Loading...
39A-76 (18) 39/3 76, n Ci##,r of far#hamyfan J Office of the 3Insyedaz ofnilDings Ief-j74 ft erarAir 212 Main Street• . Mass. 01060ldirtg 0 .-tt Northampton. Mass. 01060 m COMP _ . 7p How received: Telephone ( ) U e� a� Complaint No. e / / —S7 !I Personal ( ) r.,'It JAN 2 7 Date: Tan 77 19R9 Letter ' \ iLUt_ Time: A.M. /diP.M 1 DEPT.OF BUILDING INSPECTIONS _ NORTHAMPTON,MA.01060 Telephone No. Sin'(0q eb:k' Complainant's Name: Northampton Planning Board Complainant's Address: c/o Office of Planning and Development, City Hall Complaint received by: DEPT. OF BUILDING INS, a".OH3 212 Main Street 3 VIOLATIONS OF: Northampton, Mass. 01.OFO )G Chapter 44 Zoning Ordinances, City of Northampton D Chapter 802 As Ammended Mass. State Building Code ❑ Sanitary Code, Art.2 Complaint reported against: Name: Northampton Car Wash and SpeeDee OiI Change Tel. Address: 492 Pleasant Street Location of complaint: above Map# 39A Lot# 76,70,73,27,28 Signature of Complanants: 0t---/yo gym• IIe. ,.• Nature of complaint: By: R. J. Pascucci, Boarda •Secretary Illegal si gas,. Investigation: Yes ( ) No ( ) Investigated by: i.e. 39A- -73 - - ` -. , _ t?\iiiligi Robert J. Duca Post Ofce Box 1219 ® Consultin En ineer Gend on Drive g g � Wells, Maine 04090 OEWWWMPTINUp50 207-646-8620 City of North Hampton John Glenowicz, Electrical Inspector RE: Speedy Lube 19 Fulton Ave. North Hampton, MA. 1 x I hereby certify that the vent systems as installed at the referenced project, provides for six air changes per hour at the floor level of the pit, and four air changes per hour in the bay and office area. Signed and sealed this 20th day of March, 1989• oa ROBERT le ii 1 3 DOCA //L •Ma 24584 0 104):/ I IS t1 e BY Robert J.n Duca, P.E. /fON -, _ Registered Professional Engineer '/� Cc monwealth of Massachusetts