Loading...
23A-233 (3) 147 NONOTUCK ST BP-2017-1469 GIS#: COMMONWEALTH OF MASSACHUSETTS Mao:Block:23A-233 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: Bath reno BUILDING PERMIT Permit# BP-2017-1469 Project# JS-2017-002448 Est.Cost:$30000.00 Fee:$195.00 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Group: HANS DALHANS 101628 Lot Size(se. ft.): 22433.40 Owner: FOWLER JEFFREY P&NATASHA R YAKOVLEV Zonine: URB(100)/ Applicant: HANS DALHANS AT: 147 NONOTUCK ST Applicant Address: Phone: Insurance: 11 CHERRY ST (413) 977-6094 EASTHAM PTON MA01027 ISSUED ON:6/2 9/2 01 7 0:00:00 TO PERFORM THE FOLLOWING WORK:RENOVATE DOWNTSTAIRS BATH AND ADD 8X8 BUMPOUT FOR LAUNDRY POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 6/29/2017 0:00:00 $195.00 212 Main Street,Phone(413)587-1240, Fax:(413)587-1272 Louis Hasbrouck—Building Commissioner --1(�l(( oil File#BP-2017-1469 P/' � �K , 1/p APPLICANT/CONTACT PERSON HANS DALHANS ADDRESS/PHONE II CHERRY ST EASTHAMPTON (413)977-6094 PROPERTY LOCATION 147 NONOTUCK ST MAP 23A PARCEL 233 001 ZONE URB(100)/ i , THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST _NCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Ls1; Fee P id Permit Filled out Fee Paid Typeof Construction: RENOVATE DOWNTSTAAND ADD 8X8 BUMPOUT FOR LAUNDRY New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 101628 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON 4.10(2,/ INF*MATIO SENTED: (. L'L�Approved dditional permits required(see below) c ?(C)CLk° PLANNING BOARD PERMIT REQUIRED UNDER:§_ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § 350— 9. 3 y( _6 or7) 01 C c/C Finding „ Special Permit Variance* 012 •SI'§rip."N/t£S 0 r - Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management Demolition Delay � J 6/it', 7 Signa e of Building Official Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. * Variances are granted only to those applicants who meet the strict standards of MGL 40A.Contact Office of Planning&Development for more information. • I t5 .:�;.' tti32a 0=:-„F„ ''-::25,1.9..,,r ; ' . o, M City of Northampton u(tof ``�;"'``�"' " Section 4. ZONING Alt Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department ? kT3 3 3343 Lot Size rr �"',�1 _. —_. . Frontage l'-` " ` 1-39\ Setbacks FrontU 9.0 A- ,'h"0:4 Side 1} L /R��: . It L:^4* R: u }. _._.. Rear do "� P`� Building Height 3D1' 'z i Y Bldg.Square Footage Cil % 74 1 Open Space Footage G> _ _ % /� t (Loi area minus bide&paved a']S6 - Jl693 parking) V` ti #of Parking Spaces , / .5 Fill: ✓��l t.... ^ iA. (volume&Location) ... lV _. A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO DONT KNOW 0 YES IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO © DONT KNOW 0 YES IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water or wetlands? NO CD DON'T KNOW © YES O IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained © Obtained © , Date Issued: C. Do any signs exist on the property? YES © NO ®^ IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES O NO 0 IF YES, describe size, type and location: E. WII the construction activity disturb(clearing, grading,excavation,or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES 0 NO 0 IF YES,then a Northampton Storm Water Management Permit from the DPW is required. SECTIONS DESCRIPTION OF PROPOSED WORK(check all applicable) New House ❑ Addition lat Replacement Windows Alteration(s) FT Rooting E Or Doors 0 Accessory Bldg. ❑ Demolition M. New Signs (O] Decks [0 Siding[CO Other[DI Brief D ription of Propose,d n Work: cw nvet+C ryownS�asS cc��wv B lx'' 1--,n„pwt Jar k4 6- Alteration Alteration of existing bedroom Yes No Adding new bedroom Yes /7 No Attached Narrative Renovating unfinished basement YesNo Plans Attached Roll -Sheet Ga.1114OW house and or addition to existing housing. complete the following: a. Use of building : One Family Two Family Other b. Number of rooms in each family yl nitNumber of Bathrooms c. Is there a garage attached? / t c)) ' d. Proposed Square footage of new construction. 6s S t Dimensions___ I X l) e. Number of stories? C)ra_ I Method of heating? S 009.1`--- Fireplaces or Woodstoves A/0 Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft. of wetlands? Yes yy,,11 . No. Is construction� within 100 yr. floodplain Yes_No - Depth of basement or cellar floor below finished grade 4ij'.j'� (f^ T 1� I � x Yes No. k. Will building conform to the Building and Zoning regulations? I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES�FOORRpB�U/I�LyDIIN�G/PERMIT I, ' v_ \ ^ ,as Owner of the subject property hereby authorize to act on my behalf,in all matters relative to work authorized by this building permit application. I it\—\— Signature of Owner Date MilliMillil I, '%1115 JA I kCv S , as Owner/Authorized Agent hereby declare that the statements and information on th- foregoim application are true and accurate, to the best of my knowledge and belief. 1 Signed under.he pain]end penalties of per ry. l Thor 81tb Iws Print Name Signa ure of Owner/Agent Date SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Su rvllsor: Not Applicable 0 Name of License Holder VS ((( �\(—V CS-y)I O License Number (( their- S-\-• 1a5 Vvc.w,v,,4t,�� ! j v/k1 2ov5 Address ,C Expi in ate `i En 6O ig re Telephone 111, 9..Realeterad Homs tncrovanwnt Contractor: Not Applicable 0 I6ra`?`( Company Name?) // e9islralion Number I e [( �vs car )e� �r 7 ilao Addressl _ f 1 { �[ (off Exp at n Date `(CLL Si , C '710\tt iflrAp tir- Telephonek-1(3 171 (o I f SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152,§25C(8)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes 44 No 0 City of Northampton #?" fNS-- - SI ckMassachusetts j 4. s DEPARTMENT OF BUILDING INSPECTIONS 4k 212 Main Street • Municipal Building Jbti+ p ,, u ''j Northampton, MA 01060 r��.,,., `q0 AFFIDAVIT Home Improvement Contractor Law Supplement to Permit Application The Office of Consumer Affairs and Business Regulation ("OCABR")regulates the registration of contractors and subcontractors performing improvements or renovations on detached one to four family homes. Prior to performing work on such homes, a contractor must be registered as a Home Improvement Contractor CHIC"). M.G.L. Chapter 142A requires that the `reconstruction, alteration, renovation, repair, modernization, conversion, improvement, removal, demolition, or construction of an addition to any pre-existing owner-occupied building containing at least one but not more than four dwelling units....or to structures which are adjacent to such residence or building"be done by registered contractors. Note:lithe homeowner has contracted with a corporation or LLC,that entity must be registered r Type of Work: Prvi V < \iitr� - .'x,1.1-0 :"..,- - Est.Cost: S(-71 "/ O J`A Address of Work: 1 ;-. 11Oir,ri) L�1,�. C"�U42,_ T-'Rd R'r'.CQ Date of Permit Application: 6 , 3( I hereby certify that: ((( Registration is not required for the following reason(s): Woik excluded by law(explain): Job under$1,000.00 Owner obtaining own permit(explain): Building not owner-occupied Other(specify): OWNERS OBTAINING THEIR OWN PERMIT OR ENTERING INTO CONTRACTS WITH UNREGISTERED CONTRACTORS OR SUBCONTRACTORS FOR APPLICABLE HOME IMPROVEMENT WORK ARE NOT ELIGIBLE FOR AND DO NOT HAVE ACCESS TO THE ARBITRATION PROGRAM OR GUARANTY FUND UNDER M.G.L.Chapter I42A.SUCH OWNERS ALSO ASSUME THE RESPONSIBILITES FOR ALL WORK PERFORMED UNDER THE BUILDING PERMIT.SEE NEXT PAGE FOR MORE INFORMATION. Signed under the penalties of perjury: I hereby apply for a building permit as the agent of the owner: 67( a/r1 Dr-\ h6, v � �� yiyi, 16ag\.� q ate Contractor Name I I HIC Registration No. OR: Notwithstanding the above notice, I hereby apply for a building permit as the owner of the above property: Date Owner Name and Signature City of Northampton --,...;-:•" Massachusetts •f'I" i�A i 1 r• �. � 5S t. DEPBRTMENT OF BUILDING INSPECTIONS pot c, 212 Main Street •Municipal Building •S‘. CT 5,,..r:.f _ Northampton, MA 01060 yj00 G .. Debris Disposal Affidavit In accordance of the provisions of MOL c 40, S54, I acknowledge that as a condition of the building permit all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL c 111, S 150A. The debris from construction work being performed at: (Please print house number and street name) Is to be disposed of at: (Plea print nate and I cation of facility) Or will be disposed of in a dumpster onsite rented or leased from: (Company Name and Address) �/- .4 .•na ure of Permit Applicant or: • ner 9tte If, for any reason, the debris will not be disposed of as indicated, the Applicant or Owner shall notify the Building Department as to the location where the debris will be disposed. The Commonwealth of Massachusetts Department of Industrial Accidents li=)=-, Office of Investigations ^n'= ? 600 Washington Street =t[rl--.r Boston,MA 02/11 a-; www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Le¢ibly Name (Business/Organizationnndivi l): tO[\\`\(/v\f5 (/1\Q xdisf Address: \\ Cl2 City/State/Zip: EGi\\�\,C- tryv \\E\ Phone#: qv. 11 (...oQ1\i Are you an employer?Check the appropriate box: Type of project(required): .❑ I am a employer with 4. ❑ I am a general contractor and 1 6. 31;, New construction employees(full and/or part-time).* have hired the sub-contractors I.❑ I am a sole proprietor or partner- listed on the attached sheet. : 7. Remodeling ship and have no employees These sub-contractors have 8. ,Demolition working for me in any capacity. �nI workers' comp. insurance. 9. [1], Building addition [No workers' comp. insurance 5. [y�r1a.We are a corporation and its required.] officers have exercised their I0.121,Electrical repairs or additions •.❑ I am a homeowner doing all work right of exemption per MGL 1181 Plumbing repairs or additions myself.[No workers'comp. c. 152,§1(4),and we have no 12.[ Roof repairs insurance required]t employees. [No workers' 13 ❑Other comp. insurance required] min applicant that checks box d I must also fill out the section below showing their workers'compensation policy information. homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. 'ontractors that check this box must anached an additional sheet showing the name of the sub-contractors and their workers'comp.policy information. am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site formation. Isurance Company Name: _ )licy it or Self-ins.Lie.#: Expiration Date: Oa Site Address: City/State/Zip: tach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). si lure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a oe up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of vestigations of the DIA for insurance coverage verification. do hereby certify un r• the pains • • , ,allies of perjury that the information provided above is true and correct. s p i• aNna LJ Date: P 'none#: y( 5 17 7 ii Of`t Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): I. Board of Health 2. Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other r,...,..., o........... 0A......u. 6/22/2017 City of Northampton Mail- 147 Nonotuck ,per Louis Hasbrouck <Ihasbrouck@northamptonma.gov> 147 Nonotuck 1 message Louis Hasbrouck <Ihasbrouck@northamptonma.gov> Thu, Jun 22, 2017 at 12:14 PM To: hans dalhaus <hanscarpentry@gmail.com> Cc: Carolyn Misch <cmisch@norlhamptonma.gov> Hans, Here's the aerial for 147 Nonotuck. The yellow line is 18' but the rear lot line may not be shown correctly. If you check the property and the new addition will end up 15'or more from the rear lot line, it's allowed. If it's less, see below. Carolyn can help with the next steps. (SIGNATURES)As-of-right, if the expansion (vertical or horizontal) is for a residential use and does not extend either further into a required setback than the existing nonconforming structure, and such extension does not create any new zoning violation (such as further reducing a setback or open space), and the applicant provides written evidence satisfactory to the Building Commissioner that all owners of all parcels within 300 feet of the subject property have no objection to the expansion. (FINDING) With a finding from the Zoning Board of Appeals so long as the change does not involve a sign (see § 350-7 for signs) and § 350-9.3A(5)above does not apply and when the expansion extends (vertically or horizontally), but does not increase the nonconforming nature of the property and does not create any new zoning violation (such as further reducing a setback or minimizing open space). Louis Hasbrouck Building Commissioner City of Northampton Town of Williamsburg (413) 587-1240 office (413) 587-1272 fax Jai 147 Nonotuck.pdf 982K helps.//maiI.google.com/mail/caJui0/?ui=2&ik=ec5t19a57e&view=pt&search=senl&th=15cd0950644628f7&siml=15cd0950644628f7 1/1 r1 Fk y i :,...!.....i::;':..:,.::/:i.''..'1.:::..,... 4 • a t Y2.',i� a . fie `iF tl' Ai �n r • F ,�.v 9 ,. ..i<Nka'� • • • m i • r�^! A ` ' • �� • M r R 3 `SS y�, d +t ! ! V F, xn tie N P vFs 's �' w " ' a(b 1 ��,� x 4,4 t r X:> lkxk yµ`s w r J � s ytn � r �u{' dFr ! " b , LU F