Loading...
30B-083 (2) 43 LADD AVE BP-2018-1180 GIS#: COMMONWEALTH OF MASSACHUSETTS Meo.Block: 30B-083 CITY OF NORTHAMPTON Lot:-001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL 042A) Cateeorr SOLAR ELECTRIC SYSTEM BUILDING PERMIT Permit# BP-2018-1180 Proiect# JS-2018-002111 Est Cost- $38640 00 Fee $270 0o PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Group EDMOND BECQUEREL INC 104806 Lot Size(sq. ft.): 68824.80 Owner: GLASS LAKE PARTNERS LLC zoning: SI(125)/WP(80)/ Applicant. EDMOND BECQUEREL INC AT. 43 LADD AVE Applicant Address: Phone: Insurance: 69 SOUTH PLEASANT ST (413) 530-2588 O Workers Compensation AMHER5TMA01002 ISSUED ON:5/11/2018 0:00:00 TO PERFORM THE FOLLOWING WORX.•ROOF MOUNTED SOLAR 35 PANELS 12.08KW POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: O0I• Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate gf Occupancy Sianature: FeeTYoe: Date Paid: Amount: Building 5/11/20180:00:00 $270.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner So l� r M212 0N0 1tl3UVersronl.7 Commercial Buildin Perini[Ma 15,2000 Department use only IN ity of Northampton Status of Pemdt.B ilding Department Curb Cut/Driveway Permit212 Main Street Sewer/Septic Availability U Room 100 Water/Well Availability ampton, MA01060 TWO Sets of Structural Plans phone 413-587-1240 Fax 413.587-1272 plot/Site Plans Other Specify APPLICATION TO CONSTRUCT, REPAIR,RENOVATE,CHANGE THE USE OR OCCUPANCY OF,OR DEMOLISH ANY BUILDING OTHER THAN A ONE OR TWO FAMILY DWELLING SECTION f -SITE INFORMATION B P— 1.1 Property Address: This section to be completed by office, J L�- .,4te / vt' Map 2r( f�7 Lot e) Unit 199 Zone Overlay District Elm SL District Ca District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: � � � e A � � Can' �yMer- F—AQar) G1an �3 LrT+ct tVYi 4,rA�hp+, A4,. Name(Print) Current Mailing Address: Signature Telephone 2.2 Authorized Agent: le , ovyx Bay.,&el TnL 64 5o49le0SanV,4- AlmtierJ4A- vlw2 Name(Print) Current Mailing Address: `I13-530 Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS item tsurnmed cosi(uoiiars)to be uniciai use Only coin leted by perrmtapplicant 1. Building 14 -�w6O (a)Building Permit Fee 2. Electrical (b)Estimated Total Cost of IY Construction from 6 3. Plumbina Bulldina Permit Fee 4. Mechanical(HVAC) 70 5.Fire Protection 6. Total=(1 -2+3+4s 5) Check Number This Section For Official Use Only Building Permit Number Date Issued Sign e: Versionl.7 Commercial Building Permit May 15,2000 SECTION 4.CONSTRUCTION SERVICES FOR PROJECTS LESS THAN 35,000 CUBIC FEET OF ENCLOSED SPACE Interior Alterations ❑ Existing Wall Signs ❑ Demolition❑ Repairs❑ Additions ❑ Accessory Build[ Exterior Alteration U Existing Ground Sign LJ New Signa U Roofing LJ Change of Use❑ Other 2 (tl Brief Description Enter a brief description here. Of Proposed Work:�(' �1�1 I� / A 121OU Kw /. Q �w✓� SECTION 5-USE GROUP AND CONSTRUCTION TYPE 0 USE GROUP(Check as applicable) CONSTRUCTION TYPE A Assembly11A-1 [IA-2 11A-3 131A ❑ A-4 ❑ A-5 ❑ 1B ❑ B Business 12r 2A ❑ E Educational ❑ 28 I ❑ F Factory U r-i U r-2 U 2C IJ H High Hazard ❑ 3A ❑ Institutional ❑ I-1 ❑ 1-2 ❑ 1-3 ❑ 3g El M Memantle ❑ 4 ❑ R Residential ❑ R-1 ❑ R-2 ❑ R-3 ❑ 5A ❑ S Storage ❑ s-1 ❑ S-2 ❑ 5B ❑ U Utility ❑ Specify: M Mixed Use ❑ Specify S Special Use ❑ Specify: COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATIONS,ADDITIONS AND/OR CHANGE IN USE Existing Use Group: Proposed Use Group: Existing Hazard Index 780 CMR 34): Proposed Hazard Index 760 CMR 34): SECTION 6 BUILDING HEIGHT AND AREA BUILDING AREA EXISTING PROPOSED NEW CONSTRUCTION urri%`e USE ONLY Floor Area per Floor(sf) 1' isi 2M 2 - 3 2M 3 3m 4 4" Total i rea(ef Toiai Proposea NNW Uons(ructiun(sf) Total Height(ft) Total Height It v w.r..s���d.ru r•.r .- en -54) 1 Flood Zone i�e.m..n...• v 1 s.......ro.,,,,..t a.,.t..n- .. .._._. .._rv.rr......._._. a ... . .......�.........._............. .._......_s_.....r.._.....x_....... Public ❑ Pmate ❑ I Zone Outside Flood Zone[:] Municipal ❑ On site disposal system❑ Version1.7 Commercial Building Permit May 15,2000 8. NORTHAMPTON ZONING Existing Proposed Required by Zoning This column to bu Pllud in by BuildingD panmrnt Lot Size Frontage Setbacks Front Side L:_R: L: R:_ Rear Building Height Bldg.Square Footage % Open Space Footage % (Lot.minus bldg&paved arkin 1 #of Parking Spaces Filhm &Lacuian) A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO O DONT KNOW O YES O IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO O DONT KNOW O YES O IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water or wetlands? NO U DONT KNOW U YES U IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained O Obtained O , Date Issued: C. Do any signs exist on the property? YES n NO n v IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES O NO O IF YES, describe size, type and location: E. Will the construction activity disturb(deanng,grading,excavation,or filling)over I acre or is it part of a common plan that will disturb over l acre? YES O NO O IF YES,then a Northampton Storm Water Management Pemtil from the DPW is required. Vcmi.1.7 Commercial Building Permit May 15,2000 SECTION 9-PROFESSIONAL DESIGN AND CONSTRUCTION SERVICES-FOR BUILDINGS AND STRUCTURES SUBJECT TO CONSTRUCTION CONTROL PURSUANT TO T80 CMR 116(CONTAINING MORE THAN 35,000 C.F.OF ENCLOSED SPACE) 9.1 Registered Architect: Not Applicable Name(Registrant): Registration Number Address Expiration Date SignaW. Telephone 9.2 Registered Professional Engineer(s): Name Area of Responsibility Atltlrea9 Registration Number Signature Telephone Explretlon Date Name Area of Responsibility AddressRegistreti¢n Number Signature Telephone Expirabon Dale Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date Name Area of Responsibility Address Registration Number Signature Teleptrona Expiration Date 9.3 General Contractor YN//!1(7. l5P[` YQ.I 1Ae Not Applimble ❑ Company Name: ��m LeAIr Responslbleln Cha of ConsWotion 3 GI ale wg.&s u& sotiLwMp4m A o Add Gaw'�W�e Verslon1.7 Commercial Building Permit May 15,2000 SECTION 10-STRUCTURAL PEER REVIEW(780 CMR 110.11) Independent Structural Engine Stmctur" Peer Review Required Yes O No SECTION 11 .OWNER AUTHORVATION-TOBE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOrR1 BUILDING PERMfr I, V11L C� .r��(r P `C>I v ✓o ,as Omer of the subject property hereh�aiifhnpoe (y.0.71'IU }J 1 I^ ad on my b f,in all matt is relative to rk authorized by this building permit application. /8 Sigriant, of Owner to I, rlm im U��l'yn of,66, ,as Omer/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under a pains and penalties o r' Pont Name _ Signatwe of0 er Agent Date SECTION 12-CONSTRUCTION SERVICES 101 Licensed Construction Supervise,r:/� Not(Applicable ❑ Name M License Holtler: / 1 NIO 1 h 4 !T LGu'�'f ✓✓ ICuni 6 % License Number 13 GIP/ tp- A, 6,:V x/ 26 Arlbma Fr�im�hn nnr. Signatu Telephone SECTION 13-WORK 'COMPENS ON INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application.Failure to provide this affidavit will result in the denial of the issuance of the builloft peril. Signed Affidavit Attached Yes LE No City of Northampton 212 Main Street,Northampton, MA 01060 Solid Waste Disposal Affidavit In accordance of the provisions of MGL c 40. S54. I acknowledae that as a condition of the building permit all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL c 111, S 150A. Address of the. work: L-R L-4j- )Oze The debris will be transported by: �—A r„rd The debris will be received by: C1Af GIa ,I sn J Building permit number: Name of Permit Applicant Qj ws QeUA ,arA T z- s��rx C Date Signature of Permit Applicant The Commonwealth of Massachusetts Department of Industrial Accidents Ogee of Investigations 600 Washington Street Boston,MA 01111 www.massgov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly Name Edmond Becquerel Inc. Address: 11 Amity St City/State/Zip: Amherst, MA 01002 Phone#: 413-336-2611 Are you an employer?Check the appropriate box: Type of project(required)' L❑ 1 am a emplwcr with 4. ❑ I am a general contractor and I 6. Now commotionemployees(full and/or part-time).+ have hired the sub-contractors 2.El am a sole proprietor or partner- listed on the aaached sheet. t 2. ❑Remodeling ship and have no employees These suboontraclors have g. ❑Demolition working for mein any capacity. ,/workers'comp,insurance. 9. ❑Building addition [No workers'comp.insurance 5. LI We arc a corporation and its required.I olBcerst have exercised their 10 E]Electrical repairs or additions 3.❑ I am a homeowner doing all work right of exemption per MGL 11.E]Plumbing repairs or additions myself[No workers'comp. c. 152,§1(4),and we have no 12_❑Roof repairs insurance required.]t employees.[No workers' 13 t;yt OLhc, Solar Installation comp.insurance required.] *My applicant that checks bar#1 must dm till wt We swti.o below showing Weir mkcs'wm,cmaftm policy insmiumch. t lomm-m wh.submit his attiduchindicating Wry me doing call work and Wen him manodec,mancmrs must submit.new affid...lindicating such. :Cwrrectuntb.t check Wisbox man ettecbd m ndditimal short showing We name nr We subcmwu«sand Weirworkeri comppok,mim emim. l am an eWkyer that is prwidrng workers'compensation insurance for mV employees. Below is the policy and jab site informadan. Insurance Company Name: Atlantic Charter Ins. Co. Pokey p or Self-ins.Lic.q: WCV0135000 Expiration Dare: 01/10/2019 Job Site Address: 43 Ladd Ave City/Slate/Zip Northampton, Ma, 01062 Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine n(nn to$259190 a day aoai—rho.violator W advicad that a rnm,n(rhic dammanr may hr(nnvardad m ria.ll♦rea of Investigations of the DIA for insurance coverage verification. I do hereby ce fy under the pains a/nfit abi s of u a/tthe/-r� m fion provided aabbove n tr`uue and correct Sian ion,L��l/ �/ Date: Phone d: 413-237-8373 official use only. Do not write in this areo,to be completedby city or town official City or Triton: Permit/Liceme h Issuing Authority(circle one): 1.Board of Health 3.Building Department 3.City/l'uwn Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone g: Information and Instructions Massachusetts General Laws chapter 152 requires all emplovers to provide workers'compensation for their employees. Panamint to this assume,an enrplayes is defined as".every person in the service manother under any contract of hire, express or implied,oral or written" An=pb,,..o udCzned--".-n,tad- du �.rn.reF:� n rm"m�..r.1-1-11 e..e:n� r.._ .y^9-� "s Y""'•"•"`v v�ymuvwwv •v.. .,, of the foregoing engaged in spent enterprise,and including thelegalrepresentatives of a deceased employer,m the V . receiver or trustee of an individual,partnership,association or other legal entity,employing employees. However the owner of a dwelling house having net more than three aparrinerreas and who resides therein,or the occupant of the dwelling house of another who emplovs persons to do maintenance,construction or repair work on such dwelling house or em the grounds or building appurtenant thereto shall not because of such employment be deemed to be an employer." MGI.nhaoter 152 R)SCfFI al.cn slates that"rvery amt.nr Inral lirenimi,anenex shall withheld the ica.anrr nr _.___.__r_. ___, a.__,_,_____________ _._.,, _._._ _. .___.___..__e_a.__� ___. .._------_.__.____.___. renewal of a license or permit to operate a business or to construct buildings in the commonwealth for any applicant who has not produced acceptable evidence of cam pliance with the insurance coverage required." Additionally,MGL chapter 152,§25C(7)states`Neither the commonwealth nm any of its political subdivisions shall enter into any contract for the performance of public work until acceptable evidence of compliance with the insurance requirements of this chapter have been presented to the contracting authority" Applicants Please fill out the workers'compensation affidavit completely,by checking the boxes that apply he your situation and,if necessary,supply subeontraemm(s)morels),address(es)and phone munber(s)along with Neu certificates)of inemance. Limited Liability Companies(LLL]or Limited liability Partnerships(LLP)with no employees other than the members or partners,are not required to cam workers'compensation insumnca If an LLC or LLP does have employees,a policy is required. Be advised that this affidavit may be submitted to the Department of ]udusmal Accidents for confirmation of insurance coverage. Also be sure to sign and date the affidavit The affidavit should he returned to the city or town that the application for the permit or license is being requested,net the Department of Industrial Accidents. Should you have arp questions regarding the law or ifyou arc required to obtain a workers' compensation policy,please at the Department at the number listed below. Self-insured companies should enter their self-insurance license number on Ne appropriate line. City or Town Officials Please be sure that the affidavit is complete and printed legibly. The Department has provided a space at the bottom of the affidavit for you to fill out in the.,.at the Office of Investigations has to contactvou regarding the applicant Please be sure to fill in the penniVlicease number which will be used as a reference number. In addition an applicant that most submit multiple pemi(Aicense applications an mry given year,need only submit one affidavit indicating commit pokcv information lif necessary)and under"Job Site Address'the applicant should write"all locations in_(clic or town)."A copy of the affidavit that has been officially stamped or marked by the city or town may be provided to the applicant as proof that a valid affidavit ism file for future permits or licenses. Anew affidavit must be filled out each year.Where a home owner or citizen is obtaining a license or permitnot related to any business or commercial venture (i.e.a dog license or permit to burn leaves etc.)said person is NOT required to complete this affidavit. The Office of Investigations would like to thank you in advance for you cooperation and slam you have any questions please do not hesitate to give us a call. The Deparancnt's address,telephone and fax number: The Commonwealth of Massachusetts Department of Industrial Accidents Office of Investigations 600 Washington Street Boston, MA 02111 Tei. 8 6i%-727-4961 ext 406 or i-E%%-MASSAF F Fax N 617-727-7749 Revised 5-2605 www.mass.gov/dia Ross Solar A ConE'Jlsun Solutions company Ann: Michael Aronson Consumer Esports Group Re: Change in proposed stem's production T,..,_. ,cai y111,14C1. lhis change order letter is to clearlt communicate the reduction in your proposed system's production. Through a more in depth shade anahsis'. dating the technical site %isit the looked ten thorouehly into your sNstem"s estimated production and have Ibund ,6.. ............:.... _...:.......... ,.. L.. 1111: b U'M . . ,o-. I..�, •6.,.. .e,Ir;..n,n.1 This estimation is contingent upon the removal oithe I rev Marked "A' in the image below image. .n Please sign helot% to state that%ou understand and agree to this change. , t , Data Print I Il rr, L ----r i «�.J fJ: ,:�'•�`- _..—_ .. co� CERTIFICATE OF LIABILITY INSURANCE °110,12=011 1/ THIS CERTIFICATE 18 ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIONTS UPON THE CERTIFICATE 180LDER THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CEIRIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUMO INSURER(S), AUTHORIZED I REPRESENTATIVE OR PRODUCER,AND THE CEKI PDATE HOLDER. aDryTDNaI NRFO ffln nallevlWl mutt he Modamed N 8UBROGATION IS WAIVED,alibied W xnrvn,nm. n ns.n�,nAr,mw. ........--------.__.--,--r-.._ ..__. .__.__ ____ __ the brnn and wndulom of the policy,wrbin polld"may requke An endorsement A sum meet On this corM CAM does rlal Odder right b the sarICER hOldsrM INumauM anaNnawff a plp00cO CA=ietine Bersrtt Aquad=o 6 Aasooiatea soat (613)586-7373 pialva-oma 355 Bridge St., P. O. Box 357 .oA=SaiJ.heBequad=oi.Osaranw.taam L wn n110R Imum a-$ $DAL& y+ Colimmin xde Becquerel Ing. Ro ATLARTIC CIURTBR IBB 11 AMULty St t mRP: Ld AB)3erst INA 01002 NtDpar: COVERAGES CERTIFICATE NUMBER.'CL173708014 REVISION NUMBER: THE IS TO CERTIFY THAT THE POLICIES OF INSURANCE us=BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ASCVE FOR THE POLICY PERIOD INDICATED. MOTVATHSTANDING ANY RECUIREMENT, TERM OR COMMON OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO MCH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POUCIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH I'OLICIES,LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. TmE vesuawce rDMPY Wm E COrerlRWOI OBmMLORmDIY FJ6N OCWRPLRDF t 1,000,000 A CUMBIuOE ❑E OCCUA T +nnnnn 9 X10022673 1/5/2018 1/5/2019 NEI w am i 5,000 PEP80NKlIDV NAIXY ! 11000,000 txa3eLAr�EtV,iEuxrt,wpuEg OFR GEMWU,+60REGATE ! 2,000,000 a =IwqM ❑,OC 1000,000 i AUTOYOaIE WMDrY t �µYAUTa scoey JURYPwparn,l s nUC6 D JQJTO8 LED BUOnY NJUPYtpn�cVpl9 wPFO AINros NNOa1KO D i s x UIMp14Afw OCCUR r HoccURRExCFs 1 000 0 B lACMIMU1e Cur .. AooRlcATF ! - 000 o0a XPW079391 3/5/20:p C1/C3/2019 MOesPwnRruuwn MY RICPRBIDRRCuum %ELUIRE Y]NIA E.L EMAIACCIOEHT i 11090,000 C OffIf,FAYh*Q EXCLUDED! RC10135m00 1/10/2018 1/10/2019 14gdfry MNq E.L D13FA3E-Ea,EB is 11000,000 r exeaewr EL DI9F.I$E-pDLICYLMi I f 1.000 omcmmwor aruuimmlLaeATcminlsclr:a 1Aww+9l,Aenm.+R...In ea.rN.,.,.re..aKn.a..w..w•.s,.rrwl CERTIFICATE HOLDER ANCE TION SHOULD ANY OF THE ABOVE DESCRIBED POLICESgE CANCELLED BEFORE FOR IIIFO ONLY THE EXPIRATION DATE TIEREOF, NOTICE WILL BE DE1A191ED M ACCORDANCE WITH THE POLICY PROWM M. MR. RE,RFi AINS o INI-2014 ACORD CORPORATION. All Mgh(a starved. ACOR0 2S 1201/1071 The ACORD name And logo an mgMtarod markt of ACORD sr �y`� A 1� y ' Ross Solar —� — -m.m�— -e�x.�l�� --�-�-938.001, — "ry t s 'x ux:•— _�_ : MOUNT 9YSTEIN ❑ `o L m ---�---- ? �5 i _�y�1• li] PV- kYIS � � O N a 2 F m n4ro" w 0..00 O xvs nounwnam - W 51 O N ROOF SECTION ev-z 14-1.V w = yo s INSTALLATION DEfAD, p z rvi g �Sa 6 ry CFC ¢rvmry �. a�F aamsnoix OLDRO()F OLD ROOF TRUSS TR(ISS TRUSS TRUSS . axt•_+P v -G ` i '. b.EUS .0 I Ross �m Solar UTILITY METER AND AC DISCONNECT AND ZREC METER AY LOCATION SP-I xrs ` DRIVEWAY AMAIN SERVICEPANIEL -i t1 N INVERTIiR 07 C O N aQ O O W -ptl mm (35)SUNPOWER - 345W MODULESOD=S � ._. / O O L) z oa Pa SED� Y rnvour 7 MAP VIEW TREE',LINE �...._,.. SP-I xts uarovzo�x Note: Solar Array (.35) Sunpower SPR'.PI 345W Modulles(12.08KW) On Ironridge nSP- ail w/Quick foot l SITE PLAN O Inverter SolarEdge SE9kUS w/P'405 Optimizers(x35) SP-Is A-- ROSS Solar MA@i SERVICE PANEL k S 5b e 3 f S t Z11AW SERVICE PANEL AND EQOIPAMPNTS � C7 c M ANSI W L C O (3 N Pr•� V >�R 9tE�Fl, wm w tllm� w O o I z auwun.. LPC 1dF.TE.Rw••: oamsnaie SP-C SF T1OF1 _ Ross / Uhllty Meter within lgof( Disconnect Solar m and zREe eter(Image mage - r SRE("Meter(image I) a � f—Amled ACDisconnect(image l) Main Service Panel�� �� inside Utility Roam(Image - v Inverter inside Utility Room(Image 3) @ d 99 Main Service Panel ra/ llsi Plyxnod Conduit mn next to roofridge cap and dawn--,4i Inverkr \ 00 sEema 49=1 " / JBuxon coffurulerU Z the Panels g xz< JL� SITE PLAN mn SP-E 5<wf Y1S W/USrYUIb -Equipameat need to be relocatedaur w " 4 to install Inserter as showing SP-E on image 3. SHEET i OF 1 VECTOR E n G I f1 E E R S VSE Project Number:U1850-021-181 April 18,2018 Ross Solar Group ATTENTION:Roberto Cabral 38 Heaver Brook Rd Danbury,CT 06810 REFERENCE: Consumer Export Group Building:43 Ladd Ave,Northhampton,MA 01062 Solar Array Installation To Whom It May Concern: We have reviewed the panel layout and photographs provided by Ross Solar Group relating to the installation of the solar array at the above-referenced site. Based upon our review, it is our conclusion that the installation of the solar array on this existing roof will not adversely affect this structure. It is our understanding that the structural components of the existing roof fni ring are in good condition and free of damage. The design of the solar panel racking (means, rails, etc.) is by the nnf rnmPe .. a Plraer n rotation of Vrrrm Cm,rfiml Fndnrwinn Ane n -F—;'dly ..Rme,md 0, wm.ume.w I. m wuu e..w.. ....u.. ..v... .. rv.......... v. .w... a I....wv. ...emeuu.e . a u eur.........1 v............ ..... roof framing. Our conclusions are based upon information regarding the existing roof framing'provided by Ross Solar Group. Desitin Parameters Code:Massachusetts State Building Code(780 CMR Chapter l6,9th Edition(2015 IBC)) Risk Careen, IT Design wind speed: 117 mph (3-sec gust)per ASCE 7-10 Wind exposure category:C Ground snow load: 40 psf Existing Roof Structure Roof structure:2x0 manufactured trusses(N i0"O.C. Roofing material:gravel covered Membrane Connection to Roof Mounting connection:(1)5/16'lag screw w/min.2.5"embedment into framing at max.48"O.C.along rails Conclusions Our conclusion regarding the adequacy of the existing roof is based on the fact that the additional weight of the solar array is 3 psf or less. In the area of the solar array,other live loads will not be present or will be greatly reduced(Massachusetts State Building Code (780 CMR Chapter 16,9th Edition (2015 IBCj), Section 1607.12.5). The member farces in the area of the solar panels are not increased by more than 5%;thus,the stresses of the structural elements are not increased by more than S%. Thereftrre the ro.d,,,n nrq,of Rendon R07 4 of rhP. ?nl S IFRC ac ref rrnrrA m 71t C R Charter i4 9th Fdirinn am. met and the structure is permitted to remain unaltered. 651 W.Galena Park Blvd., Ste. 101/Draper, UT 84020/1 (801)990-1775/F(801)990-1776/www.vectorse.com VSE Project Number:U1850-021-181 Consumer Export Group Building L/ E C T O R 4,18/2018 E tl O I fl E E R S The solar array will be flush-mounted (no more than 6" above the roof surface) and parallel to the roof surface. Thus, we conclude that any additional wind loading on the structure related to the addition of the proposed solar may is negligible. The attached calculations verify the capacity of the connections of the solar may to the existing roof against wind(uplift), the governing load case. Because the increase in lateral forces is less than 10%,this addition meets the requirements of the exception in Section 807.5 of the 2015 IEBC as referenced in 780 CMR Chapter 34,9th Edition. Thus the existing structure is permitted to remain unaltered. Limitations Installation of the solar panels most be performed in accordance with manufacturer recommendations. All work performed must be in accordance with accepted industry-wide methods and applicable safety standards. The contractor shall notify Vector Structural Engineering, LLC should any damage,deterioration or discrepancies between the as-built condition of the structure and the condition described in this letter be found. Particular attention must be paid to the maximum allowable .....:.,..,.v..,..,.,—t— -^.d the 1.....:,... of SCI:i..xnds..bn:....e..,.,,v o,J.>� r,..,.,o..:....� lO O..:..r....--f F......:...........�.. . ..ag. w.mw wr .vwom. Yw.em.emv... w.w. weery ..ummwmm awb. - w...'.uuu.w staggered, except at may ends, so as not to overload any existing structural member. The use of solar panel support span tables provided by others is allowed only where the building type, site conditions, site-specific design parameters,and solar panel configuration match the description of the span tables. Electrical engineering is the responsibility of others. Waterproofing around the roof penetrations is the responsibility of others. Vector Structural Engineering assumes no responsibility for improper installation of the solar may. Vector Structural Engineering assumes no responsibility for the effects ofsnow,falling from roofs onto other roofs,property or persons due to the installation of the solar may. VECTOR STRUCTURAL ENGINEERING,LLC �X OF FIC T. A 'IV op:Amo 04/18/2018 Roger Alworth,P.E. MA License:47740-Expires:06/30/2018 Principal Enclosures RTA/jnt 651 W. Galena Park Blvd.,Ste. 101/Draper, UT 84020/1(801)990-1775/1 (801)990-1776/www.vectorse.com �M E C TO R WIND JOB NO.: WIND 1 SUBJECT: PRESSURE E n G I n E E R S PROJECT: Consumer Export Group Building ]Components and Cladding Wind Calculations Label: Solar Panel Array Note: Calculations per ASCE 7-10 SITE-SPECIFIC WIND PARAMETERS: Basic Wind Speed [mph]: 117 Noes: Exposure Category: C Risk Category: II ADDITIONAL INPUT& CALCULATIONS: Height of Roof, h [ft]: 25 (Approximate) Comp/Cladding location: Gable Roofs Os 7' Enclosure Classification: Enclosed Buildings Zone 1 GCp: 1.0 Figure 30.4-2A (enter largest abs. value) Zone 2 GCp: 1.8 (enter largest abs. value) Zone 3 GCp: 2.8 (enter largest abs. value) c: 9.5 Table 26.9-1 Zg [ft]: 900 Table 26.9-1 Kh: 0.95 Table 30.3-1 K,: 1 Equation 26.8-1 Kd: 0.85 Table 26.6-1 Velocity Pressure, qh [psf]: 28.2 Equation 30.3-1 GCp: 0 Table 26.11-1 (largest abs. value) OUTPUT: p=4n GCo — GCp; Equation 30.9-1 Zone 1 Pressure, p [psf]: 28.2 psf(1.0 W, Interior Zones') Zone 2 Pressure, p [psf]: 50.7 psf(1.0 W, End Zones') Zone 3 Pressure, p [psf]: 78.8 psf(1.0 W, Comer Zones'within a) (a= 3 ft) �MECTOR CONN JogNo.: 1 SUBJECT: CONNECTION E rl O I n E E R S PROJECT: Consumer Export Group Building Lag Screw Connection Capacity: Demand: Lag Screw Size [in]: 5/16 Max, Trip. (^ a MM T,.4�� n n n Pressure Max ..d. i,o rvua �asne aa.c 2 Max. upim (0.6 Wind) Tributary Area Force (lbs) Embedment' [in]: 2.5 (psf) Width(ft) (ft) Grade: SPF G =0.42 Zone Capacity[lbs/in]: 205 INDS Table 12.2A 1 16.9 4.0 11.0 186 Number of Screws: 1 2 30 4 4.0 11.0 ] 335 G..�nn .ra�io i w'c�i.' 1 't I I t7 4 v i 1 u i ��� puy Total Capacity[lbs]: 586 Demand< Capacity: CONNECTION OKAY 1.Embedment is measured from the top of the framing member to the beginning of the tapered tip of the lag screw. Embedment in sheathing or other material is not effective.The length of the tapered tip is not part of the embedment length. 2.Wax,Trib Area'is the product of the'Max.Tributary Width'(along the rails)and 1/2 the panel width/height (perpendicular to the rails). 21-1111 �MECTOR JOBNO.: GRAVI0YLOA SUBJECT: GRAVITY LOADS E rl O I rl E E R 5 PROJECT: Consumer Export Group Building CALCULATE ESTIMATED GRAVITY LOADS Increase due to Original ROOF DEAD LOAD (D) _ _pitch loaning Roof Pitch/12 1.0 Gravel Covered Membrane 5.5 1.00 5.5 psf 1/2" Plywood 1.0 1.00 1.0 psf Framing 3.0 psf Insulation 0.5 psf 1/2" Gypsum Clg. 2.0 psf IM, E & Pv6e 1.5 psf DL 14 psf PV Array DL 3 psf ROOF LIVE LOAD (Lr) Existing Design Roof Live Load [psf] 20 ASCE 7-10,Table 4-1 Roof Live Load With PV Array[psf] Massachusetts State Building Code(780 CMR Ch w/Solar Panel SNOW LOAD(S): Existing Array Roof Slope (x:121: 1 1.0 1 1.0 Roof Slope ["]: 55 Snow Ground Load, pa [psf]: 40 40 ASCE 7-10, Section 7.2 Terrain Category: C C ASCE 7-10,Table 7-2 Exposure of Roof: Pallial Ex osed Partiall Ex osed ASCE 7-10,Table 7-2 Exposure Factor, Ca: 1.0 1.0 ASCE 7-10,Table 7-2 Thermal Factor, C,: 1.1 1,1 ASCE 7-10,Table 7-3 Risk Category: 11 II ASCE 7-10,Table 1.5-1 Importance Factor, Is: 1.0 1.0 ASCE 7-10, Table 1.5-2 Flat Roof Snow Load, pt[psf]: 35 35 ASCE 7-10, Equation 7.3-1 Minimum Roof Snow Load, pm[psfj: 20 20 JASCE 7-10, Section 7.3.4 Unobstructed Slippery Surface? No No ASCE 7-10, Section 7.4 Slope Factor Figure: Fi ure 7-2b Fi ure 7-2b ASCE 7-10, Section 7.4 Roof Slope Factor, Cs: 1.00 1.00 ASCE 7-10, Figure 7-2 Sloped Roof Snow Load, ps [psf]: 35 35 ASCE 7-10, Equation 7.4-1 Design Snow Load, S [psf]: 35 35 � B NO.: U1150-021-181 VECTOR SUBJECT: LOAD COMPARISON E rI G I n E E R S PROJECT: Consumer Export Group Building Summary of Loads Existing With PV Array D[Psql to 1 17 L rpuir S[psfJ 35 35 20 Maximum Gravity Loads: Existing With PV Array D+L, [psf] 34 17 —IASCE 7-10, Section 2.4.1 D+S[Psf]1 49 52 (ASCE 7-10,Section 2.4.1 Maximum Gravity Load [psfl:l 49 52 Maximum Member Forces: LOCATION I House GEOMETRY Span(ft) 77.6 (Approximate) Solar Panel Array Start,a (ft)l 55.9 (Approximate) Solar Panel Array Length, b(it) LU.b (Approximate) Truss/Rafter Spacing(it) 1,3 MEMBER FORCES Existing With PV Array Ratio Vertical Reaction,Vr(lbs)l 2510 1 2522 100% OK Vertical Reaction,V,(lbs)l 2510 1 2580 103% OK Moment @ Center, M (Its-ft) 48673 49139 1 101% JOK The member forces in the area of the solar array are not increased by more than 5%; thus,the stresses of the structural elements are not increased by more than 5%. Therefore,the requirements of Section 807.4 of the 2015 IEBC as referenced in 780 rMn f6en•a.xe O•A eAiHn..ars ma•—A•k.e'...... ie nn.miNad m romain lunaltered. O BOTTOM I ROOF RIDGG E CM roJ i-- 30464" ----47U3"-- —_ - ,; p — ___________r �7 = y > ___------------_ y S _ —1RONRIDGE W/QUICK FOOT :108.00" 440.05"—> 3 (35)SUNPOWER 345W M06ULP,5=4 � N 4 c o ROOFLAYOUT - ,wiom V1 W o W 9 0 ED x w `E W TECNNI .ATA (O cI1TtiR xi Is' c O R x $' U SOLARMOOVLE p951ATOWE0.5P0.Ptl WSW 130tlKW1 SIMPO JCSW W MOOIILE 0.8.1. 1. F MCI(ING SY'.i. IRONx1IXiE RAIL W/ VI KF T u+vERTER roLAR¢ncssE9cus w(1•msarrlMv.Exs .Fs 2 PROPOSED ARRAY VIEW W DATA MONIfORMti A21MlIT1{ I46' PV-1 AGLLE YIS Ix Ross Solar A ConEdison Sdutbns company Agreement for the Sale and Installation of a Solar Photovoltaic System This Agreement("Agreement")dated March 9th 2018 between Consumer Exports Group. Inc. ("Owner")and CES Danbury Solar LLC(Contractor),a Con Edison Solutions com- pany doing business as Ross Solar("CES Danbury Solar')with an address of 38 Beaver Brook Road, Danbury,CT 06810, sets out the terms and conditions by which CES Dan- bury Solar will install a Solar Photovoltaic System(the"Solar PV System")on Owner's property located at 43 Ladd ave Florence MA(the"Property"). I. Description of Work and Materials. CES Danbury Solar shall furnish all materials,tools,ma- chinery,and installation and supervisory services(collectively,the"Wort:")described in Exhibit ("Solar PV System Scope of Work"),in accordance with the terms of this Ageement. The installa- tion location,listing of components,estimated energy output,pricing,and drawings and other spec- ifications included in ExIdbjt A help define the Work and are an integral part of this Agreement. 2. Contract Price. As full payment for the Work to be provided by CES Danbury Solar under this Agreement,Owner shall pay CES Danbury Solar the sum of$38,640.00(the"Contmet Price"), payable according to the terms in Exhibit B. Owner agrees and understands that CES Danbury So- lar will incur significant costs and expenses once the Agreement is signed.In the unlikely event the Owner decides,for whatever reason,not to proceed with the project,Owner hereby agrees to reim- burse CES Danbury Solar for direct costs and expenses incurred after execution of this Agreement, wiucu May iiiciude utility,engineering and design reel 3. Payment Schedule. The Contract Price shall be paid in accordance with the payment schedule(the "Payment Schedule")attached hereto as Exhibit B.The Contract Price may be adjusted only by means of a written Change Order executed by both CES Danbury Solar and Owner. A. Waiver of Owner's Claims. The making of the final payment shall constitute a waiv- er of all claims by Owner,except those arising from: 1.The terms of any warranty set forth in this Agreement; 2.A third party lien arising from CES Danbury Solar's Work; 3. Faulty or defective Work appearing after substantial completion of the Solar PV System, B. Waiver of CES Danbury Solar's Claims. CES Danbury Solar's acceptance ofthe final payment from Owner shall constitute a.waiver of all claims by CES Danbury Solar,except those claims previously made in writing and identified by CES Danbury Solar as outstanding at the time of the final payment. C. Payment Faiiure, if Owner fails to make any payment when due,CES Danbury Solar may cease or suspend the performance of the Work;provided,however,that CES Danbury Solar may resume performance of the Work after payment or other resolution of the dispute. This remedy is in addition to any other right or remedy that CES Danbury Solar may have. Such failure by Owner to make payment when due is a material breach of this Agreement. If pay- ment of any portion of the Contract Price is not received within thirty(30)days of invoice, in- terest shall be added t9 the amonat Llpe Atsa aaa�ul CES Danbury Solar LLC DBA Ross Solar,a Cor Edrson Solutions Company 38 Beaver Brook Road,Danbury,CT 06810 P: (203)512 4500 E1 License:0196093,CT HIC:0647449,MA HIC:186927,NYC Contractor ID:61M74 1 ted by law. If legal DrmeeHinea gre re 6u d t^^p„��4;^...,..o.+iwimrw, ail dosis, incivam _ .y,....,.. .,, uupn,u g actual attorney fees,shall be added to the unpaid balance. D. Notice of Lien RiehtsI CES Danbury Solar, its subcontractors, laborers,or equipment ormater- ial suppliers performing,or otherwise supplying materials or equipment in connection with, the Work may have the right to place a lien on the property in accordance with applicable law if they are not paid due to the wrongful acts or omissions of Owner. 4. Time of Completion. CES Danbury Solar and Owner agree that the Work to be performed under this Agreement is anticipated to start within 180 days of signing of this Agreement,and to he com- pleted within sixty (60)days of the later of equipment delivery or installation commencement,pro- vided,however,that the paries acknowledge and agree that time is not of the essence for the com- pletion of the Work and the star slid completion dates are only estimates based on currently avail- able information and are not guaranteed. CES Danbury Solar agrees to start and diligently pursue i13C 1W k to compietion,but shall not be responsible for delays for any of the following reasons: failure of the issuance of all necessary building permits within a reasonable period of time;utility interconnection approvals;funding of loans/project financing applied for by Owner;disbursement of funds into funding control or escrow;acts or omissions of neglect or willful misconduct of Own- er or Owner's employees,representatives,contractors or agent;acts of God;stormy or inclement weather;strikes,lockouts,boycotts,or other labor union activities;extra work ordered by Owner, acts of public enemy. riots or.... regular............... ..u.o u.o. 'aD kn ou ire war cnan- Dels; imposition of government priority or allocation of materials; failure of Owner to make pay- ments when due;delays caused by inspection or changes ordered by the inspectors of authorized governmental authorities;delays in governmental approvals;acts of independent wntructors or subcontractors not affiliated with CES Danbury Solar;or other causes beyond CES Danbury Solar's reasonable control.Nothwithstanding anything to the contrary herein,Owner may cancel this Agreement if the work is not completed within 210 days of the date of this Agreement mrovided the reason for such failure to complete is due to an act or omission of Owner. 5. Licenses and Permits. CES Danbury Solar shall,at its sole cost and expense,comply with all state and local licensing,permitting,and registration requirements for the performance of the Work. CES Danbury Solar will work with Owner to obtain all required building permits.CES Danbury Solar will pay for all necessary building and electrical permit fees. If applicable, vwnet will he responsible for any municipal fees, including,but not limited to,zoning,special utility fees or fees and costs associated with upgrades to the Property required by the munici- pality,other governmental authority,or utility company. 6. Representations and Warranties. A. CES Danbury Solar and Owner each hereby represent and warrant to the other as follows: i. Each party has the full power,authority,and right to enter into and perform it's obligations under this Agreement. ii. This Agreement is a legal,valid,and binding obligation of each nam;en- forceable against it in accordance with its terms,except as may be limited by bankruptcy,insolvency,or similar laws affecting creditors'rights generally and equitable remedies. iii. Entering into this Agreement will not violate its operating agreement or by- laws or any other contract or agreement to which that party is also a parry. iv. Neither party may amend or otherwise change this Agreement without the n fes. prior wriden consent of the other party. CES Danbury Sotar LLC DU Ross Solar,a CmEdiwn Solot m Company 38 beaver Brook RW,Danbury,CT 06810 P: Ir 512 4500 El License:0196093,CT HIC:0647449,M4 HIC 186927,NYC Contractor ID: 616674 2 B. CFS TaAnlarhP _w�w, 1. — _ _ 1 . r._.... g . ,_ wuL..s. i. __. The Work shall be performed in a workman-like manner, in accordance with standard industry practices and in compliance with all building codes and other applic- able laws;provided,however,that if other,more restrictive standards or requirements are set forth in any attached plans or specifications defining the Work,such other stan- dards or requirements shall control. ii; The,Work �hwll hr ,..r...,.. U- ; .r. r: Cr �rYaauu.y .,...__ .uwuscu anu auuiurizea as required by law. iii. CES Danbury Solar shall provide Owner with appropriate releases or waivers of liens upon receipt of final payment from Owner for the Work. iv. CES Danbury Solar shall remove all debris or other garbage from the Prop- erty resulting from the Work,and leave the Property in broom or rake,as applicable,clean condition after the Work has he,e,p vnmrktnd v. CES Danbury Solar is responsible for paying all ordinary and necessary ex- penses of its staff. vi. CES Danbury Solar is insured for injury to its employees and others incur- / ring property damage or injury directly as a result of the acts of CES Dan- , bury Solar or its employees or subcontractors.Please provide copy of insur- ance certificate. vii.CES Danbury Solar shall obtain all necessary approvals from all local au- thorities or other regulatory agencies required for the Work. viii.CES Danbury Solar may, in its discretion, engage licensed subcontractors in perform the Work;provided,however,that CES Danbury Solar will at all times remain responsible for the completion of the Work in accordance with this Agreement. C. Owner hereby represents and warrants to CES Danbury Solar as follows: i. Owner is the registered owner of the Property or has a valid leasehold/license to use same and will provide evidence of such ownership/license to CES Danbury Solar at or prior to execution of this Agreement. ii. Owner will make timely payments of all amounts due CES Danhury_Solar under this Agreement. iii. Owner shall notify CES Danbury Solar of any changes to the Property poten- tially affecting the Work or warranty obligations not less than thirty(30)days prior to the effective date of any such change. iv. Owner shall provide such assistance to CES Danbury Solar as may reason- ably be required for the performance of the Work. 7. Work Warranties. A. Collection of Defective Work. For a period of five(5)years from the date of substantial completion of the Work or such longer period as may be required by law,CES Danbury So- lar shall correct any Work found to be defective or otherwise failing to conform to_Fxhihir A wliPthPr such defect or nonconformance is observed before or after substantial completion. CES Danbury Solar shall correct any such defective or nonconforming work within a reasonable period of time after receiv- ing written notice from Owner and at CES Danbury Solar's sole cost and expense,except as may oth- erwise be agreed to in writing by the parties;provided,however,that CES Danbury Solar shall not be required to repair any damage to the Solar PV System that occurred after substantial completion of the Work,unless the parties agree that such damage is directly due to an act or omission by CES Danbury q-1— ;.�o....J...— .......�_.._...._..._.,n... . . .,...P�.,y.,�.,.,. ,,.ocoauu..wrs mar occurred poor to the substantial completion of the Work. CES DanburySolar LLC DBA Ross Solar,a ConEdiwn Sdutims Company 38 Beaver Brook Poad,Danbury,CT 06810 P:(203)517 4500 E1 tkmse:0196093,CT HIC:0647449,61A HIC:186977,NYC Contractor ID:616674 3 t - Y. "w.,.iny'ns-spuct- -. fled in Exhibit C. C. No warranty provided by CES Danbury Solar shall be valid until full and final payment of all amounts due under this Agreement, including any Change Order,is received by CES Danbury Solar from Owner.The delaying of payments will not extend CES Danbury Solar's warranty period bevond the meriod of five(5)vears of the cononm6orim,of the Snlar PV Svete. 8. Termination. This Agreement may be terminated: A. By either party for a material breach of any provision of this Agreement by the other party, if such breach is not cured within ninety(90)days of the receipt of written notice thereof. B. By Owner, if CES Danbury Solar fails to carry out the Work after 120 days'written notice to CES Danbury Solar. 9. Access to Work. CES Danbury Solar, its employees,agents and contractors,as well as any m quired utility or governmental representatives,shall have such access to the Work and the Property as may reasonably be required to perform their obligations in connection with this Agreement,in- cluding,but not limited to,any required inspections of the Work. CES Danbury Solar shall be per- mitted to use driveways and unpaved and paved areas leading to or adjacent to the Work site for its equipment.Owner will provide a free and unobstructed area for ground level activities required for or associated with rooftop installations. All weather access will be permitted. W. Incentives and Taxes. Owner will pay for all taxes and assessments associated with the in- stallation. Without limiting the foregoing,the filing of Federal Tax Form 3468(Energy Invest- ment Credit)is the sole responsibility of the Owner.Owner acknowledges that the foregoing credit is based on current law,which is subject to change. Owner's obligations hereunder are not in any way contingent on approval of Owner's applications for tax credits or grants. Incen- tives and tax credits may be subject to federal income tax. CES Danbury Solar does not give mxadvi.e and Oisne should di—ms all mp:iczdors xga"iog cF Ig aL'a[icn dascr'�"d herein with its accountant or other tax professional. it. Location of Property Lines. Owner is solely responsible for locating and informing CES Danbury Solar of the location of all property lines and CES Danbury Solar shall be entitled to rely on the information provided by Owner. CES Danbury Solar may require Owner,at Own- er's expense,to provide a licensed surveyor's map of the property showing the relevant proper- ty lines. - - 12. Responsibilities of the Parties. (a)CES Danbury Solar shall promptly notify the Owner of(a)subsurface or latent physical conditions at the Work site differing materially from those indicated in this Agreement,or(b)unknown physical conditions differing materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in this Agreement. Owner shall pay for any expense incurred due to such conditions. (b)Owner is responsible for supplying electricity to the site as necessary for installation,and agrees to provide toilet facilities at Owner's expense. CES Danbury Solar LLC DBA Puss Solar,a CwEdison Solutions Carnpany 38 Beaver Brook Riad,Danbury,CT 06810 P: (203)512 4500 E1 License:0196093,CT NIC:0647449,"NIC:186927,NYC Contractor ID:616674 4 r (cl Owner ie remnncihle fur nrnvidmg nn interont—nnarfion e..=,,.,.t6..A..r.........»...:.... system for the completed installation operates without interruption.The dab monitor is not a requir ment for the Solar PV System to function properly. (d)Owner is responsible for having sufficient funds to comply with this Letter Agreement. This is a cash transaction unless otherwise specified. (e)Owner is responsible for the removal and protection of any personal property and CES Danbury So- lar is not responsible for any loss,damage or destruction of any personal property not removed or prop- erly protected. (t)Owner is responsible for any roofing or insulation replacement,as well as any necessary structural or other unumdes. includine electrical seryige npernrlec�which mgv M re�nired v.mS L,and enry nc . ....._y_...,........._, ...... fully install the Solar PV System. Excavation, backfill,any seeding and/or sodding are to be provided by Owner as required.Owner is responsible for any variance requirements or architectural review board hearing costs/fees associated with the installation of any ground mount system. (g)Owner is responsible for any damages to the real property and any personal property during the per- formance of the Work,except to the extent that such damages are caused by the sole neelieence of CES Danbury Solar. Working on a roof and installing solar panels may create airborne dust Vdirt,debris,and odors. Therefore,during installation of the Solar PV System,Owner and/or other occupants will keep all windows closed,all rooftop air intakes inoperative and closed,and all vehicles parked a safe dis- tance from the building. (h)Once Owner and CES Danbury Solar have executed the Agreement,CES Danbury Solar will pre- pare the structural and electrical designs for the Work and will have such designs reviewed by profes- sional engineers prior to applying for permits.If,as a result of the engineering review,any structural or electrical upgrades are deemed necessary,CES Danbury Solar will prepare a cost estimate to have the required upgrades incorporated into the Work pursuant to a Change Order.Owner will have the option to perform the necessary and required upgrades independent of CES Danbury Solar if the Owner has a preferred vendor that is qualified for such upgrade work. (i)CES Danbury Solar will work closely with the utility company that has jurisdiction for this installa- tion. In the event that the utility company requires upgrades or additional related work in order to prop- erly and safely interconnect the Solar PV System,the costs shall be the responsibility of Owner.CES Danbury Solar will work with the utility to mitigate any such necessary costs to the extent possible. 11 F—b..'S.... .A+.'�M�:v %F.1A —AU----,AGUe 1-1ati tic n....r...r a ,-_-a-n....v. .�vagi. Rotor luau nut oe responsi- ble for any claims,damages or expenses arising from the presence or disturbance of asbestos-con- taining or other toxic or hazardous materials,or arising out of,or in any way related to,biological growth,including,but not limited to,all types of mold,or any other type of existing contamina- tion in or on Owner's Properly. Removal,encapsulation,and/or disposal of any existing asbestos or other hazardous contaminated materials are not a part of this Agreement.Owner is responsible for ensuring that the Work area is environmentally safe. Nothing herein shall make CES Danbury Solar,its affiliates,or their officers,directors,employees or agents liable for any damage to the Property, its components, its contents, injury to occupants, interruption of business or loss of rev- enue or opportunity,including,but not limited to,all claims,damages or expenses arising out of or in any way related to or resulting from biological growth,including,but not limited to,all types of mold or any other type of contamination of Owner's Property. All such liability is ex- pressly excluded and disclaimed. 14. Assignment Neither party may assign its rights under this Agreement without the consent of the f CES Danbury Solar LLC DBA Puss Solar,a ConEdbon Sdutiom Company 38 Beaver Brook Road,Danbury,CT 06910 P: (203)512 45� E1 license:0196093,CT HIC:0647419,1AA HK:186927,NYC Conn or ID:616674 5 Cts"+ cd-..nw.,. ., ,.:Aad 6....-.e. .6.»Pre neek—,Q-1— A•o dh. ,.,:e6.....rhe...;... .n Yin a7,Yry —,uvr. ,.u"......,v......,..7 ., ,a.y,y .. ....,y..o. written consent of Owner,to sell,transfer or reorganize CES Danbury Solar and to assign its rights and obligations under this Agreement to:(i)any affiliate,subsidiary,or parent entity or(ii) a successor in the operation of CES Danbury Solar's assets and/or business by reason of a reorga- nization,merger,consolidation,or sale,where substantially all of such assets are acquired by such successor. 15. Successors and Assigns. All references in this Agreement to the parties shall be deemed to include,as applicable,a reference to their respective permitted successors and assigns. The provi- sions of this Agreement shall be binding on and shall more to the benefit of such successors and assigns of the patties. This Agreement is solely for the benefit of Owner and CES Danbury Solar,and is not intended for the benefit of any other parties. 16. No implied Waiver. The faidure of either party to insist on strict performance of any covenant or obligation under this Agreement,regardless of the length of time for which such failure continues, shall not be deemed a waiver of such party's right to demand strict compliance in the future.No consent or waiver,express or implied,to or of any breach or default in the performance of any obligation under this Agreement shall constitute a consent or waiver to or of any other breach or default in the perfor- mance of the same or any other obligation. 17. Nature of Relationship; Indemnity. CES Danbury Solar is not an employee of Owner. In per- forming its obligations under the Agreement,CES Danbury Solar is working in its capacity as an independent contractor. CES Danbury Solar agrees to indemnify Owner for any claims arising di- rectly from CES Danbury Solar's negligent performance of the Work. 18. C_han_oP Urders, Chngld Owner con.ctnlction lender,or any governmental agency or authority or -- inspector direct any modification or addition to the Work,the Contract Price shall be adjusted ac- cordingly.Modification or addition to the Work shall be executed only when both Owner and CES Danbury Solar have signed a change order("Change Order). The change, if any, in the Contract Price resulting from any such Change Order shall be as agreed to in writing. The Change Order may also increase the time in which the Work to be performed pursuant to this Agreement is to be completed. No additional Work to be performed pursuant to a Change Order shall be performed without prior written agreement of Owner. Any Uhange Order fors for changes or extra work shall be incorporated in,and become a part of this Agreement. 19. Types of Materials. All materials used by CES Danbury Solar in performing the Work shall be new,in good condition,and in compliance with applicable laws and codes. 2C. Ir'le and R.I.,"fi," . Tits to -.d risk of loss of le 111.•hail to On upon bet❑g affixed to the Property;;provided, however,that such transfer of title and risk of loss shall not re- lease Owner from its obligation to pay for the Work in accordance with the provisions of this Agreement. At all times following the transfer of title/risk of loss to Owner and prior to final pay- ment being made to CES Danbury Solar,Owner shall be solely responsible for procuring insurance to cover the Solar PV System against casualty or loss. 21. Replacement of Materials. If any of the materials specified in Exhibit Aare unavailable such that completion of the Work would be delayed form unreasonable period of time,Owner shall have the option to select alternative materials of similar specifications and price from alternative(and readily available)materials proposed by CES Danbury Solar. 22. Amendment or Modification. This Agreement may only be amended,modified or changed by means of a written amendment or Change Order executed by both parties. CES Danbury War LLC DBA Russ Solar,a ConEdison Solutiom Company 38 Beaver Brook Road,Danbury,CT 06810 P: (203)512 4500 E1 Lk.:0196093,CT HE:0647649,MA HE: 186927,NYC Contractor 10:616674 6 1 ?J. Governing law. 'his Agreement shall be governed by the taws of the Commonwealth of Mess. achuseds. In the event a dispute arises in connection with this Ameeneut aim to the com- mencement of lhigatimn by either party,the parties agree to first miempt ro resolvo the matter through gond faith discussim[s and negotiation fm a period of not les than thirty,(70)days. 24. Couoterparb/Eketric Sigmrtures, This Agreement may be executed in one or am cieunM- pars,each of which shall be deemed me original but all of which shall constitute ane and the same instrument. Forpunposesofthis Agnmemem.useufa fausimile,e.mail,oratherelec[ronic medium shall have the sane[once and effect as an original signauue. 25. Severab0lty. Whenuver possible,each provision of this Agreement will be interpreted In such a manner as to be effective and valid under applicable law,but in the event that any provision of this Agreement is delerminel an be invalid,illegal,or uncnt'nrocable in arty respect under applicable law or rule,such invalidity,illegulity or unenforceability will not affect any other provision, mud this Agrsxmcem will be reformed.coreswcd,and onforeed as if such invalid,ilIm alar nn.frmr able provisions had never been amained herein. 26. Notices. Any notice required to be given pursuant to this Agreement shall be in writing and sent to the other party addressed to the representative who executed die Agreement an behalfof such party,and at the address shown en die fel page of this Agreement or such aklress as may be communicated in writing to the other pony. 27. Entire Agreement This Agreenent constitutes the final complete,and"elusive statement of dce agreement of Owner and CES Danbury Solar with respect to the subject matter lareof,and snpersedm any mid all dicer prior and ixintemponcceous agmamonA and understandings,both written and oml,between lieu panics. In Wimess Whereof,CLS Danbury Solar and Owner have caused this Agreemen[te,be Main- cd res of the date first set forth above. CLS DANBURY SOLAR,LLC By: Nanic(prim or type): t��`I-sre 'Rth::.. Michael f`Hr!'` � f By:--- title:- 7 EXHIBIT A SOLAR PV SYSTEM SCOPE OF WORK The Project described above (hereinafter referred to m the "Project") includes complete design and installation of the Solar PV System. The scope of the Solar PV System Project will cover the following_ tasks: • Submission of state rebate application(if applicable) • Submission of Building Department permit applications • Submission of application to appropriate utility for interconnection agreement • Assembly and proper roof placement of racking system or alternative mounting design • Installation of PV panels on ground via selected racking system or alternative mounting de- • Installation and grounding of DC electrical wiring between panels • Installation of inverters • Installation of AC wiring from inverters to customer's electrical service • Installation of solar electric meter • Installation of required DC and AC disconnect switches • Provision of equipment-related documentation for operation and maintenance • Coordination of all final inspections and interconnections. Solar PV System Location: 43 Ladd ave Florence MA Q-1—PAT c.,.....,. p............_.. :...:__. _. ....w. . . ..7•.z...w ..p....cu..neuug: The System,with a total Manufacturer's Peak PV Output Rating of 12.075 Watts DC includes: • 12.075kW(35 Sunpower P-17345 watt panelsi • SolarEdge inverter with optimizers A Web Monitoring Tool. The System shall be Roof mounted with OMG roof attachment hardware • Also included in the Installation are all related hardware, disconnect switches, and wiring,required for a complete installation. Solar PV System Estimated Annual Energy Output: Estimated year one production= 12,790kWh(subject to shade analysis) Solar PV System Contact Price: Thirty Eight Thousand Sia hundred Forty dollars and 00/100 cents. Solar PV System Drawings and Other Specifications: TBD and subject to client approval r '/ v CES Danbury Solar LLC DBA Pm Solar,a ConEdison Solutions Company 38 Beaver Brook Roes„Danbury,CT 06810 P: (203)512 45M E1 License:0196093,CT HIC:0647449,MA HIC: 186927,NYC Contractor ID:616674 8 EXHIRI—u D PAYMENT SCHEDULE Amount Payment When Due Deposit due at Signing 1,000.00 15% Due upon securing Utility Contingent approval 6,728.00 Completion of Permitting 30% Due upon delivery of Goods to Site 11,592.00 50% Due upon completion of the project 19,320.00 38,640.00 Total of Owner's Payments 38,640.00 Total Project Costs CES Danbury Solar LLC DaA Ross Solar,a C.Ednon Solutions Company 38 Beaver Brook Road,Danbury,R 06810 P: (203)512 4500 El License:0196093,CT HIC 0647449,W HIC:186927,NYC Contractor ID:616674 9 EXHIBTT C CES DANBURY SOLAR WARRANTY CES Danbury Solar,LLC warrants to(honer that the Work shall be free from defects for a period of five (5)years from the date of commissioning of the Sol"PV System. This warranty is extended to Owner and to any succeeding owner of the Property. This warranty will not apply: I. To defects or malfunctions resulting from failure by Owner to properly operate the Solar PV Sys- tem in accordance with the printed instructions provided. 2. To the Solar PV System as originally installed that has been subject to accidents,alterations,mis- •'bus C c "04 II..Lw" _f t'c like, ,.. .. , sguusasg ur we Nae,repairs made or attempted by others without the express written permission of CES Danbury Solar. 3. To indirect, incidental or consequential damages to property or persons. This warranty is conditioned on the following: y wla. .43 Wtillvd iu wrung wiihm ten(i 0)days of the first knowledge of defect by Owner or his representative. 2. CES Danbury Solar is given the first opportunity to make any repairs,replacements or corrections to the Solar PV System defects at no cost to Owner within sixty(60)days of CES Danbury So- lo's receipt of such written notification. THIS WARRANTY IS THE ONLY WARRANTY MADE BY CES DANBURY SOLAR,LLC AND ALL OTHER WARRANTIES,EXPRESS OR IMPLIED, WHETHER WRITTEN OR ORAL,INCLUDING WARRANTIES OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE ARE EX- PRESSLY EXCLUDED. THIS WARRANTY SHALL BE OWNER'S EXCLUSIVE REMEDY AVAIL- ABLE UNDER THE AGREEMENT. r CES Danbury Solar LLC DBA Ross Solar,a ConEdbon Solutions Company 38 Beaver Brook Road,Danbury,CT 06810 P: (203)512 45M Et License:0196093, CT HIC:0647449,w MIC: 186927,NYC Contractor 0:616674 10 This limited Warranty is eRed,.for SunPowa i`photawlfolc modules for comme¢iol insrrehations with"SPR'and°COM"in the product model number and sod after Apel I, 2013. 1. LIMITED WARRANTY SunPower Corporation I"SunPower'I warrants that for 25 years beginning on the Warranty Start Date' (the"VVari Period"), its photovoltaic modules specified above I'PV Module(sl"h shall be free from defects in materials and workmanship under normal app roation, installation, use and service conditions,and the power output of the PV Modules will be at least 95%of the Minimum Peak Powi rating for the first 5 years,and declining by no more than 0.4%per year for the following 20 years,so the power output at the end of the final year of the 25 year warranty period will be at least 87%of the Minimum Peak Power rating. If any IM Module fails to conform to This Limped V\hrmnnl O.nr rnvido,l tti0!—,!— ;5 ^^"'^"•A--«hili-'-` "ower in ifs Jnr sole discretion)not to have resulted from one of the excluded everts set forth in Section 3 below, then for the Warranty Period, SunPower will repair, replace(new or refurbished] or refund the defective PV Modules as set forth herein. SunPower will make all reasonable ei to repair or replace the PV Module with an electrically and mechanically compatible PV Module with an equal or greater power rating. If this is not commercially feasible,then SunPower will refund the purchase price of the defective PV Module as paid by the customer. The repair, replacement or refund remedy provided herein shall be the sole and exclusive remedy Limited Warranty for any repaired or replaced PV Module shall not extend beyond the Warranty Period. In the case of a valid claim for PV Modules installed by SunPower,an affiliate of SunPower or an authorized SunPower installer, the Limited Warranty,rovers: li) reasonable and customary transportation costs for return of he PV Modules; lii) reshipment of any repaired or replaced PV Modules; and )iii)costs associated with installation, removal or reinsiollotion of the PV Modules. 2. GENERAL CONDITIONS FOR WARRANTY CLAIMS a) Warranty dorms must in all events be filed within the Warranty Period. bl Warranty claims may only be made by, or on the behalf of Il Ike original end customer, as named in the certificate of guarantee or invoice, as applicable, and (Ii1 any subsequent title holder of the PV Modules upon satisfactory proof of m,00;ion or rromFkr It=rFo�d��..�1-..d aslv.i c!w iom--A �I.r :.'e . ik • . .,..e......o�v.. o2iiirrcuro of guaranies or invoice, as applicable_ or When fM Modules are used on a mobile platform of any type, such as a vehicle, the Warranty Period shall be limited to 12 years. of In cases of PV Module replacement,any replaced PV Module shall pass into the ownership of SunPower. 3. EXCLUSIONS AND LIMITATIONS The Limited Warranty does not apply to any of the following: al PV Modules subjected to misuse, abuse, neglect or accident; alteration, improper installation, application or mmi (including but not limited to installation, application or removal by any party other than SunPower, a SunPower authorized dealer or technician approved by SunPower in writingl; nonobservance of the applicable SunPower installation, users and/ I u:} »rr lbr„ o-at "di aornl m_. r i a .{n-,ib _ r,ih- .e rlc lrr u.ee. � I or i hr rJ evolve s,,r r sur, :i iri d m v.tl be _pl c, ;rsef..Am VwRPow is pocky r',.nr�eo d mMd,r. ,sho..nor I t robs;. Feok li ialin J .�rhr „r xck ai roc rlo i$SI(F ,rLr s_r�r r L7 o L,,nnne.r trx dNJ90n e gh,rope spec FP150JbL.Smr'wva -G iesen, :�ey ev.reGuSea nve oN c..c lnuh 0..ns io e-sna �r,�p,..e. r ��rrwu .SWiPO -npro,Ja od :resiivg rczNvre or u Iln.>(mrcgn�axd iesunq rgenaw vmv nquasl. �umeniX.5a50a1 RnA -. SUNPOWER or maintenance instructions or noncompliance with national and local elegric rrxies rg _ . mmVtili,pljpp� t.., _,..,a....,. other than an approved service technician of SunPower;conditions exceeding the voltage,wind,or snow load specifications; power failure surges, lightning, flood, or lire;damage from persons, Insects, animals, or industrial chemical exposure; glass breakage from impact or other events outside SunPower's control. bl Cosmetic affects stemming from normal wear and tear of PV Module materials or other Cosmetic variations which do not cause power output lower than what is guaranteed by He limited Warfanly. Normal wear and tear of PV Module materials can inClude, but is not limited to, fading of frame color, weathering of Class coatinas, and areas of discalour lun mmup.J pr over individual solar cells or any part of the PV Module. C) PV Modules installed in locations;which in SunPower's absolute judgment may be subject to direct contact with bodies of salt water dl PV Modules for which the labels containing product type of serial number have been altered, removed or made illegible. el PV Nodules which have been moved from their original installation location without the express written approval of SunPower II PV Modules which have been installed on singlefamily homes or semidetached homes, including but not limited to duplexes and townhomes. For clarity, apartment and condominiums are not excluded. SunPower shall not be held responsible or liable to the customer or any thirdparty,arising out of any nonperformance or delay in performance of any terms and conditions of sole, including this Limited Warranty, due to acts of God, war, riots, strikes, fire, flood or any other cause or circumstance beyond the reasonable control of SunPower. 4. LIMITATION OF WARRANTY SCOPE SUBJECT TO THE LIMITATIONS UNDER APPLICABLE LAW,THE LIMITED WARRANTY SET FORTH HEREIN IS EXPRESSLY IN LIEU OF AND EXCLUDE ALL OTHER EXPRESS OR IMPLIED WARRANTIES, INCLUDING BUT NOT LIMITED TO WARRANTIES OF MERCHANTABILITY AND OF FITNESS FOR PARTICULAR PURPOSE, USE, OR APPLICATION, AND ALL OTHER OBLIGATIONS OR LIABILITIES ON THE PART Of SUNPOWFR IHNIFS.S PlrH nTHFu 1AIAPPA IInF� =^.uLIvAPVP11 O LITIF$ ARE EXPRESSLY AGREED TO IN WRITING, SIGNED AND APPROVED BY SUNPOWER. SUNPOWER SHALL HAVE NO RESPONSIBILITY OR LIABILITY WHATSOEVER FOR DAMAGE OR INJURY TO PERSONS OR PROPERTY OR FOR OTHER LOSS OR INJURY RESULTING FROM ANY CAUSE WHATSOEVER ARISING OUT OF OR RELATED TO THE PV MODULES, INCLUDING, WITHOUT LIMITATION, ANY DEFECTS IN THE W MODULE, OR FROM USE OR INSTALLATION. UNDER NO CIRCUMSTANCES SHALL SUNPOWER BE LIABLE FOR INCIDENTAL, CONSEQUENTIAL OR SPECIAL DAMAGES, HOWSOEVER CAUSED, LOSS OF USE, LOSS OF PROFITS, LOSS OF PRODUCTION, LOSS OF REVENUES ARE THEREFORE SFeCiFiCAICr 66T VVITIOUT iiMiTAT Oki EXCLUDED. SUNPOWER'S AGGREGATE LIABILITY, IF ANY, IN DAMAGES OR OTHERWISE, SHALL NOT EXCEED THE PURCHASE PRICE PAID TO SUNPOWER BY THE CUSTOMER, FOR THE UNIT OF PRODUCT OR SERVICE FURNISHED OR TO BE FURNISHED,AS THE CASE MAY BE, WHICH GAVE RISE TOTHE WARRANTY CLAIM. SOME JURISDICTIONS DO NOT ALLOW LIMITATIONS ON IMPLIED WARRANTIES OR THE EXCLUSION OF DAMAGES SO THE ABOVE LIMITATIONS OR EXCLUSIONS MAY NOT APPLY TO YOU, IF ANY PROVISION OF THIS LIMITED WARRANTY IS HELD UNENFORCEABLE OR ILLEGAL BY A COURT OR OTHER BODY ^` 111 Al ,,S,;,T i�, SUCH rr"nOb'iSiViNS SHALL BE MODIFIED 10 THE MINIMUM EXTENTREQUIRED SUCH THAT THE REST OF THIS LIMITED WARRANTY WILL CONTINUE IN FULL FORCE AND EFFECT 5. OBTAINING WARRANTY PERFORMANCE If you feel you have a justified claim covered by this Limited Warranty, immediately notify Lal the seller and installer of the PV Modules, or I I any out orize_SIJ.I -war ip_ryp,— p.Irl rr,,,—un,--�„., —,,,t,,,,�„-„ --ii-G6 ui we wmdcrs shown oerow. Your installer, or SunPower will give advice on handling the claim, which shall include, without limitation, the provision of the warwnty,card, online warranty, registration Information, invoice, and/or evidence of the dale of delivery of the PV Module, serial number and product number of affected modules, and evidence of claim. The return of any PV Modules will not be accepted unless prior written authorization has been given by SunPower. Dxxrmeme_ f 0rs](o Rcr A SUNPOWER ROSS Connecticut Office www.RossSolaKimup.com 38 Heaver Brook Road InfoSaRossSolarGrouo corn V VS Danbury,CT 06810 Phone:(203)5124500 Fax:(866)271-3016 GROUP Attn: 8uildina Department Official 11 / I 11A�� I, /9%I[ Ott e, 1 f^��Dl?Sf1✓1 , authorize Ross Solar Group and their subcontractor to install the rooftop, gcound m i ind or pole rnn in solar array and to file a building permit,zoning,wetland& health departments on my behalf. I grant Ross Solar Group and their subcontractor permission to access a copy of this property's survey,site plans and burg plans. Should you have any questions, or require u'G,iliun'ui a'efaiuie e call Koss Solar Group at 203-512-4500 ext 7001. H'oYme gnature �- Print Name Jattan, Arnaris From noreply@salesforce.com on behalf of CAP@nationalgrid.com Sent Thursday, April OS, 2018 8:14 AM To: dl - Solar Interconnect Subject: 00172856-MA CONDBIONAL APPROVAL TOINTERCONNECT [ref:_OODdOfPcB-- 5000W1CBHWI:ref] Attachments: 172856 - Consumer Exports Group - Signed SIA.pdf ***H:%TFRNAI, SFNDER. Do not click on links or documents if sender is unknown and never provide user ID or assword.*** nationaligrid Greetings, Since the contractor did not famish and email address for the Billing Customer,the Contractor needs to ensure the Billing Customer receives as copy of this email along with its attachments. Your Simplified Interconnection Application(00 172856)has been conditionally approved for construction, meaning Thai you are authorized to construct and test the new system, but not to leave it online. National Grid will provide an "Authority to Intercennect"letter only after all requirements and standards, as detailed below,have been met,and after your standard meter has been replaced with a bi-directional net meter.This is especially important, as operating a generation system behind a standard meter may rause billing errors. ****This Conditional Approval is not authorization to perform a service upgrade,service relocation, parallel service, or service drop replacement. Any modification to the existing service will require approval under a separate work order and is subject to existing ESB requirements. *"A bi-directional meter MAY be set at your location per our discretion once Conditional Approvai has been issued but you are not authorized to operate your system until National Grid has provide an"Authority to Interconnect'letter. The bidirectional meter may be in place but it will not bill correctly until the"Authority to Interconnect"has been issued. an Please use the Simplified Checklist to ensure that you provide all necessary documentation.Note: The project completion documentation on the checklist may need to be submitted at different times. Any documents not attached to this email are available t anlar.?: r.T� • waw■ ��L, SolarEdge Power Optimizer Module Add-On For North America P300 / P320 / P400 / P405 • • • PV power optimization at the module-level - Up i02i%more energy — Superior efficiency(99.5%) - Mitigates all types of module mismatch losses,from manufacturing tolerance to partial shading — Flexible system design for maximum space utilization — Fast installation with a single bolt — Next generation maintenance with mn,iola-leyel mnnitoring — Module-level voltage shutdown for installer and firefighter safety .a �_ 0 1 «- vim.o �urnm (till., nl Fill, wwvasolaredge.us solar " • � � SolarEdge Power Optimizer Module Add-On for North America P300 / P320 / P400 / P405 P300 P320 P400 P405 par 6(Fitell modules) (br M1yFpower (for)1896ce11 dw.1.Al. 60-cell modules) motlulesl motlulesl INPUT Rated Input DC Power"I 300 320 400 405 W Absolute Maximum Input Voltage 48 80 125 Vdc (Voc at lowest temperature) MOOT Operating Range 8-48 880 12.5-105 Vdc Maximum Short Circuit Current(Isc) 10 11 10.1 Adc Maximum DC Input Current 12.5 13.75 12.63 Ad, Maximum Efficiency 99.5 _ % Weighted Efficiency _ 98.8 _ % ategory Cwtvoltage CII OUTPUT DURING OPERATION(POWER OPTIMIZER CONNECTED TO OPERATING SOLAREDGE INVERTER) Max mum Output Correct 15 Ad, Maximum Output Voltage W 85 Vdc OUTPUT DURING STANDBY(POWER OPTIMIZER DISCONNECTED FROM SOLAREDGE INVERTER OR SOLAREDGE INVERTER OFF) Safety Output Voltage per Power Vtic Optimizer STANDARD COMPLIANCE EMC _ FCC Partly Class 8,IEC6100 -6-2,IEC630006-3 Safety IEC62109-1(closs It safety),111-1741 ROHS yes INSTALLATION SPECIFICATIONS Maximum Allowed System Voltage 1000 Vdc Compatible inverters All SolarEdge Single Phase and Three Phase inverters Dimensions fW x L x H) 128 x 152 x 225/ 128 x 152 x35/ 128 x 152 x 50/ mon/in 5 x 5.92 x 1.08 5x 5,97x 1.37 5x 5.97 x 1.96 Welght(including cosi 760/17 830/1.8 1064/23 gr/Ib Input Connector MC4 Compatible Output Wire Type/Connector Double Insulated;MC4 Compatible Output Wire Length 0.95/3.0 1.2/3.9 m/ft Operating Temperature Range 40-+85/-40-+185 'C/'F Protection Rating IP68/NEMA6P Ra_Iamee Hom Ilty n-inn Nateai(pn mltFe moEub.rt�oavle.ei ppm K%pmwieanaa0ovtl. PVSYSTEM DESIGNUSING SINGLE PHASE THREE PHASE 208V THREE PHASE 480V A SOLAREDGE INVERTER-1 Minimum String Length 8 10 is (Power Optimizers) _ Maximum Rring Lert 25 25 50 (Power Optimizers) Maximum Power per String 5250 _. 6000 12750 W Parallel Strings of Different Lengths es or Orientations It u—,im.ea m res P405 mm pew/w uAmus//arm Men.me. solar — Single Phase Inverters for North America SE3000H-US / SE380OH-US / SE5000H-US / SE6000H-US / SE760OH-US / SE10000H-US i saler� ..tID ••, 0 5p8r�j .-IIII..: 5 1D>✓WK: 111111111:.' 5 •ie• e •te• e o _ e e le' � e � a a Optimized installation with HD-Wave technology a Specifically designed to work with power optimizers a Record-breaking efficiency Fixed voltage inverter for longer strings Integrated arc fault protection and rapid shutdown for NEC 2014 and 2017,per article 690.11 and 690.12 UL1741 SA certified,for CPUC Rule 21 grid compliance Extremely small — High reliability without any electrolytic capacitors — Built-in module-level monitoring 11111111111' — Outdoor and indoor installation wave vYi ue,.�c au cgi'a c ua,o,ni",uc.co,nevvil� rvoum a y'r