07-035 (2) 310 CMR: DEPARTMENT OF ENVIRONMENTAL PROTEC I ION
10.99: continued .
F t'CCs DEP File No. 246- 389
(To be provided by DEP)
Form 8 •
Commonwealth City/Town_Northampton—
o Maaxachvsettr
Applicant nave"orO_a- eijP:U' )1',w"'-
Assessor's Hap it Parcel # Map 7, Parcel 35
Certificate of Compliance
Massachusetts Wetlands Protection Act,G.L. c. 131, §40
and
The City of Northampton's Wetlands Protection Ordinance
From lr pton oLnathQ n mmiIssuing
rortbanppon conservation commission Westfield Executive Park,
53 Southampton Road
TO c/o Tighe & Bond Westfield, MA 01085-5308
(Name) (Address)
February 8, 1999
Date of Issuance _. ..... _
Northampton Conservation
This Certificate is issued for work regulated by any Order of Conditions issued to
Commission/Office of Planning & Development July 25, 1996
dated
pard issued by the__,I3orthampto Consetvatio ommicsion ...
I. IBI It is hereby certified that the work regulated by the above-referenced Order of
Conditions has been satisfactorily completed. See Exhibit "A" for ongoing condition
not to expire with the issuance of this Certificate.
2. ❑ It is hereby certified that only the following portions of the work regulated by the
above-referenced Order of Conditions have been satisfactorily completed: (If the
Certificate of Compliance does not include the entire project,specify what portions
are included.)
3. ❑ It is hereby certified that the work regulatedby the above-references Order of
Conditions was never commenced. The Order of Conditions has lapsed and is
therefore no longer valid. No future work subject to regulation under the Act may be
commenced without filing a new Notice of Intent and receiving a new Order of
Conditions,
(Leave Space Blank)
411/94 3010 CMR-429 429
310 CMR: DEPARTMENT OF ENVIRONMENTAL PROTECTION
0.99: continued
4. ❑ The certificate shall be recorded in the Registry of Deeds or the Land Court for the
district in which the land is located. The Order was originally recorded on
tk,od ek ki_45/G (date)at the Hampshire County Registry of Deeds
Book... 4/514q , Page s c
5. ❑ The following conditions of the Order shall continue: (Set forth any conditions
contained in the Final Order,such maintenance or monitoring,which are to continue
for a longer period.)
Issued by Northampton ConservationSommission
Signature(s)
1
_.- ic 7
When issued by the Conservation Commission this Certificate must be signed by a majority of its members.
On this__
25th dayof January 19 99 before me personally
Mason MA-rankk
ippeared , to me known to be the person described in, and who
executed,the foregoing instrument,and acknowledged that he/she executed the same as his/her free act and
deed, Commonwealth
otnhto`
to
/�W'LP Connon eel n rsacbusetts
Notary Pub
/ My ,rm : sruu Nit
1/09727
Detach on dotted line and submit to the Northampton Conservation Commission
To Northampton Conservation Commission Issuing Authority
Please be advised that the Certificate of Compliance for the project at
File Number has been recorded at the Registry of _and
has been noted in the chain of title of the affected property on 19
If recorded land,the instrument number which identifies this transaction is _.....
If registered land,the document number which identifies this transaction is _
Signature Applicant
4/1/94 310 CMR- 430 430
EXHIBIT A
DEP NO. 246-389
Ongoing conditions that shall not expire with the issuance of this Certificate of Compliance are
as follows:
-- Maintenance,to include mowing and removal of woody vegetation,shall be
allowed beyond the life of this Order of Conditions.
Specifically, the following maintenance tasks will be performed by the City on an annual basis:
--- Mowing of the upstream slope, downstream slope,toe and emergency spillway
areas of the dam. Mowing must be done not less than once per year and not more
than four times per year and will extend to the pond level on the upstream slope
and at least twenty(20)feet downstream of the toe of the dam and around the
stilling pool. Mowing within the emergency spillway located on the left end of
the dam, facing downstream,will extend from the pond level to the limit of the
cleared area downstream.
---- Removal of debris around the dam's normal inlet structure and outlet structure
and removal of sediment from the stilling pool located at the discharge of the
outlet pipe.
---- Operation of the pond drain gate valve at least annually to insure the valve is in
good operating condition.
---- Repair of the access road from the Moose Lodge to the darn, as needed.