiC `A
Z 40:E
NO 5:U:41,__,
Andrew D. Leone, P.E. ` b
Principal ISTE
`CSrtX,.gL ENFs
u : Panasonic
Panasonic's unique heterojunction technology uses ultra-thin
amorphous silicon layers.These thin dual layers reduce losses,
resulting in higher energy output than conventional panels.
Advanced bifacial cell designed for increased energy output.
The cell utilizes sunlight reflected back from the rear side
material which captures more light and converted into energy.
Panasonic
"'�YiIYYI�
High Efficiency at High Temperatures 25 Year Product and Performance Warranty**
As temperature increases, HIT"''continues to Industry leading 25 year product workmanship
perform at high levels due to the industry leading and performance warranty is backed by a century
temperature coefficient of-0.258%/°C. No other old company-Panasonic. Power output is
module even comes close to our temperature guaranteed to 90.76% after 25 years, far greater
characteristics. That means more energy than other companies.
throughout the day.
Quality and Reliability Higher Efficiency 19.7%
Panasonic's vertical integration, 20 years of . Enables higher power output and greater energy
experience manufacturing HIT"'and 20 internal yields. HIT"provides maximum production for your
tests beyond those mandated by current limited root space.
standards provides extreme quality assurance.
Low Degradation Unique water drainage
HIT"N-type" cells result in extremely Low Light The water drainage system give rain,water and
Induced Degradation (LID)and zero Potential snow melt a place to go, reducing water stains and
Induced Degradation [PID)which supports soiling on the panel. Less dirt on the panel means
reliability and longevity.This technology reduces more sunlight getting through to generate power.
annual degradation to 0.26%compare to 0.70%
in conventional panels,guaranteeing more power
for the long haul.
Panasonic
lllllf�lll
T
W
LITI "I I �l
ul �
Yl R�ony .LI PN xd SW
f=1 FLcvn.v 221,
"Ot
I.v
4�,- IT,
........ .. I Tz Tl 9t d 1!
N i I I
opz
j, h SeCtOn A-AB-B
............ .. .
11- 1 11 rT 1 11 n>1 11 1,'111 Sl
f IT I j I I It
ul Ii
T.—
.`TTI
IT
U
NOTE,
Panasonic
solar - • • z •
SolarEdge Single Phase Inverters
for North America
SL3000H-US / SE3800H-US / SFA 0OH-US / SE6000H-US /
SE7600H-US
e e
a
a
e
. •
ii
Optimized installation with HD-Wave technology
x Specifically designed to work with power optimizers
w Record-breaking efficiency
" Integrated Arc Fault protection and Rapid Shutdown for NEC 2014 and 2017, per article 690.11 and 690.12
Extremely small
— High reliability without anyelectrolyticcapacitors
— Built-in module-level monitoring
- Outdoarand indoor installation wave
— Optional:Revenue grade data,ANSI C12.20 Class 0.5(0,5%accuracy)
solar Single Phase Inverters for North America
'.cllr 'F�CpI lh JO'JL 1LLU0 JtI-IIS 5 CLI IIS
SE.3O00H US Se3800H US SE5O00. US SESOOLH us SE760GN-US
OUTPUT
Rated A Power t)LRPut is).1 38 i SJUO 6000 150, VA
Max.AC Power Coil 3000 ogre S^.Oo [000 7.Ll
AC out put VolN ge Ml n.Pour.-Mux.1183 ME 22rP - - V
ACOntPoI VOPzge Min.-Nom.-Mrs (211-)4, 264) V R, x` C' V
AC Pre4r only lNpvnnal 993 W-oll H
M3xnoun, nnlmuous ootpot Qime'C 2oNV
RP—l Conhe a 1 Output Cuwent 2ENI 11 21 2. 32 A
6rel tgreznom 1 A
Uhluy Monlonng,IslammPy Pm[peoon, yes
CPU Ill Ctmr,rable oll—IIolhs
INPUT
Maxi.nani PC Power 46SC SMo 1]50 33ril :'3r]J W
Tcnvtmmer-loss,Ungm onihed yes
Maximum Input VPllage =bE Vdr
Nomina l CCI nPW Vohage InO 400 Wr
Maxmum Input Current 2091 - - -' ' - AT
Maxrnum!'i not Current 2401 9 PC.3 1:.5 _u r .J Arlr.
Mux Input Short Crmlt Current 40 Air
Fel e-Polarity Error choo
6roid FoPIL lsoiatmn Uet.Clicr 000G 4e'rrdly lq
elo— rv.Rer I ffi nnnry 99 192
CE,M,Lted'[6dency
11,ut e Pmrermnsumpvon <2' `A'
ADDITIONAL FEATURES
...Pnrt_d n- "T"Enl rler10ee5 PrEsIrs t thrr,Pt ZlrjHee(Qp I ,-ellu3r ophon ill
9evenue trade Lots,ANSI C32Co Poounar.
4swd Shumown-NEC 2014 am 2017 690 12 Antomnl RIP,,' RtlmrtLI ou Ir xhui.m ,xLL
STANDARD COMPLIANCE
Safety JL 1741,UL6990,CSA 222,Canadian Asp orm'dins,E,CI.L M CO
Gild Cnnnecno n Standards IEEE 64),NJe 2P,3ulu 14IHII
En,is i CC Pro 1So1ss3
INSTALLATION SPECIFICATIONS
AC ouhne Cnndurt Size/AWG R,,1 e I or^' Co,our l 14. ,AWG
Corm,,,C IDoTNE,/A ISrnngs/Awa uan3e O. s lt/1-2 x1,,,14-n AVJG
0 11 1 "uh Safely swdm(HPWxul 1 x1.:6 rC-.9 /1 .71112d u
n/n,•
W, 'hu wIM Wets Swi W
Norse 91ID
or Ine Newrnl Con—To I
Oper b 6T n re
atuHance -1TIe II / 2E T" reF 411 4 .-C
mtection Haling NEMA 3H llnnene Loi ISalet9""0'1
or.,re..on PMef1....I "roor"e
solar - . •
SolarEdge Power Optimizer
Module Add-On For North America
r300i razor PJ70 ; raao ; r40
PV power optimization at the module-level
— Up to 25%more energy
— Superior efficiency(99.5%)
— Mitigates all types of module mismatch lasses,from manufacturing tolerance to partial shading
— Flexible system design for maximum space utilization
— fast installation with a single bolt
— Next generation maintenance with module-level monitoring
- Module-level voltage shutdown for installer and firefighter safety
solar " a • z SolarEdge Power Optimizer
Module Add-On for North America
P300 P 11(1, P3,?0r' 1' .o0 P40`.S
P300 P320 P370 P400 P405
Ito,60.,11 tuna (for FigM1-Power I[or b"In-0awer Ilor 12&96-cell (Ior,thin pill
ides) At UI moOules 60 o,n Rwel1 n nd0") rnaaulesl
morlulesl
INPUT
Ritad lnuut DC tower" 300 le. ,Z, IF-1 t05 r.
Ass 1 AP Far ezimum In Put Vdt,pe IC r,e le) 21, Vrie
IVOCet to Wert tomperatcre'
MPPTOP at np,Ra',P,e b 93 d 6L o F;l .2.. Lfi VJ,
+Aaxnt,rm jhor .uwlt Grm_nr llta) LG , !'l �+..
Maxlmrrm DC lnaut Cluu'rl 12.5
ar:i ti:n Chilli,
Weig+tlee EMaency IF e
OGurV II
OUTPUTDURING OPERATION(POWER OPTIMIZER CONNECTED TO OPERATING SOLAREDGE IN VERTfiflI
May.mum 0 W pof CP„ent 15 Atl_
Mar'Lol On[pul VPllaye 60 RS ....
OUTPUT DURING STANDBY(POWER OPTIMIZER DISCONNECTED FROM SOLAREDGE INVERTER OR SOLAREDGE INVERTER OFF)
Selety Ootrr Vpl6ge per Low,
Opnnr.a.,
STANDARD COMPLIANCE
FMC FCC PartI5 Class It,AC610:C 6-2.I1 C6100C 68
sate[, 11CG2109 1(111”11 sate[,),UeI
Aohs Yes
INSTALLATION SPECIFICATIONS
Ma/anu,l AlloweJ Systerl aeoltaee 1000 .r.
Co•nI IL:i,air All SaIarL I, ar,,anbTFr I i .r,
Dimensions)W e L x 11 12Y IC2 7F/S x591 x 198 1)b `J x111 R�1 S .un/m
\N1,,IF Ili1 f i,lablesl C10/L4 .rs. .r '45(L9 gr/Ib
InputCar rartor MC4 Cumvzbb a -4y qHa MC4 n, 1nl.
"I III,Ir niFCC,
OFFFltW ,,,I...me,ter Dole, 11111.t, Fa :ComPat Flp Mf4( p �lils myalllD _r" Lle
nrvp'rer"ol Al
OutpN Wl'e Leng,F D95i3A l.2/i9 m/fi
Operating Temperature Range -40-*SS/-40-.1,1 j 'F
rOte[Iion Raring .,11:MA6B
Ro(alrvn HvniuiLY .J
PV SYSTEM DESIGN USING SINGLE PHASE SINGLE PHASE THREE PHASE 208V THREE PHASE 480V
A SOLAREDGE INVERTER""" HU WAVE
Mmlrwm Siring Length
Power Opbmaersl
,u,. r.�:hirg-englM1
]E110
rb.ucU^brr;os
Maas r y, ,ng
17111lo. Ow,IF 5v0 EJ00 ',l5", W
1E7610H USI
Le I n l._cegl a t
Ctri 1, Lot,
,IF e., Ja _miI,aoal.
I sw oo/,vo, uF
REVISION.
SNAPNRACK SERIES 100 RACKING SYSTEM TYPICAL ROOF LAYOUT
NOTES:
- STANDARD LAG BOLT SPEC ASSUMES - - -
S/16" LAG BOLTS WITH 25"
EMBEDMENT IN ROOF STRUCTURAL -
MEMBERS/RAFTERS
-TORQUE ALL Tj" HARDWARE TO THE
FOLLOWING: ROOF RAFTERS OR
-SILVER S.S. 10-16 FT-LBS STRUCTURAL MEMBERS
-BLACK S.S. 7-9 FT-LBS
RAIL CAN MOUNT TO EITHER SIDE OF
POST(UPSLOPE vs. DOWNSLOPE)
-FOR UNEVEN ROOF SURFACES, USE L AMPS ACK MODULE
MID CL
UP TO TWO LEVELING SPACERS PER L MID C --MODULE OVERHANG
FOOT OR STANDOFF. SEE DRAWING (NOT TO EXCEED 30%
�-
"STANDARD RAIL LEVELING" FOR OR MANUFACTURER'S
DETAILS AND LIMITATIONS " - RECOMMENDATIONS)
ymoi- ..
MODULE OVERHANG
STANDOFFS ARE BOLTED
INTO ROOF RAKERS R
' STRUCTURAL MEMBER
"RAIL SPAN" , .
DISTANCE BETWEEN
ROOF ATTACHMENTS
"RAIL END OVERHANG" (NOT TO EKOFED
34%OF ACCEPTABLE RAIL SPAN)
��11 MAINSTREAM ENERGY CORP. DESIGNER GMcPBeoU- SCALE'. DNS PART NUMBER' DESCRIPTION'. REV
sppan�-'�Q@C�3� - "' DRAFTER DRyen 5100 D06 SERIES 100 TYPICAL LAYOUT F
�I mbaOna ._. _ - . APPROVED BY 'ogre. 120113