06-051 (13) File N MP-2007-003I
APPLICANT/CONTACT PERSON MASSACHUSETTS ELECTRIC COMPANY
ADDRESS/PHONE 548 HAYDENVILLE RD (413)582-7457 0
PROPERTY LOCATION 548 HAYDENVILLE RD
MAP 06 PARCEL 059 001 ZONE SI
THIS SECTION FOR OFFICIAL USE ONLY:
PERMIT APPLICATION CHECKLIST
ENCLOSED REQUIRED DATE
ZONING FORM FILLED Olr
Fee Paid O tfl '3- 5
Building Permit Filled out
Fee Paid
Typeof Construction: ZPA-INSTALL ABOVE GROUND FUEL STORAGE TANK
New Construction
Non Structural interior renovations
Addition to Existing
Accessory Structure
Building Plans Included:
Owner/Statement or License
3 sets of Plans/Plot Plan
THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON
INF ATION PRESENTED:
Approved Additional permits required(see below)
PLANNING BOARD PERMIT REQUIRED UNDER: §
Intermediate Project: Site Plan AND/OR Special Permit with Site Plan
Major Project: Site Plan AND/OR Special Permit with Site Plan
ZONING BOARD PERMIT REQUIRED UNDER: §
Finding Special Permit Variance*
Received&Recorded at Registry of Deeds Proof Enclosed
Other Permits Required:
Curb Cut from DPW Water Availability Sewer Availability
Septic Approval Board of Health Well Water Potability Board of Health
Permit from Conservation Commission Permit from CB Architecture Committee
Permit om Elm Street Co - s- on
�...1_ / 6
Signature of Building Officio Date
Note:Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning
requirements and obtain all required permits from Board of Health,Conservation Commission,Department
of public works and other applicable permit granting authorities.
* Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact the Office of
Planning&Development for more information.
•
File No PO93/
Please type or print all information and return this form to the Building
Inspector's Office with the$15 filing fee(check or money order)payable to the
City of Northampton //�
I. Narne of Applicant:,M+ AhcAZi4v5e Drr '.'�L�7214. �A Y�ATHark Ai 6210
'$ F-N^1 ire JILLt �RMdt 2_-hse7
Address: ��n A(4Q(1d AM�e�Tetephone: 4/3�- SS2- "z45 7
2. Owner of Property: AIACCA C 44,.1 SE-r1S E Lr. i3A MAT cr•kAc_ 6 WA
"344er ,de✓et)
Address: 543 644VOesidiLt.4 PO , f loan44*lPt3.1Telephone: 4a 3 - Sf}Z- 74S'7
3. Status of Apptiicc7ant: Owner x Contract Purchaser Lessee Other(explain)
4. Job Location: 4k i4 4_„aj ArerA _ ..
�^�- p# � rt
Datr7s�`iS � hi4
`— d erJ 4911101_ 7tare - :•
ttainxito aea sto v tion Rtt s35istac 'tom _
- „ -=..� {rtitnL EPJN Y_Tf1EEGfi4DINGIEPARTAtJag ._ =v '.
5. Existing Use of Structure/Property: in tilt , OFAr'•c+ 4ataccRZ46e ft-z. ..�
uef4-1 ct of A n €i at-,e er,
Set
6. Description of Proposed Use/Work/Pmject/Occupation: {Use addttional sheets If necessary): 'TTAcUEt)
Wo¢K Some/Argy
JagStau 67000, 642r_o.J Aso✓ar_ tc leo vAlt P4F ?a°zez n
Pt act_ ,c'a S-Parz 4 C VA,/F. Z-1 ee.v0e7 Ytrvpr I-uez-
1yr�A,rtie t4JU/P4/e-ttiC 4,0 F✓ez /wNlzoer,✓S sysrar .
7. Attached Pians: Sketch Plan .tc Site Plan Engineered/Surveyed Plans
8. Has a Special Pernit/Variance/Finding ever been issued for/on the site?
NO X DON'T KNOW YES IF YES,date issued:
IF YES: Was the permit recorded at the Registry of Deeds?
NO _ DONT KNOW
IF YES: enter Book Page, and/or Document
9.Does the site contain a brook, body of water or wetlands? NO X,._ DONT KNOW YES
IF YES,has a permit been or need to be obtained from the Conservation Commission?
Needs to be obtained Obtained ,date issued:.. .._.....
(Form Continues On Other Side)
W:VkClenemeleUR.N151nri8imi16aildinghlsnecioan+mg2vmii-Applimissn waivcibe 814120.^4
10. Do any signs exist on the property? YES '2( NO
IF YES,describe size, 5. I Q,
type and location: tlyan 1 S (i.P?rote �j 0.6��? r yl
121 tom t7 $ -1-.,-(-1 O!! .� !! ( 1 .
o ,
Are there any proposed changes to or additions of signs intended for the property? YES NO V
IF YES,describe size, type and location:
11. Will the construction activity disturb(clearing,grading,excavation, or filling)over 1 acre or is it part of a common
plan of development that will disturb over 1 acre? YES NO )e
IF YES, then a Northampton Storm Water Management Permit from the DPW is required.
12. ALL INFORMATION MUST BE COMPLETED,or PERMIT CAN BE DENIED DUE TO LACK OF INFORMATION
This column reserved
for use by the Building
Department
EXISTING PROPOSED REQUIRED BY
64. Ct44N601-') ZONING
Lot Size
30.37 CI Cis S 3-0,87 aces$
Frontage
41,4, r 44,4 fT =
Setbacks Front 'GO 1 b 0
(re Te Side L• no R: Ilio L: '"�p R: \w R:
yMAi.t gLDf,�
Rear 1y1$ ZETc2-4ti4 1COS
Building Height - - -
t FT 1 $ F7
Building Square Footage yv.nv+ t43zo 1 -
rosuicC r)$o
t,ml.wC t-sw —GT-At 37 4`o0 _
%Open Space: (lot area
minus building E paved
Parking Nal 37c) i./entrly -
#of Parking Spaces _
k1 I 1\ 7 _
#W Loading Docks _
I
FII: -_- ..
(votume B location) — -
13. Certification: I hereby certify that the information contained herein is true and accurate to the best of
my knowledge.
Date: 1I I2 1t)Ce Applicant's Signature A-Pr/111 ITao 7scC PkiaTIAG 12-
NOTE:Issuance of a zoning permit does not relieve an applicant's burden to comply with all zoning
requirements and obtain all required permits from the Board of Health,Conservation Commission,
Historic and Architectural Boards,Department of Public Works and other applicable permit granting
authorities.
W:IDocamemnWO[uncioagmaRBmieing-Inspecionzoning-Pram-AppbeationpassiveAoc 814n004
•
nationalgrid
September 13, 2006
City of Northampton
Building Department
240 Main St
Northampton, MA 01060
National Grid
Mike Miller, Facilities Engineer
Facilities B-166
300 Erie Blvd W.
Syracuse,NY 13202
Re: City of Northampton Zoning Permit for Diesel Fuel Storage Tank
Northampton Building Inspector:
Massachusetts Electric DBA National Grid is currently in the process of installing a 6000 gallon
Aboveground diesel Storage Tank(AST) at the 548 Haydenville Rd facility in Northampton.
The tank is replacing an 8000 gallon Underground diesel Storage Tank (UST)which has recently
been removed. The 8000 gallon gasoline UST is not being replaced.
The facility at 548 Haydenville Rd is used for utility crew operations and offices. The 6000
gallon diesel fuel AST is used exclusively for utility crew truck and equipment fuel. The site
was selected for a tank replacement because of the strategic location of Northampton to provide
a reliable fuel supply for utility repair crew trucks in the event of a widespread electrical outage.
Attached are documents describing the site and the proposed new AST construction:
1. Zoning Permit Application and check for filing fee
2. Northampton Service Building Site Plan (site overview)
3. Northampton SPCC Plan(which identifies old and new fuel locations)
4. Proposed Motor Vehicle Fueling Station Layout, SK-1 I2-)
5. Northampton,General Scope of Work (z)
The contractor for this project is Cyn Environmental Services which is based in Stoughtan, MA.
Paul Reidy is Cyn's Project Manager for the tank project. Michael Miller is the Project Manager
for National Grid. Mr. Reidy has contacted the Mr. Azbrook of the Building Department. Mr.
Azbrook forwarded the Zoning Permit Application to Cyn. Ms. Mish of the Planning
Department directed National Grid to submit a Zoning Permit Application.
Please contact Michael Miller at(315)428-5637 or cell phone(315) 569-3809 for questions
related to this application. The local contact for National Grid at the Northampton facility is
James Neveau, Environmental Engineer and he can be reached at(413) 582-7457.
Respectfully sub ted,
Michael Mil er, Project Engineer
JY NATIONAL GRID PETROLEUM STORAGE PROJECT
Site:Northampton,548 Haydenville Rd, Northampton, MA 01060
General Scope of Work:
• Remove one 8000 gallon double wall diesel fuel UST, fuel island, canopy, piping,
conduit and equipment.
• Provide UL 2085, 6000 gallon AST on concrete pad,with remote fill, single
diesel fuel suction I hose dispenser.
• Install Owner furnished EJ Ward fuel management system with Contractor
provided programming and startup.
• Connect to Owner furnished Veeder Root console with Contractor provided
alarms, acknowledgement, sensors, Ethernet card, programming and startup.
• Provide electrical conduits with power, communications and controls wiring.
• Provide bollards,concrete fueling apron one side, and asphalt paving.
• Provide new base and new light.
• Provide fiber optic cable through new conduit from fuel island to building and
excess cable for Owner's use.
• Owner shall make indoor connections for Veeder Root and EJ Ward FCT to the
LAN.
y 0¢sZ z
verx,11,V,F1;,vs,
•
r
WESTERN MASSACHUSETTS NORTHAMPTON
NATIONAL GRID PETROLEUM STORAGE PROJECT
Site:Northampton, 548 Haydenville Rd,Northampton, MA 01060
General Scope of Work:
• Remove one 8000 gallon double wall diesel fuel UST and one 8000 gallon
unleaded fuel UST,fuel island,canopy,piping,conduit and equipment.
• Provide UL 2085,6000 gallon AST on concrete pad, with remote fill,single
diesel fuel suction 1 hose dispenser.
• Install Owner furnished EJ Ward fuel management system
pr. . • . c • . - . ;.
• Connect to Owner furnished Veeder Root console with Contractor provided
alarms, acknowledgement, sensors, Ethernet card, programming and startup.
• Provide electrical conduits with power,communications and controls wiring.
• Provide bollards,concrete fueling apron one side, and asphalt paving.
• Provide new base and new light.
• Provide€,ber Opti--eahle CATS cable through new conduit from fuel island to
building and excess cable for Owner's use.
• Owner shall make indoor connections for Veeder Root and EJ Ward FCT to the
LAN.
dccuaiwpiA;YE
.sissirosits !VW.'
•
r w e
It
WESTERN MASSACHUSETTS NORTHAMPTON
Niagara Mohawk
A National Grid Company •
Michael A.Miller,P.E.641 0.411
Engineer, Facilities
300 Erie Boulevard West
Syracuse,NY 13202
Phone 315.428.5637 Cell 315.569.3809
Fax 315.460.1306
michael.miller@us.ngrid.com
4 . /
.ctcsrrs .?wtssxan :mamas. «mm�c �sty;:.,ruaL:„:,xaz.+�:U:.:+,._.a:�u:;wrru :sa'�"
,.._a;;excne��✓ spa ....._.., . ., ,...,nasi�.�.v� .. ?.rte _ .�„ �r,vr . .,.<„ ,, .,_;�,.,;.,sn.,� -P...o r.��L;J[asKenu:ar.
Wrxl.. a ......ethen shed
lake precedence aver scaled dimensions.
6 Tu era.ine is mooed in conycroa .Nn
• In.Vmrel .. No e
o,mun.a.nnwl Ilse..press ether
pm-mimeo of CYN Envmmmltl Services
We Browing .Noll riot be used tot cmtl-
ruction W.aosn ata approved by the
projnt mmol..
PROPOSED LOCATION OF THE NEW EJ WMO _ EDGE OF ASPHALT
NEL MAWDEMENI SYSTEM PEDESTAL. 1 r ---
ELECTRICAL CONDUITS SHALL PENETRATE
CONCRETE PID UNDERNEATH PEDESTAL --
I
PROPoSEO MFA LIGHT LOGMk1. BASE TO Et ANTENNA POLE .- 6,000 GALLON ABOVEGROUND STORAGE mix NO IPP. ---REVLON • DATE
24'ABOVE FINISHED GRADE - 1
_...� 1 ' TANK AND EOUIPMEM PID REVISIONS
PROJECT: --
\ y¢_ PROPOSED REMOTE Fll. LOCARON
nationalgrid
I
[_r—i .`Q _g 12' 6' LOCATION:
NEW GASBOY DIESEL SINGLE HOSE DISPENSER ----r 1 . -._0 8_ 6' ( 548 HAYDENVILLE ROAD
__) i QC 1.16' 25-6' - NORTHAMPTON, MA
r 6' DIAMETER CONCRETE Cgn__ FlllEO BOLIMpS4 FEEL ( 1YPIC0. )LOGA1pNL1NE REPRESEMS 0F MPMLT TRENCH PAIDI. C , � II
/ WITHIN THIS ZONE ARE CONDUITS RUNNING r 1
10 THE ANTENNA POLE. i
—..._.i _ _ _ yI / Cm
APPROXIMATE LOCATION OF PARKING SPACES- 1 I Ir 28 0'OVERALL EQUIPMENT PID i OnWfxOna SIMS
•, II 11 I j
I / A
I
\ , 1 zs'-D' DANE APRON L
® IW TOSCA DA 02
VE
'� 1 P.O. Box 119
1 STWCHTW. MA @0>2
I liL. (700) 242 - 9818
S i I TEL (781) 341 - 1777
FAX (781) 297 - 7963
I
1
I
I I DRAWING TITLE'
II PROPOSED
MOTOR VEHICLE
r� FUELING STATION
��,/ LAYOUT
<'/ LALMN:
LWDSCPPE MFA
•/ CHECKED::
-
/ NANO PPP
:0
WENGn
N0xaEWIaI/G¢xr tuann
n"
;® 5K-1
L
*Men Amensicen on Paw hairy.Nice
IN.w...>nN 0,.' melee eM...ai
This&o.^9 i.—S n emlattN.it
the is li. i.o without
the awns wN �enN
.m ul Cm Fa.Y.mwtIS Sant..
IM.Oink"YM not W weed W tonal-
ruction popes Iola appro..d y N»
PROPOSED IOGDDI OI 1I MW EJ WARD ww• I..wawa
FUEL
MINIUM SYSTEM PEDESTAL.
EDGE 0(ASPHALT ._-_ _. _-___--_._wawa.___
1411/11(
ELECRICL CONDUITS SNWL PENETRATE ._1 !
CONCRETE PID UMERNEAAI PEDESTAL -..
1
-ONIFIN2A PDC / . - 6,OW CALON 1BOYEGROIWD STORAGE OM 110:1IPP REN9Q1 1 DATE
PROPOSED AREA IGH LOCATION. RISE TO BE - / I 1
2e'ABOVE FINISHED CHIDE _. REVISIONS
.TANK AND EQUIPMENT NO
PROJECT
( `. • / / )- PROPOSED REMOTE FILL LOCATION
�r I N' l
''' c. • t , nationalgrid
I I 31 �
1 I
(iI LOCATION
NEW GASBOY DIESEL SINGLE HOSETENSER --_--__.4 r - f` .36* 54B H0.IDENNLLE ROAD
WW-
-, / f -O A 25_6. NORTHAMPTON. MA
1 I ._) 1
i i 4 FEET( • ) -i 6 DIAMETER CONCRETE
FILLED WORDS 13-0. CIA
I
/ 1 !OASIIFD LWE RPHESENTS DG:NtPgOMWAiE I % I I
LOCATION OF ASPHALT TRENCH PATCH. I
N DRS ZONE ME CONDUITS RUNNING . I 1 !
MNN
PPPROMWAIE LOCATION a PARKING SPACES---.� TO THEMEMPoIE. .—waw a— __wawa-0.1 i 26 0'OVERALL EQUIPMENT POD-j (.m MOS SEANCES '
CYN
�Ta NAyo&i vIct RI ' I /
o�,o� _I ENVIRONMENTAL
11 �__ -_� SERVICES
< I I -
\ 1 f TS'-t'DRIVE APRON
\ I I 100 SC In1v(
I 1 STOUGHTON. MA 02072
I I LEL (200) 242 - 5818
\ I I TEL.(761) 341 - 1777 '
1 11 PAY(76!) 297 - 7963
1
I
I
I 1 1 DDE:
PROPOSED
/�/ I MOTOR VEHICLE
FUELING STATION
I LUT
LANDSCAPE AREA
DRAIN: F.1P.AYO
CITE CIC .
/// �IN�)/ Ir u — 7
J) iilpVVil� • , rano 9s AMMOEauwEw LAYOUT:
SCALE: I/1 6'. -. I'_0"
WANG NO.
/'14./
MKT AUGUST 4, GB ..
r
L
2 ,
iO-£0662-H. I 2 I 3 I 4 I s 1 e —•-
fi --
USG!an re Ten
I\ III A
1 la
i �- I H ! 1 \ ;; ;
1i i 1 w; ,
o
'' K,_c----1-611111.? 1
- i. I ,-\ /' , _ z////// / /m /
-- d
///r i Awzo:a e `cam x 8 .d
/r ' tram so i i
e I Y
I ' '/ P ?*
) % , n 4e I
.. to S W1
% / /i 16 M „ � G�
/ -.
, 111 f
•
6 r
P you „
9 u, } / / 7
N / Y
a e o &I ,ao - _.—�_.__.._.- iso _ �,a' _ �1 f:: :I,rrownaen
/g : o �� ,
1 � s3 g
i
D
u DR.wr./C floc.ft, u Moft,od 0
NEW ENGLAND POWER SERVIOE COMPANY
ATs
SRIC,RR COMPANY
N ,r+ gyp, NORTHAMPTON JEEV/CE OU/LO/NG S
Ab S/TE PLAN
/,
iti
° E { 'F{ �/^ ..MnxH rmz-
111
l
/ \\ \ c
,90 43, +EwaS;11- C-'>`:
_ -.>�xPP .� �>y V ti x' VAA.,� V
MAINTENANCE � �\\\Q 11;1'.
,'����
GARAGE /n:,„,.< t'.� A`��.��
I HAZARDOUS wise_ rORAGE 6 AAA '�.;,- :::.-z..-"-
14 1..,..-''_-:
`y� ,
livacAct f suw likb/A4 \� \ -mx 'AZ- `•'�,~ ^.S'
1 / owz, .W vvv v
1N
vvv
al
bp wr 1 actin
R --F
.I. ,I�AAAN A
�. TA ! 1/ As ;III
'` AMPS GARAGE AREA VAA A'\\.\\‘‘‘
A:� �
•
(125 r7T Peery1-14) 111) 111 ( 1 ;:,v�v�
K / v vvgv`
) 1vvyv
�I
is-
/-- a90—.,.o tees \ \ \
\ _ OFFICE AREA k i
LP Y/.NB
N.
/ ^. 'rxq\ r7b Nsj 4Ru[v\
111 m
v
jx \ rRANNO9MCM f—' / OC6/IP CM MIN
�� / / �r e v
‘..—./ a a Lm n A nu ` 8 wn UTILITY volt
.I ocs/w A9 e� acln POST
II
} `
0,„,. rcae
v
II
_ I 14evJ _/... -'—5901 /
__ _ I
III 1-
\ V t __ ' !�.3
` °j'° Ccae:a0 COP
SCALE: ,'= BO'
o..�.LP uN,rcp
t , __ (-iso /" rx. 07027/ FIGURE N0.2
HAYDENViLL ROAD SITE PLAN
ri [ A(OVA
MASSACHUSETTS ELECTRIC COMPANY
RTE. g A
-A ._ T N„B NORTHAMPTON SERVICE CENTER
----------bc2/< NORTHAMPTON, MASSACHUSETTS .
SPILL PREVENTION CONTROL AND
COUNTERMEASURES — S,P_C,C
457
30/0
2
ARCHIVE4 N
\ \N266V 117SiiF