Loading...
36-002 (4) 1135 BURTS PIT RD BP-2017-1471 GIs#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 36-002 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGLLcc.1144/2�A) Category: SOLAR ELECTRIC SYSTEM BUILDING PERMIT Permit# BP-2017-1471 Project# JS-2017-002450 Est.Cost:$11000.00 Fee:$75.00 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Group: SOLARCITY CORP 110253 Lot Size(so. ft.): 9191.16 Owner: RIVERA DELBUSTO HECTOR Zoning: Applicant: SOLARCITY CORP AT: 1135 BURTS PIT RD Applicant Address: Phone: Insurance: 604 SILVER ST (9781215-2369 0 Workers Compensation AGA WA M MA01001 ISSUED ON:6/1 9/2 01 7 0:00:00 TO PERFORM THE FOLLOWING WORK:INSTALL 7.2KW SOLAR PANEL ON ROOF POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 6/19/2017 0:00:00 $75.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner File#BP-2017-1471 APPLICANT/CONTACT PERSON SOLARCITY CORP ADDRESS/PHONE 604 SILVER ST AGAWAM (978)215-2369 Q PROPERTY LOCATION 1135 BURTS PIT RD MAP 36 PARCEL 002 001 ZONE THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid 146 • Building Permit Filled out 171 Fee Paid Typeof Construction: INSTALL 7.2KW PANEL ON ROOF New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 110253 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INF9RMATION PRESENTED: le--Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management II- • ' ion Delay 9 Aide Si u.L of Building 6 tat Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. -Department use only City of Northampton Status of Soma Building Department CurbCuppdveway Permit 4� 212 Main Street SexedSepbekvallaaifilly ' ` Room 100 WatemmeHAvalebwty Northampton, MA 01060 Two Sets of Savanna Plans N phone 413-587-1240 Fax 413-587-1272 Plot/Site Plans Cater Specify AP LIGATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address: This section to be completed by office 1135 Burts Pit Rd, Map '27(1) Lot 0 C12` Unit. Zone Overlay District Elm St District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: Hector Rivera Del Busto 1135 Burts Pit Rd. Name(Print) Current Mailing Address- Op - (413)219-0728 NE<TeR r<wESP\6(< 1�O5Tka Telephone Signature 2.2 Authorized Agent: SolarCity Corp/Jamesadua 604 Silver St Agawam MA 01001 (mblPrint) Current Mailing Address'. ``, 978-847-7170 Signat4 e Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by permit applicant 1. Building 3,000 (a)Building Permit Fee 2. Electrical 8,000 (b)Estimated Total Cost of Construction from(6) 3. Plumbing Building Permit Fee 4. Mechanical (HVAC) 5. Fire Protection �/J 6. Total=(1 +2+3+4+ 5) 11,000 Check Number 776(61-3 75- This Section For Official Use Only Building Permit Number'. Date Issued. Signature: Building Commissioner/Inspector of Buildings Date Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be tilled in by Building Department Lot Size Frontage Setbacks Front Side L. R: L. R: Rear Building Height Bldg. Square Footage Open Space Footage (Lot area minus bide&paved parking) #of Parking Spaces Fill: (volume&Location) A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO DONT KNOW YES IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO DONT KNOW YES IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water or wetlands? NO DONT KNOW YES IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Obtained , Date Issued: C. Do any signs exist on the property? YES NO IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES NO IF YES, describe size, type and location: E Will the construction activity disturb(clearing, grading,excavation,or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES NO IF YES,then a Northampton Storm Water Management Permit from the DPW is required. SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House Addition Replacement Windows Alteration(s) Roofing Or Doors Accessory Bldg. Demolition New Signs [ ] Decks [ ] Siding[ ] Other E Brief Description of Proposed � a�„ J Work: Install solar electric panels to roof of existine home to be interconnected with home's electrical system- (•C) Alteration of existing bedroom Yes No Adding new bedroom Yes No Attached Narrative Renovating unfinished basement Yes No Plans Attached Roll -Sheet sa. If New house and or addition to existing housing.complete the following: a. Use of building : One Family Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i Is construction within 100 ft of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT Hector Rivera Del Busto as Owner of the subject property hereby authorize SOLARCITY to act on my behalf, in all matters relative to work authorized by this building permit application. NC7u(Z. Kwc&A - t0e‘---€)‘-sT`) 6/14/17 Signature of Owner Date SOLARCITY CORP/James DiPadua as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. SOLARCITY CORP/James DiPadua ntN ne7 Cr—) �V 6/14/17 Signature of Owner Agent Date SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable ❑ Name or License Haider_SOLARCITY/Dan Kelley 110253 License Number 604 SILVER ST AGAWAM MA 01001 12/01/19 Atlares3- Expiration Date /� 774-364-3145 Signature Telephone 9.Realetered Home Improvement Contractor: Not Applicable ❑ SOLARCITY CORP/James DiPadua 168572 Company Name Registration Number 604 SILVER ST AGAWAM MA 01001 03/08/2019 p Expiration Date J\ Tele hone 978-847-7170 SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes ❑ No C 11. - Home Owner Exemption The current exemption for"homeowners"was extended to include Owner-occupied Dwellines of one(I) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official.on a form acceptable to the Building Official that he/she shall be responsible for all such work performed under the buildine permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers' Compensation) and Chapter 153(Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner'certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances, State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature _ _ :4 tan d]rre. nes*b'Ad ltfilatrar f Putt,MAIO 144e7 'mane amass killundisraidnil:DoOkraCtuitnateraitlitirlisniage Audlettear floc 14.y Pilot kit to Parbteetatiorsiatts SosciFY Corp. _ Ad,: 3055 ClearvIew atsY of son Mate4_G9.9440k Phut elk 8e8.76pA§g en pa ny4nn alai sayee. .WhISM erw lM I. 14�a ,mille ms11 5 &Dina moil na.t Rd1 4Qlb mn/m WeEiadlSaM�ps arenleilli 2137 dAaf0a'af ar• idtd.auiedaal 7• ©$lmfi� Abel Soso ecopbna 7i.a.di•Raea wse2.Mears tit*12111112.2292212 .Qt7wS120Mart R DiodldV,.dlte ps_.las'a�a aeg iee+p.. a4�daa1 S0 wavy. aa.owe I&D9.elrl ryhoceKIil= , aClI tars,rt4aaQlit aresohns..WMt ILQfl ai0noiecn l a out Pt roams'sal7, dfYafa0ayuda pin E2U'Lehpb la.a. r7aiai7t =Or%oshorbwo"' masa Sa151tP1L ?as.dmrd..ean.w +M.nrr +rrrli�_rp____ rlYscairttras am `wst m.+.swpma n avAaone 1�Mk ysear�0e NOW ma♦AW+`r. tali twhp lliq sane essastaliessnargfirmirspies kis NSA pig SWAMI Mos*zoom aae.Zutdl Merton Ir*fllde Corld>aly Papa lr*sac uo.C•YVC678?tl15-67 flown ut 911/2017 Matt \\35 P #3,J2VCa ,1-. &D ��>oNt PTL). Asha opt eau nal ovormato Celt/.s.3 flpSritiapie Harter rrd rye.haf S Mesar sena tawny s.pslrrtri.oit.iLldaa$a Man kW ao as(OpO1212 oriental ISM erre 04.14.101.30noatribvi 7.raYkei•!nl sail odd ps.Mss M aa.era STOP ICU ORDliaand a Ibe graph 2200.2d.2/221drm.•WOR Is.IMa disia espy oUI .11oiralmy to foomiol M salmi or .. t,--1 :reargot hranrs emir maple. rA ...,..Ye#.i/adlnab sV 11Yt�Mstl.lehlsRl.enrswas batt ,, 41110YaR.rR a►WOWS bea M sfrispi+Vir*ar.Iwad Ely vaaam lMdae.aea hilignatif thilanhalli U2Maad. Dir iiypdaapadtl 6Glp'M.aq/L LYdabae il•alor LPSYlgapadr t.alNT.'a.l Tia ae • • eget CERTIFICATE OF LIABILITY INSURANCE °womni aN"`N MS t>RCATE IS 16 WS At A WATER OP INFIANVattRI ONLY MO GONERS NO tame WON vie CRINtCATE IUSER THIS • C6RW[CATE Ns tart AFFTIWAINELY an WARMLY MOW.WWII SM ACTSR 11•E LOW A SE A#O *)DY 1HE POtMiIES 109.04 TWS XspnMCATE RV WORMCR DOES WIT WN8111UlE A C'ONtRACT HRTm.R1 TE 1SWLXt INSURRRIR,Al TWMZET I REPRESEXTATNEORPROCRICENANDThECIRTMAW HOLM h&ORTART:Min at814:We Width a-RAObflttW MIRRf.fa;LPARStIal malt b*w iRwal. C WWW5MIKOWYWRW RRIOettm thio Mese WRRWORO,A anbsPRWY.math Rattles Mayrestlra autrehmwront Asd<Nantrm Mr mews tbaa trtmofo*Me W U. I calWatoboliterailleuarast.andansweidaoms ax�s a ROM&IRRAXR Wa¢ Dna SH 1O Want !fM140 b KM Ao:BWmBaltUaRp&W Mmni!MOINwgwAmwavr rmx . . *WSW laalaa:Nw . . HP SatasSUIXOS"ESfkaibW mwRms:wA 4R. gNMnU SKR mates e:Awn=AoaMiwsswOwtml IOM • 1rt.Nants. . . _. ( . Pasax, COVEHAta cg1TFAt!4UMR: MatmMMNaT ryEVWINNUS litAs SIO t.wt YTE%T'RE MONS NSI®SHOW TWE 0W4 OWED TR TIH MSeM milED MOVE ravine PNIDY PERM Ob 14W1OMTfl7. ROTOWaRfeRaNwallat atRef OROainLu asaeY mama at OTMR LgXeENT%UR 'XS WEN INS CEATIHQAtE MY OR RIMER OR mfwa'PPEmOppMw{t TIE*(SWWCE AF%OlWED RT TE POLDER comma,WREN IS RE TO N/IRE TERM& EXCUONINSMCLIONINRORS OF=11 MOO UMIIS SHOIWWtYWWE HRA'ItEDUORDWI PND CUM tt TeEcewmrR ., .'_•';•.. d' ' xw, _SMD A K•GpR9wAlaRlaRLLlwnir• e .B1EmSIX 'are In IOaI s MMEi IaMmeAVR':X:=Is , . ' v :e 1MN1MO X"R RESOR - •NDEW9. Dram, _$ SNS . ,rEvona(aAnywgwY z "MIR ffiitosaKiIEMtatyrarayss 'fiaFNLM `M ,a 2146000 M Nay 28 . "IOC P.tOUAte,;pasaaMaRts=s TRDl>19 • cam 5 ' A .yyt anion/ :t. }NMa01111n Mira �mi5f%wl .�a*YIH ktiEST 'i 1.=.110 • X i aoNADq w tY unt hrw.nm�e .Sr" M 1 .11 :ARTYN6tei laMals I 1 • maMntwr IDI 1u rbia i; IA ;"seMeakae' main mw TYniA •W"IIIM•01i1W my" TJg1ID1v :it dMtdMwt :a WOW A .,.. 114601,7 £Y50KANL4Hi} .mento pRataefi AA wax.WEMNoget IS • a"` �`3:..,. YwGigrymacNPWEMCA N Osa.vat=t$S:s • IMOD • W.PSfetRiLLCATS41 mW Mistnk (MOO IMdaI .s t YFSMW4na./Ytf(a*•dVM9/(M l::g4£.d OERTIHaATEHOWER QAHGeLtATAN WearlMNaba UOMnaurcem anwRE4Riupa as88CMCM+BREPta NNam¢aHb CIE WARRIOR ME MOM tY,11Ee RM.L RE 44SvoREu M SoWivaon NAR AOmrDA$DEI@IIINE POLSYPRWHSIMt e�tl� caaH:A8v3nines ms . 61808.014 RCORDCORPORRTOW AR Heald: tauvat imoms pion) lila Atom Dame and Wan re*Nitre./!narks DTAbCRD • Massachusetts L.-apartment ctit:. c Safety Board of Bu .dung Reg-.ations and Standards License- CS-110253 Construct. <,� ; . .._ ., T... DANIEL KELLEY ,.sj•; ';' 11 ROLLING WOODS ROAD HUBBARDSTON MA 01462 ' ' ' . x�Hralor : Con'n_^. ssic-.e. 12/01/2019 •✓b Y m.,..n...Nb Of ce of Corwuewr NM*'6 airs"RegulWon KOMEIMPROVEMENT CONTRACTOR Registration vaHdfor date. roundwtly - .' TYPE:Swdenart Card before Consua6on date. CdBusintun to: Beadiattlen O Office of Coneumit Affairs Business Re9uletlan 1Rg72 0ab7t 10 10 Park Plaza-Suite 6170 SOLAR CITY CORPORATION Boston,MA 02118 DANIEL KELLEY \\ /lI1 9055 CLEAPVIEW WAY U y- without signature SAN MATEO,CA 94002 Underse0retary if?,r• • f nt.1/ / die/Ora N (1(11.;,)(1(1 ertirilj r Office of Consumer Affairs and Business Regulation 10 Park Plaza-Suite 5170 Boston, Massachusetts 02116 Home improvement Contractor Registration Type: Supplement Card Registration: 168572 SOLAR CITY CORPORATION ExpfraiMn: 03/07/2019 24 ST MAFMN STREET SW 2UNIT 11 MARLBOROUGH,MA 01752 BPdata Address and return cord. Mak reason fat change. • .8327"37. F.:171:07.."4•4: F2 EmMornent tJLdcard Office of ri;sersner realm&Business Regulation Registration valid for incevidual use only (•• TYPE:Su:dement Card before the ettpkation elate If found rewm to SMint 18824.4122 Off=of Consumer Affairs and Business Regulation 16E672 631137/2019 10 Park Plaza-Site 5170 SOLAR CITY CORPORATION Boston,MA 02116 •At JAMES DPACUA arLC6Q1L— afitne..0., 3055 CLEARVIEW WAY SAN MATEO,CA 94402 / Not valid without signature Undersecretary • DocuSign Envelope ID:D74A5309-3963-4239-8879-7178CD85C534 SolarCity I PPA toner Information installation tocation Date Hector Rivera Del Busto 1135 Burts Pit Road 6/9/2017 1135 Burts Pit Road Northampton,MA 01062 Northampton,MA 01062 4133911123 Here are the key terms of your Power Purchase Agreement $0 14. 50c 2 .90% 20yrs System installation cost Electricity rate per kWh Annual Escalator- Agreement Term ros� Fos os l u D 6Initial here( i D 6 initial he. I D 6 os The SolarCity Promise LH D •We guarantee that if you sell your Home,the buyer will qualify to assume your Agreement. _..... . Irma -ere •We warrant all of our roofing work. re •We restore your roof at the end of the Agreement. �j f A D •We warrant,insure, maintain and repair the System Initial Here �—/ f� •We fix or pay for any damage we may cause to your property. •We provide 24/7 web-enabled monitoring at no additional cost. •The pricing in this Agreement is valid for 30 days after 6/9/2017. Your SolarCity Power Purchase Agreement Details Your Choices at the End of the Initial Options for System Purchase: Amount due at contract signing Term: •At certain times,as specified in $0 •SolarCity will remove the System at no the Agreement,you may Est.amount due at installation cost to you. purchase the System. $0 •You can upgrade to a new System with •These options apply during the 20 the latest solar technology under a new year term of our Agreement and Est.amount due at building inspection contract. not beyond that term. $0 •You may purchase the System from Est.first year production SolarCity for its fair market value as 7,926 kWh specified in the Agreement. •You may renew this Agreement for up to ten(10)years in two(2)five(5)year increments. 3055 Clearview Way, San Mateo, CA 94402 1888.765.2489 I solarcity.com 2743952 tomes Purciase Agreement,version 1113.1,June 6.2017 SAFC/5E6A Comp leant SolarCity Corporation DBA Sia Energy Contractors License MA HIC 168572/EL-1136MR Document generated or 6/9/20 Copyright1W&201SolarCity Corporation,All Bights Reservec r DocuSign Envelope ID:D74A5309-3963-4239-B879-7178CD85C534 24. NOTICE OF RIGHT TO CANCEL. By signing below,I agree that SolarCity can contact me for YOU MAY CANCEL THIS CONTRACT AT ANY TIME PRIOR telemarketing and informational purposes via call or text using TO MIDNIGHT OF THE THIRD BUSINESS DAY AFTER THE automated technology and/or pre-recorded messages using the DATE YOU SIGN THIS CONTRACT. SEE EXHIBIT 1 THE phone number(s)I provided that are listed on the first page of this contract.I understand that consent is not a condition of ATTACHED NOTICE OF CANCELLATION FORM FOR AN purchase. You may opt-out of this authorization at any time by EXPLANATION OF THIS RIGHT. calling us at:888-765-2489 or sending us written notice and 25. ADDITIONAL RIGHTS TO CANCEL mailing it to:SolarCity Corporation,Attention: Phone Authorization Opt-Out,3055 Clearview Way,San Mateo,CA IN ADDITION TO ANY RIGHTS YOU MAY HAVE TO CANCEL 94402. THIS PPA UNDER SECTION 24,YOU MAY ALSO CANCEL THIS PPA(A)AT NO COST AT ANY TIME PRIOR TO I have read this Power Purchase Agreement and the Exhibits in MIDNIGHT OF THE TENTH BUSINESS DAY AFTER THE DATE their entirety and I acknowledge that I have received a YOU SIGN THIS AGREEMENT AND(B)AT ANY TIME PRIOR complete copy of this Power Purchase Agreement. TO COMMENCEMENT OF CONSTRUCTION ON YOUR HOME. Customer's Name:Hector Rivera Del Busto 26. Pricing eocuelaned by,/ The pricing in this PPA is valid for 30 days after 6/9/2017. /f{J' /J//� If you don't sign this PPA and return it to us on or prior to Signature: ��i(/ 4<m2uue444w.. 30 days after 6/9/2017,SolarCity reserves the right to reject this PPA unless you agree to our then current pricing. Date: 6/9/2017 Customer's Name: Signature: Date: Power Purchase Agreement SolarCity approved Signature: Cal Lankton VP,Energy Sales and Operations Date: 6/9/2017 o ' ` o i Version#67.5-TBD SolarCity. RU tri • Y. PIG 1 June 13, 2017 mss* y♦ NG RE: CERTIFICATION LETTER 'i6 (,'ryt al NO. 52791 t Proj .o. 'r_#' ectMob#0102722 Project Address: Rivera Residence egos ie �.L/ / 1135 Burts Pit Rd � { Northampton, MA 01062 AEU Northampton SC Office SpringfieldDWa Henry 7L Design Criteria: ""•."'»„°•"."" -Applicable Codes MA Res. Code,8th Edition,ASCE 7-06.and 2005 NDS -Risk Category e 11 -Wind Speed=90 mph,Exposure Category C,Partially/Fully Enclosed Method -Ground Snow Load =40 psf -MP1: 2x4 @ 16"OC,Roof DL= 7 psf, Roof LL/SL is 28 psf(Non-PV), Roof LL/SL= 28 psf(PV) Note: Per IBC 16131; Seismic check is not required because Ss=012424 <0.49 and Seismic Design Category(SDC) =B < D To Whom It May Concern, A jobsite survey of the existing framing system of the address indicated above was performed by a site survey team from SolarCity. Structural evaluation was based on site observations and the design criteria listed above. Based on this evaluation, I certify that the existing structure,with upgrades specified in the plans, directly supporting the PV system is adequate to withstand all loading indicated in the design criteria above based on the requirements of the applicable existing building and/or new building provisions adopted/referenced above. Additionally,I certify that the PV module assembly including all standoffs supporting It have been reviewed to be In accordance with the manufacturer's specifications and to meet and/or exceed a requirements set forth by the referenced codes for loading. The PV assembly hardware specifications are contained in the plans/docs submitted for approval, . A . Version#67.5-TBD SolarCity RU HARDWARE DESIGN AND STRUCTURAL ANALYSIS RESULTS SUMMARY TABLES Landscape Hardware-Landscape Modules'Standoff Specifications Hardware X-X Spacing X-X Cantilever V-Y Spacing Y-Y Cantilever Configuration Uplift OCR MP1 64" 24' 39" NA Staggered 30.946 portrait Hardware-Portrait Modules'Standoff Specifications Hardware X-X Spacing X-X Cantilever V-Y Spacing I Y-V Cantilever Configuration Uplift DCR MP1 32" 16" 65 NA Staggered 25.7% StructureMounting Plane Framing Qualification Results Type Spacing 1 Pitch Member Evaluation Results MP1 Stick Frame 16"O.C. r 14° Member Analysis OK • Refer to the submitted drawings for details of information collected during a site survey. Al member analysis and/or evaluation is based on framing information gathered on site.The existing gravity and lateral load carrying members were evaluated in accordance with the IBC and the IFBC. STRUCTURE ANALYSIS- LOADING SUMMARY AND MEMBER CHECK- MP1 Member Properties Summary MP1 Nodzonlal Member Spans Upgraded Rafter Properties Overhang 1.16 ft Net W 1S0" Roof System Pro Span 1 ........ 6.17 ft Whitt 3.50" Number of Spans(w/o Overhang) 2 Span 2 6.75 ft Nominal Yes RoofingMaterial Comp Roof 2)3 _.. A(BN525 Re-RoofNo Span4 Sx(in.^3). 3.06 Plywood Sheathing Yes Span 5 Ix(In^4) 5.36 Board Sheathing None Total Rake Span 14.51 ft TL DefEn Limit 120 Vaulted Ceiling No PV 1 Start 1.17 ft Wood Spades SPF Ceiling Finish ,112"Gypsum Board PV 1 End 12.00 ft Wood Grade 42 RaferSippe 14° PV 2 Start Fb(psp 875 Rafter Spacing 16"O.C. PV 2 End Fe(psi) 135 Top Lat Bradng Ful PV 3 Start E n(p 1,400,000, Bot Lat Bracing At Supports PV 3 End E-min 51.0,000 Member Loading Summary Roof Pitch 3/12 Initial Pitch Adjust Non-PV Areas PV Areas Roof Dead Load DL 7.0 psf x 1A3 _ 7.2 psf 7,2 psf PV Dead Load PV-DL 3 0 osf l x 03 3,1 psf Roof Live Load RLL 20.0 pg x LOU 20.0 psf Live/Snow Load LL/S1.2.4 40.0 psf x 0l i x 0.7 28.0 psf...... 28.0 psf Total Load(Governing LC) TL 1 35.2 psf 38.3 psf Notes: 1, ps=Cs*pf; Cs-roof,Cs-pv per ASCE 7[Figure 7-2] 2. pf=0.7(Ce)(Cs)(I,)p,; Ce=0.9,C 1,1,15=1.0 Member Analysis Results Summary Governing Analysis Max Moment 0 Location Capacity DCR Result (-)Bending Stress(psi) -1,012,9 7.3 ft -1,638.0 62% Pass ZEP HARDWARE DESIGN CALCULATIONS- MP1 Mounting Plane Information 1 Roofing Material Comp Roof Roof Slope 14° Rafter Sparing 16"O.C. Framing Type/Direction Y-Y Rafters I PV System Type SolarCity SleekMount" Zep System Type Z5 Comp Standoff(Attachment Hardware) Como Mount Type ç Spanning Vents No Wind Design Criteria Design Code i IBC 2009 ASCE 7-05 Wind Design Method Partially/Fully Enclosed Method Basic Wind Speed V 90 mph Fig. 6-1 Exposure Category C Section 6.5.6.3 Roof Style Gable Roof Fig.6-11B/C/D-14A/6 Mean Roof Height h 15 ft Section 6.2 Wind Pressure Calculation Coefficients Wind Pressure Exposure K, 0.85 I Table 6-3 Topographic Factor Ka 1.00 Section 6.5.7 Wind Directionality Factor Kd 0.85 Table 6-4 Importance Factor I 1.0 Table 6-1 Velocity Pressure qM1 qh= 0.00256(Kz)U (Kd)(V^2)(I) Equation 6-15 I Wind Pressure I Ext. Pressure Coefficient(Up) GCp(Up) -0.88 ,Fig.6-11B/C/D-14A/B Ext. Pressure Coeffident(Down) GCp(Down) 0.45 Fig.6-118/C/D-14N6 Design Wind Pressure p p=qh(GCp) Equation 6-22 Wind Pressure Up Pone -13.1 psf Wind Pressure Down Praowm 10.0 psf ALLOWABLE STANDOFF SPACINGS X-Direction V-Direction Max Allowable Standoff Spacing Landscape 64 39" Max AMowable Cantilever Landscape 24" NA Standoff Configuration Landscape Staggered Max Standoff Tributary Area Trib 17 sf PV Assembly Dead Load W-PV 3.0 psf Net Wind Uplift at Standoff T-actual -197 lbs Uplift Capacity of Standoff T-allow 637 lbs Standoff Demand/CapadN DCR 30.9% X-Direction Y-Direction Max Allowable Standoff Spacing Portrait 32" 65" Max Allowable Cantilever Portrait 16" NA Standoff Configuration Portrait Staggered Max Standoff Tributary Area Trib 14 sf PV Assemb* Dead Load W-PV 3.0 psf Net Wind Uplift at Standoff T-actual -164 Its Uplift Capacity of Standoff T-allow 637 lbs Standoff Demand/Capacity DCR I 25.7% ABBREVIATIONS ELECTRICAL NOTES JURISDICTION NOTES A AMPERE 1. THIS SYSTEM IS GRID-INTERTIED VIA A AC ALTERNATING CURRENT UL-LISTED POWER-CONDITIONING INVERTER. BLDG BUILDING 2. THIS SYSTEM HAS NO BATTERIES, NO UPS. CONC CONCRETE L. A NATIONALLY-RECOGNIZED TMETG CITY OF NORTHAMPTON DC DIRECT CURRENT LABORATORY SHALL UST ALL EQUIPMENT IN EGC EQUIPMENT GROUNDING CONDUCTOR COMPLIANCE WITH ART. 110.3. BUILDING DEPARTMENT (E) EXISTING 4. WHERE ALL TERMINALS OF THE DISCONNECTING EMT ELECTRICAL METALLIC TUBING MEANS MAY BE ENERGIZED IN THE OPEN POSITION, FSB FIRE SET-BACK A SIGN WILL BE PROVIDED WARNING OF THE GALV GALVANIZED HAZARDS PER ART. 690.17. 1., GEC GROUNDING ELECTRODE CONDUCTOR 5. EACH UNGROUNDED CONDUCTOR OF THE These plans have been reviewed GND GROUND MULTIWIRE BRANCH CIRCUIT WILL BE IDENTIFIED BY And approved. HDG HOT DIPPED GALVANIZED PHASE AND SYSTEM PER ART. 210.5. I CURRENT 6. CIRCUITS OVER 250V TO GROUND SHALL ///------))) Imp CURRENT AT MAX POWER COMPLY WITH ART. 250.97, 250.92(B). - - . - UUU I / // 7 _ / ' / Isc SHORT CIRCUIT CURRENT 7. DC CONDUCTORS EITHER DO NOT ENTER Date kVA KILOVOLT AMPERE BUILDING OR ARE RUN IN METALLIC RACEWAYS OR kW KILOWATT ENCLOSURES TO THE FIRST ACCESSIBLE DC / / LBW LOAD BEARING WALL DISCONNECTING MEANS PER ART. 690.31(E). Signature ....//// MIN MINIMUM 8. ALL WIRES SHALL BE PROVIDED WITH STRAIN S ,( (N) NEW RELIEF AT ALL ENTRY INTO BOXES AS REQUIRED BY NEUT NEUTRAL UL LISTING. NTS NOT TO SCALE 9. MODULE FRAMES SHALL BE GROUNDED AT THE OC ON CENTER UL-LISTED LOCATION PROVIDED BY THE PL PROPERTY LINE MANUFACTURER USING UL LISTED GROUNDING P01 POINT OF INTERCONNECTION HARDWARE. PV PHOTOVOLTAIC 10. MODULE FRAMES, RAIL, AND POSTS SHALL BE SCH SCHEDULE BONDED WITH EQUIPMENT GROUND CONDUCTORS. S STAINLESS STEEL STC STANDARD TESTING CONDITIONS TYP TYPICAL UPS UNINTERRUPTIBLE POWER SUPPLY V VOLT v c VOLTAGE AT OPENPCIR POWER VICINITY MAP INDEX W WATT 3R NEMA 3R, RAINIIGHT A. • PVI COVER SHEET PV2 SITE PLAN PV3 STRUCTURAL VIEWS ' PV4 THREE LINE DIAGRAM LICENSE GENERAL NOTES catsneele Attached GEN #168572 1. ALL WORK TO BE DONE TO THE 8TH EDITION • ° -- ELEC 1136 MR OF DIE MA STATE BUILDING CODE. L , 2. ALL ELECTRICAL WORK SHALL COMPLY WITH '- THE 2017 NATIONAL ELECTRIC CODE INCLUDING . MASSACHUSETTS AMENDMENTS. BLTrts Pit Rd • MODULE GROUNDING METHOD: ZEP SOLAR AHJ: Northampton ManBY DATE COMMENTS n DATE COMMENTS • a UTILITY: National Grid USA (Massachusetts Electric) Google —a CONFIDENTIAL- THE INFORMATION HEREIN !Ie 11111ffM1 JB-0102722 00 PREMISE OWIER DEAITIEIt DESIGN: CONTAINED SHALL NOTcE USED FOR ME HECTOR RIVERA DEL BUSTO Hector Rivera Del Busto RESIDENCE Alex Tos _ r.5o1arCity. Nffi ST OE ANYONECICEPT Ca ARCITY1I Mc.. uzs CSKRY'. 1135 BURTS PIT RD .1 {.7• NOR SHALL IT BE DISCLOSED IN MOLE OR IN ZS Comp V4 w Metal—Flashing 7.2 KW PV ARRAY APIA PART TO OTHERS cOUTSIDErpnN NE Rc1oINN Y NORTHAMPTON, MA 01062 ORGAMIZADON,EXCEPT IN CONNECTION MIH Mown NE SALE AND uss or THE RESPECTIK (24) Hanwha Q-Cells # Q.PEAK-G4.1/SC300 24 sL Malin D1.,Oolong Z Unit H XUflgTY EGIAPMENT, MIHWT NE W ITTENPACE NNE: SHEET RE? DAT[ Marlborough,MA 01782 PERMISSION OF S OTY INC. ` T: (850)602-1028 E: (650)619-1029 Della ; Solivia 6.6 TL COVER SHEET PV 1 6/13/2017 (bee}soL-an(765-2Nm) mnsala,agcrhh PITCH: 14 ARRAY PITCH:14 MP1 AZIMUTH:180 ARRAY AZIMUTH: 180 MATERIAL:Comp Shingle STORY: 1 Story SAC Of © 1`i ® •/ e ANG G,\ IIMU 0 °'11 CM L1 m i NO.52791 i __ CMSTEa�O i/ _ _ ,--MMMT// Henry Zhu,,,,,:;.1i74.17 �W2,. , • q MP1 ., RSD ® LEGEND - - - - 0 (E) UTILITY METER & WARNING LABEL INVERTER W/ INTEGRATED DC DISCO RSD 0 & WARNING LABELS r-1 DC DISCONNECT & WARNING LABELS Q h!c-I AC DISCONNECT & WARNING LABELS ® DC JUNCTION/COMBINER BOX & LABELS C. DISTRIBUTION PANEL & LABELS CITY OF NORTHAMPTON LOAD CENTER & WARNING LABELS Front Of House BUILDING DEPARTMENT O DEDICATED PV SYSTEM METER (E) DRIVEWAY These plans have been reviewed Rm RAPID SHUTDOWN And approved. STANDOFF LOCATIONS pp . . .-- CONDUIT RUN ON EXTERIOR . / v-- - CONDUIT RUN ON INTERIOR 135 Burts Pit Rd Date t - / 7 ' l - GATE/FENCE HEAT PRODUCING VENTS ARE RED r � " INTERIOR EQUIPMENT IS DASHED Signature d '� SITE PLAN N Scale: 1/8" = 1' w t+ E 01' 8' 16' `s, CCNFlDFNTPI - ME INi1MiMATCN 1[RBN "Mat JB-0102722 O Q REVISE OPER OESE1�TIpE OE9M: =\N CCNTMNED SHALL NOT BE USED PCR THE HECTOR RIVERA DEL BUSTO Hector Rivera Del Busto RESIDENCE Alex las t'.,iSohn'}" BENEHT 6 ANYONE EXCEPT SOURCITY INC.. MN: C.. MONsTsF 1135 BURTS PIT RD 7.2 KW PV ARRAY -A ` 1•Y NOR SHALL IT BE DISCLOSED IN MOLE OR IN ZS Comp V4 w Metal-Flashing PART TO OTHERS COME ME REGIMENTS NORTHAMPTON, MA 01062 (G.ANI7A110N, EXCEPT IN CONNECTOR Mnx 24 5L Math DA*.BUABog 2 Una 11 THE SALE AND USE OF THE RESPECTIVE (24) Hanwha Q-Cells # Q.PEAK-G4.1/SC300 SHEET: REV: DAM Marlborough.MA 01752 SMARMY ECUIPMENT, 1A1HWT ME I P1Ex p.AEIER PACE x 1: (650)638-1026 1: (550)63e-1029 PEMMSSION a SOUROTY INC. Delta # Solivia 6.6 1L SITE PLAN PV 2 6/13/2017 (HRH)-S01--CITY(765-2•811) .n.ra,alrw. ` (N) 2x6 SPE #2 WEB IN DIRECT BEARING WITH TOP AND BOTTOM CHORD. NAIL (N) WEB TO (E) WEB PV MODULE WITH 10d NAILS 0 6in O.C. STAGGERED 5/16" BOLT WITH INSTALLATION ORDER FENDER WASHERS i LOCATE RAFTER, MARK HOLE I ® ! ZEP LEVELING FOOT (1) LOCATION, AND DRILL PILOT 1 (E) 1x6 ZEP ARRAY SKIRT (6) HOLE. (4) {2)I SEAL PILOT HOLE WITHA ZEP COMP MOUNT Csi POLYURETHANE SEALANT, 4�r '-2" -9" I• UPGRADES NEED TO BE ADDED TO BOTH ZEP FLASHING C ,4`V (3) mn (3) INSERT FLASHING. SIDES OF THE TRUSS, EVEN THOUGH V __ i•__ E_I (E) LBW f (E) LBW WE ARE ONLY INSTALLING ON MPI (E) COMP, SHINGLE � — PLACE MOUNT. SIDE VIEW OF MP1 NTS (E) ROOF DECKING (2) INSTALL LAG BOLT WITH A 5/16" DIA STAINLESS (5) (_) SEALING WASHER. MP1 x-SPACING Ix-cANTaEVER v-SPACING r-CANTILEVER NOTES STEEL LAG BOLT LOWEST MODULE SUBSEQUENT MODULES INSTALL LEVELING FOOT WITH 11 WITH SEALING WASHER (6) BOLT & WASHERS. LANDSCAPE 64" T 24" 3r O" STAGGERED (2-1/2" EMBED, MN) PORTRAIT 32" 16" 65" 00 [' ROOF AZT 180 PITCH 14 (E) RAFTER STANDOFF RAFTER 2x4 @ 16"OCSTORIES: 1 J ARRAY AZI 180 PITCH 19 1 C.1. 2x4@16"OC comp Shingle X AND Y ARE ALWAYS RELATIVE TO THE STRUCTURE FRAMING THAT SUPPORTS THE PV. Scale: 1 1(2" = 1' X IS ACROSS RAFTERS AND Y IS ALONG RAFTERS. Io TnoE (E) RAFTER y" ' '� 1 ' Y ''•s'►,. • Ye t NG C. {E) '.X WEB N ::).791 m I �� (N) 2X6 WEB NAILED TO (E) 1X WEB 4 O I Fca �{(i11QY SIMPST�i SOW 22300 WOOD SCREWS IOR 10d NAILS STAGGERED 0 6in O.C. Y ( ) CEILING � JOIST 1.1 /��-�Y'��Y`��,' TOP VIEW OF (N) WEB \ . N.T.S. /^ I OM CONMOENNAL- THE UAIMJX IERONTHE J[B fIIIIftA: JB-0102722 00 MIME AHectfk M �`*�` olar Vity GUMMED SIWI NOT BE UM)FOR THE HECTOR RIVERA DEL BUSTO Hector Rivera Del Busto RESIDENCE Alex Tas BENEFIT OF ANYONE EXCEPT SINMATY INC., NCL$ttC SYSTEM i•••u x�SIMS Il( D%;�N S m N ZS Comp V4 w Metal-Flashing 1135 BURTS PIT RD 7.2 KW PV ARRAY PAM m CNERS WISVE THE accwERFS NORTHAMPTON, MA 01062 (RGAHMANCR,EXCEPT N minimax ICH *MGM THE NeNn Drive,Baking},TIMI II THE SALE MD USE OF THE NcsfEcnLE (24) Hanwha Q-Cells I Q.PEAK-G4.1/SC300 PAC MNG slit. Ircr BATE Ne* Drive, NA o11sz PERLSMAR�CEQUIPMENT. n NOHOW THE *RIPEN son PV 3 6/13/2017 (eee}(sAa�.UtV)4.38-1028 2489) w:..OM-1029 Delta y Solivia 6.6 TL STRUCTURAL VIEWS GROUND SPECS MAIN PANEL SPECS GENERAL NOTES INVERTER SPECS MODULE SPECS LICENSE BONO (N) #8 GEC TO TWO (N) GROUND Panel Number:LC112DF(125A) Inv 1: DC Ungrounded INV 1 -(1)Delta # Solivia 6.6 R LABEL A -(24)Hanwha Q-Cells ;;Fk Q.PEAK-G41 SC300 GEN #166572 RODS AT PANEL WITH IRREVERSIBLE CRIMP Meter Number 041322995 Inverter;6600W, 240V. 97.5%, Zigbee, PLC, RCM PV Module: 300W274.5PTC, 40MM, Black Frame, MC4, LEP, 1000V ELEC 1136 MR Overhead Service Entrance INV 2 Voc: 3476 Vpmax: 32.41 INV 3 Isc AND Imp ARE SHOWN IN THE DC STRINGS IDENTIFIER (E) 125A MAIN SERGE PANEL MULTI-CONTACT (E) 100A/2P MAIN CIRCUIT BREAKER Inverter 1 IND Branch Socket © B 1 (E) WRING CURER-HAMMER 6 A ;� DC" Disconnect J Delta oC. 100A/2P 9 . I K. MP 1: 2x6 Solivia 6.6 R I I R, (E) LOADS C I _ EGG Li ® I - 1, V © 1 A4 D 4-- DC' eoG• I E :I=mo G S. 1 35A/2P oxo _ T ecc a R 1 MP 1: 2x6 ll \� J V ____�� V GEC T� co rG. �, \ EGO 1 cxo I v , 9J M �(1)Cmtil Kit; 3/9•EMT V -L ag� _1 Eoaars . I - 1 G - --r-4 TO 120/240V SINGLE PHASE UTILITY SERMCE I1I 11 PHOTO VOLTAIC SYSRM EQUIPPED W1111 RAPID SHUTDOWN Voc* = MAX VOC AT MIN TEMP POI (I)CURER-HWMpt /BR240 PV BACKETED BREAKER -(DOURER-HAMMER i OG222URB B -(4)Delta Shc la A -(2)MULn-CCNTACTIPV-A2B4 Br km; 0A/A, 2 pa a DIsccnnec. 800. 2 OVoc, N -FuaTle,NEMA R AC ma t R R id Shutdown, 6®V, 0A. NEMA 4X NC9 _ Brond MeR C4 U-Joint Connector,Female Fa ale Mole DC - -(I)WMR-HWMFR i�2Q20 - -(I)CUIlER-H11A�MMER /GGIOORB -(2)MULT-CONTACT PV-A254 Breaker; 20A/IP-20A/IP, I Space. Duplex Ground/Neutral Kit; 60-100*.General Duty(OG) Brandi Plug: NC4 U-Joint Connecter,Male Male Female -(2)5/8f xP8 /% 8. Copper 0 no_(I)AWG 16, Solid Bare Copper (..J It -(1) (N) ARRAY GROUND PER 690.47(D). NOTE: PER EXCEPTION NO. 2, ADDITIONAL ELECTRODE MAY NOT BE REWIRED DEPENDING ON LOCATION OF (E) ELECTRODE 0)AWG g 1111191-2. Black )AWG)ANG#10 PV Wire, 600V,Block Voc* =277.3 VDC Isc =19.54 ADC (4)AWG#10,PV We, 600V Bock Mx' =277.3 VDC Isc=9.77 ADC O k(1)AWG I6. IHN4-2, Red Okal-(I)AWG I6 Sold Bare Copper EGG Vmp =19446 VDC Imp=18.52 ADC Oka-(I)AWG Soi Bore Copper Eat Vmp =194.46 VDC Imp=9.26 ADC II)AWG#10, 1HYM-2. White NEUTRAL Vmp 240 VAC Imp=27.5 MC i(41)AWG (I)Conduit Kt 3/C EMT LLL (I)Conduit Kit; 3/9• DAT -(1)AWG R.111WH-2 Oen ECC/CEQ-(I/Conduit Kit; 3/4"EMT (2)AWG/10 PV Wrq 600V, Bad Voc* =277.3 VDC Isc =19.54 AOC r'�(4)AWG p0 PV%re, 800V, Blod V0C* =277.3 VDC Isc -9.77 ADC ®�(I)AWG/6 Shctl Bare Copper EGC Vmp =19446 VDC Imp=18.52 ADC r,-). v✓-(1)AWG/6 Sold Bare Copper EGC Vmp =194.46 VDC Imp=9.26 ADC EL Conduit Kit; 3/4•EMT 1 R(I)Conduit Kit: 3/e EMT Ol�(4 A%C htp PV We. SOONBlackV c' =2773 VDC Iso =19.54 ADC to}(I)AWG#6 Shce Bore Copper EGG v p =19446 VDC 1 p=16.52 ADC . L3(1)Cmdult Kt 3/4•EW ©� Gj(2)AWG/10 PV We. 600%.Black S * =2773 VDCid=1954 POC (I)AWG IS. Solid Bare Copper ECC Vmp =194.46 VDC Imp=18.52 ADC I �L 11 T Conduit Kit V4• Mi J 8-01 O r37 ct c1 00 PREMISE OWER CESIY�n01: DESIGN: CONFIDENTIAL- 1M INFORMATION F HFIEN JOB xLYOA: U L LL =iKte CONTAINED SHAM NOT BE USED FOR THE HECTOR RIVERA DEL BUSTO Hector Rivera Del Busto RESIDENCE Alex Tas SolarCity. BENEFIT OF ANYONE EXCEPT SOJRaTY INC., MMUMING STSIEY: r••A l.�/ NOR SHALL IT BE DISCLOSED IN WHOLE OR IN ZS Comp V4 w Metal-Flashing 1135 BURTS PIT RD 7.2 KW PV ARRAY IIA PMT TO OTHERS C fT IN ON EC11 4 RECIPIENT'S sawn NORTHAMPTON, MA 01062 ORGAMEATION,EXCEPT M WRSCCnax Wm 24 SL Martin Drlw,BWdhq Z UM 11 TIE SAGE MD USE OF ME UT THEM (24) Hanwha Q-Cells G.PEAK-G4.I/SC3Ga SHEET: RB DATE Molborwgh,MA 01752 cn Watt EQUIPMENT, WTIINC. WRIrIFN N1ffl1ER PAGE xNE PERMISSION OF SDIWa1T INC. Delta # Solivia 6.6 TL THREE LINE DIAGRAM / r (650)655-1028 w 638-1029 PV 4 6 13 2017 Owe)-sec-aTY(765-2489) 38-102 dam CAUTION POWER TO THIS BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN: - Address: 1135 Burts Pit Rd AC DISCONNECT 1I i UTILITY iSERVICE INVERTER AND DC DISCONNECT r SOLAR PHOTOVOLTAIC ARRAY(S) PHOTOVOLTAIC BACK—FID CIRCUIT BREAKER WI MAIN ELECTRICAL PANEL IS AN A/C DISCONNECT PER NEC 690.17 OPERATING VOLTAGE = 240V 1B-0102722-00 C ITINEDAS- WEwBExUSED FOR THEREIN .m ruler J8-0102722 00 HECTOR RIVERA DEL BUSTO Hector Rivera Del Busto RESIDENCE � Tas ��}`SolarCity. *NEM OF enE SOraxixE r even.ar AxYa.Y MERE swnan INC.. Sawnxc ssmE 1135 BURTS PIT RD NCR SHALL IT BE DISCLOSED w 5wa¢OR w ZS Comp V4 w Metal—Flashing 7.2 KW PV ARRAY hx PART TO arms OUTSIDE THE xEaPlg2rs SmuEs NORTHAMPTON, MA 01062 ORCAmux!nax,IXCEFL CONNECTOR MM ME SALE ANO USE a ME RESECT* (24) Hanwha Q—Cells k Q.PEAK—G4.1/SC300 24 St Saab Dna IM01 G.2 Ma II PFIdlI551CNSOLARCITY ECf SC NT, WITHOUT 111E NAI11EN mum PPAGENAME SKIT RUG OAR is (650)638-1028A F A(650)638-1029 Delta # Solivia 6.6 TL SITE PLAN PLACARD PV 5 6/13/2017 03813)-SOL-CITY 065-248* ww..aaealxaora WARNING:PHOTOVOLTAIC POWER SOURCE Label Location: Label Location: Label Location: (C)(CB) WARNING (AC)(P01) WARNING (DC) (INV) Per Code: Per Code: Per Code: ELECTRIC SHOCK HAZARD ELECTRIC SHOCK HAZARD NEC 690.31.G.3 NEC 690.17.E NEC 690.35F DO NOT TOUCH TERMINALS THE DC CONDUCTORS OF THIS ( ) Label Location: TERMINALS ON BOTH LINE AND PHO IOVOLTA!C SYS TEM ARE TO BE USED WHEN PHOTOVOLTAIC DC (DC)(INV) LOAD SIDES MAY BE ENERGIZED UNGROUNDED AND INVERTER IS DISCONNECT Per Code' IN THE OPEN POSITION MAY BE ENERGIZED UNGROUNDED NEC 690.14.C.2 Label Location: Label Location: PHOTOVOLTAIC SYSTEM (INV) MAXIMUM POWER-_A (DC)(INV) EQUIPPED WITH RAPID Per Code: POINT CURRENT(Imp) Per Code: SHUTDOWN CEC 690.56(C) MAXIMUM POWER-_v NEC 690.53 POINT VOLTAGE(Vmp) Te1AXIMUMT SYSTEM S VOLTAGE Woo) SHORT-CIRCUIT CURRENT LIST) A Label Location: WARNING (P01) INVERER OUTPUT Per Code: T CONNECTION NEC 690.64.8.7 Label Location: DO NOT RELOCATE WARNING (DC)(INV) THIS OERCCRRENT DEVICE ELECTRIC SHOCK HAZARD Per Code: IF A GROUND FAULT IS INDICATED NEC 690.5(C) NORMALLY GROUNDED CONDUCTORS MAY BE UNGROUNDED AND ENERGIZED Label Location: CAUTION (D)(POI) PHOTOVOLTAIC SYSTEM Per Code: CIRCUIT IS BACKFED NEC 690.64.6.4 Label Location: WARNING (DC)(CB) ELECTRICAL SHOCK HAZARD Per Code: DO NOT TOUCH TERMINALS NEC 690.17(4) Label Location: TERMINALS ON 601H LINE AND LOAD SIDES MAY BE ENERGIZED CAUTION (P01) IN THE OPEN POSITION DUAL POWER SOURCE Per Code: DC VOLTAGE IS SECOND SOURCE IS NEC 690.64.6.4 Al WAYS PRESENT WHEN PHOTOVOLTAIC SYSTEM SOLAR MODULES ARE EXPOSED TO SUNLIGHT Label Location: PHOTOVOLTAIC POINT OF (P01) Label Location: INTERCONNECTION Per Code: PHOTOVOLTAIC AC (AC) (P01) WARNING ELECTRIC SHOCK NEC 690.17.4; NEC 690.54 (AC):AC Disconnect Per Code: I IAZARD.DO NOT TOUCH (C): Conduit DISCONNECT TERMINALS.TERMINALS ON NEC 690.14.0.2 BOTH THE LINE AND LOAD SIDE (CB): Combiner Box MAY BE ENERGIZED IN THE OPEN (D): Distribution Panel POSITION FOR SERVICE (DC): DC Disconnect DE-ENERGIZE BOTH SOURCE AND MAIN BREAKER. (IC): Interior Run Conduit Label Location: PV POWER SOURCE (INV): Inverter With Integrated DC Disconnect MAXIMUM AC _ A (AC) (P01) MAXIMUM Ac _ A (LC):Load Center OPERATING CURRENT Per Code: OPERATING CURRENT (M): Utility Meter MAXIMUM AC MAXIMUM AC v NEC 690 OPERATING VOLTAGE _ .54 OPERATING VOLTAGE V (P01): Point of Interconnection CQ F1BENTAL- NE INFORMATION MEIN CCNLUNED SHOAL NOT BE USED FOR ..:0 I/ 3055 Rearview Way THE BENEFIT Or.ANYONE EXCEPT m AROTY INC.,NOR SHALL IT BE DISCLOSED . SraMateo,ras44oz IN MOLE OR IN PART TO OTHERS OUTSIDE THE REORIENTS ORGANI}ATN!H. Label Set Int/` /� T.(650}638-1028 e(650)638-1029 EXCEPT IN CONNECDON WTI 114E SALE MD USE Of ME RESPECTIVE N'JO�4 I (888)-SOL-CITY 065-2489)AVM Solartlty.mm SIXAFOTY EQUIPMENT. MMCUT ML MITTEN PERMISSION Or SOAROIY INC. Jo 2 1: • Model RSSfiW 4-2 Connection Diagram: $" B rv� •^ DELTA RAP XX1 Xsex f ope y o �^`. ONROOF T G GF PV . • . ,. ... y Na 5 [ _io ° • �MnFNOW, C US ;L— ,., �� �° . .. _ • rcfr. CRSS AC AC t one cnndut BREAKER GRID Iw all wirng Technical Specifications - Awe._ Awe._ _1.': InputRatingstc#4,1e1:7(e1171.IX ; 1-'1.04'Novie+k''r��6S °ss4' :.`. . °e ... 2:, 0V DC . 600V DC .,!' ... veno al 1 4 aellIMMI . 6a6b al W • - A WA WA 5A / /� Output Ratings Max.Number of Output Circuit 1 2 20A 20A / t Maximum Current Controlled Conductor 25A 25A Output Terminal Wire Size 10AWG 126AWG Output Conduit Size WA 3PD(two toles) Control Signal Method PLC Signal SV Signal Wire 5V Signal Wire Voltage Rating WA 600V --- 5V Signal Wire Size Range WA 24-14 AWG General Data Rapid S h u td O w n Device 7.67 x 591 x 2.09(200 x 150 x 53) 12.44 x 10.04 x 2.16(316 x 255 x 55) nabs(13kg) 6.6I1s 13.0X9) for Delta 3.0r'7°6 TL Inverters Input Connectors MC-4 PV Conned&orAmphond H4 PV connector MC4 PV ConnecororAmphennl H4 PV Connector oumut Connectors MC4 PV Connecta orM*end 114 PV Connector Screw Terminal Blocks 40-158°F 140-70°C) 40-168°F(40-70°C) Deltas Rapid Shutdown Devices provide an automatic disconnect of 600VDC al 40-185°F(4O-WC) 40-185°F(40-85'C) residential or small commercial PV array system,fully compliant with the Rapid Humidity 0-1W% 0-110% Shutdown requirements of NEC 2014 article 690.12.It is compatible with Delta's 2000n aboveaee level 2000m above sea leve single-phase residential inverters. al 10 Yeas 10 Years Standard Compliance KEY FEATURES Enclosure Protection Rating NEMA 4X NEMA4)( •NUM 4X Protection Safety UL 1741,CSA 222107-1 OL 1741,CSA22.2 107-1 •Compact and Lightweight NEC Code NEC 2014Mitle 690.12 NEC 2014Mide 690.12 •Rack Mount Installation Delta Products Corporation,Inc. •Fast Connect with PV Connectors 46101 Fremont Blvd. •Compliant with NEC 2014 article 690 12 Fremont,CA 94538 Sales Email: Inverter.Sales@delta-corp.com •PLC Communication(Model RSS-6001-1 only) Support Email: InverterSupport@delta-corp.com Sales Hotline_ 1-877-440-5851 or S w 1-877-342-4832 Support Hotline. +1-877442-4832 Support(Intl.) +1-626-369-8019 A C US 6i1 AE LTA Mondayte Fridayr 7 to Spin PS7 Mean from Hommel Q pt•ELTn www.delta-americas.com/solarinverters Delta Solar Inverters Datasheet for SolarCity sr -._. KW r, 5rsr"Afafii.til 'G".VKa k z viola ClieVief ." %7D INPUT OM al11111..111111111 tarp - row A MOA 16°'&16V MOP ow MPP wade. M - 440 W .:www WOO .r 61 . SIiTG[Y e as is 'wit—, $cidcUty CI CuT IAC • w0 20 x w ---- %mo . w IIINIIIIIIIISIIIIII SINS a� VI 5200 W 2013 v 00wY 561/0 W®140 v w vwv xo e� a• w.v®x°Auvw mv ,w v® 144AwVwV A®aAwv 15 w ®mv 5p®xwo • ® re1 arsA®140V +A®xaevr aAa„w "-- g r - II 1 Si IIIIIIINISISI GENERAL SPECIFICATION 'Pr 000 0710)@107 I11111111111111S11111111111E *77 I� ® 3,e%®xwwv,37w,xox,w I; '. I n e-rww 7cude:reamve radrlmm *Wel xwwtwawe.esea level 1700158605•11075„401721671711 258017837513167704010716mml �� 47 71177110 75w329WI MI1111111111111011111111111111= - wo.��iA® w�Eov1715 �� 1 777771=wway..imn I ee.weev«, T 4 ppm efspnng lembapis•1 07037€3.73 boo 111111111111111111111111111111111111111 Awvrx AWG 6 CoppY 10170413groNEC wmel 1111111SMINNI11111 1.11.11111111.111 3 LEDs 44774.7 Lal ® 0.777"77*Mm HEMP 411 IEC 011“032311Se3 mni Solar Inverters 11111111111111MIS ix 0"8 Transformerless(TL).3 8 kW, 5.2 kW,6.6 kW,7.6 kW Main NEC 69037 IlL 1741 CFID 1111=111111111111111111111111111111111 ICE IS*IEEE**7 SWIMS wnlsaw..e NEC -Wttle 0porahn9 Voltage Range_85-55eV ULMilaliSiii IL vMeS.{Type 09011{s„�w,,SrmART ussl Wide Operating lemperatro Rmg¢ 13-1E61 (-25-70'C) Ilii111111111111111111111111111111 MEI CU 1 Onset 147/137707731 &Wanda R14.31. eco ,547 Nigh CEC P_fBeiency:97 5% weq�w 5 WARRANTY Integrated AFCI(Arc Fault Circuit Interruption, SIIIIIIMIIIIIMME rwv NEMA 4X plus Sall Mist Corrosion Protection ,ea 46111Frerma am Natural Convection Cooling Fromunl CP 9,536 -Dual MP PT(5.2kW/6.6kW/7.6kW) y„ssi uwwwu S7300010700 71 B77.4140? Compact and Lightweight ."-- ql t ightMMwe -s,......".,, a AELTA 1)L 1741 ELL 1547 f IEEE 154711 CEC Say //]] I.Isted/Ut 16991%Typo 1)I NFC 690 11 e V AELTT 'SolacCity ZepSolar Next-Level PV Mounting Technology `1%M1SolarCity Z polar Next-Level PV Mounting Technology isZS Comp Components for composition shingle roofs1,1%. V ' 0, **is .4.4.4.40.4. _its ..1.. ....b.40.41. .., sisi.......ii,... 4110101,411" ."�, �O:�Sr;,O Mounting Block Array Skirt Interlock '+ ®®®®_' Part No.850-1633 Part No.850-1608 or 500-0113 Pan No.850-1388 or 850-1613 414.5. �:��4w Listed to UL 2703 and UL 2582 Listed to UL 2703 Listed to UL 2703 *Sir 10.400,41* 411.444% .04AS ibitt.... it$404b e e 7 ...„... .....a. „lir „...... ..<)„ , sits_ ewe ,...:...))..... 4.7104%.,.., „bow 40.4. x'.44.4,y V*%. Flashing Flashing Accessory Grip Ground Zep V2 1511 -"re Listed to Uart No L 2703 and UL 2582 634 Listed to ULart No 850-1606 or 850-1421 Pal No Listed to UL 467 and UL 2703 7.4 if i .,440,6k): r'Te DescriptionV mounting solution for _.. ... ®y shingle roofsI fil VP Works with all ZepCompatible Modules • Auto bonding UL-listed hardware creates structural and electncal bond • ZS Camp has a UL 1703 Class"A'Fire Rating when installed using modules from 1111 any manufacturer certified as'Type 1•or'Type 2" Captured Washer Lag End Cap DC Wire Clip OUSTED Part No.850-1631-001 Pan No. Part No.850-1509 Specifications 8501631-003 (L)850-1586 or 850-1460 Listed to UL 1565 Oestgned for pinched roofs (R 850-1588 or 850-1467 Installs in portrait and landscape orientations ZS Comp supports module wind uplift and snow load pressures to 50 psf per UL 2703 Wind tunnel report to ASCE 7-05 and 7-10 standards ZS Comp grounding products are UL listed to UL 2703 and UL 467 y� ZS Camp bonding products are UL listed to UL 2703 wire �\ Engineered for spans up to 72 and cantilevers up to 24 qnq� 'd Zep wire management products listed to UL 1565 forpositioning devices •. 0 Attachment method UL listed to UL 2582 for Wind[riven Rain ' Leveling Foot Part No.850-1397 zepsolarcom zepsola¢om Listed to UL 2703 The document does not create any express warranty by Zen Solar or aboutproducts or services Zaps ty P warranty forThis documentMOS not create any express each me end-user documentation snppedw Zep Solar theW Thesolelyach product ashipped. v v Zpep sol abouta Ws warranty P maeYrre reaponsmproduct for eenlyro Me stela Play orZepsear s products for a use.Specifications are subject to change wn notice.Parents and Apes:zspas corn reseals roteenfensthe mummy ofZps s products for �.s annsucts constitutes lsubject change once Pnee sole specifications rerened to in the oe and warrantyUCI corn The OL.SE0{,,Or aaa pqs M1eprim 79pace Document a 060-1890-001 Rev C Date lest exported May 24.20164:51 PM Document ft 800-1890-001 Rev C Date last exported May 24.20160:51 PM powered by 0.faNTUM 3 Formal 6 .- 394 Ina 1 a7 in (Including f 1 (1570mm a moo inril a 40mm) wale09 (20.0x21 Front Cover 013i (32mmi. n NY pre stressed gls with anti reneunn technology H Sack CCompositellm .. mm tt FrameSlackd n I. 'tel Cell 6 10 0 AMULTRA. cells i lit, 0-3.05 313.54 7581 1 06 ] ad Il 90 1519 1 1 class IP' 1h bypass diodes xma.. '^ 84 I. i i f Cabl sl ble (3147.24n11200mn) taa724n112aomml _IF in sicst y - Canada M rLontMU 1168 P\ 1 P41(\G . /5 C`...,. 2 g5-$ e , POWER CLASS 295 300 305 MINIMUM PERFORMANCE AT S1ANOAR TEST EON ItIONS,SVC'(POWER TOLERANCE+5W/OWI (, Power M MPp' P. IWI 295 300 305 O,ANTUM ULTRA SOLAR MODULE anonCIaallCurrent' LAI 9977 984 Open Circuit Voltage* V. TVI 3946 48 39.16 4005 Current at MPP' lad IAL 917 9.36 9,35 Voltage et MPP' V,,,. IVI 3241 32.63 The new high-performance module q.PFAR-G4.1 LSC is the ideal solution a....-- —"" Efficiency( , IwI 71/7 -1a.o 7163 for all applications thanks to its innovative cell technology U.AN LVA ; MINIMUM PERFORMANCE Al NORMAL OPERATING COMLIMONS,NOG' Lt T R4 and a black"is c+t,91t ' frame design for improved aesthetics, I Power atMPP' P,,. [WI 2181 2218 2255 developed toachieve increased was the best performance under real conditions—even with low radiation intensity and on clear, hot summer days. 1 _ E L A / Tee 94 I Open easy • installationsafety. rd cell design 0 Voltage' V. WI 359 3746 3 f L AlI20 72 A35 , I Vo Mg MPP V NI3 CO 3o a9 3067 tunn w'r, 4.. r spectrum AM Mm,.e °-t OR. eSTC. % NOr S% -annul,m,Non specPM!50 •typicel. Alt ,nr,dillu O CELLS PERFORMANCE WARRANTY PERFORMANCE AT LOW IRRADIANCE t'""tt LOW ElECTNIOIiV GENERATION COSTS - _ 1 ‘,.°-!) Higher yield per surface area and lower BOS costs thanks to ., At least 94 6.4 cf nominal powni nif la'0 Yearn _A. higher power classes and an efficiency rate of up to 18.6%. _ - Al!nit 83 6%or nominal newer up In i i years ,43. ---- {{ # 7. ''r`R ter Ms 0 the o. Ciao,: of tour Full wafrantie.3 in dece,danne win air wAranly tam INNOVATffiEA -NEA1NEr1 TELNNOtOGY n ` 99993-239393 Optimal yields,whate e the weather with excellent low-light .__._ m d oi _ -< wrrtiner'"'"F"'"'"' and temperature behavior. 11up.an, a.". coiriparia3,1051anos0 .0 nn. ((l ENDURING'IIGH PERFORMANCE TEMPERATURE COEFFICIENTS I1 Lt] Long-term yield security with Anti-PID Technology', QCELLS i Temperature Eoeryenl aria o I%/KI +0 04 Temperature Coefficient of V. p 1%/111 Coo Hot-Spot-Protect and Traceable Duality 1ra.QTM.Tra.Cr i TOP BRAND FY yin TemperatureTemperatureLCoefficient pit P.. v I1%/KI -039 Normal Operating Cell Temperature er 1°O e xp113±s 41a5a3'c1 c o 110, A RELIABLE INVESTMENT Inclusive 12-year product warranty and 2E-year . 0 maximum System Voltage Vyr ryl 100011tC)/I000IW Sffity Class II r . Ma,Imomnm Series fuse Rating IA OCI 30 Rattan Ontt H TYPE 1 N linear performance guarantee' LI y Oed¢n load.push mita Ima/WI 75(3600 Pal remitted module temperature -401 rip to*185F C s(,UMPA//, on continuous dusto Alit t 40°C up ah"CI NAz 2 ® oeelm load,pull NU` Obs/11(1 556(2566 Pal -see installation manual I htlpOlnlySlalline "q®M� QUALIFICATIONS AND CERTIFICATES PACKAGING INFORMATION 5 °OMPP' .a.....n. number al Modules per Pallet 26 _ IEC r.1/16(Ed 9. tirnll !EC 61oappl¢mion ua.A Number oil Pallets per 53'Container Se Number M Pallet per 40'Container API t. candid Cells -t00v P] u. PalIetDmensions(LxWxH) 68 un x453lax lin If against grounded,with fictive me. 1746ioms 1 u0mm x 1170n n 1 tel foil covered module surface,25.0 te THE IDEAL SOLUTION FOR: 168 ti a • Weiyht 1254 lbs(569 kg) P ®ren, awenm s.-aruteet on�rfor f further rias 0e sn ,mco iso a. .CA 92614 _A - 19t9 n . nnra a.4 tom wwwucells in NOTE InStalletion insiruet(ons ninsi fe followed See the m,tanat.ao werabre manual nr contact our'snow F„,nre depaament tor loaner don on aPP a..a oto atoll and use information of this prodaii na 30 Ca C C 135996 Engineered in Germany Q `ELLS