Loading...
23B-035 (6) 61 LOCUST ST- DENTIST BP-2017-1418 GIS#: COMMONWEALTH OF MASSACHUSETTS Man:Block:23B-035 CITY OF NORTHAMPTON Lot:-001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category:SOLAR ELECTRIC SYSTEM BUILDING PERMIT Permit# BP-2017-1418 Project# JS-2017-002351 Est.Cost:$123306.00 Fee: $360.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: PIONEER VALLEY PHOTOVOLTAICS 106329 Lot Size(sq.ft.): 27007.20 Owner: WOHL FAMILY DENTISTRY LLC Zoning:NB(1001/URB(0)/ Applicant: PIONEER VALLEY PHOTOVOLTAICS AT: 61 LOCUST ST - DENTIST Applicant Address: Phone: Insurance: 311 WELLS ST - SUITE B (413)772-8788 Workers Compensation GREENFIELDMA01301 ISSUED ON:6/7/2017 0:00:00 TO PERFORM THE FOLLOWING WORK INSTALLATION OF 104 PV MODULES ON ROOF POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House ti Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occu sane Si•nature: FeeType: Date Paid: Amount: Building 6/7/2017 0:00:00 $360.00 212 Main Street,Phone(413)587-1240, Fax:(413)587-1272 Louis Hasbrouck—Building Commissioner File#BP-2017-1418 APPLICANT/CONTACT PERSON PIONEER VALLEY PHOTOVOLTAICS ADDRESS/PHONE 311 WELLS ST-SUITE B GREENFIELD (413)772-8788 PROPERTY LOCATION 61 LOCUST ST-DENTIST MAP 23B PARCEL 035 001 ZONE NB(100)/URB(01( THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid �� Building Permit Filled out I l Fee Paid Typeof Construction: INSTALLATION OF 104 PV MODULES ON ROOF New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 106329 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFOgMATION PRESENTED: /Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* _ Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Pennit from Elm Street Commission Permit DPW Storm Water Management Demoli : D- Signa Tuil.mg i(ficial Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. * Variances are granted only to those applicants who meet the strict standards of MGL 40A.Contact Office of Planning&Development for more information. 9.uq 4 a�O PV Squared Solar j wwwpvsquared.coop I Phone:413-772-87881Fax:413-772-8668 • • 311 WeMAllsElS[,ec.Lic.Ste.B)A13764 j Greenfield,MAH1C 1MA 0130140077 6 -ms Dear Town Inspections Officials, Please see our enclosed applications to permit a Solar Photovoltaic System in your jurisdiction. As you are likely aware, PV Squared is a worker-owned-cooperative B-Corp, employing 40+ people in Greenfield. We have installed thousands of PV Systems out of our Greenfield, MA Headquarters since 2002. PV Squared is committed to complying with all Commonwealth laws and regulations. Our worksite guidelines are created with the intention of exceeding all safety, electrical, and building requirements as defined by their respective jurisdictional entities. This includes the work of people from multiple disciplines, including electrical engineering, structural engineering, civil engineering, electricians, construction supervisors, roofers, and their associated helpers. We are a company that values training and education. We make certain that every individual is qualified for the roles and responsibilities that they assume, It is our policy to pay for the employees travel and training time and cost of the education, including CSL and Journeyman and Master Electrician classes. As an electrical contractor we are furthermore guided by the January 30, 2009 Massachusetts Board of State Examiners of Electricians (BSEE)judgements, and rulings that have followed. We pay strict adherence to these mandates and all electrical work is conducted by an electrician and an electrician's apprentice in a 1:1 ratio. We also understand that non-electrical tasks associated with a Solar installation can be completed by non-electrical workers, such as CSLs and others. I have attached our installation policy for your review, as well as a list of example non-electrical tasks. Should you have any questions or concerns regarding this policy or delineation of work, please let us know. We are a learning organization that is always trying to improve on what we do. Respectfully, • Adam Thurrell Operations Manager Versionl.7 Commercial BuildinekPermit May 15,2000 Department use only r." — City of Northampton Status of Permit: Building Department Curb Cul/Driveway Permit JUN — 6 "...,i .j 212 Main Street SewerdSeptic Availability Room 100 Water/Well Availability Lr -J lrlorthampton, MA 01060 Two Sets of Structural Plans ---- -------phorrl 413-587-1240 Fax 413-587-1272 Plot/Site Plans Other Specify APPLICATION TO CONSTRUCT, REPAIR,RENOVATE,CHANGE THE USE OR OCCUPANCY OF,OR DEMOLISH ANY BUILDING OTHER THAN A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address: Thls section to be completed by office 61 Locust St., Map a"J / Lot p 3 6 unit Northampton, MA 01060 Zone Overlay District Elm St.District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT ¢.1 Owner of Recoil: Wohl Family Dentistry, LLC 61 Locust St., Northampton, MA 01060 Name(Print) Current Mailing Address: (4B) 537-2957 See attachment A Signature Telephone 2.2 Authorized Aaent Pioneer Valley Photovoltaics Cooperative 311 Wells Street,Greenfield, MA 01301 Name(Print) / Current Mailing Address: af / (413) 772-8788 Signature _ Telephone SECTION -ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by permit applicant 1. Building $66,400.00 (a)building Permit Fee 2. Electrical (b)Estimated $56,906.00 ConstructionTotal from Cost(6)of 3. Plumbing - Building Permit Fee 4. Mechanical (HVAC) 5.Fire Protection f(, 6. Total=(1 +2+3+4+5) $123,306.00 Check Number -715It r�� � V This Section For Official Use Only Building Permit Number Date Issued Signature! Building Commissioner/Inspector of Buildings Date Versionl.7 Commercial Building Permit May 15,200() SECTION 4-CONSTRUCTION SERVICES FOR PROJECTS LESS THAN 35,000 CUBIC FEET OF ENCLOSED SPACE Interior Alterations 0 Existing Wail Signs 0 Demolition❑ Repairs 0 Additions 0 Accessory Building 0 Exterior Alteration 0 Existing Ground Sign❑ New Signs❑ Roofing 0 Change of Use 0 Other 0 Brief Description Installation of 104 PV Modules on the South-facing roof of the dentist office. Of Proposed Work: SECTION 5-USE GROUP AND CONSTRUCTION TYPE USE GROUP(Check as applicable) CONSTRUCTION TYPE A Assembly ❑ A-1 0 A-2 0 A-3 0 1A 0 A-4 ❑ A-5 ❑ 1B 0 B Business 0 2A ❑ E Educational 0 2B 0 F Factory 0 F-1 0 F-2 0 2C 0 H High Hazard 0 3A 0 I Institutional ❑ 14 ❑ 1-2 0 1-3 0 36 0 M Mercantile 0 4 0 R Residential 0 R-1 ❑ R-2 0 R-3 0 5A 0 S Storage ❑ S-1 ❑ 8-2 ❑ 58 0 U Utility 0 Specify: M Mixed Use ❑ Specify: S Special Use ❑ Specify: COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATIONS,ADDITIONS AND/OR CHANGE IN USE Existing Use Group: Proposed Use Group: Existing Hazard Index 780 CMR 34): Proposed Hazard Index 780 CMR 34): SECTION 6 BUILDING HEIGHT AND AREA BUILDING AREA EXISTING PROPOSED NEW CONSTRUCTION OFFICE USE ONLY Floor Area per Floor(sf) t 1n 2"d 2 3rd 3,d 4'" 4" Total Area(sf) Total Proposed New Construction(sf) Total Height{R) Total Height ft 7.Water Supply(M.G.L.c.40,§54) 7,1 Flood Zone Information: 7.3 Sewage Disposal System: Public 0 Private 0 Zone Outside Flood Zone❑ Municipal 0 On site disposal system Fersionl.?Commercial Building Permit May 15,2000 8. NORTHAMPTON ZONING Existing Proposed Required by Zoning This column TO be fiikd in by Building Department Lot Size Frontage Setbacks Front Side L: ,R: L: R: Rear Building Height Bldg.Square Footage Open Space Footage %a (Lot arca minus bldg&paved parking) #of Parking Spaces Fill: (volume&Gmat o ) ever 0 O 0 0 0 O IF YES, IF YES: D O D 0 CO 0 IF YES 0 CI O 0 O 0 IF YES, Needs to be obtained O Obtained O Date Issued 0 O O 00 E. Will the construction activity disturb{Gearing,grading,excavation,or filling)over I acre oris it part of a common plan that will disturb over t acre? YES O NO O IF YES,then a Northampton Storm Water Management Permit from the DPW is required. Version1.7 Commercial Building Permit May 15,2000 SECTION 9-PROFESSIONAL DESIGN AND CONSTRUCTION SERVICES-FOR BUILDINGS AND STRUCTURES SUBJECT TO CONSTRUCTION CONTROL PURSUANT TO 780 CMR 118(CONTAINING MORE THAN 35,000 C.F.OF ENCLOSED SPACE) 9.1 Registered Architect: Not Applicable ID Name(Registrant): Registration Number Address Expiration Date Signature Telephone 92 Registered Professional Engineer(s): Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date Name Area of Responsivity Address Registration Number Signature Telephone Expiration Date 9.3 General Contractor Pioneer Valley Photovoltaics Cooperative Not Applicable Company Name: Christopher T. Krezmien Responsible In Charge of Construction 311 Wells Street, Greenfield MA 01301 Address r, • (413) 772-8788 Signature — Telephone Version1.7 Commercial Building Permit May 15,2000 SECTION 10-STRUCTURAL PEER REVIEW(780 CMR 110,11) Independent Structural Engineering Structural Peer Review Required Yes 0 No 0 SECTION 11 -OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT i Carina L_Wah) for Wohl Family Dentistry ,LLC ,as Owner of the subject property Pioneer Valley Photovoltaics Cooperative, LLC hereby authorize to act on my behalf,in all matters relative to work authorized by this building permit application. See attachment A 04/27/2017 Signature of Owner Date I Pioneer Valley Photovoltaics Cooperative, LLC as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury, Philippe Rigollaud Print Name 05/30/2017 Signature of Owner/Agent Date SECTION 12-CONSTRUCTION SERVICES 10.1 LICensed Construction Supervisor: Not Applicable 0 Name of License Holder. Maya Fulford CS-106329 license Number 159 Clark Drive , Giulford, MA 05301 03/14/2018 Address �/�,^ ,[ n 1 Expiration Date l/ 10- i. fiv_pcd (413) 772-8788 Signature Telephone ........— SECTION 13-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.O.L.c. 152,§2$C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application.Failure to provide this affidavit will result in the denial of the issuance of the building permit, Signed Affidavit Attached Yes � No 0 Attachment A AUTHORIZATION TO PROCEED AND SERVE AS AUTHORIZED AGENT I hereby agree to the Project as set out above,and I agree to pay the contract price according to the Terms of Payment. I further agree to the Terms and Conditions attached hereto as a part of this Proposal and Agreement. I hereby authorize Pioneer Valley Photovoltaics Cooperative to proceed with the above-referenced Project in accordance with this Agreement. I further authorize Pioneer Valley PhotoVoltaics Cooperative, or its designated representative,to obtain required permits for this project on behalf of the Owner. I will allow any photographs or videos of this project to be used by Pioneer Valley Photovoltaics Cooperative for marketing purposes.A check for the First Payment is enclosed and I am returning this Agreement within 21 days of the Proposal date. CARINA L.- PJO1L_ 9121-1)11 Printed Name Date 411 �1 P,nN oww@c liratu.� / Title oK . rli FMIIA beN)STRy, ZLC Pate 2 e 13 Rupcv�.an]Agreement a 00012489 'v.:Favoy ocnUmry.ILC-April 24.2017 C� lw a rnirnrvnr.cieafCl otiaataaccahteatila Office of Consumer Affairs and Business Regulation -- 10 Park Plaza-Suite S170 Boston, Massachusetts 02116 Home Improvement Contractor Registration Registration. 160077 - - — TynePemM6 COrpurafion EM>Mabon' 9/16/2017 Tnf 270455 PIONEER VALLEY PHOTOVOLTAIC'SO = PHILIPPE RIGOLLAUD - _ 311 WELLS ST SUITE B -" -- -_- - GREENFIELD, MA 01301 .l'Update Address and return Lard.Mark reason for change. l I] Address 0 Renewal i] Employment 0 Loot Card SCAT 3 nwlsis 2Yk `rr ..a. ,•wnv/fro/&IG.:mxd..,ar $L1, Cate etGostomerMlites&Eadam Emoted. Lkense Or registration Valid for indirid.l nee only ME IMPROVEMENT CONTRACTOR before the expiration date. Wound return to: ReelMnoMe 140077 Type: Office of Consumer Affairs and Easiness Regulation Expratinn 9/16M017 Prorate Corporation 10 Park Plaza-Snite 5170 Boston, �/ Boston,MA 02116 SG �.. PIONEER VMi FY PHd coop PHIUPPE RIGOLLAUD - 311WELLS STSUITE R GREENFIELD,MA D1301 uadereeeremry Not valid wide kj7 Massachusetts Department of Public Safety Board of Building Regulations and Standards License: CS-106329 Construction Supervisor MAYA FULFORD 159 CLARK DRIVE - t ULFORD VT 06301 Expiration: Commissioner 0311412018 1 A oe CERTIFICATE OF LIABILITY INSURANCE D Ti`3/2M DDI Y) THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder In lieu of such endorsement(a), PRODUCER CONTACT Linda Powers Webber a Grinnell tPNliGo. TE (413)586-0111 iAX ms Will sae.5441 8 North King Street E;';A!LaglpoPersewebberandgrinnell.com INSURERO AFFORDING COVERAGE NAICI Northampton MA 01060 INSURER AliDI Global Ins. Co/Energi L. INSURED INSURERS Markel Insurance Company 1 _ Pioneer Valley Photovoltaics Cooperative, Inc. INSURERcanter'1 Ins. Co of Hannover/Energi Attn: Kim Pinkham INSURER O: _ 311 Wells Street, Suite B INSURER E: y Greenfield MA 01301 INSURER F: COVERAGES CERTIFICATE NUMBER:Master Nap 1-2018 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS,r MIS0. aTl POUOY EEE POLICY UP1 _ LTR TYPE Of INSURANCE /NSD WYD) POLICY NUMBER iMMDDIYYYYI IMWIDIYYYYI LIMITS K COMMERCIAL GENERAL I laeluTY CACHOCCURRENLE I$ 1,000,000 A I CLAIMSJMOE I X I OCCUR .DAM4GES(EtcciEU e$ENISES�Ee IflD cel $ 100,000 ECCCR000241217 1/1/2019 1/1/2018 MEDEXP(Any one.piyon) $ 5,000 PERSONAL 8ADV INJURY $ 1,000,000 WTI_AGGREGATE LIMIT APPLIES PER [ GENERAL AGGREGATE 3 2,ODO,000 ' K POLICY LOG PRODUCTS•COMNOR AGS S 2,000,000 OTHER'. $ AUTOMOBILE LIABILITYCOMBINED SINGLE LIMIT $ 1,000,000 l .itaaccident) -_ A ,{ANY AUTO BODILY INJURY(PHINTOF) $ ALL OWNED . SCI1EUmED ��AUT65 K AUTOS SACCF-000341217 1/112019 1/1/2018 OODPLYRYURYAOIE Went) S K HIRED AUTOS 8 AUTOS NON-OWNED PROPERTY DAMAGE $ • _ AUTOS 1Per accident) _.. Underinsured motorist 0l spin $ 100,000 K UMBRELLA/JAB X OCCUR EACH OCCURRENCE I$ 3.000,000 B EXCESS uA8 CLAIMS.MADE ,AGGREGATE8 3,000,000 DED X RC'IENIoN$ 10,000 RXRGR000241717 1/1/2017 1/1/2018 PER 0TH- YNR%ERS COMPENSATOR AND EMPLOYERS'LABILITY PINI K STATUTE ER . _ ANY PROPRIETORPARINERIEXECUTIVE ' N/A el EACH ACCIDENT $ 1,000,000 OFFICER/MEMBER'OFFICEREMBER EXCLUDED? _. A (Mandatory in NH) BNGCR000241317 1/1/2017 1/1/2018 EL.DISEASE•�EA EMPLOYEE S 1,000,1100 �Y tlacntObeNt r SCRIPTIpNOFGf'c'tNTtpNS Seism 'EL.DTEA$E-PJLY'I LIMIT 5 1,000,000, C Commercial Property CYB1'8174800 1/1/2017 1/1/3010 Business personal propel $1,750,000 Installation $350,000 DESCRIPTOR OF OPERATIONS/LOCATIONS m VEHICLES(ACOR6101,Additional Romana Schedule,may be attached if momspace is mouths* CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE FOS Informational Purposes Only THE EXPIRATION DATE THEREOF, NOTICE WILL SE DELIVERED W ACCORDANCE WITH THE POLICY PROVISIONS, AUTHORIZED REPRESENTATVE Lunda Powers,/LMP ,,. M�„cL o"^-»'��'� @ 198&2014 ACORD CORPORATION. All rights reserved. ACORD 25(2014/01) The ACORD name and logo are registered marks of ACORD INSOPS°mann • The Commonwealth of Massachusetts o '1 Department of Industrial Accidents :irc 1 Congress Street,Suite 100 'EFi= Iia' Boston, MA 021144017 wwwanass.gov/dia Workers'Compensation Insurance Affidavit:Builders/Contractors/Electricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. Applicant Information Please Print Legibly Name Busincas/Organization/Individua0: PIONEER VALLEY PHOTOVOLTAICS Address:311 WELLS STREET,SUITE B City/State/Zip:GREENFIELD, MA 01301 Phone #:413-772-8788 Are you an employer?Check the appropriate box: Type of project(required): I-�i am a employer with 45__employus train andk,r part-tine)' 7. ❑New construction 2.❑I am a sole proprietor or partnership and have no employees working for me m 8. ❑Remodeling any capacity.[No workers comp.insurance required.] 3.0l am a homeowner doing all work myself.[No workers'comp.insurance required.]' 9. ❑Demolition 10 0 Building addition 4.0T an a homeowner and will be hiring contractors to conduct all work on my progeny. I will ensure that all contractors either have workers'compensation Irowance or are sole 11.0 Electrical repairs or additions proprietors with no employees. 12.0 Plumbing repairs or additions 5.0 I am a general contractor and I have hired the sub-contractors listed on the atiacliod sheetij❑ROOF repairs These sub-mmnactors have employees and have workers'comp. insurance.: an We are a corporation and its officers have exercised their right of exemption per Wit.c. 14.[pother SOLAR PV 152.41(4),and we have no employees.[No workers'compinsurance required.] "Any applicant that cheeks box ni must also 511 out the section below showing their workers'compensation policy information. 'Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a nety affidavit indicating such. 1(0n/rectors that cheek this box most attached an additional sheet showing the name of the sub-connecters and state whether at not throe entities have employees. If the suh.contraaors have employees.they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance,jar my employees. Below is the policy and job site information. Insurance Company Name: ROI Global Ins. Col Energi Policy or Self-ins,Lie.#: EWGCR000241217 Expiration Date:01/01/2018 Job Site Address: 61 Loosut St. City/state/zip:Northampton MA 01060 Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under MGL c. 152.§25A is a criminal violation punishable by a fine up to SI,50080 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to S250.00 a day against the violator. A copy of this statement may be ltorwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pains and oj'perjury that the information provided above is nue and correct. Signature: 1 Date.5/30/2017 Phone if:413-772-8788 7" Official use only. Do not write in this urea,to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle one): J ' I.Board of Health 2.Building Department 3.City/Town Clerk 4. Electrical Inspector 5.Plumbing Inspector 6,Other Contact Person: Phone#: WOHL FAMILY DENTISTRY Northampton 4•a i • (pv�2 Roof Mounted PV System II\\ S...- 37.44 kW DC Owner: Wohl Family Dentisty.LLC O. Owner Contact: Martin Wohl, Dentist Owner, Carina Wohl primary contact Email:carinawohl@gmail.com - Phone:, 413 5372957 e Owner address: 261 Locust Street, oo Northampton MA 01060 7 Site Address: 61 Locust St, Northampton MA -• / ' 01060 System 1 Size: 23 kW DC System 2 Size: 11.5 kW DC PV Array: (104) SPR X22.360-COM on portrait in 2 sub-arrays of S rows ..i Mounting Ironridge racking on L-feet on Ecofasten Quick foot bases. . `ived� Roof Structure: See PE letter - rt' a I l i; Roofing,Material: asphalt shingles ,y,: ' • Vreeland Design Associates An integrative approach to design engineering and site planning Date May 31, 2017 To: Adam Turrell Pioneer Valley PhotoVoltaics Cooperative 311 Wells Street, Suite B Greenfield, MA 01301 From: David Vreeland,P.E. Vreeland Design Associates Re: Wohl Family Dentistry, 61 Locust St, Northampton, MA: Structural assessment of existing roof to support proposed solar arrays. 1 have investigated the roof framing of the 48'x 93', 2-story wood framed commercial building. The building, constructed in 1985 is framed as two separate sections;the eastern section,48'x 40', framed with 2-ply 2x6 cambered piggy backed Fan design roof trusses installed at 4' on-center, and a western 48'x 45' section framed with 3-ply 2x6 piggy backed cambered Fan design roof trusses installed at 6'-4" on-center. The two sections are joined by an 8' wide connector with the south face of the connector setback 12' from the front of the building. The roof has a 7(12 slope. 2x4 purlins installed 16" on-center perpendicular and in-between the top chords of the trusses support 2x3s on the flat installed 24"on-center running cave to ridge and secured to the 2x4 purlins. Plywood roof sheathing is attached to the 2x3s. The roof trusses appear to be constructed with southern yellow pine lumber. The roofing is asphalt shingles. 55 PV solar panels will be installed on the eastern section and 49 solar panels on the western section. I have reviewed the mounting details for the proposed arrays. Based on my calculations and a PV solar panel unit weight of 464 lbs, with the attachment points of the arrays placed directly over the roof trusses on both the east and west sections, the existing roof framing is adequate to support the proposed PV solar arrays and the snow and wind load requirements of the current MA State Building Code. Please contact me if you have any questions or need additional information. Sincerely, 2#1"c* V VREEL f DAEwAD Aw.ND et, Y� � CIVIL w David Vreeland, PENo.4631 Vreeland Design Associates P ytc k 116 River Road, Leyden, MA 01337 Phone: (413) 624-0126 Email: dvreeland@verizon.net Fax: (413) 624-3282 _ a$.4, is f ?� R rm '—'----�. . _ .ate--• SunPower'r X-Series Commercial Solar Panels I X22-360-COM More than 22% Efficiency High Performance & Excellent Reliability Captures more sunlight and generates more power than conventional panels. 022 Maximum Performance SERIES Designed to perform in demanding real-world conditions of high temperatures,partial shade from overhead wires,and low light VT . Commercial Grade Intended for commercial sites where maximum SP=-nzaco-min energy production is critical. Highest Efficiency' Generate more energy per square foot X noses mr mercial par el con er:mom sr rilignt to elecuiAt, I s producing i 38s more pow:r per panel and 70%12'ore er erg., per squer :over 25 gears Highest Energy Production" maxeon5 solar Cells:Fundamentallybetter Produce more energy per rated watt Fngireereo for performancedesigned for reliability. More energ n[:ower y0cr apt i ati pus iiiglveCf n p Cr for mar re Tel%es 81 C%more energy per cued igats This erg sni-ge inceases oer Engineered for Peace of Mind producing 21%more energy over he me' 25 years to meet voui reeds.= Designed to deliver consistent,trouble-free energy over a very long lifetime.'' - 21 Designed for Reliability I - The SunPower Maxeon Solar Cell is the only cell built on a solid copper foundation.Virtually impervious;o the corrosion and cracking that `s degrade conventional panels' f_ Same excellent durability as E-Series panels 111 Rank in Fraunhofer durability test' 100%power maintained in Atlas 25+ comprehensive durability test" r , MOWN SUNPWER . • Kiiiii { ztm-3 - -eai K > . r SunPower i X-Series Commercial Solar Panels 1 X22-360-COM Sun?ower Offe s The Best Como ned tower Arlo eaaaaial Wan alta Power Warranty Prodoot Warranty t:: M. e..,uarr,teen Gams 95%for f rs , ttesis. rmb-ed xo....e.dsc P :dlur defect ar Leverage -04%./.r 10 yea 25 rha:.ncodes pane r'eWacement coats' Sta N to Power Pimp'. SPR422160-COM QHSnc Gs rt C rrsa s NOS00H2008ES 1 002004 j6e21 ,IoC b'],9,. nC i ante k EALI ,E.,n Pale Eiscency VHC a PVGJOG naterivotage( neel 606V cost n b p Creche to Crade(LI g be fo`UL point.) Rated Current(Imp) 5543 Arn'los a l est 1E( 6 / OpentOrct.t Vo tage Noe/ 6n.S V DVcer.fest I t 109rPV5C.203674443/ ' Shn Crtx Curreol(ist; 6fi8A _ 52't Sprat Tc�t ICC 61701(rra<aiunseve iy) y-Ae iGcGtose IGSS GM 4 ItSs.TC V ICC _ PlC tssr. Pott a Induced Ce ai n fee..0001' n I IsGix.momsefies hSB 'SP nva'as el St ngL UL (JVJFT GLC_ Ps.ser Temp Coef i__0% { _ of 'Temp Coe`. 6Tn n✓+'C ape.'atliag Con of Ane c par)' 1222,d Currentie'ro:o f. '- nt.=^C TCTcyra. `E -c -;In+ 8E'lz140'Cto+gp°Q Inc.L. t t -r.e i- h -.G:m5dam e ha a i)^p‘23 Gt;s1 . omeae r .c a.=I.- _ .n-.rlr 's Pe. r• Apr Ce Gass6 .� So,a•Ce:s 96 n onocpsta 1.Ioe Maseon Gen Ill o f 5L7L t vol .11:.I] Tf IYI eea b..-s HICh tansm y.unterpeed ant-ref ect've lurr['n Box ER-OS. paobe NIC4 co t Jr w eptl r 41 LG G 86LK, - Ide — qµe Max Ludo cern 0 ost 2400 Pa,244 kgn"rCnl.&back SilosSfloA. 112 ssft 5400 1,zPa .ki'ftpr opt _ r V 3 mn xnr C S 2 C aryyzed t ckin n5 Flp i. 1559mm G6rtvn .n `rov wsirs (6r3m) /- psl0) ar t L .,p a Pa iel .�H ca:c e �r I I '� J e f " al .elr d l rn CN)1ILE 1pr 4Gm i u rn Y 1 Inti it 1❑ I ill .11 i 11111119 kr-. _ rMIME 2c 1 22"CV'P5F1°1145IDE 4 X 398 mm tmM,,,Avon, p 46F.ml(A) rel., se t iya uuv yq . r .-.ad m':fnn Dnaalt a_. I+rtn +axe`_ S U N P i _ WER` • • /jetIRONRIDGE XR100 Rail See Descri•tion / Length rcIbn Propertiey Value Total Cross-Sectional Area 0.582 in' .66 Section Modulus (X-axis) 0.297 in3 .46 Moment of Inertia (X-ox6) 0.390 in° t - -— Moment of Inertia (Y-axis) 0.085 in4 Torsional Constant 0.214 in3 Polar Moment of Inertia 0.126 in° 1 99 APPROVED MATERIALS: 2.44 600546, 6005A-T61, 6105-15, 6N01-16 2.34 (34.000 PSI YIELD STRENGTH MINIMUM) .58 j 1.25 Clear Pad Black Part Description/Length Material Weight Number Number XR-100-132A XR-100-132B XR100, Rail 132"X11 Feet) 7.50 lbs. XR-100-168A XR-I00-1688 XR100. Rail 168"(14 Feet) 6000-Series 9.55 lbs. Aluminum XR-100-204A XR-100-2048 XR10q Rail Zoe 17 Feet) 11.60 lbs. v1.1 /7.44k IRONRIDGE XR100 Bonded Splice „, ,,,,„------ 04 XR-100 RAIL 12.0 riiii II,/ XR-100-SPLC-BD I O KIT, XR100 BONDED SPLICE P tr 1) Splice, XR100, Mill 12”long 2) Screw, Self Drilling 24 63 —mi— 1.93 .31 _........ II I i I ■ WIMP al x.42 15 H-- 93 (- #12-14 TYPE"B"THREAD Property Value Property Value Male5a1 6000 Series Aluminum Material 300 Series Stainless Steel Finish Mill Finish Clear vi.0 tan Z QuikFoot PRODUCT GUIDE CD Exploded Product View/S.O.M. — 1 Installation Instructions - 2 w .. ��—A Cu[ Sheets - p ecITlca Uons - a U li?johb Lisi 0 V) Ill AG t-EcoFasten Solar . ,, QuikFoot— Product Guide Exploded Product View, Bill o` Materials ,t; , ,; fi Y ,' , _ Materials Needed for Assembly „` 1' 0111 Item No. Description of Material/Part Quantity ` ii aid 1 QuikFoot Base Plate 1 i i i 101 if ii- i.` , 2 Fastener(Length to be determined) 2 3 QuikFoot!"iashi^g i { .4- 4 EPDM Washer 1 .'.I 5 L-102-3"Bracket*(other options available) 1 0 - 6 5/15"EPDM Bonded 18.8 SS Washer 1 7 3/8"Stainless Steel Hex Nut 1 Q Required Toots 40 i 60...........................6a JD 1 til/ ' o k cars 4:111109.- i` 4� f l ' '; . QuikFoot- Product Guide Cut Sheers OF-AL-Base ` 2X 0 .33in 1 [8.38mm] t1. 1 l Co--ea A may, u .0% 6 `n c 0 .- M � � 1 I lie 1 44. 04411 I la , l 1 .SOin [38.10mm] 3/8r'-16 Stud ? A — E E 4op QF-M : 1 .5' I QF-L : 1 .75" -____t 1 A 877-859-3947 EcoFasten Solar All content protected under copyright.All rights reserved 10/09/14 31 EcoFasten Solar products are protected by the(ollowino U.S.Patents'.8.151.522 828,153.700 828.181,398 B2 8,166 713 B2 8.146.299 B2 8.209.914 828,245.454 828,272.174 B2 8.225557 82 11 , i 1,111 4. , qi QuikFoot- Product Guide Cur She s: QFL-312 i n ,. r, « .... . I i 111'1 h It id R.38in �I I' li ii [9.53mm] .032in is— ' ', , [0.81mm] • „k - �,' - 11 c; l 2.00in [304.80mm] - il i o i 3.00in [76.20mm] \ [% I' amp bra:clan q Y f .SOin ' _ 1-.0,_8.00in _ [ 12.70mm ] [ 203.20mm] QuikFoot- Product Guide Cut Sheets- Bracket Options- SCL-101-3 ' y l co A 3/8" T� ��41 r \_.. ,..0 ..„ tiai ....... 4 46 SERRATIONS ....... I ) ., , , - 17/8"_ nR1/16" - 1/4.. - a0 C --I 3/4" F- 1/16" 1 �Il:.. R.005 - /c R.010 2X R.01 icij�15 60.00° t� ° 3/81-.002 - 1/8'. // (4 7/8" X 82° SOME 3:1 877-859-3947 EcoFasten Solar All content protected ander copyright.All rights reserved.10/09/14 37 EcoFasten Solar products are protected by the following U.S.Patents 8.151522 828153,700 828.181.398 B28.166.713328.146.299 828.209914 828245,454 828272.174 828.225,557 82 I "t I QuikFoot- Product Guide Specifications; V v I4 PART 1 GENERAL •Ieiii n 11,(1); 1' SUMMARY 1.3 SUBMI' fAc 1 t �..01. . A wORY INCLUDES A. Submit manufacturer's written spec.`canons. B. Base plate is 6000 series aluminum with one �I . t i' 1. Quit;Foot base plate atacnm_e tt bracket thatPEM lype Press-In Soo 18 8 55 . B. Submit Standard product cut sheets ,pi I . attaches directly to the roof deck C Submit installation instructions. C. Fasteners to be compatible with chosen roof I 2. Provide appropriate bracket and fasteners D. Submit product specific load test data,showing application and meet specified pull out values I i 1 � for the roof system. ultimate and allowable load values specific to as shown in load test data. Y B- 0MA-60SECTOHS the roof aeck speofied`cr the project 0 Counter flashing H 032 gauge alum nu n em I Section 07600 Flashing and Sheet Metal bossed to accept shape of stainless steel base 2-Section 07500.Roofing 1 1 QUALITY ASSURANCE plate i 3 Division 1Administratie and Procedural Installer to be experienced in the installation of Requirements specified roofing material for no less than 5 years in P 3 FINIS >it 4.D nsior 7 termal and Moisture Pr ,ecunn __area of the project. i A Bracket is mill finish aluminum L2 S"S EM DESCRIPTIOP: I S DELNCRY/STORAGL/HANDLING B. Base Flashing-Black-kynar painted A. COMPONENTS: Inspect material upon delivery. Notify manufacturer I§ i 1. QuikFDo[system consists of aluminum wghln 24 hours„fan missingordefeciveiem5- c-dcketandbas plate witeel and ss steel y FART EXECUTION stud,(1)stainless steel nut(i)EPDM washer Keep mater a dry,covesem and off tFe ground until and(1)bonded stainless steel and EPDM Insmlled31 EXAMINATION washer. PART 2- PRODUCTS A Substrates Inspect structure on which brackets 2. Fasteners are to be installed and verify that it will with- mann To be of meta com0atible Mt ui Foct ny a bracket C.t fAP1iJFAt-7t7R£R any adaronai l-x-dmg tnat may be ncurreed. B Fasteners should be selected for compat- 289FHarreasten Solar® hbllity with the roof deck. 289 Harrel Street,Morrisville,VT 05661 B Notify General Contractor of any deficiencies •0 C Fastener strength should exceed or be {877)859-3947 before installing EcoFasten Solar brackets. r" equa to that of the a owat)ie load of ecofastensolar.mm system.See test data at C VerTy that roofing material nos oeen h d 2.2 MATERIALS correctly prior to installing solar attachment p i , ( www.ecofastensolarcom brackets. I ' a 3 Sealant(if required by roof manufacturer). A. Attachment Bracket to be roof manufacturer approved. 6000 Series Aluminum(choose one) > 7 INSfA1-i ATION 'IA - 0 4 A uminum minter-gashing 1.CP-SQ-Swed A Comply v6.02 a -nite:'tural dray in s and project y,t SAluminum attachment bracket 2. F-t i iA� engineers retb as for location l.2 3.P-3-CSK system.Comply with Manufacturer's witten [n- 2B, DESIGN REQUIREMENTS: 4SCL"101-3 stallation instructions for installation and layout 1. Bracket spacing to be recommended by 5 L-102-3" project e--'��ineer. 6.;=102-5° I' 2. Install a minimum of two fasteners per 7.Z-101 base plate. 8.Comp Slide ' S`" 3. It Is important to design new structures or 8 Custom assess existing structures to make sure that x - trey can withsta^d retained loads . Pioneer Valley PhotoVoltaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 INSTALLATION CREW OPERATING POLICY This policy applies to all PV Squared employees in Massachusetts, but is particularly directed at those involved in the installation of solar electric and other renewable energy systems (licensed electrician, learner/apprentice electrician, licensed constructor supervisor, supervised carpenter and laborer). When engaged in this work as an employee of PV Squared on a IN Squared project site, activities of PV Squared employees are covered under the General Liability Insurance maintained by the Cooperative. It is the intent of this policy to provide clarity to installation situations where the applicable codes and regulations are unclear, ambiguous, or silent. It is possible that a municipal building or electrical inspector could interpret the codes and regulations in a manner that differs from what appears here. But this policy sets out, in writing, how the cooperative interprets legal work requirements and unclear details. It is an internal consensus working model, intended to be revised and improved from time to time. As a general matter, a city's or town's Building Commissioner is charged with enforcing the State Building Code, Plumbing and Gas Code, Electrical Code and Architectural Access Code. The commissioner addresses concerns about the safety, accessibility and security of construction of homes and businesses. The commissioner also enforces zoning bylaws. In accordance with Massachusetts General Law, employees of the cooperative who perform electrical tasks and activities must hold a Massachusetts journeymen's electrician license or be under the direct supervision of such licensed personnel. These tasks and activities include installing electrical wiring, conduits, apparatus, devices, fixtures or other appliances for carrying or using the electricity associated with Renewable Energy Generators (electrically active solar photovoltaic modules, wind turbine-generators, hydroelectric generators, etc.). In no circumstances shall the Massachusetts licensed journeymen have more than one learner or apprentice working with him/her or under his/her supervision. Mounting structures come in a variety of configurations and have differing functional and physical characteristics. A structural component or assembly becomes associated with electrical work as the Renewable Energy Generator is electrically bonded to the mounting structure. Unless otherwise noted in M.G.L. c.143 §§3 through §§60 inclusive, all structural work defined as follows shall not be required to be performed by a Massachusetts licensed journeymen electrician: • Structural improvements • Elements of a Renewable Energy Generator's support structure that fall under a building permit (e.g., assembly of top-of-pole mounting structure on steel pole with concrete foundation prior to execution of any required electrical bonding of the support structure and associated renewable energy generator (solar electric module) to the support structure Policy it 9 Installation Crew Operating Policy Pioneer Valley PhotoVoitaics Cooperative POLICY DOCUMENT #9 Current version adopted by the Board of Directors on April 28, 2011 • Roof-top mounting support structures including but not limited to posts, stand-offs, flashings, feet, and mounting rails • Operation of heavy equipment involved in moving, hoisting, digging and other tasks • Earth work, excavation and concrete work • Manual labor involved in moving loading and unloading of equipment • Moving, hoisting, and attaching an electrically bonded panel assembly (defined as one or more assembled and electrically bonded solar electric modules) to an existing structural support designed to host the panel assembly. Note however that construction of a panel assembly is an electrical task due to the required electrical bonding activities. Repair and Servicing of Installed Equipment Repair or replacement of an electrically bonded and/or energized renewable energy generator (e.g., installed solar electric panel) will be performed by a licensed electrician or property supervised learner or apprentice working with the licensed electrician. Replacement of an installed inverter must be performed by a licensed electrician or properly supervised learner or apprentice working with the licensed electrician, if the work requires removal of AC and/or DC conduit and associated wiring that originates outside of the installed inverter (e.g., removal of external AC conduit and wiring between the inverter and point of interconnection with the on-site electrical service). Note that this activity may require a wiring permit in some local jurisdictions. This requirement also applies to the servicing of an installed inverter that involves replacement or repair of components and wiring internal to the pre-manufacturer inverter (i.e., factory installed components that were originally shipped with the inverter) even though such activity may not require a wiring permit. Replacement of an installed inverter may also be performed by a qualified technician who may or may not be a licensed electrician or properly supervised learner or apprentice working with a licensed electrician if the inverter is of a "plug and play" design. Such a qualified technician can also performed other tasks that include installation and servicing inverter-based performance monitoring systems (e.g., replacing internal communication cards, making "plug and play" ethernet connections, etc.), assuming these activities do not require creation of a new AC power source circuit to operate the communication system(s). Policy # 9 Installation Crew Operating Policy Non Electrical Work at a typical PV Squared installation: • All Material Handling tasks o Module prep and moving o Ladder lift setup o Ladder set up o Trash/recycling removal and sorting • Structural Improvements o All carpentry work • Roof Mount Array o Fall protection anchor setup and removal o Layout and mounting bases o Racking up to but not including"bonding/grounding related activities" o Leveling of racking o Sealing seams/patching roofing/additional flashing • Ground mount array o Site work, earth moving o Trenching/digging o Construction of racking up to but not including "bonding/grounding related activities" • Conduit run o Making holes in structure o Fire blocking, sealing penetrations o Stickers • Power Board o Build wall, hang plywood o Stickers • Interconnection o Stickers • Monitoring o Wifi options o Any"plug and play devices o Programming of monitoring devices o Computer based activities • Installation completion o Final building inspections o Install pictures-See checklist o Update one line and roof drawings to reflect as built o Completion checklist o Notes for others o COC left onsite • Misc o Truck Organizing o Material List, ordering o Daily check-in o Customer interaction and training activities • 4® k roof overall 480Yz" ••e:••••••••••'•%•4 k rail overall 459" k Array i,•.i•••%•4 p�•b%p,%p4 9 arra overall 4s7° 9 nYz" East *•4•• yk 04" Tor A Ai ,nu +=c Array •••i• } -Ar ±-1- 13/2 13Yi Open L-Feet on Ecofasten clan view © I I _ , n. Quikfoot bases attached ESTIMATED SILL OF MATERIALS�J r ' ' to roof structure with (2) vpail MAKE&MOMEL Na } (1 ° rall) 192" } (14' rai) 16E" (14' rail)9d" }' GRK RSS 5/16" x3-1/8" RUL I4Clear IronmgexR100 20 42" fasteners RAIL 17 Clear Ironridge%Rl 00 10 TYP. SPLICE Ironridge%RIOO splice 20 + 24" r- _111 I WIr'� T 24 < BASE Eco Fasten Quikfoot 106 "Ircl 1-1 =_I ii MOD. SunGower%22-3G0-COM 55 LTJ _i_ I L-Feet facing 1919"TYP. 11 DOWNSLOPE all 1. western T arygto be centered in roof t LI - LI Li— 1-1 - - J —� I �- Li rows but bottom. plane. \\\ �� 2. Exact framing location to be verified on as 3 interfrde ilgwith syrcesor aces avoid interfering with splices or bases. 1 I9, 0. Vnlessot assemblerwise yasedn eded are ■ ■ ■ ■ ■ ■ ■ ■ I ■ ■ stagered and spaced at 48'Oc. ll IJ lJ V lJ lJ EJ a. Mm-allowable fell span 15 6 Max.ould now ele rail xceedcmoghly 113 length 0f _ IIr■ y� IIilever is ST and I��—r jjll� adjacent span , , , `_ --� f-' , ' 7. Additional or alternative bases may be used array in response to actual root profile to comply with rail equipment overall overall 8. speciKeepfcations-at least v'a a from bases 324" 30Y'/z" _ _ Snasplices away _ _ 9. Module has G5 frame with dimensions of II Lid 1 II H ��� U II \ 10. Clamp centerline Lo be within 2'and 16" I�� Array Start Point 3 • LTJ _ bd� m of either end of The module frame. See Note#1 n. Torque Ironridge uroclamps m801n-lbs. 12. Torque LFeet-to-rail nuts to 250 in-lbs. '/ Trusses @48' O.C. 13 Roof material is asphalt mingles_ L-Feet facing mm ® I ® ® ill ® .NO UPSLow onOPE blyttom ",- " y - 1 REVISIONS O a DESCRIPTION DATE r- n o _ 1 1- o 11 - o :17 ,0B. Wohl Family Dentistry } SITE. 61 Locust Street, ' 8%4" t """ "" ',9'99 Nt Northampton, MA 01060 i /goad9 S plieRu�,-( .6 -7-/"/ nn e. Array Layout VY. John Griese EON e: 11625 City of Northampton ogre. osrovzo0 PAGE: 272 SEALe v11 xl7• MindingfNo Department 512E „"2017 5HLE1. A-02 O Plan ew Eastern Array / 212 Main Street +�"'+ Squared Solar Northampton, MA 01060 i^0 311 wellsslteet,wheB //� Greenfield.MA 01301 •% r •f design@pvsquaredcoop 413-772-8788 ft) 444 $ p'q'•**i•*i'. M roof overall 740" �.�... ' k rail overall 500Y7' } we. Array ..*QJ**•l**.j*l '�` East •I*•11 12" xa array overall 4982" k 29Y2 n� 8/4" Array l*J Open L-Feet on _--ni_--- __�� ---_ + View Ecofasten Quikfoot N 1�MM'�'�'�i� �_r�an'r_ 1 , ESTIMATED PlanBILMATERIALS bases dttaCilf`n' t0 LA ll liiii l lJ lJ 11 ll LA ll PART. MAKE&MODEL NO'. roof structure with RAIL 14'Clear Ironadge%Rl 00 20 (2)GRK RS5 5/16" x 42" RAIL 17 Clear ronridge%R100 6 3-1/8"fasteners 24" TVP SPLICE Ironridge%Rl 00 splice " 16 1- BASE EcoFasten Quikfoot094 M n n11_ _ _ MOD. SunPower 22-36000M 49 L-Feet facing lJ IJ��J� lJ lll lJ lJ LI J�IJNIJ PROJECT NOTES. DOWNSLOPE all Ii�ii7iiiiiil17iiii�iW�1 19}52"T'P. I. Eastern array to centered N-S in roof rows but bottom. jj IIIU l -- - linotioni -- ' -- — �j is pxray tot eastern iedge2 Exact naming mcauon m be verified on tea.ma 3. Slide rail assemby az needed to avoid interfering with splices or bases. �� a Unless otherwise noted bases are staggered and spaced at 4B'oC. '. _p 11 11 11 ��_ merailspania2a LiL J alanl � t.1— ►, `J blerailcantileeeris6B and Ii_ __iin_IMali_ _Ii_ii1.1.%=fi i_ 1_ _■_ IIadjacent pa�'°eearpugny � Should now lle&Inbr LJ Ll Ll ll L J lJ ll ll LI IA 7. Additional or alternative bases may be i (1 ' rail) l• i ii 1 i i 5' raip 128Y2' array roof used in response to actual roof profile to comply with rail equipment overall overall specifications. Ke at y m bases SIIIIIII II U � 307Y2 324.. a Mpleas 5amlwith memi clamL1 II II II1111 II I ■ II 4 xd1 a5 frame with dimensions of ll ll �J LJ��IJ ll lJ -- Ll LI J=lJ� lJ z^. // i.������ �a�i�i��� ,1,. Clampcenterlineto be within land le. Array Start Point J See Note#1 _1i 11nii_ iiiii_Ia II iI I of either end of the module frame. Lan lJ ll l LJ l ll lJ 11. Torque dge UFO clamps to 80 in-lbs. Trusses @ 48"O.C. i i ii i i �� 12. Torque L-Feet-to-rail nuts to 250 in-lbs. 13. Roof material is asphalt shingles. I L-Feet facing 20Yz UPSLOPE bottom I1 n II II II ■ _ 1I II 11 _1I_ row only. ilii"i`�J `i`il a 17t 60" -s- fill) _ 7i� -1,ll ll l n REVISIONS DESCRIPTION DATE + M " JOB: Wohl Family Dentistry 1 SITE 61 Locust Street, rrwI '�// 8Ya' Northampton, MA 01060 iii7eitidq_S 0jCgLCS/y 1 7 / ( Array Layout ByTITLE SIZE: JohnI Griese1 ! SUNT. 11615 City of Northampton DATE: 05/05/2017 PAGE 1/2 Building Department 3CALE' 154"1D' SHEET. q_01 / Poen Review ,r.v^ U Western Array 212 Main Street4 Squared 40044 PV Solar Northampton, MA 01060 ^+0 311 wells Street Suite B Greenfield,nnA 01301 1 �/./ design@pvsquareredmop . 4I3-772-87R8