Loading...
39A-058 (5) 48 LYMAN RD BP-2017-1480 GIS#: COMMONWEALTH OF MASSACHUSETTS Mao:Block:39A-058 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: SOLAR ELECTRIC SYSTEM BUILDING PERMIT Permit# BP-2017-1480 Project# JS-2017-002439 Est.Cost:$35625.00 Fee:$75.00 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Grouo: PIONEER VALLEY PHOTOVOLTAICS 106329 Lot Size(sq.ff.): 19209.96 Owner: WAGNER RICHARD&RUTH FOLCHMAN Zoning: URB(100)/ Applicant: PIONEER VALLEY PHOTOVOLTAICS AT: 48 LYMAN RD Applicant Address: Phone: Insurance: 311 WELLS ST - SUITE B (413) 772-8788 Workers Compensation GREENFI ELDMA01301 ISSUED ON::6/20/2017 0:00:00 TO PERFORM THE FOLLOWING WORK:INSTALL 31 PANEL 6.72 KW ROOF MOUNTED SOLAR SYSTEM POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: OI: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 6/20/2017 0:00:00 $75.00 212 Main Street,Phone(413)587-1240,Fax:(413)587-1272 Louis Hasbrouck—Building Commissioner File#BP-2017-1480 APPLICANT/CONTACT PERSON PIONEER VALLEY PHOTOVOLTAICS ADDRESS/PHONE 311 WELLS ST- SUITE B GREENFIELD (413) 772-8788 PROPERTY LOCATION 48 LYMAN RD MAP 39A PARCEL 058 001 ZONE URB(I00)/ THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid /P-1c'0 0 Building Permit Filled out Fee Paid TypeofConstruction: INSTALL 31 PANEL 6.72 KW ROOF MOUNTED SOLAR SYSTEM New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owned Statement or License 106329 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRESENTED: f/Approved Additional permits required(see below) PLANNLNG BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management sn Delay Old-77 Signature of Buil.i Official Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission, Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. �� Department use only City of Northampton Status of permit. // N, / Building Department Curb Cut/Driveway Permit \fes` i 212 Main Street Sewer/Septic Availability vy Room 100 watedWell Availability 9 Northampton, MA 01060 Two Sets of Structural Plans phone 413-587-1240 Fax 413-587-1272 Plot/Site Plans Other Specify AP LICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Procell Address: 2 QrThis section to be completed by office Map 7 I A- Lot 05(5 Unit 48 Lyman Rd. Northampton, MA 01060 Zone Overlay District Elm St District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: RICHARD WAGNER Northampton,MA 01060 Name(Print) Current Mailing Address'. 413-559-9155 See attachment (A) Telephone Signature 2.2 Authorized Agent: Pioneer Valley PhotoVoltaics Cooperative,LLC 311 Wells Street,Suite B,Greenfield,MA,01301 Name(Print) „ifCurrent Mailing Address: 413-772-8788 Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by permit applicant 1. Building $35,625 (a)Building Permit Fee 2. Electrical (b)Estimated Total Cost of Construction from(6) 3. Plumbing Building Permit Fee 4. Mechanical(HVAC) �(J 5. Fire Protection 6. Total=(1 +2+3+4+5) $35,625 Check Number in This Section For Official Use Only Building Permit Number: Date Issued: Signature: Building Commissioner/Inspector of Buildings Date g6Uq 4 ASO PV Squared Solar wwwpvsquared.coop my�soo Phone:413-771-87881 Fax:473-771-8668 +• 311 Wells St.Ste.BI Greenfield,MA 01301 MA Eke.Lk.A13764 MA HIC 140077 Dear Town Inspections Officials, Please see our enclosed applications to permit a Solar Photovoltaic System in your jurisdiction. As you are likely aware, PV Squared is a worker-owned-cooperative B-Corp, employing 40+ people in Greenfield. We have installed thousands of PV Systems out of our Greenfield, MA Headquarters since 2002. PV Squared is committed to complying with all Commonwealth laws and regulations. Our worksite guidelines are created with the intention of exceeding all safety, electrical, and building requirements as defined by their respective jurisdictional entities. This includes the work of people from multiple disciplines, including electrical engineering, structural engineering, civil engineering, electricians, construction supervisors, roofers, and their associated helpers. We are a company that values training and education. We make certain that every individual is qualified for the roles and responsibilities that they assume. It is our policy to pay for the employees travel and training time and cost of the education, including CSL and journeyman and Master Electrician classes. As an electrical contractor we are furthermore guided by the January 30, 2009 Massachusetts Board of State Examiners of Electricians (BSEE)judgements, and rulings that have followed.We pay strict adherence to these mandates and all electrical work is conducted by an electrician and an electrician's apprentice in a 1:1 ratio. We also understand that non-electrical tasks associated with a Solar installation can be completed by non-electrical workers, such as CSLs and others. I have attached our installation policy for your review, as well as a list of example non-electrical tasks. Should you have any questions or concerns regarding this policy or delineation of work, please let us know. We are a learning organization that is always trying to improve on what we do. Respectfully, Adam Thurrell Operations Manager Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be tilled in by Building Department Lot Size Frontage Setbacks Front Side L: R:. L: R: Rear Building Height Bldg.Square Footage Open Space Footage (Lot area minus bldg&paved parking) #of Parking Spaces Fill: (volume&lineation) A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO O DON'T KNOW O YES O IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO O DON'T KNOW O YES O IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water or wetlands? NO Q DONT KNOW O YES IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Obtained O , Date Issued: C. Do any signs exist on the property? YES NO Oi IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES O NO O IF YES, describe size, type and location: E. Will the construction activity disturb(clearing,grading,excavation,or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES © NO O IF YES,then a Northampton Storm Water Management Permit from the DPW is required. SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House n Addition ❑ Replacement Windows Alteration(s) in Roofing n Or Doors 0 Accessory Bldg. ❑ Demolition ❑ New Signs [o) Decks [O Siding[O] Other[ +0] Brief Description of Proposed Work: In,tallation of roof mounted rhoio.vohair,>rm for,oISr rye=on south..ast.ao of hoot roof Alteration of existing bedroom Yes X No Adding new bedroom Yes X No Attached Narrative Renovating unfinished basement Yes X No Plans Attached Rall -Sheet sa.If New house and or addition to existing housing.complete the following: a. Use of building:One Family Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft.of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No 1. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT i. Richard Wagner ,as Owner of the subject properly hereby authorize Philippe Rigollaud to act on my behalf,in all matters relative to work authorized by this building permit application. See attachment (A) Signature of Owner Date . 1111111111.11.11.11.111 Philippe Rigollaud ,as Oweer/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. PHILIPPE RR///IGOLLACD Print Name 6/7/2017 Signature of t Date SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder: Maya Fulford CS-106329 License Number 159 Clark Drive, Giulford VT, 05301 03/14/2018 Address err Expiration Date 413-772-8788 Signature Telephone 9.Reclstered Home Improvement Contractor: Not Applicable ❑ Pioneer Valley Photovoltaics Cooperative. LLC 140077 Company Name Registration Number 311 Wells Street, Suite B, Greenfield, MA, 01301 09/16/2017 Address Expiration Date Telephone 413-772-8788 SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes D No 0 11. — Home Owner Exemption The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(I) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780. Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official that he/she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153(Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature AUTHORIZATION TO PROCEED AND SERVE AS AUTHORIZED AGENT I hereby agree to the Project as set out above,and I agree to pay the contract price according to the Terms of Payment. I further agree to the Terms and Conditions attached hereto as a part of this Proposal and Agreement. I hereby authorize Pioneer Valley PhotoVoltaics Cooperative to proceed with the above-referenced Project in accordance with this Agreement. l further authorize Pioneer Valley PhotoVoltaics Cooperative,or its designated representative, to obtain required permits for this project on behalf of the Owner. I will allow any photographs or videos of this project to be used by Pioneer Valley PhotoVoltaics Cooperative for marketing purposes. A check for the First Payment is enclosed and I am returning this Agreement within 21 days of the Proposal date. h 4Ii '7 Prlllted Name Date e Title PrDPow:and Agreement 100012560 Page 70'3 Richard Wagner 411113 2017 ,4FI „ C7T ` , ,, A t/cam e m Office of Consumer Affairs and Business Regulation : 5Wm - 10 Park Plaza- Suite 5170 Boston,Massachusetts 02116 Home Improvement Contractor Registration = • A O CERTIFICATE OF LIABILITY INSURANCE DATE(M)DDN ) 1/3/201'7 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER COIRACT Linda Powers Nue Webber & Grinnell I NE F,� (913)586-0111 X.):"131586-64.1 B North King Street aass:1powers@webberandgrinnell.corn INSURER(S)AFFORDING COVERAGE NAIC/ Northampton MA 01060 INSURER A HILI Global Ins. Co/Bnergi INSURED INSURER Markel InsIII'8nCe Company Pioneer Valley PhotoVoltaics Cooperative, Inc. INSUREROInter'1 Ins. Co of Rannover/Bnergi Attn: Kim Pinkhanl NISURERD: 311 Wells Street, Suite B INSURER E: Greenfield MA 01301 INSURER F: COVERAGES CERTIFICATE NUMBER:Master Exp 1-2018 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. SN —AL01:1SUBR POLICY EFF POLICY EX? LIMITS LTR TYPE OF INSURANCE INSD MD POLICY NUMBER IMMIDDM'YYI IMMID/WY X COMMERCIAL GENERAL LIABILITYEACH OCCURRENCE $ 1.000.000 DAMAGE TO RENTEDx - A CW MSMFOE X OCCUR PREMISES(Ea onrencel $ 100,000 EOGCH000241217 1/1/1017 1/1/7018 MED EXP(My Onepe on) $ 5,000 I ___ _ _ i PERSONAL B AW INJURY $ 1,000,000 GENL AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 X POLICY PRO- 1 , LOC PRODUCTS-COMP/OP AGG"$ 2,000,000 OTHER. i$ AUTOMOBILE LIABILITY COMBINED SINGLE LIMN j 1,000,000 , (Ea accident) A ANY AUTO BODILY INJURY IPM person) 4 ALL OWNED , SCHEDULED AUTOS AUTOS GfA1000241217 1/1/2017 1/1/2018 BODILY INJURY(Per awtlenl) $ ND ,PROPERTY DAMAGE X HIRED AUTOS X AUTOSUTOS -(Per accident) $ __.__ I .Unlerinsuretl mdum BI spin $ 100,000 HUMBRELLA UAB X OCCUR ' EACH OCCURRENCE $_____ 3.000,000 B 1 EXCESSUAAS CLAIMS-MADE" , 1 AGGREGATE S 3,000,000 DED I XDETENTION$ 10,000 REAGa000241717 1/1/2017 1/1/2010 $ I WORKERS COMPENSATOR i K ;STCATUTE IE=H i AND EMPLOYERS LIABILITY Y/x 'ANY PROPRIETOR/PARTNER/EXECUTIVE xlw I E.L EACH ACCIDENT OFFICER/MEMBER EXCLUDED? A IMyaazMatc n Nibe H)) EWccR000241217 1/1/2017 1/1/2018 E.L.DISEASE-EA EMPLOYE $ 1,000,000 Ifer DESCRIPTION OF OPERATIONS below EL DISEASE-POLICY OMIT I$ 1,000,000 C Commercial Property CPR17E174000 i 1/1/2017 11/1/2018 Business personal properly $1,750,000 Installation $350,000 DESCRIPTION OF OPERATIONS/LOCARONS/VEHICLES(ACORD 101,AMM8ana1 Remarks Schedule,may be aftaclled N more spate le roguing) CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE FOr Informational Purposes Only THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE Linda Powers/LMP r,- -\c."mak' 1 ®1988-2014 ACORD CORPORATION. All rights reserved. ACORD 25(2014101) The ACORD name and logo are registered marks of ACORD INS025l7D14O1 The Commonwealth of Massachusetts In.--— Industrial Accidents se=1'101=. .e Department De Partment of _;-e_ a 1 Congress Street,Suite 100 _ 4.1 Boston, MA 02114-2017 - www.mass.gov/dia Workers'Compensation Insurance Affidavit:Builders/Contractors/Electricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. Applicant Information Please Print Legibly Name(Business/Organization/Individual):PIONEER VALLEY PHOTOVOLTAICS Address:311 WELLS STREET, SUITE B City/State/Zip:GREENFIELD, MA 01301 phone#:413-772-8788 Are you an employer?Check the appropriate box: Type of project(required): L O I am a employer with 45 employees(full and/orpan-time)' 7. ❑New construction • 2❑1 am a sole proprietor or partnership and have no employees working for me in 8. ❑Remodeling any capacity.[No workers comp.insurance required.] 3.0 I am a homeowner doingall work myselfworkers'comp.insurance required.] 9. ❑Demolition Y [No p q .]t 4.0 1 am a homeowner and will be hiringtractors to conduct all work on10❑Building addition con my property. Iwnl ensure that all contractors either have workers'compensation insurance or arc sole 11.0 Electrical repairs or additions proprietors with no employees. 12.❑Plumbing repairs or additions am a general contractor and I have hired the sub-contractors listed on the attached sheet. 13.�Roofrepairs These sub-contractors have employees and have workeri comp.insurance.: 1SOLAR PV 6.0 We are a corporation and its officers have exercised their right of exemption per MGL c. 4.0Oher 152,§1(4),and we have no employees.[No workers'comp.insurance required.] 'Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. ,Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. tContractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: HDI Global Ins. Co/Energi Policy#or Self-ins.Lic.#: EWGCR000241217 Expiration Date:01/01/2018 lob Site Address: 48 Lyman Rd City/State/Zip: Northampton MA 01060 Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under MGL e. 152,§25A is a criminal violation punishable by a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of investigations of the DIA for insurance coverage verification. I do hereby certify under the pains and enalaes ofperjury that the information provided above is true and correct. Signature: Date: 06/08/2017 Phone ft:413-772-8788 Official use only. Do not write in this area,to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other • IContact Person: Phone 01144 Q 4G WAGNER - Northampton • Proposed W Sub-Arrays • Owner: Richard Wagner 1111111111 -/Address: 48 Lyman Road Northampton MA 01060 Phone: 413-559-9155 'Ear Phone: e-mail: longstrider@me.com I System Size : 7.56 kW DC PV Array: (21) Sunpower SPR-X22-360- C-AC modules, two sub-arrays separated by gable dormer. Mounting: Invisimount racking on L-feet on Quickfoot bases Roof Structure: Rafters 2x6 full dimensional, @ 16"OC. 45° roof pitch. See PE letter Roofina Material: DaVinci Single Width Slate Polymer Roof Tiles. Vreeland Design Associates An integrative approach to design engineering and site planning Date: June 7, 2017 To: Adam Turrell Pioneer Valley PhotoVoltaics Cooperative 311 Wells Street, Suite B Greenfield,MA 01301 From: David Vreeland, P.E. Vreeland Design Associates Re: Richard Wagner,48 Lyman Rd,Northampton, MA: Structural assessment of existing roofs to support proposed PV solar arrays. I have reviewed the roof framing details in the areas of the proposed PV panel installations. The main 24'x 42', 2-story house was constructed in 1900 and has had extensive renovations. The house ridge runs northeast to southwest. The house rafters are full dimension 2x6 installed at 16" on-center, spanning I I'-8"with a 12/12 roof pitch. The rafters are supported on a double 2x4 top with the 2x4 studs at 16"on-center. Full dimension 2x7 attic floor joists are attached to the sides of the 2x4 studs just below the top plate and prevent the rafters from spreading. A 12' wide gable dormer is located on the southeast facing roof approximately 16' back from the southwest gable end. 21 PV solar panels are to be installed on the southeast facing roof, 9 panels north of the dormer and 12 panels on the south. The slate like roofing are Davinci polymer shingles. I have reviewed the mounting details for the proposed arrays. Based on my calculations and a PV solar panel unit weight of 46±lbs, with the attachment points of the array placed at a maximum of 4' on center and staggered to minimize the load to any one rafter,the existing roof framing is adequate to support the proposed PV solar arrays and the snow and wind load requirements of the current MA State Building Code. Please contact me if you have any questions or need additional information. Sincerely, i ,ty 010 OF VREELAND W.4 8 CIVIL David Vreeland,PE g'ck9No.4ean Vreeland Design Associates or To FSatoN,e�° 116 River Road, Leyden, MA 01337 Phone: (413) 624-0126 Email: dvreeland@verizon.net Fax: (413) 624-3282 ff ar sem' :3ln .px w + K a n r O 1r SunPower® X22-360-C-AC Residential AC Module Series Design-Driven Advantages ©22 • #1 module aesthetics and efficiency' LL • Unmatched module reliability �- � SERIES • No electrolytic capacitors • 25-year Combined Power and Product Warranty Maximize Value for Roof • Size system for roof,not string inverter Optimize performance of each module Expand Deployment Options • Complex roofs and partial shading • Small systems • __ _ _ _ •_ _ _. • System expandability Simplify&Speed Installation Optimize System and Installation Efficiency Factory-integrated microinverter Robust,• doublelockingAC connectors SunPo,verr AC Modules which include a racory-integr, and - Design flexibility offsite and onsite Stir novo" rricroinverter..Irovidea revol it bran combin :lcr of high - No DC string sizing process efficiency,high reliability,and module level DC-to-AC power conversion- • Fewer installation steps than competing systems Designed specIDcally for use with SunPower h e isiMo.rnt"and the • Intuitive commissioning SunPower Monitoring Sy em,SnrPower AC Mod ties ere;Ho nad iistallaton bestir.-c lass system aesthetic and irw:lvecnibility into Component of Complete System • Built for use with SunPowera Invisi Mou ntm systerr'performance.AIS thi Torres withnt Lest Comb r ed f ewer and the SunPower Monitoring System and Product Warranty. Superior system reliability and aesthetics '"n sunpower.corn SUNPOWER� `. 4 r`4 24` �� a ay, .`"`� #b '. {rte ^ y+ " t ;yr k e.' i x 4J 4- . ,-• srSs�:.wN -' ;et ,• . a Ask` t '' - ..w ISunflower® X22-360-C-AC Residential AC Module Series Power Data Mechanical Data SPRX22-36DC-AC Solar Cells 96 Mo^oc sta Ire Maxeonw Gen III No vnal Pcwer' Pnom) 360W F-on'Class !1g^.-ta-smss.0^.tempered gasant oti Power Iolerance +y-o% reflective mating Avg, PEne1 Effe e^c/ 22 2* E*Yronme tol Dr don-sled ernp Coef-IPcvde') 20%.C - R_„ Th t.hypass slodes Frame Class 1 b ack onod 7cAM (h gl Ps AA'anngi •Shade tolerance . Integrated mod.e-level maximum sower Weight tS Alis 206 kg; co n:t-ackng Max i Recommendes 1 3 in.(33 mm) Module Sparing AC Hoc In(a(Data Output @240 V(min/nom/max) 211/240/264V Output @ 208 V(min'ten/max_) 183/208/2291, War rar,5 al LI Ccllfica:ions Operat.ng Frequency(min/-pm/max) 593/60.0/605 Ilzw-•rarities • 25 year rlted oower wrrnt aay Output Power Factor(min) 099 • 25 yred proauct warm � _.. 7 AC Max Continuous Outou:Current@2<OV 1 33 A • Ve 1741,Ind*ding comp lance with I AC Max Continuous Outout Current @ 208 V 151 A asp icable regovelrenrs of ILLL 1 S /and AC Max Cont Outp_t Power 320 W IEEE 15421 DC/AC(FC Ccrwe sV LR ency 96JR I • FCC and ICES-003 Class B Maxun tS Per 21)A Branch Cray(u 2L0V l2r gle chase; • AC module Type 2 Fre Rated Max.Lnits Per 20 A Branc-Cvcu t C 208 V 10,two pole, • LII 2/u Lisred when Installed with Cert fWGons InvtSiMounC° l ested Operatipo Cur dCfonSInvC ssAPre Pare4 when stalled with, ween Oper at ng Temp -40`F to+185 F -u0°Cm ,S5" fM c aand when ofSUnP we eo! !area dboco Power Max Ambient Temp. 122°F(Eo'Q mod*le frame is<_25"1889 cm) W nd'.62 ps O00 Pa 305 ag n fro't&hack . Ater.a g Ccrre^:(AC)M ti_Ie designation. Max.mad Snow 12Sst 6000 Pa,611 k on[ p g/mr h eneoles mstallauon n a¢ordaace wt'-‘NEC l Baa Resistance el(25 mm)diameter hail J m;)11(2; 690.6 mis) I PID Test Pote^tial-nduced degradat:on tree 1 int e,, III t ■ 'I. Lid /-m 91. . t a.xmr SUNP , HWER ' �+si , ���" � ��� a a t , t i< x m.� v. tt / ,, .:xis m* t SunPower® InvisiMountTM Residential Mounting System Simple and Fast Installation • Integrated module-to-rail grounding • Preassembledmid and end clamps • Levitating mid clamp for easy placement og • Mid clamp width facilitates consistent,even t s` module spacing • Simple,pre-drilled rail splice � � • Lb_2703 Listed integrated grounding i Flexible Design • Addresses nearly all sloped residential roofs . c • Design in landscape and portrait • Rails enable easy obstacle management - Customer-Preferred Aesthetics _- • #1 module and#1 mounting aesthetics • Best-in-class system aesthetics Elegant Slmelloity • Premium,low-profile design • Black anodized components SunPower InvisiMounfM is a SunPower-designed • Hidden mid clamps and end clamps rail-based mounting system. The I nvisiMount system and capped,flush rails addresses residential sloped roofs and combines faster Part of Superior System installation time, design flexibility, and superior aesthetics. • Built for use with SunPower DC and AC modules The InvisiMount product was specifically envisioned and • Best-in-class system reliability and aesthetics • Combine with SunPower modules and engineered to pair with SunPower modules-The resulting monitoringapp system-level approach will amplify the aesthetic and installation benefits for both homeowners and installers. sunpower.com uatasneet S U N POWER t • .A .p. SunPowerk InvisiMount'T Residential Mounting System 1nvlsiMorirl Component mages vcri_dp,I A ars and Ra,i 'lie'/�tl:.n ranI�'I • s� Fti' Mia Clamp End Clamp ^ail E.Pail Splice C'o.irc Liv Assemtly F.-.J Cap maw InvisiMoupt Component Decals 1nvlsiModnt Operating Condors unoonen[ Natenal t mperatu(e -40°Cm 42 Ftc 19L -a -oathsr ) 0 p" port -- _ -i - — . 000 Pad force O dRp br e c.les5sa, S 5 15 61 M C pr d Clem p pl V tl e > c alu'ry a 00 :. 110, ss NI p6„rptl.ed el.rrc I agT6 636e so_RI IrvisiP ount Wa a nTies ACO CC ,`ieatl a llS ▪ Sp,i2e AI ,60J5 Ti 33C In(y oz/R) Beare"C arranry ▪ d 30 1 E n LSS o9 r.n..� tw,iantp marl 2st 142-70 eltL _laced copper L ▪ Cap ! ila2k accal?0Vl copclyre IC 2,8 IC 21 ml - L 12703 Lured Cer.x__. P. n Toon Haldrone Sapported by IrNslMosnt Sys;err Deslgn Tool • r p pleA0achrert shirole o - t rrert Roof Attachment I lardwane"Ala Irantles APP Coen .ed d I Tle.o 1 a J r ,.c., Or r oof Artactrers _er ,IacE -1-^cnha,d aemanufacturersdo.am r a.orr .Module frame that 5 zomptiblr with rnelvvuMcu uyyrem r yvued Ira ha'vnu¢mcerorerrArlit corporatior All POrISP3,ErJel 31113FUNER the H b elIn ISIh NT_. (radrma4.2 or rep.012,ed 1 P II he J p 1 1 „e..oe r 'p50r.c r co o- ru d sbee.are„1 << < ben t r a. .. Document&509506 Rev( SUNP ":IWER I' *ten U i kFOO L PRODUCT GUIDE Exploded Product View/B.0 M. — 1 Installation Instructions — 2 Cut Sheets—3 Spon a4-'F-s-4 tsiJ Q LU LL:! d 00-0 EcoFasten Solar i.1 if 1 QuikFoot— Product Guide Exploded Product View, BIl1 of Materials ' , �fa. .. ,,, , l 1' Materials Needed For Assembly H } t.H 6 1 Item No. Description of Material/Part be determined) Quantity �l h �� i I, 2 1 QFasteneruikFoot Base(Length Plateto 1 0 , ( 2 © 3 QuikFoot Flashing1 JI _ 4 EPDM Washer 1 di % f 5 L-102-3"Bracket*(other options available) 1 L, } ® 6 5/16" EPDM Bonded 18.8 55 Washer 1 7 3/8"Stainless Steel Hex Nut 1 I { 0 Required Tools 0 lie II 1 4 I / 0 f d" s` sr 4 Ate (7. / . `• . Eco asteJo4] roducs are nSolce Ow contentpng(is.tl Pater ents B2 15370hts 818served 10/09/148B281.1 ' EcoFes�en Solar pmtludsare protected by 0e following US Pa�enLi8.151,622 828,153 700 B2 8.1813088108.713828,106299648109i914628.245i454 8282]21]0828225,55/82 ' QuikFoot- Product Guide Cut Sheets: QF-AL-Base I dc II ' t 41 ✓ ' II, 1 2X 0.331n [8.38mm] I ,. ii. l t lire � I nod" I1 U u o 0 11DL Lo in NC 0 N Lo CO N FI � Fa.____ tyl 1 .5O [n 38.10mm] /w i 3/8"-16 Stud FiA 4 QF-M : 1 .5" 1 QF-L 1 .75" . _, It i 1877-859-3947 EcoFasten Solar All content protected under copyright.All rights reserved. 10/09/14 3.1 EcaFasten Solar products are protected by the following U.S.Patents.8151522828153700 B2 8 181.398 828166,713 299 82 8209 914 83 8.245,454 82 8,272174 82 8,225.557 82 JI h'4 fifi QuikFoot Product Guide Cut Sheers QFL-812 l i t r ' Ih� Ifil -I ;l Il R.38in � i Hi ' H11 [9.53mm] .032in if l [0.81mm] A 0 - - II W II 400 12.00in _ [304.80mm] 11 . it 3.00in [76.20mm] . %/ 50in V 8.00in [ 12 70mm] .. [203.20mm] ,. 877-859 3947E Fasten Solar AH content protected under copyright.All rights reserved 10/09/14 3 2 ' 1 FnnFasian Solar products are protected by the following U Si.Paten'.8.151522 B2 8.153.700 B2 8181.398 B2 8,166.713 B28.146,299 62 8209914162 0 245.454 82 8.272,174 828,225557 B2 ij 3 iJ i i1 ie� , i QuikFoot- Product Guide Cut Sheets. Bracket Options SCL-101-3 ;l i ',11,' � i 1, i, ' it ' 1 ,' � 3/8" 1, ' r c / OS , 4111110 Aj na 4 46 SERRATIONS ./. { .1.1:".1., � I ii 1II41 b, it — ± C LD tcr1 17/8" /— R1/16" .1 p 1/4 to , 1 3/4" 1/16' - AH R.O05 R.O1O y' 1 k . --- 2X R.O1 ��V LI j/ `r 60.0(0%\ d 4 0 3/8"-.0026.006 - — 1/8" / 0 7/8" X 82° DETAIL A NN./ SCALE 3:1 1 1 877-85e-9947 EcoFasten solerAll content ped under copyng .All rights reserved. 10/09/14 37 ECOFaslen Solar products are protected by the following ngUUS.Parents.0.15/522620.153,700 B28,101390 B20.166.]13 828.146 299 828,209 910 820,245.054 82 8.2]2,1]4 028.225,557 B2 iy r 1 rk` l 1 ii QuikFoot— Product Guide Speci:ications 'I dht i1 Y .lvrit., II -I DART I -GENERAL �N 11' lt111t 11-1 11l 'NMAR* 1 i SUBMITTAL I A. WORK INCLUDES A Submit manufacturers written Specifcations. B. Base plate is 6000 series aluminum with one ,1 { 1 QuikFoot base plate attachment bracket that g Submit standard product cut sheets. PEM Type Press In Stud 18.8 55. I I ( 1l' attaches directly to the roof deck C Submit installation instructions C Fasteners to be compatible with chosen roof 11 a 0: / fl 2 Provide appropriate bracket and fasteners 0 Submit product specific load test data,showing application and meet specified pull out values j1 .l 111 for the roof system. as shown in load test data. ^l ultimate and allowable load values specific to B. RELATED SECTIONS the roof deck specified for the project. D. Counter flashing is 032 gauge aluminum e • 1 W co- 1 Section 07600:Flashing and Sheet Metal bossed to accept shape of stainless steel base 2 Section 07500 Roofing 1 c. Q JA_GJ ASSU RAN CE plate 3 Division 1.Administrative and Procedural Installer to be experienced in the installation of Requirements specified roofing material for no less than 5 years in 2.3 1 WISH 4 Division 7 Thermal and Moisture Protection the area of the project j 1 ill " - S9S3FM DESCRIPTION A. Brackens mill finish aluminum el '- I5 DELIVEL'/STORAGE I IAND'_ING B. Base flashing-Black-kynar painted A. COMPONENTS'. Inspect material upon delivery.Notify manufacturer 1. QuikFoot system consists of aluminum within 24 hours of an missingor defective items. 3EXECUTION bracket and base plate with(1)stainless steel y PART - ' 11113 1 WIstud,(1)stainless steel nut,(1)EPDM washer Keep material dry,covered,and off the ground until 1and(1)bonded stainless steel and EPDM installed. 3.'. EXAMINATION washer. A. SubstrateInspect structure on which brackets 2. Fasteners PART'c- PRODUCTS are to be installed and verify that it will with- A.To be of metal compatible with QuikFoot stand 1 2.1 MANUFACTURE any additional loading that may be incurred. t bracket EcoFasten Solar® ( B. Fasteners should be selected for compau 289 Harrel StreetMorrisville,VT 05661 B. Noti General Contractor deficiencies Misty with the roof deck �' ofany C Fastener strength should exceed or be (877)859-3947 before installing EcoFasten Solar brackets. equal to that of the allowable load of the www.ecofastensolacmm C Verify that roofing material has been installed system.See test data at correctlytoi stallin solar attachment r '.2 MtachmeIS priorP g 1 www ecofastensolarcom - brackets. '1 A. Attachment Bracket 3 Sealant Of required by roof manufacturer)'. to be roof manufacturer approved. 6000 Series Aluminum(choose one) ?.,11 :NS ALLATION 4 Aluminum counter-flashing 1 CP-SQ-Slotted A. Comply with architectural drawings and project ..�° �r f S. Aluminum attachment bracket 2. F111-A engineer's recommendations for location of �1� 3.P-3-05K system.Comply with Manufacturer's written in- �'p' R B. DESIGN REQUIREMENTS- 4.SCL 101-3 stallation instructions for installation and layout ( 1 Bracket spacing to be recommended by 5 L-102-3" project engineer. 6 L-102-6" i2. Install a minimum of two fasteners per 7.7-101 base plate. 8.Comp Slide 3 It is important to design new structures or 8 Custom ` is assess existing structures to make sure that r they can withstand retained loads. I 877-859-3947 EcoFasten Solar All content protected under copyright All rights served 10/09/14 41 j EcoFasten Solar products are protected by the following US.Patents 8151522 B28.1537000 B28,181.398 B20.166,913820,146.299828.209.914828.245454 B28272,179828.225557 B2 Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 INSTALLATION CREW OPERATING POLICY This policy applies to all PV Squared employees in Massachusetts, but is particularly directed at those involved in the installation of solar electric and other renewable energy systems (licensed electrician, learner/apprentice electrician, licensed constructor supervisor, supervised carpenter and laborer). When engaged in this work as an employee of PV Squared on a PV Squared project site, activities of PV Squared employees are covered under the General Liability Insurance maintained by the Cooperative. It is the intent of this policy to provide clarity to installation situations where the applicable codes and regulations are unclear, ambiguous, or silent. It is possible that a municipal building or electrical inspector could interpret the codes and regulations in a manner that differs from what appears here. But this policy sets out, in writing, how the cooperative interprets legal work requirements and unclear details. It is an internal consensus working model, intended to be revised and improved from time to time. As a general matter, a city's or town's Building Commissioner is charged with enforcing the State Building Code, Plumbing and Gas Code, Electrical Code and Architectural Access Code. The commissioner addresses concerns about the safety, accessibility and security of construction of homes and businesses. The commissioner also enforces zoning bylaws. In accordance with Massachusetts General Law, employees of the cooperative who perform electrical tasks and activities must hold a Massachusetts journeymen's electrician license or be under the direct supervision of such licensed personnel. These tasks and activities include installing electrical wiring, conduits, apparatus, devices, fixtures or other appliances for carrying or using the electricity associated with Renewable Energy Generators (electrically active solar photovoltaic modules, wind turbine-generators, hydroelectric generators, etc.). In no circumstances shall the Massachusetts licensed journeymen have more than one learner or apprentice working with him/her or under his/her supervision. Mounting structures come in a variety of configurations and have differing functional and physical characteristics. A structural component or assembly becomes associated with electrical work as the Renewable Energy Generator is electrically bonded to the mounting structure. Unless otherwise noted in M.G.L. c.143 553 through §S60 inclusive, all structural work defined as follows shall not be required to be performed by a Massachusetts licensed journeymen electrician: • Structural improvements • Elements of a Renewable Energy Generator's support structure that fall under a building permit (e.g., assembly of top-of-pole mounting structure on steel pole with concrete foundation prior to execution of any required electrical bonding of the support structure and associated renewable energy generator (solar electric module) to the support structure Policy # 9 Installation Crew Operating Policy Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 • Roof-top mounting support structures including but not limited to posts, stand-offs, flashings, feet, and mounting rails • Operation of heavy equipment involved in moving, hoisting, digging and other tasks • Earth work, excavation and concrete work • Manual labor involved in moving loading and unloading of equipment • Moving, hoisting, and attaching an electrically bonded panel assembly (defined as one or more assembled and electrically bonded solar electric modules) to an existing structural support designed to host the panel assembly. Note however that construction of a panel assembly is an electrical task due to the required electrical bonding activities. Repair and Servicing of Installed Equipment Repair or replacement of an electrically bonded and/or energized renewable energy generator (e.g., installed solar electric panel) will be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician. Replacement of an installed inverter must be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician, if the work requires removal of AC and/or DC conduit and associated wiring that originates outside of the installed inverter (e.g., removal of external AC conduit and wiring between the inverter and point of interconnection with the on-site electrical service). Note that this activity may require a wiring permit in some local jurisdictions. This requirement also applies to the servicing of an installed inverter that involves replacement or repair of components and wiring internal to the pre-manufacturer inverter (i.e., factory installed components that were originally shipped with the inverter) even though such activity may not require a wiring permit. Replacement of an installed inverter may also be performed by a qualified technician who may or may not be a licensed electrician or properly supervised learner or apprentice working with a licensed electrician if the inverter is of a "plug and play" design. Such a qualified technician can also performed other tasks that include installation and servicing inverter-based performance monitoring systems (e.g., replacing internal communication cards, making "plug and play" ethernet connections, etc.), assuming these activities do not require creation of a new AC power source circuit to operate the communication system(s). Policy # 9 Installation Crew Operating Policy Non Electrical Work at a typical PV Squared installation: • All Material Handling tasks o Module prep and moving o Ladder lift setup o Ladder set up o Trash/recycling removal and sorting • Structural Improvements o All carpentry work • Roof Mount Array o Fall protection anchor setup and removal o Layout and mounting bases o Racking up to but not including"bonding/grounding related activities" o Leveling of racking o Sealing seams/patching roofing/additional flashing • Ground mount array o Site work,earth moving o Trenching/digging o Construction of racking up to but not including "bonding/grounding related activities" • Conduit run o Making holes in structure o Fire blocking,sealing penetrations o Stickers • Power Board o Build wall, hang plywood o Stickers • Interconnection o Stickers • Monitoring o Wifi options o Any"plug and play'devices o Programming of monitoring devices o Computer based activities • Installation completion o Final building inspections o Install pictures-See checklist o Update one line and roof drawings to reflect as built o Completion checklist o Notes for others o COC left onsite • Misc o Truck Organizing o Material List, ordering o Daily check-in o Customer interaction and training activities 020 / 7 teav`� ' Qs �n 4�� Zflt pton j ment ` ����� w � eet 01060 ' Array Start Point Open L-Feet on Ecofasten Quikfoot bases Array Start Point �'4 See Note#1 attached to roof structure with(2)GRK RSS See Note#1 et 5/16"x 3-1/8"fasteners Plan View .4 roof overall 558 k ESTIMATED BILL OF MATERIALS PART. MAKE b MODEL NO: �' - to dormer 279 �'- -k— 30 �' to skylight 189 �' RAIL Sonlrower Inmslmoom 15 k array& rail overall 209Y k Ak array& rail overall 1254 k SPLICE SunPower Invisimount 4 12 ^ a 12 _ BASE E r Quikfoot 52 ' t � t t MOD. Su P %22360L-AC 21 Q••II _ __ _ y _ — _ P ECTN TF. _ - • o] . . , • rra o S'.A y pl t ge y. hto r 116ra pbl tl0 der"( m i 4Y4 —iy— • 32 �'- 9 �- rase. oz E Is m sI b r 2/1111 o_ site- -i-- 3232 BYz ->'- 3232 y- 3. x2/ 1 bry a et lad interfering with PI' bckk , ,I ,I lJ` aV oth t a base5 are gg ea tl p tl 8'O.C. la- T r _'_�_._ J— I �- m 5. M Ila bl 1 p 9V 15- allowable rail cantilever is 3r and 1 — e tl1/31 gh ( dj ent N v 32 —y-- _ --/— 48 14Y. -�— 32 i 3 —< v 7 Aaaronalo altemaree bases may be Nro N used in response to actual roof profile to >. = pN with T q ip nt L° 12/ _� 32 32 —�-L - ru 2 PCp(a1a m _ ■ - - __ - ■■y _I}�_Iy_ __ _ ■ _ 411 cu ,_ 8. pbas 2"f mralentls_ l.■J ' PI , a {jJ 9. module hG5 frame th dlmensars of 2 - L 00 41A"x41 2" t8". _ _ _ _ _ _ _ 10. Clamp centerline b M1' 2'and 16.. C 111 . III II t.� either end of the moduleframe. 11, Torque Invisimount clamps ro AS In-lbs. 12. Torque f -L - l nuts to 375 in-Ins. -/'— r —F d— 32 —�- L Is Roof mater rali to polymer Nes. -i-- 3k i 32 —JA— 4Y4 -F- 3 32 —f- . Ihv ) II( I jilt clamps 2'- 16' _ mfrom edge m REVISIONS } 4 1- } N DESCRIPTION DATE 6 —} k array& rail overall 125%11 k 24% > 24%4 -k array& rail overall 1254 �.' .r— 6 JOB: Wagner SITE: 40 Lyman Road :-5'..N Northampton,MA01060 / ` \ TITLE: Array Layout / John Gnese EDN n: 11637 (10 2x6 full Rafters DATE: 06/12/2017 PAGE: 1/1 @ 16" O.C. scn�. v4^=ro".SHEET A-01 SIZE: n^x11'• i +0011 PV Squared Solar L-Feet facing U PSLOPE a�/1�A +0 311 well,50eet,smleB throughout roof. �,•, Greenfield,MA 01301 Le��f design@pvsquareacoop •• 413-7728788