Loading...
06-062 (10) Y y.. a ,Ar • • . . 5 • W � ' 3301-IAYDENVILLE RD - -' BP-2007-0856 lits#: -,.COMMONWEALTH OF MASSACHUSETTS Map-Block:06-062Ci.-;TY OF NORTHAMPTON Loth-00-001 PERSONS-CON/TRACI4853 WITH UNREGISTERED CONTRACTORS Femut: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: BUILDING PE IT Permit# BP-2007-0856 -:"- -- - Proiect# JS-2007-001411 37+,-C'asr22800009- —. _.._ .. Fee:$201350 -PERMISSIONIS HEREBY GRANTED TO: OnSt Glass: Cprttatcenr: License: Ilse-Group_ -. - _. RENE:LFJCIER - 034964 Lot Size(sp itk--- OtYleei.:--iMELERKFSTRICK J Zoning.SR ;:- . Applicant RENE-LUCIER --. .-. at:330:1 YDENV(ELE RD - -... . -.._ Applicant f_ Phone: Insurance: 42PITEA MITTS- itOS INt -1T -- . _..__., 413330-1112 -- _. WC WEST SPRINGFIEL`GIVIAGIO = ISSUED ON:S/2/20070:00:00 TO PERFORM THE FOLLOWING WORT:CONSTRUCT 2 STORY 3 UNIT TOWNHOUSE WlGARAGES(PORCHES(CONSERVATIOt.fRESTRICTION LINE WAS MOVED BASED ON PB DEC) POST THIS CARD WCi YIS VlStROni TIIIL STREET _ .._ Inspector of Plumbing --TTorospeto' iMiriug- b.PW � Building Inspector - EiRaall;' >3 Underground: ___ Sym )liftMdetenc /� ee,,�� Footings:CNC-LI-50- Z ,y Rough,.La'iket744C Rough 1 "0 House# Foundation�� rt ** t p[rvel ay Finan ..— / Z—O -®_•'� ,...14- :K40' Final: - Final: $ tc" _,Dic" a-;7-p(4'—Lits- Rough Frame: OK Ffr?vlr\ rrfm ci 77 Gas:. FireDenartmeiet :1 Fireplace/Chimney: Rough e- F�.b-��ti:. - Insulation_ 1 - _. Uait B FI,JAc. el< Fevoi ^7 Final: amok �Jc �} , - Final:_S4€C: $4 A OFf 3o 2M�,,, The _- i? t - _. ALS° PENDW .:_FLA i.,Qi Dc P7' <f/$N^'G THIS PERMIT-MAYSEREYOKEB 3Y Tb.CITY'OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES ANDRECVLATIONS Certificate of Occupancy nature:..._. - ,ee Iat. .= _ -- V Fiwi ifi`Ic U _,. . ` 3 e's Thi T:-- : rae R Building -512/2007000:00 =: $201390860(872 212 Main Street,Phone,(413#-587-1240,Fax: (413)587-1272 Building Commissioner-Anthony Patitio vm gl • �0_7 w/p..A1 ca oti 1/4.) N) t� U File 4 BP-2007-0656 APPLICANT/CONTACT PERSON RENE LUCIER ADDRESS/PHONE 42 PHEASANTS CROSSING WEST SPRINGFIELD (413)330-1112 PROPERTY LOCATION 330 HAYDENVILLE RD MAP 06 PARCEL 062 001 ZONE"S R THIS SECTION FOR OFFICIAL USE ONLY: _PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out alt 1s 1 / ps Fee Paid / Typeof(;gnstmction' CONSTRIIG'C 2 STORY 3 UNIT TOWNHOUSE W/,,, 'ARAGES/PORCHES New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/tsoStatementPlns/ oLicense D34964 /i wt o 3 sets r/ Plans Plot Plan :4 THE Et OWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INF ATION PRESENTED: Approved Additional permits required(sec below) PLANNING BOARD PERMIT REQUIRED UNDER:§ , Intermediate Project: Site Plan AND/ORSpecial Permit With Site Plan /�R'"'troa"� Major Project: Site Plan AND/OR Special Permit With Site Plan{{ 0.64p°r cO✓fa -{lOn/ ZONING BOARD PERMIT REQUIRED UNDER: § *.VOC/7oa) Li Anis Finding Special PermitVariance*,..... _.........._ LAS Ago oIca Received&Recorded at Registry of Deeds Proof Enclosed £4s4.,0 O.C/ Other Permits Required: /1)y'/.✓nrNG iralif Curb Cut from DPW Water Availability Sewer Availability AFElsitti Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm S t Commission al dal Signature ofe ofBuild Dat. Note:Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A.Contact Office of Planning&Development for more information. \ Versionl.7 Commercial Buildin_Permit Ma 15,2000 in l ' : r.- / . City of Northampton 1,i 3}. Irl= ' t. (011uilding Department it , s' - ".'... �_ :,-/ ilt. \ ik 212rMa'n:Street '- xt . �'r� Room 100 c _ rG..- s «-, Norttiampt5n, MA 01060 h � r6-_ "' phone 413=587-1240 Fax 413-587-1272 yrs=y `.- t1ii ?� f APPLICATION TO CONSTRUCT,REPAIR RENOVATE,CHANGE THE USE OR OCCUPANCY OF,OR DEMOLISH ANY BUILDING OTHER THAN A ONE OR TWO FAMILY DWELLING SECIIONi3ffEINFORMATIOR — - - - - - t7i+ropertv-Addres _rssec6onto-Eetompiefedtyoffrce- 330 Na it1✓oI-4 r+-DA1 '' - O _ .-..�a°, ,._� unit y � . _ ,. 1 opeont cit. of 711 /V dal:,_ K . - ��= � I„,_I--ET 4Distric _ J - .03.Mader x:4 SECTION 2-PROPERTY OWNERSHIPfAUTHORlZEDAGtiNT �f� 2.1 Owner of Record: I fira,fu c - mtt�'1 ec /l o It.) r8 It ronrA,.o.,jpfq,✓ olodo Name(Print) Current Mailing Address: NII- f14 _5 - sD Signature Telephone 2.2 Authorized Agent: I R = LUg�liate I 42- fxkrTS CAI , i _, I o e Name(Print) f off( /' �Y Current Mailing Address:f2 2,. Signature �A AK e.1. .4-t". - Te `i'l J L348coo /� ) 33o 1 1 tZ C� Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be ± Official Use Only completed by permit applicant 1. Building /Ra (a)Building ennitFee i 2. Electricali (b)Estimated Total Cost of - 6660 Construction from(6) 3. Plumbing i a mm p Building Permit-Fee 96/ ?r/4 o 4. Mechanical(HVAC) 2 1 Oona t7- (2 .A /87)1X Sd 5. Fre Protection 6 Total A(1 + +3+4+5) 27£3 Check Number 6�- // 9o9 ye, /// Q This SecdonForcial Use Only (,e'( (/ 7 uS if _g.Perm int I-- - TY3fe' Issued Signature: Building Commissioner/Inspector of Buildings . .Date Version!.7 Commercial Building Permit May 15,2000 , SECTION 4-CONSTRUCTION SERVIcESFSPROJEGTS',CESS THAN 35,00b CUBICFEETOFENCLOSEDSPACE ' , ' -:i - Interior Alterations ❑ Existing Wall Signs ❑ Demolition Repairs 0 Additions ❑ Accessory Building 0 Exterior Alteration 0 Existing Ground Sign 0 New Signs 0 Roofing Change of Use❑ Other 0 Brief Description ''Enter a brief description here. Of Proposed Wert g ? (2 $J1\, n a g-rc' S SECTION 5-USE GROUP ANOCONSTRUCTIOtFT.YPE-, ,. -, USE GROUP(Check as applicable) CONSTRUCTION TYPE A Assembly A-1 0 A-2 0 A-3 0 14 I 0 A-4 ❑ A-5 0 18 I 0 B Business 0 24 0 E Educational ❑ 2B I 0 F Factory 0 F-1 0 F-2 0 2C I 0 H High Hazard 0 3A ❑ t Institutional 0 1-1 0 1-2 0 1-3 0 38 0 M Mercantile 0 4 0 R Residential A R-1 0 R-2 0 R-3 0 5A 0 S Storage 0 S-1 ❑ S-2 ❑ 58 I ❑ U Utility ' ❑ Specify.1 —_J M Mixed Use 6 Specify .. S Special Use 0 Specify.r t COMPLETE TISSECTIOKIF:EXGSTING BUILDING U DERgol1d RENOVATroNS,AOOITIONSAND/OR CHANGE IN USE Existing Use Group: I Proposed Use Group: Existing Hazard Index 780 FMR 34): I Proposed Hazard Index 780 CMR 34):I— SECTION SBUILDING NEIGAFANDAREA BUILDING AREA EXISTING PROPOSED NEW CONSTRUCTION �' "" �'' "'� > g , Floor Area per Floor(s0 n;-,58y s x T� er "eatrztegii§Foiii-Siricrreflizivr, ',,,a14" 4n. 4e , .—._ te 0 Total Area(sf) Total Proposed New Construction(sf) s = -- x, -r $..;.. --utztegitiddi-1t-r18'151imer 1T-7,,, Total Height(ft) _ N'. rc`' . :: ._ _sue-a .-_ w -b ; Total Height ft r - e" 4 z.c3 p�.S 7.Water Supply(M.G.L.c.40,§54) 7.1 Flood Zone Information: 7.3 Sew a Disposal System; Public g Private 0 Zone' _ Outside Flood Zoneg Municipal .4 On site disposal system I Version 1.7 Commercial Building Permit May 15,2000 a4 WI I.V. Existing Proposed Required by Zoning This column to be filled in by Building Departmeenpntt/J Lot Size I ,c C Ac aer S r /quits goo P .,,wr;. Frontage ?ii. 07 i 2/ 9. OT H //20 A Setbacks Front WO 46.-11 17 c Side L:'�p! Rill- L1 R:�I ,I 7S�i ..125 Rear Jre• ; 1.. i imldmgHeignt :941.5" 2c7 i„ / -.. Bldg.Square Footage I nn Open Space Footage % -- (Lot artminus a mimbldg&paved I/091 /0 T4 lIV! � i . parking) #of Parking Spaces • I b1 I IX i _I Fill: ' (volume&Location) l i • A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO 0 DON'T KNOW 0 YES 0 IF YES, date issued: ,S 31 0 IF YES: Was the permit re orded at the Registry of Deeds? NO 0 DON'T KNOW 0 YES 0 IF YES: enter Book • g 7 0 Page, 9 and/or Document A' /6 V 5 0 B. Does the site contain a brook, body of water or wetlands? NO O DONT KNOW O YES :4 IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained © Obtained (�( , Date Issued: : D/a-9l1 d S �' �/ �( ,..aril Oa rt"_vwir/.ott Ot' C. Do any signs exist on the property? YES O NO IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES © NO �-r�j IF YES, describe size, type and location: j E. Will the construction activity disturb(clearing,grading,ex vation,or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES O ' NO IF YES,then a Northampton Storm Water Management Permit from the DPW is required. Version 1.7 Commercial Building Permit May 15,2000 • SECTION 9-PROFESSIONAL 0E9IGN AND CONSTRUCTION-SE$.VICES-FOR BUN-DINGS AND STRUCTURESSUBJECT TO CONSTRUCTION CONTROL PURSUANT'TO ma CMR t16(CONTAINING MORE TNAN 35,000 C:F.OF'ENCLOSEO.SPACE) 9.1 Registered Architect Not Applicable ❑ Name(Registrant): Registration Number Address _—.. ...--_. —�i....— Expiration Date Signature Telephone 9.2 Registered Professional Engineer(s): Name Area of Responsibility ' Address Registration Number i —_.—_ Signature Telephone Expiration Date Name Area of Responsibility Address _kk Registration Number r Signature Telephone Expiration Date Name Area of Responsibility Address Registration Number -J Signature Telephone Expiration Date I I • ,..Name ....... ,... _ Area of Responsibility Address .._ —.. Registratiw Number I � Signature Telepime Expiration Date /9.3 General Contractor ✓ tfAGi yT1 fSE b (oh/ 64.ryu/p L Not Applicable ❑ Company 1 Name: , a c gsI(✓CS i/sA,iuc. (Ai , SIP E.(J /VA olo87 Responsbie in Charge of Construction Rau e L V L1 4-I Yt, r . Address 4{3 1341590o301//2 Signature Teleptone • Versionl.7 Commercial Building Permit May 15,2000 SECTIORtO-STRUCTURALPEERREVIEW'(Tso CR7K.'IIO-44j . - Independent Structural Engineering Structural Peer Review Required Yes 0 No 0 SECTION1t-OWNER.AUTHORLZATION-TO-BECOMP.E:EFED=WEHEM- OWNERS AGENT ORCONTRACTORAPRLIESFORBUILOINOPERMIT . .01'2 r C K "Pt E 1 ~ H _ ;.as Owner of the subject property hereby authorizesbJ .Lr G� C(2,- ........ to act on my behalf,in all rs relative to work authorized by this building permit application. 7 — Jett • Signature of Owner tt Date I, t� U Luc t�hv ' _... __ ,as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief_ Sit ned under du As and .en.ities . Print Name Signature of Ovner/Agent Date SECTIOILYZ-CORS.TRSlCIWNSSERVid‘ " 10.1 licensed Construction Supervisor: Not Applicable O. �r Paine of License Holder:' rti C {-tom cD' 4 q 64-. _... -�--- License Number j A-1- Peta$Arns ! i!>S, iii. (A5 fCk2 n4A. 0t087 ! 1'2- 28.-- a7 Expiration flake Mtlress 4n _ _ I33a tit? Signature Telephone W� SECTION 13-WORKERS POMPENSAflON INS UR CtAPf1aAnt*GL.&YSZ•;§251:{6}) ' - Workers Compensation Insurance affidavit must be completed and submitted with this application.Failure to provide this affidavit will result in the denial of the issuance of the building permit Signed Affidavit Attached Yes No • The Commonwealth of Massachusetts �.. Department of Industrial Accidents • 11: r Office of Investigations 5 5 __:_ 600 Washington Street !S. = Boston,MA 02111 www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information / Please Print Legibly Name(Business/Organizariodindividual): ?EAC�41it11 `�Jd�Sjl/,1 Ono UP tvL Address: 42-- P}}-Eq 5A+yr) CjgUSS(A] City/State/Zip: t + S PIA ,o lO SS Phone#:443 3 3p 1 ( I Z. Are you an employer?Check the appropriate box: Type of project(required): 1.❑ I am a employer with 4. ❑ I am a general contractor and I 6. g New construction employees(full and/or part-time).* have hired the subcontractors listed on the attached sheet. 7. ❑ Remodeling 2.❑ I am a sole proprietor or partner- ship and have no employees These sub-contractors have 8. ❑Demolition workingfor me in anycapacity. employees and have workers' P ty. 9. ❑Builth E addition [No workers'comp.insurance comp. insurance.* corporation 5. Q We are a corporation and its 10.0 Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 11.0 Plumbing repairs or additions myself Na workers'comp. right of exemption per MGL 12.0 Roof repairs insurance required.]Y c. 152, §1(4),and we have no employees. [No workers' 13.0 Other camp.insurance required] 'My applicant that checks box el must also 6n out the section below showing their workers'conwensanon policy infornutiw. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside connattors must submit a new affidavit indicating such. `Contractors that check this box must attached an additional sheet showing the name of the subcontractors and state whether or not those entities have employees. If the subcontractors have employees,they must provide their workers'comp.policy numbs. lam an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. (�, Insurance Company Name: &2k.N 812E7y'I,A Policy#or Self-ins.Ltic. #: w 08336 3(9Bt Expiration Date:- I2_/'Ldt /Q a '7 Job Site Address: PAEtJllll-4� lett kleirr(Aat& [w ,) MA City/State/Zip:- CIC 0 Attach a copy of the workers'compensation policy declaredo page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to 31,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER anda fine of up to 3250.00 a day against the violator. Be advised that a copy of this statement maybe forwarded to the Office of Investigations of the DIA for insurance coverage verification. Ido hereby testi der the paipjznd penalties of perjury that the information provided above is true and correct Signature: 4--W,ta : Date: 3/1 ( ® 7 • Phones': 4—L2) 7 3 4.8 Soo C 4I 3 3 3011 7 /ELL Official use only. Do not write in this area,to be completed by city or town official City or Town: Permit/License Issuing Authority(circle one): I.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: Massachusetts Department of Environmental Protection .Bureau of Resource Protection -Wetlands WPA Form 2 - Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 A. General Information Important: When filling out From: forms on the Northampton computer, use Conservation Commission only the tab key to move To: Applicant Property Owner Of different from applicant): your cursor- do not use the John Hanley and Patrick Melnik return key. Name Name 110 King Street v(ifm) Mailing Address Mailing Address /TownNorthampton MA 0p 60 Code Slate Zip City/Town State Zip Code 1. Title and Date (or Revised Date if applicable)of Final Plans and Other Documents: Build Out and Open Space Plan for Beaver Brook Estates 04/13/20055 Title Date Multi-family Development Plan for Parcel 24 07/27/2005 Title Date Title Date 2. Date Request Filed: 04/15/2005 B. Determination Pursuant to the authority of M.G.L. c. 131, §40, the Conservation Commission considered your Request for Determination of Applicability,with its supporting documentation, and made the following Determination. Project Description (if applicable): Construction of: two multi-unit buildings off of Route 9 as a stand alone cluster, six houses with frontage on Route 9 with common driveways, a 19 unit cluster and utilities, two storm detention basins, two common driveways, a bikepath connector, and removal of a building located at 28 Evergreen Road Project Location: Route 9 and Grove Avenue Northampton Street Address City/Town 005/006/011A 6,7,12/ 19,20,21,58,61/003 Assessors Map/Plat Number Parcel/Lot Number wpammecloc•rep 3I1/05 Page 1 of 5 L.ri Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands WPA Form 2 — Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Determination (cont.) The following Determination(s)is/are applicable to the proposed site and/or project relative to the Wetlands Protection Act and regulations: Positive Determination Note: No work within the jurisdiction of the Wetlands Protection Act may proceed until a final Order of Conditions (issued following submittal of a Notice of Intent or Abbreviated Notice of Intent)or Order of Resource Area Delineation(issued following submittal of Simplified Review ANRAD) has been received • from the issuing authority (i.e., Conservation Commission or the Department of Environmental Protection). ❑ 1. The area described on the referenced plan(s)is an area subject to protection under the Ad. Removing, filling, dredging, or altering of the area requires the filing of a Notice of Intent. ❑ 2a.The boundary delineations of the following resource areas described on the referenced plan(s) are confirmed as accurate.Therefore,the resource area boundaries confirmed in this Determination are binding as to all decisions rendered pursuant to the Wetlands Protection Act and its regulations regarding such boundaries for as long as this Determination is valid. ❑ 2b. The boundaries of resource areas listed below are not confirmed by this Determination, regardless of whether such boundaries are contained on the plans attached to this Determination or to the Request for Determination. 5 3. The work described on referenced plan(s) and document(s) is within an area subject to protection under the Act and will remove, fill, dredge, or alter that area. Therefore, said work requires the filing of a Notice of Intent. 5 4. The work described on referenced plan(s)and document(s) is within the Buffer Zone and will alter an Area subject to protection under the Act. Therefore, said work requires the filing of a Notice of Intent or ANRAD Simplified Review(if work is limited to the Buffer Zone). 5 5. The area and/or work described on referenced plan(s)and document(s) is subject to review and approval by: Name of Municipality Pursuant to the following municipal wetland ordinance or bylaw: Name Ordinance or Bylaw Citation wpemrmzdoc.rev.311/05 Page 2 of 5 Massachusetts Department of Environmental Protection Bureau of Resource Protection -Wetlands WPA Form 2 - Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Determination (cont.) 6. The following area and/or work, if any, is subject to a municipal ordinance or bylaw but not subject to the Massachusetts Wetlands Protection Act: D 7. If a Notice of Intent is filed for the work in the Riverfront Area described on referenced plan(s) and document(s), which includes all or part of the work described in the Request, the applicant must consider the following alternatives. (Refer to the wetland regulations at 10.58(4)c. for more information about the scope of alternatives requirements): ❑ Alternatives limited to the lot on which the project is located. ❑ Alternatives limited to the lot on which the project is located, the subdivided lots, and any adjacent lots formerly or presently owned by the same owner. ❑ Alternatives linked to the original parcel on which the project is located, the subdivided parcels, any adjacent parcels, and any other land which can reasonably be obtained within the municipality. • ❑ Alternatives extend to any sites which can reasonably be obtained within the appropriate region of the state. Negative Determination Note: No further action under the Wetlands Protection Act is required by the applicant. However, if the Department is requested to issue a Superseding Determination of Applicability, work may not proceed on this project unless the Department fails to act on such request within 35 days of the date the request is post-marked for certified mail or hand delivered to the Department. Work may then proceed at the owner's risk only upon notice to the Department and to the Conservation Commission. Requirements for requests for Superseding Determinations are listed at the end of this document. ® 1. The area described in the Request is not an area subject to protection under the Actor the Buffer Zone. ❑ 2. The work described in the Request is within an area subject to protection under the Act, but will not remove, fill, dredge, or alter that area. Therefore, said work does not require the filing of a Notice of Intent. ❑ 3. The work described in the Request is within the Buffer Zone, as defined in the regulations, but will not alter an Area subject to protection under the Act. Therefore, said work does not require the filing of a Notice of Intent, subject to the following conditions (if any). ❑ 4. The work described in the Request is not within an Area subject to protection under the Act (including the Buffer Zone). Therefore, said work does not require the filing of a Notice of Intent, unless and until said work alters an Area subject to protection under the Act. wpabouteoc•rev.311/0.5 Page 3 of5 • Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands WPA Form 2 — Determination of1 Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 B. Determination (cont.) ❑ 5. The area described in the Request is subject to protection under the Act. Since the work described therein meets the requirements for the following exemption, as specified in the Act and the regulations, no Notice of Intent is required: Exempt Activity(sire applicable slatuatory/regulatory provisions) ❑ 6. The area and/or work described in the Request is not subject to review and approval by: Name of Municipality Pursuant to a municipal wetlands ordinance or bylaw. �O�mafThei u rt JaS naatsnrltf MNttprErc atf +as Name Ordinance or Bylaw Citation C. Authorization This Determination is issued to the applicant and delivered as follows: ❑ by hand delivery on r by certified mail, return receipt requested on 39 Au6uSr aoas Date Date This Determination is valid for three years from the date of issuance(except Determinations for Vegetation Management Plans which are valid for the duration of the Plan). This Determination does not relieve the applicant from complying with all other applicable federal, state, or local statutes, ordinances, bylaws, or regulations. This Determination must be signed by a majority of the Conservation Commission. A copy must be sent to the appropriate DEP Regional Office (see Attachment) and the property owner(if different from the applicant). .\!natures: \ , • \. �\ %. \ • '' LLe. f __\.___:" it H aSA116USf 4045 Date wpaiorma aoc.rev.3/1N5 Page 4 of 5 • .,.„LMassacBureauhusettsofResource Department Protection of Environmental-Wetlands Protection WPA Form 2 — Determination of Applicability Massachusetts Wetlands Protection Act M.G.L. c. 131, §40 D. Appeals The applicant, owner, any person aggrieved by this Determination, any owner of land abutting the land upon which the proposed work is to be done, or any ten residents of the city or town in which such land is located, are hereby notified of their right to request the appropriate Department of Environmental Protection Regional Office(see Attachment) to issue a Superseding Determination of Applicability. The request must be made by certified mail or hand delivery to the Department, with the appropriate filing fee and Fee Transmittal Form (see Request for Departmental Action Fee Transmittal Form) as provided in 310 CMR 10.03(7) within ten business days from the date of issuance of this Determination. A copy of the request shall at the same time be sent by certified mail or hand delivery to the Conservation Commission and to the applicant if he/she is not the appellant. The request shall state clearly and concisely the objections to the Determination which is being appealed. To the extent that the Determination is based on • a municipal ordinance or bylaw and not on the Massachusetts Wetlands Protection Actor regulations, the Department of Environmental Protection has no appellate jurisdiction. wwm,mzaoc•rev.vf/Os Pages ars- gilt? cf AS3 r) DCP .T MCNT OF BUILD rT1C INSPZQ ;�'S iOv 1':S'ECTO2 272 }Salo Strrt ' Mumdpnl Building NorLiu uptor, A1ns 01060 - 1 Square trace 'Basemen: $.33 - / 5-7S7 afroun[ 1st Floor a $-?O /y- J. -no Floor @ $ )as� 61f .96 1/2 Floors, Att c, zrz9 $_li -6 OD _10 • ob Dec $_Io TO_;_ Si 90g. Or 1/U a 6 — 6 a • • Melnick Condo Haydenville Rd 20 11 220 6 3 18 Garage 238 Units 20 36.5 730 8 12 96 826 less Garage 238 Net Units 1st and basement 588 X3 1764 2nd Floor 826 x3 2478 Porches U1, U3 4 8 32 X2 64 U2 6 8 48 Gross Basement 1764 $264.60 @$0.15/SF Gross Porches 112 $16.80 @$0.15/SF Gross Garages 714 $107.10 @$0.15/SF Gross First Floor 1764 $882.00 @$0.50/SF Gross 2nd Floor 2478 $743.40 @$0.30/SF Permit Fee $2,013.90 The Commonwealth of Massachusetts r= =F = �w Massachusetts Highway Department 10 Park Plaza,Boston 02116-3969 City of Northampton June 13,2006 From the Office of: Massachusetts Highway Department 811 North King Street,Northampton,MA 01060 J rAte. CU To: Patrick J. Melnik,Esq. /L6 cu—r 110 King Street Northampton,MA 01060 LK IoQQ.� A / You may proceed with the work described in Permit#2-2006-0023 dated All p T tom. Department for work in the City of Northampton. Please read carefully the instructions printed on the back of the Permit and note particularly those conditions, which apply to the work authorized. Your attention is also called to the time given for the completion of this work. If it should be desired to extend the time for doing the work or alter any of the conditions of the Permit,written applications for such changes should be made as soon as possible to this office. Upon completion of the work outlined, please fill out the form given below, detach and mail to this office. (A sketch on the back of the form or on a separate sheet,showing the location of any structures installed, should be submitted. This sketch should show the relative position of the structure by measurements to definite points within the highway location). IF THE NOTICE BELOW IS NOT RETURNED,THE LIABILITY ASSUMED UNDER THIS PERMIT CONTINUES. Sincerely,� (20,71—.444,— Albert R. Stegemann,P.E. District Highway Director * * Please return lower portion when work is completed. Retain Permit for Grantee and/or successor files * * City of Northampton (Date) ,200 District Highway Director Northampton, Massachusetts 01060 Dear Sir: Please be advised that the work authorized under Permit#2-2006-0023 issued by the Massachusetts Highway Department was completed in accordance with all requirements of the Department on , 200 Signed Patrick J. Melnik,Esq. 110 King Street Northampton,MA 01060 JL/C =K—= ,r The Commonwealth of Massachusetts Ala L, _ ,. Massachusetts Highway Department Permit#2-2006-0023 PERMIT---NORTHAMPTON Subject to all the terms, conditions and restrictions printed or written below, and on the reverse side hereof, permission is hereby granted to Patrick.). Melnik,Esq.to enter upon the State Highway Layout in the City of Northampton known as Route 9 or Haydenville Road for the purpose of constructing and utilizing a six(6)unit subdivision access on the southerly side of the highway. The District Highway Director shall be notified in writing 48 hours in advance of any work by the Grantee. All described work shall be completed as directed by,and to the satisfaction of, the Director. The access shall be constructed so as to prevent the drainage of water and debris from entering directly upon the highway. The access is to extend from Station 31+76±to Station 31+98±at the State Highway Layout Line, flaring to extend from Station 31+61±to Station 32+13±at the existing edge of the paved highway. The access shall be SURFACED IN TWO(2)COURSES WITH HOT MIX ASPHALT PAVEMENT to a minimum depth, after rolling, of three and one half(31/4") inches to the limits as shown on the attached sketch. Said access shall have an eight-inch(8")foundation of compacted gravel and shall butt and not overlap the existing edge of the hardened surface. That portion of the access within the State Highway shall be maintained by the Grantee at their expense and to the satisfaction of the Director. The area on each side of the access shall be graded, loamed,fertilized, limed and seeded. Bituminous concrete sidewalk and cement concrete handicapped access ramps shall be constructed as required by The City of Northampton with all work done in accordance with the current "Architectural Access Board Rules and Regulations,"the "Americans with Disabilities Act,"dated December 1991,and the"Massachusetts Highway Department Wheelchair Ramp Standards,"effective October 8, 1997. The Grantee shall be responsible for all maintenance of the sidewalk. THE GRANTEE AND/OR SUBSEQUENT OWNERS ARE ADVISED THAT THIS PERMIT IS INTENDED TO GRANT ACCESS AND EGRESS FOR THE SIX UNIT SUBDIVISION ONLY. ANY FURTHER DEVELOPMENT,EXPANSION,NEW BUSINESS,OR CHANGE IN USE SHALL REQUIRE THE FILING OF A REQUEST FOR A DETERMINATION OF NEED FOR A NEW PERMIT. ANY EXPANSION,NEW DEVELOPMENT OR CHANGE IN USE SHALL BE SUBJECT TO THE "MASSACHUSETTS ENVIRONMENTAL POLICY ACT, CHAPTER 30, SECTIONS 61 AND 62A-H". THE FINISHED CONSTRUCTION SHALL CONFORM TO THE ATTACHED SKETCH, as prepared by the Massachusetts Highway Department. At the end of each workday, the Grantee shall keep the highway surface free of any dirt,dust or debris of any nature, resulting from the work. The Grantee shall utilize mechanical sweepers,water,calcium Page 4 1 • Permit#2-2006-0023 chloride or bitumen and sand, in accordance with Section 440, Roadway Dust Control, of the 1995 MassHighway Department's Standard Specifications for Highways and Bridges, as amended. DIG SAFE NUMBER: 20060102907 If construction within the State Highway Layout does not commence within the period allowed by Dig Safe,the Grantee shall obtain a new DIG SAFE NOTIFICATION NUMBER, which can be found at www.digsafe.com or by calling 1-888-344-7233. AT&T Wireless customers can contact Dig Safe by dialing#DIG (#344). The Grantee shall procure all permits, licenses, required easements and give all notices necessary and incidental to the due and lawful prosecution of the work(including Conservation Commissions, Tree Wardens,etc.). All shoulder areas,paved areas,grass areas,drainage lines and structures, curbing,edging, or other highway appurtenances that are disturbed due to the work shall be replaced and/or restored to its original condition. Adequate warning signs, traffic cones and other traffic control devices must be erected in accordance with the Manual on Uniform Traffic Control Devices(Millennium Edition), as amended, which can be found at http://mutcd.thwa.dotgov, as revised. Said devices shall be placed and replaced by the Grantee at the work site as required. Traffic shall be maintained at all times. If one-way traffic prevails, uniformed police shall be in attendance at the expense of the Grantee. All personnel working within the State Highway Layout shall wear approved safety vests. Reflectorized plastic drums shall be used in the highway work zones; the use of metal drums is not allowed. The Grantee's property shall be graded in such a manner that storm water or other drainage shall not flow directly onto the State Highway Layout. Any ponding of water,which may occur in this area as a result of the work herein described, shall be the responsibility of the Grantee. The existing gutter grade and line shall not be changed. The highway surface shall not be disturbed. No parking is allowed within the limits of the State Highway Layout No signs,fences, or other appurtenances shall be located within or overhang the State Highway Layout line.No parking is allowed within the limits of the State Highway Layout Any disturbed area shall be replaced in kind,e.g., loamed,fertilized, limed and seeded,bituminous concrete, gravel, etc. If the Director deems it necessary, an inspector shall be assigned to the work and the cost of said inspector shall be charged to the Grantee. All work proposed and materials used shall conform to the"Massachusetts Highway Department Standard Specification for Highways and Bridges," 1995 Metric Edition,and the"Massachusetts Highway Department Construction and Traffic Standard Details," 1996 Metric Edition, as amended. Page# 2 Permit#2-2006-0023 Both can be found at www.mass.gov/mhd (Select"more" under the section: Permits, Forms, and Publications). All material necessary for the restoration of the highway (including but not limited to Hot Mix Asphalt Pavement, Cement Concrete Masonry; Control Density Fill; stone; gravel; backfill materials; etc.) shall be furnished by a Department Certified Supplier. For a list of specific suppliers, please contact Ms. Karen Korvek, District Materials Engineer at(413)582-0565. No tracked vehicles will be allowed on the highway surface without a protective mat. Adequate lights, signs and barriers shall be provided by the Grantee. All utility companies whose services are located within or adjacent to the proposed work areas shall be notified in writing of the proposed work at least 48 hours prior to the start of any excavation in said areas.This is independent of required Dig Safe notification. The shoring and bracing of trenches along with other related excavations shall conform to the applicable rules and regulations of the Commonwealth of Massachusetts Division of Industrial Safety and the U.S. Department of Labor, Occupational Safety and Health Administration. Failure to comply with the terms of this Permit;past and future directives from the Massachusetts Highway Department, any other local, state and federal regulatory agencies, shall be cause for immediate revocation. The Grantee shall indemnify and save blameless the Commonwealth and its Highway Department, against all suits, claims or liability of every name and nature arising at any time out or in consequence of the acts of the Grantee in the performance of the work covered by this permit whether by themselves or their employees or subcontractors. A copy of this Permit must be on the job site at all times for inspection. Failure to have this Permit available at such site will result in suspension of the rights granted by the Permit. The Grantee's attention is directed to the requirement of Chapter 228 of the Acts of 1972 concerning excavation. (SEE OTHER SIDE FOR ADDITIONAL CONDITIONS) All work within the State Highway Layout shall be completed within 12 months of the issuance of this Permit. Dated at Northampton This Thirteenth Day of June 2006. Albert R. Stegemann,P.E. District Highway Director \( t.. C-SPF \C-2 Page# 3 Permit No.2-2006-0023 COMMONWEALTH OF MASSACHUSETTS HIGHWAY DEPARTMENT PLAN COVERING PERMIT REQUESTED BY Patrick J. Melnik, Esq. FOR DRIVEWAY APPROACH IN Northampton — Route 9 (Haydenville Road) DATE: June 2006 SCALE I"=30' J I tfi .3100 uI Ce ASTIC GAS W_JN-4, _ _ --- /' ' ,< -miss STRIP AREA B'/PVC-SAN. SEWER SERNCE- ® '� - r f - __ __:._.__...........:.s - ...A d 1 / k Tit t �� ��\ I , APPROVED TRAFFYC ENGINEER HMD-122 • "FOLLOWING CONDITIONS APPLY TO PERMITS" Conditions Relating Padnutardy to Penns tar the Laying of Pipes.Conduits.etc. After any pipes.conal its.drains or other dmderground structures are laid,or any excavation is made in the roadway.the trenches or opening,shall be proteriy backfilled with suitable material,the back-idling shall be thoroughly ramped,and the,urYace of the road over said'Meares shall he left even with the adjoining ground.If the work is done in cold weather no I Pozen material shall be used for baIX-lilling. Wherever the hardened surface of the roadway.gutters,or any pan of the surface or the highway is dirtarhed it shall be replaced in as good condition as before was disturbed.and if new,materials are required they shalt correspond with those already to plate on iM mad. Where senate pipes are to cross the highway the connections shall be made without disturbing the hardened surface of he roadway-by driving the pipes under the roadway,or the service pipes shall he carried under and across the road in a larger pipe.unless otherwise ordered by the Dtrectoe The Grantee shall maintain the surface of the roadway over said stauures as long as the Department may deem necessary. untd all signs of the u caches shall have been el mmated, (badmen Relating Particularly to Permits for the Erectiem of Poles.Wiresand Overhead Structures,and the Coning and Trimming of Trees In the etecuat of pole tinew unless otherwise herein provided.no trees located within the limns of the State Highway shall be eau or trimmed. No goy rams shall be attached to trees without a special permit from the Depamnentand in no event shall they be so attached as to girdle.the trey or in any way interfere with their growth. The wires shall be so protected at all time and places that they shall not interfere with or Injure the trees either LN Ids or outside the Jourdan of the highway. Where the cutting or tramming of trees is authorized by this permit. only such cum ng and trimming shall be done as may be designated by the Director. In the cixbaructlmi or tecvmtrnlian of pole lines no guy wires shall be erected nearer to the surface of the ground than xh feet: provided. however, that the owners of such lints may maintain such guy wires at a lower elevation than six feet from the ground until such time as the Department shall notify them to remove said wires or to the elevation apt stated. in order to protect the trees through whah arty wires may past. said pates shall be insulated and such other tree guards used as may he directed by the Director. Where high tension wires are erected tinder this permit, they shall be so located that. under condo ions of maximum severity as regards a coating of ice or,mow. there shall hea space of at least eight feet between such high tension warns and dice auras. The Grantee,shall. within sixty days from the date or completion of the work. Idle in the office of the Department a plan showing the location of each pole erected in accordance with the permit. said plan to be of such size and in such form as the Department may direct. General and Additional Conditions Whenever the word "Department"ix used hereta it shad mean the Massachusetts Highway Depanmem.M the Commonwealth of Massachusetts, Whenever the word 'Director"ix used herein it shall meanthe District Highway Director or ether authorized representative of the Department Whenever the word ''Grmnee'is used herein it shall mean the person or persona. corporation or municipality to whom this permit is grrvanted, or their legal representatives, During the progress of the work all structures under ground and above ground shall be properly protected from damage or injury: such barriers shall be erected and maintained as may be necessary for the protection of the traveling public: the same shall be properly lighted at ntghn and the Grantee shall be responsible for the damaged to persons or property due tour resulting front arty work done under that permit. Except as herein authorized, no excavation shall be made or obstacle placed within the limits of the State highways In such a manner as to interfere unnecessarily with the travel over said road. If any grading of sidewalk work done under this permit interferes with the drainage of the State highway many way. such catch basins and outlets shall be canaracted as may be necessary. in the opinion of the Diraam, to take proper care of such drainage. Wherever the hardened surface of the roadway is disturbed and the Director may consider it necessary or advisable to do so. said.surface will be restored by the employees of the Department. at such time as the Depanmem may direct, and the expense thereof shall be borne by the Grantee. who shall purchase and deliver co the road the materials necessary for said work if and when directed by the Director. Alt payments to materialmen and to laborers. inspectors. etc.. employed by the Department for or on account of the work herein contemplated shall be made by said Grantee forthwith on receipt of written orders, pay rolls. or ouches approved by the Department. IF THE GRANTEE DOES ANY WORK CONTRARY TO THE ORDERS OF THE DIRECTOR. AND. AFTER DUE NO VICE. FAILS TO CORRECT SUCH WORK OR TO REMOVE STRUCTURES OR MATERIALS ORDERED TORE REMOVED. OR FAILS TO COMPLETE WITHIN THE SPECIFIED TIME THE WORK AUTHORIZED BY THIS PERMIT.THE DEPARTMENT MAT.WITH OR WITHOUT NOTICE CORRECT OR COMPLETE SUCH WORK IN WHOLE OR IN PART,OR REMOVE SUCH STRUCTURES OR MATERIALS.AND THE GRANTEE SHAM.. REIMBURSE THE COMMONWEALTH FOR ANY EXPENSE INCURRED IN CORRECTING AND/OR COMPLETING 'THE WORK OR REMOVING THE STRUCTURES OR MATERIALS. ALL OE THE WORK HEREIN CONTEMPLATED SHALL BE DONE UNDER THE SUPERVISION AND TO THE SATISFACTION OF TRE MASSACHUSETTS HIGHWAY DEPARTMENT. AND THE ENTIRE EXPENSE THEREOF SHALL BE BORNE BY THE GRAM FE. On the completion of the work herein contemplated all rubbish and debris shall be removed and the roadway and roadsides shall he left neat and presentable and satisfactory to the Director. The Department hereby reserves the right to order the change of location or the removal of any strum e or structures authorized by this penis at any rime, said change or removal to be made by and at he expense of the Grantee or its/their successors or assigns. said This as perm;may be meddled or:evoked at any time by the Department without rendering said DepanmeatW the Cwrafwnwea(th eF Massachusetts liable in eany Granteeway. The shall pay the salary- subsistence and travel expenses of any inspector appointed by the Del-moment to supervise.the work herein rhmcnAll of tilt. the aboveica the con lima be applicable primed ro sde n the lace inof t h p rimit al ap lye zem<are Indonei.uznv sled the.mnddlrnrc on Ihn fees.oY the permit In pnc afe the pnrdNom thea ny on the re of the C nstit apply. The acceptance of this permit or the doing of any work thereunder shall eu�tamr an agreement try the Grantee to e:m;p1Y with ail of the conditions and restrictionsminted ur maven herein, MUNICIPAL SEWER/STORM DRAIN AVAILABILITY APPLICATION Northampton Streets Department I25 Locust Street Northampton,MA 01060 587-1570 A Department of Public Works Trench Permit and Sewer Entry Permit shall be required prior to any construction or connection activity associated with this application. Location: 330 Haydenville Road Inquiry Made By: Pat Melnik Cr. 3 `f_675c Date of Inquiry: 3/12/07 Reason for Request: New Construction Hook into City Sewer ((�� Municipal Sewer Main in Front of Location: Yes .�. Nosr /�Tc YY RoPeer Municipal Storm Drain Available: Yes No X Size of Sewer Main: Material'. t/.l_ - Age: Depth of Sewer Main: /✓Q C& l t/ 'RRRG?DS Size of Service Connection: A.76 iNE Type of Service Connection: Tie-in to Sanitary Main Tie-in to Sanitary Service at Street Line Comments: /}/(j Ci7'/ TELo2OS Note: If this availibility is for new construction,this form must be hand delivered to Building Inspector. A corresponding "sewer entrance fee" shall be paid prior to making any connection to the municipal sewer system. Arrangements of such installation shall be made with the Northampton Streets Department with a minimum of 5 working days notification. All work shall conform to Northampton Streets Department specifications. Storm Drain Concurrence e A1. / J // John Hall Douglas McDonald. Environmental Planner Sewer Department Engineenng Department cc; Ned Huntley,Director DPW Anthony Patillo, Building Inspector QI,. A., 17„ tool `5/647 HERITAGE SURVEYS, INC. • Professional Surveyors and Engineers College Highway & Clark Street Post Office Box 1 Southampton, Massachusetts 01073 Bruce A. Coombs, President Telephone (413)527-3600 Professional Surveyor, MA, CT& VT Facsimile(413) 527-8280 E-mail: bruce@heritagesurveys.corn Website: heritagesurveys.corn Page 1 of 4 March 30,2006 HSI Job M 3923-980831 Beaver Brook Estates Multifamily Development - Parcel 24 Haydenville Road Northampton, MA 01060 STORMWATER POLLUTION PREVENTION PLAN (SWPPP( NOTE: This Stormwater Pollution Prevention Plan shall be retained onsite at the project location. Project Name and Location: Beaver Brook Estates Multifamily Development-Parcel 24 Haydenville Road Northampton, MA 01060 Assessors Map 06 Parcel 062 42° 21' 3F N -72° 41' 11" W Owner Name and Address: Patrick J. Melnik 110 King Street Northampton, MA 01060 Narrative Description Existing Site Description: The existing property is located on the westerly side of Haydenville Road (Route 9), Northampton. The parcel is a vacant piece of land approximately five acres in size. The parcel contains a large area of bordering vegetated wetlands and a vernal pool is located to the north and south of the property. The property is mostly wooded with a smaller brush open area. Prosect Description: The proposed project involves the construction of two buildings, which rake up six multifamily units with a paved driveway/parking area. The driveway entrance to the units is located in the center of the parcel frontage off of Haydenville Road. All units will have a one-car garage and a patio. The stormwater drainage from the impervious areas shall be directed into proposed detention basin. (See Operation and Maintenance Plan dated February 6, 2006 for additional information). The stormwater runoff from the proposed roof areas shall be directed into dry wells. The sanitary sewage shall be connected to the existing sanitary sewer facilities available on Haydenville Road. Pre-Construction Actions Some of the most important actions should take place during the pre-construction phase. These include: • Protecting tree roots from compaction by construction equipment. • Delineating trees and vegetation to be protected during construction with clear markings in the field. • Hold a pre-construction meeting with the owner, contractor, project consultant and the City of Northampton to discuss the construction schedule. Page 2 of 4 March 30,2006 HSI Job #3923-980831 • Stormwater Runoff/Management The stormwater management for the proposed project consists of a detention basin. The basin will receive stomwater runoff from the proposed driveway/parking area, into the forebay of the basin. The detention basin will allow for pretreatment of runoff within the forebay of the basin before entering into the main part of the basin. The outlet control structure for the basin is a broad crested rectangular weir, which discharges the pretreated stormwater to a stone rip-rap area leading to a wooded area. Install Sediment Control Measures • The proposed limits of work shall be the existing tree/woods line as shown on the plan. No tree removal is proposed. • Sedimentation barriers shall be installed per plan specifications before any clearing or construction work begins and shall be maintained throughout the duration of the project until disturbed areas have been stabilized. • Avoid disturbing vegetation on steep slopes or other critical areas and locate material stock piles, borrowed areas, and access roads away from critical areas. Project Construction Sequencing • The project shall be constructed as follows. o The proposed driveway/parking areas and stormwater basin shall be constructed. o Construction of proposed multifamily buildings and connection of utilities to constructed buildings. o Stabilization of disturbed areas by loam and seeding. Land Clearing and Grading • Schedule project so clearing and grading are done during periods of low rainfall or the time of minimum erosion potential. Clearing only those areas that are essential for completing site construction. Temporary Surface Stabilization • Stage construction so that one area can be stabilized before another area is disturbed. This reduces the time that an area is left unstablized. • Sedimentation barriers shall be installed immediately on all disturbed areas and shall be maintained throughout the duration of the project until disturbed areas have been stabilized. Permanent Surface Stabilization • Stabilize all denuded areas within 15 calendar days after final grading. Disturbed areas that are inactive and will be exposed to rain for 30 days or more should also be temporarily stabilized. Landscaping and Final Stabilization • During favorable seeding dates and in areas where vegetation can be established, the following should be implemented: o Use seeding and fertilizing in very flat, nonsensitive areas with favorable soils. o Use seeding and mulching for less erosive soil or on moderately steep slopes with moderately erosive soils in relatively sensitive areas. o Use seeding with multiple mulching treatments or sodding for highly erosive soil, very steep slopes, or sensitive areas with highly erosive soils. • If stabilization is required during the time of the year that vegetation cannot be established, implement the following practices: o On moderate slopes or soil that is not highly erodible, mulching should be employed. o On steep slopes or highly erodible soils, multiple mulching treatments should be used. • Route construction traffic to avoid existing or newly planted vegetation. • Divert runoff away from denuded areas or newly seeded slopes. Waste Disposal • Waste Disposal All waste materials will be collected and stored in a proper receptacle in accordance with all local and State solid waste management regulations. All trash and construction debris from the site will be deposited in dumpsters. The trash will be hauled to an appropriate waste disposal site. No construction waste materials will be buried onsite. All project personnel will be instructed regarding the correct procedure for waste disposal. Page 3 of 4 March 30,2006 HSI Job#3923-980831 • Hazardous Waste All hazardous waste materials will be disposed of in the manner specified by the manufacturer and as required by local or State regulation. Site personnel will be instructed in these practices. • Sanitary Waste All sanitary waste will be collected from the portable units as required by local and State regulation. Spill Prevention The following are the materials management practices that will be used to reduce the risk of spill or other accidental exposure of materials and substances to stormwater runoff. Good Housekeeping The following good housekeeping practices will be followed onsite during the construction of the project. • All materials stored onsite will be stored in a neat, orderly manner in their appropriate containers. Materials which have the potential for contaminating runoff during storm events will be stored in their appropriate watertight containers, stored under a canopy, tarpaulin, shrink wrapped or otherwise precluded from direct exposure to precipitation. • Empty containers that may contain chemical residues shall be disposed of in accordance with State and local regulations. • Products, where possible, will be kept in their original containers with the original manufacture's label. • Chemical or petroleum product will be used up before disposing of the container. • Manufacturers'recommendations for proper use and disposal will be followed. • The site superintendent will inspect daily to ensure proper use and disposal of materials onsite. Petroleum Products • All onsite vehicles will be monitored for leaks and receive regular preventive maintenance to reduce the chance of leakage. • It is recommended that, if practicable, all refueling, repair and changing of equipment and vehicle fluids shall be conducted in a designated area and outside the 100'buffer zone. This area will be designed in a manner to reduce the potential for contamination of onsite resources. For refueling, repair and changing of equipment and vehicles outside of the designated area, care should be taken to avoid activities within ±100 of wetlands or other environmentally sensitive areas. • Petroleum products will be stored in tightly sealed containers, which are clearly labeled. • An area will be designated for the collection and storage of all chemical and petroleum based products and containers for the collection and storage of all chemical and petroleum based products and containers for these products. The containers shall be protected from rain events. • Any asphalt substances used onsite will be applied according to the manufacturer's recommendations. • The project superintendent will regularly inspect the site to insure proper disposal methods of used antifreeze, oil, filters and other hazardous materials are followed. Fertilizers • Fertilizers used will be applied according to manufacturer's product standards. The contents of any partially used bags of fertilizers will be transferred to a sealable plastic container to avoid spills. Paints • All containers will be tightly sealed and stored when not required for use. Excess paint will be properly disposed of according to manufacturers'instructions or State and local regulations. Concrete Trucks • Concrete trucks will not be allowed to wash out or discharge surplus concrete or drum wash water on the site. Page 4 of 4 March 30,2006 fist Joh M 3923-98083 f. Spill Prevention In addition to the good housekeeping and material management practices discussed in the previous section of this plan, the following practices will be followed for spill prevention and cleanup: • Manufacture's recommended methods for spill cleanup will be clearly posted and site personnel will be made aware of the procedures and the location of the information and cleanup supplies. • Materials and equipment necessary for spill cleanup will be kept in the material storage area onsite. Equipment and material may include but not be limited to brooms, dust pans, mops, rags, gloves, goggles, absorbent material (e.g. kitty litter, sand, sawdust) and plastic and metal trash containers. • All spills will be cleaned up immediately after discovery. • In the event of a spill of a hazardous substance, the spill will be immediately contained and the spill area will be kept well ventilated. Personnel will wear appropriate protective clothing to prevent injury from contact with a hazardous substance during cleanup operation. • Spills of toxic or hazardous material will be reported to the appropriate State or local government agency, as required by regulatory standards. Pollution Prevention Plan Certification I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. I� Signed: q Patrick J. Melnik 110 King Street Northampton, MA 01060 Telephone: (413) 584-6750 Fax: (413) 584-6789 Date: _....___114/0}07 _ Contractor's Certification I certify under penalty of law that I understand the terms and conditions of the general National Pollutant Discharge Elimination System (NPDES) general permit that authorizes storm water discharge associated with the construction site activity identified as part of this certification. Signed: Date: HERITAGE SURVEYS, INC. Professional Surveyors and Engineers College Highway& Clark Street Pon( ffire Box I Southampton, Massachusetts 01073 Bruce A. Coombs, President Telephone (413) 527-3600 Professional Surveyor, MA, CT& VT Facsimile/413)527-8280 E-mail bruce@beritagesurveys.corrt Website: hentagesurveys.com February 6, 2006 HSI Job 43923-980831 Beaver Brook Estates Multifamily Development For Parcel 24 Haydenville Road Northampton, MA OPERATION AND MAI.NTENANCE PLAN Schedule for Inspection and Maintenance of the Stormwater System: The *owner shall inspect the system after major storm events and contact a licensed contractor as outlined below, sediment and debris shall be properly disposed of off the site. Routine and Ron-Routine Maintenance Tasks: The "owner shall keep the stormwater system in working condition at all times. These tasks shall be performed daily and any material shall be disposed of properly. During the inspection of the stormwater system the pavement areas and travel ways shall be swept and the debris and sediment shall be properly disposed of off site. It is also recommended that an additional sweeping be performed after fall leaf debris has ceased. The detention basins shall be cleaned a minimum of every five to seven years by a licensed contractor. Plan for Sediment, Debris, and Oil Disposal: The "owner shall obtain the services of licensed contractor to perform this operation and maintenance plan. These contractors shall provide to the *owner records of the approvedsites for disposal of sediment, debris and oil and schedule of work to be performed. Copies of these records shall be made available upon request to the Northampton Board of Health. Page 2 of 2 February 6, 2006 .HS1 Job #3923-980831 Maintenance of Stormwater Controls: The proposed drainage system is designed to minimize and simplify maintenance requirements. Until construction is completed and all tributary areas are stabilized, frequent inspections and maintenance of the drainage system will be required by the *owner. The detention basins shall be cleaned every five to seven years. The *owner shall contact a licensed contractor qualified to perform the necessary maintenance Construction Related Controls: Prior to construction a synthetic filter and/or straw bale bathers shall be installed, as shown on the accompanying plans. All erosion and sediment control measured shall be inspected daily during grading and after all rain storms by the contractor and shall be kept in functioning condition until tributary areas are stabilized. Sediment shall be removed from silt fences, check dams, and filter dams when it reaches a depth of six inches. Filters shall be cleaned or replaced when water continuously ponds over six inches deep. Ponded water shall be discharged to an upland area with sediment controls, as required. The forebay shall be cleaned a minimum of four times per year and inspected monthly. A fixed vertical, concrete sediment depth marker shall be installed in the bottom of the forebay to measure the sediment deposition. The sediment depth marker will allow the owner* to monitor the accumulation and anticipate maintenance needs.The sediment shall be cleaned out when an accumulation of 6' of sediment is reached. AU sediment and hydrocarbons should be handled properly and disposed in accordance with local, state and federal guidelines and regulations. A stone tracking mat shall he installed and maintained at any point where construction traffic from an unpaved road enters into the paved portion of the site or street, If any questions arise regarding erosion and sedimentation control measures the Environmental Professional and/or Project Engineer shall be consulted immediately. *Owner = Homeowners Association Bk: 08763 Pg: 7 3 . . IO47"i Fciem .l i paining Board -DecisionSAY 3 1 2006 City of Northampton 'Nearing No.: PLN.2006.0027 Date:May 31,2006 WIY WLChhb 6in 'TPPOCAIGON TYPE: SUBMISSION DATE' NORTHAMPTON MA 01060 PB Special Permit with Major Site Pt 1/311006 Applicants Name: Owners Name: Surveyors Name: NAME: LANAE COMPANY NAME: Penick Melnik,Esq. Patrick Melnik,Esq. ADORES& A0.MESS: ADDRESS. 110;Ong Street 110 King Street TOWN: STATE: ZIP CODE: TOWN: STATE ZIP CODE: TOWN: STATE: ZIP CODE NORTHAMPTON MA 01060 NORTHAMPTON MA 01060 PHONE NO.: FAX NO.: PROMNO: FMNO.: PHONE NO. FM NO.: EMAIL ADORES& EMAIL ADDRESS: EMAIL AMscSS: Site Information: SMUT NO.: SITE ZONING: HAYDENVlLLE RD TOWN: SaCTIUN OF BYLAW: NORTHAMPTON MA 01080 Section 10.5:Open Space Residential Development MAP: BLOOM: LOT: MAP DATE: ACTION MEN: 06 062 NPCP Approved With Conditions Book1 NATURE OP PROPOSED WORK: IIIElk:a7e3Pg:7 Page: 1 of 3 Consbucuon of 6 two story residential condos with gauges and parking. Recorded: 08!22/2008 11:50 AM WARDSHIP: - - ._ CONOrON OF APPROVAL ._ t Prior to Issuance ata building permit the applicant show that the Once of Planning and FINDINGS. Development has determined that the following Issues have been addressed: a,the applicant shall resubmit a plan showing a revised Conservation Restriction(CR) boundary that is aligned with the no disturbance area. b,the applicant must record a CR on the parcel as shown. The CR shall be reviewed and approved by the City as standard procedure prior to submission to EDEA. c.Revised plans must be submitted for review and approval showing a low how out/et Pipe at _? approximately elevation 401. Pretreatment must be provided to remove 80%TSS. d.An operations and maintenance plan shall be submitted for approval by Department of Public Works and recorded at the registry of deeds. 2 Prior to the issuance of p certificate of occupancy and in order to meet the traffic mitigation reyu/rements of this project the applicant shall Install a S'sidewalk for traffic mitigation In the Touton shown on revised plans. The sidewalk shag be constructed into the parking lot of the project site 1. in order to meet the traffic mitigation requirements,the homeowner's Association shall be responsible for clearing snow for the entire stretch of sidewalk from this property to Leonard Street 4. The no disturb boundary should be dearly and permanently marked with boulders and signs. The Planning Board granted the Specie!Permit fora iwnit townhouse cluster open space development based on the application and the following plans submitted with the application: I. "MulU'Pamgy Development P/an for Parcel 24'prepared by Heritage Surveys,Inc.And William A.Canon Landscape Architects,Dated December 7,2005 Last Revised March 17,2006. 2. "MultJFamily Development Plan-Sidewalk flan'prepared by Heritage Surveys,Inc and William A.Canon landscape Architects,Dated May 4,2006. 3. Letter Dated May 8,200a from Patrick J.Melnick to Northampton Planning Board regarding installation or the sidewalk. DesTMS&2006 Des Laurier.Municipal Solutions,Inc. Bk: 08763 Pg: 7 Planning Board - DecisionMAY 3 1 2006 a City of Northampton 'Hearing No.: PLN-2008-0027 Date:May 31,2006 tan T bLCt1 kb Ott:t APfCAIOW TYPE: wSMINStON DATE: NORTHAMPTON MA 01060 PB Special Permit with Me/or Site PI 1/3/2006 Applicant's Name: Owner's Name: Surveyors Name: NAME: WME: COMPANY NAME Patrick Melnik,Esq. Patrick Melnik,Esq. ADORERS: ADDRESD ADDRESS: 110 King Street 110 King Street TOWN: STATE: ZIP CONE: TOWN: STATE ZIP CODE: TOWN: STATE LP CODE'. NORTHAMPTON MA 01060 NORTHAMPTON MA 01060 FSU$ NO.: FANO: PRONE NO..: fRZNO.: POME 40. FAX NO: EMAIL ADDRESS: EMAIL ADDRESS: EMAIL ANVERS: Site Information: STREET NO., SITE ZONING: HAYDENwLLE RD TOWN: SECDON OF BYLAW: NORTHAMPTON MA 01080 Secffon10.5 Open Space Residential Development MAP: e4OCK LOT: MN'DATE: ACTION TAKEN: 06 062 Approved147M Conditions Book: Pe W: Pip t� II 7�I - t, NATURE Const.FPRon of6 two Bk:87B3Pg:7 Page: 1 of 3 Construction o/6 two story residential condos with garages and parking. Reoarda0: 06/27/2006 11;60 AM HARDSHIP: CONonlou or APPROVAL PRONGS 1. Prior to Issuance ore building permit,B»applicant show that the Office of Planning and Development has determined that the following issues have been addressed: a,the applicant shall resubmit a plan showing a revised Conservation Reshlcdon(CR) boundary that Is aligned with the no disturbance area. b.the applicant must record a CR on the parcel as shown. The CR shall be reviewed and approved by the Ctty as standard presiders prior to submission to EDEA. C.Revised plans must be submitted for review and approval showing a low Row outlet pipe at approximately elevation 401. Pretreatment must be provided to remove 80%TSS. d.An operations and maintenance plan flail be submitted for approval by Department of Pubkc Works and retarded at the registry of deeds. 2.Prior to the Issuance ofe certificate of occupancy end in order to meet the traffic mitigation requirements of this project the applicant shall install a 5'sidewalk for traffic mitigation In the location shown on revised plans. The sidewalk shall be constructed into the parking lot of the project site. 3. in order to met the traffic mhigadon requirements,the homeowner's Association shaft be responsible for clearing snow for the entire stretch of sidewalk from this property to Leonard Street 4. The no disturb boundary should be clearly and permanently marked with boulders and signs. The Planning Board granted the Spacial Permit fore 64Init townhouse cluster open space development based on the application and the following piens submitted with the application: 1. "Mum-Family Development Plan for Parcel 24'prepared by Herbage Surveys,Inc And William A.Canon Landscape Architects,Dated December 7,2005 Last Revised March IT,2006. 2. 'Mub4Family Development Plan-Sidewalk Plan'prepared by Heritage Surveys,Inc and William A. Canon Landscape Architects,Dated Maya 2006. 3. Letter Dated May 8,2008 from Patrick J.Melnick to Northampton Planning Board regarding Installation of the sidewalk. GooTMS482008 Des Lauder*Municipal Solutions,Inc. Bk: 08763 Pg: 8 Planning Board -Decision City of Northampton Hearing No.:PLN-2006-0027 Date: May 31,2006 4. -Drainage Calculations Multifamily Development for Parcel 24 Haytlenville Rd.- Prepared for John J.Hanley, Trustee,prepared by Heritage Surveys,Inc. Dated September 29,2005. The Planning Board found: A. The requested use protects adjoining premises against seriously detrimental uses. Cluster open space residential developments are allowed by special permit. The overall development with the open space protection will result in a smaller footprint and will leave a buffer between this property and other properties on Haydenville Rd Thus,sound and sight buffers end views,light and air will be protected through permanetly protected open space to the rear of this site. B. The requested use will improve pedestrian access along this section of Route 9 through the installation of a sidewalk on the Mass Highway Rightof-Way. The Installation of the off-site sidewalk along with the permanent maintenance for snow removal meets the traffic mtlgatlon required per section 11.6(2). The project including any concurrent road improvements,will not decrease the level of service(LOS)of all area roads or Intersections effected by the project below the existing conditions. Mass Highway has approved the access and has determined that there will not be a negative effect on their system. C. The requested use will promote a harmonious relationship of structures and open spaces to the natural landscape,existing buildings and other community assets in the area. The project Includes permanent protection through a Conservation Restriction of the rear of the site that contains bordering vegetative wetlands that Is habitat to sensitive and ram end endangered species. D. The requested use will not overload,the City's resources including the effect on the Cly''water supply and dlstribution system, sanitary and storm sewage collection and treabnent systems,fire protection,streets and schools. Stonnwater will be managed on site In accordance with Department of Public Works standards and the site will be served by private water. E.The requested use meets the criteria in section 10.5 for cluster open space requirements.The open space portion of the property will provide protection to valuable wildllfe/wetland habitat The boundaries will be clearly marked to ensure protection. F. The requested use bears a positive relationship to the public convenience or welfare. The Installation of the sidewalk will enable residents to walk safely to the abutting neighborhood and schools In Leeds. G.The requested use will promote City planning objectives identified In the Chy of Northampton Open Space and Recreation Plan and Vision 2020 document The clustered townhomes will provide an alternative housing option. H.Compliance with the following technical parformanc terrdards: 1.Curb cuts onto streets have been minimized,with onlj/'one. 2.Pedestrian,bicycle and vehicular traffic movement on site have been separated to the extent practicable. COULD NOT DEROGATE BECAUSE: FILING DEADLINE'. ISVLING DATE: HEASSNG CONTINUED DATE: DECISION DRAFT BY APPEAL DATE: 3/2/2006 3/16/2006 5/25'2006 6/8/2006 REFERRALS IN DATE HEARiNG DEADLINE DATE: HEARING CLOSE DATE: FINAL SIGNING BY: 'APPEAL DEADLINE 31W2008 323/2006 5/25/2006 6/W2006 6/20/2006 FIRST ADVERTISING DATE: HEARING DATE: VOTING DATE: DECISION DATE: 39/2008 323/2006 5/25/3006 5/31)2006 SECOND ADVERTISING DATE: HEARING TIME: VOTING DEADLINE: DECISION DEADLINE: 3/16/2006 7:30 PM 8/232006 823/2006 MEMBERS PRESENT: VOTE, Frances Volkmann votes to Grant Jennifer Dieringer votes to Grant Paul Voss votes to Grant Francis Johnson votes to Grant Keith Wilson votes to Grant Kenneth Jodrie votes to Grant George Russell votes to Grant MOTION MADE BY: SECONDED BY: VOTE COUNT: DECISION. Geolgt".Russell Keith Wilson 7 Approved with Conditions MINUTES OF MEETING' Available In the Office of Planning&Development I,Carolyn Misch,as agent to the Planning Board,certify that this is a true and accurate decision made by the Planning Board and certify that a copy of this and all plans have been fled with the Board and the City Clerk on May 31,2006. GeoTMSO 2006 Des Laurier'Municipal Solutions,Inc. Bk: 08763 Pg: 9 - Planning Board - Decision City of Northampton Hearing No.: PLN•2006-0027 Date: May 31, 2006 Ic fythat a copy of this decision has been mailed to the Owner and Applicant Notice of Appeal An appeal from the decision of the Planning Board may be made by any person aggrieved pursuant to MGL Chapt 40A,Section 17 as amended within twenty(20)days after the date of Me Ming of the notice of the decision with the City Clerk The date is listed above. Such appeal may be made to the Hampshire Superior Court with.certified copy of the appeal sent to the(4 1, •j Cityp/j7 � Northampton. il'+++I(((;;;.���[[[III' MAY 3 1 2006 CITY CLERKS OFFICE NORTHAMPTON MA 01060 June 21, 2006 I, Wendy Mazza, City Clerk of Northampton, hereby certify that the above Decision of the Northampton Planning Board was filed in the Office of the City Clerk on May 31, 2006, that twenty days have elapsed since such filing and that no appeal has been filed in this matter. Attest: Jli City Clerk-C y o£ N hampton GeoTMS®2006 Des Landers Municipal Solutions,Inc. p�j --REQTBTEB ATV:ST:HAMPSHIRE, MARIANNE L. DONORTTE CITY OF NORTHAMPTON, MASSACHUSETTS ' )rdtei DEPARTMENT OF PUBLIC WORKS `� l' 125 Locust Street Av,ip.• Northampton, MA 01060 413-587-1570 Fax 413-587-1576 Edward S. Huntley, P.E. Director ASSIGNMENT OF HOUSE NUMBER(S) Street: Haydenville Road Assessors Map: Sheet 6 Lot 62 House Number: #330 Haydenville Road Date: March 7, 2007 Remarks: Reference is made to Plan of Land in Northampton, Massachusetts Surveyed for John J.Hanley, Trustee The Beaver Brook Nominee Trust by Heritage Surveys, Inc. dated June 30,2006.#330 Haydenville Road is assigned to Parcel B (containing a total of 5.735 acres) on said plan. Applicant requested a house number for permitting purposes. This plan is recorded in Plan Book 206 Pagel. lI I .. Ir es Lauri P.E. c I y Engine: cc. Central Dispatch Board of Health Water Division Tax Collector Sewer Division Massachusetts Electric Streets Division Verizon Telephone Inspectors Comcast Assessors Bay State Gas Police Department Post Office (Northampton) James Thompson (GIS Coordinator) Post Office(Easthampton) Registrar of Voters Applicant: Patrick J. Melnik 110 King Street Northampton, MA 01060 K'.AHouse Numbers\ NOTICE OF ASSIGNMENT EMPLOYER: COMBO1.0. STATUS OF EMPLOYER PEACHTREE DESIGN GROUP INC 000555531 Corporation 42 PHEASANTS CROSSING - W SPRINGFIELD, MA 01089 COVERAGEGROUP 0573339 Coverage under this assignment The Waiver o: Our Right to applies to Massachusetts Recover from Others Endorsement operations only. For coverage is available on Pool policies. outside of Massachusetts, contact Contact your agent for details. the appropriate Pool or Plan for that state. AGENT FINCH & PERRAS INS AGENCY INC INSURANCE COMPANY: OR 6 CAMPUS LANE GRANITE STATE :NS CO PRODUCER: EASTHAMPTON, MA 01027 RES:DUAL MARKET OPERATIONS P 0 BOX 409 P?RSIPPAt_, NJ 07054-0409 (800) 645-2259 AGENCY FEIN:042391561 CLASSIFrCATION OF OPERATION CLASS ESTIMATED RATE ESTIMATED CODE TOTAL ANNUAL PREMIUM REMUNERATION CARPENTRY-DWELLINGS - THREE STORIES OR LESS 5651 550,000 9.53 $4, 515 CARPENTRY-DETACHED ONE OR TWO FAMILY DWELLINGS 5645 50 9.03 50 CARPENTRY NOC 5403 $0 16.46 $0 EMPLOYERS LIABILITY 100/100/500 9845 STANDARD PREM_M $4 5"_5 EXPENSE CONSTANT 0900 $284 TE_RROiRISM CHARGE 9740 515 ESTIMATED ANNUAL PREMIUM: $4, 614 DIA ASSESS. 4.2% 5190 EST. ANNUAL PREM. PLUS ASSESSMENT 55, 004 INSTALLMENT BASIS Annual DEPOSITPREMIUM: 55, 604 THIS IS NOT A BILL COMMENTS Coverage effective 12:01 A. on 12/20.'06 Add endorsement WC 00 03 08 to this policy. An approved Form 153 - Affidavit of Exemption for Certain Corporate Officers or Directors - was submitted with this application. Effective 1-3-07, GAIL L C:ER & RENE :UC:ER has elected to be exempted from. coverage. DATEOFNOTCE: 01/02/07 PREPAREDBY: Paulette Coffman EXT 514 * * VOLUNTARY DIRECT ASSIGNMENT The workers'Compensation Rating and Inspection Bureau of Massachusetts 101 Arch Street • Boston, MA 02110 (617)439-9030 • FAX(617)439-6055 • www.wcribma.org + J`D 1 It PemM# 0444‘401 � Permit Date I i REScheckliaSoftwarence Version 3.7i3 CompCertificate Report Date:05/02/07 Data filename:Unhan.rck Energy Code: 2000 IECC Location: Northampton,Massachusetts Construction Type: Single Family Glazing Area Percentage: 13% Heating Degree Days: 6404 Construction Site, Owner/Agent: Designer/Contractor: HAYDENVILLE ROAD RT 9 PAT MELINIK LEEDS,MA C:azng D r B-Facler iminiaa Ceiling 1:Fiat Ceiling or Scissor Truss: 764 300 0.0 27 Wall 1:Wood Frame,16"o.c.: 345 19.0 0.0 13 Window 1:Vinyl Frame:Double Pane with Low-E: 126 0.300 36 WaIt 2:Wood Frame,l6"o.c.: 640 11.0 0.0 54 Door 1:Solid: 35 0300 11 Floor 1:All-Wood Joist/Truss:Over Unconditioned Space: 262 19.0 0.0 12 Floor 2:All-Wood Joist/Truss:Over Unconditioned Space: 558 11.0 0.0 40 Furnace 1:Forced Hol Air:94 AFUE Compliance Statement The proposed Siding design described here is consistent with the buhrang piens,specifications,and other calculations submitted with the pomrlt application.The proposed building has been designed to meet the 2000 IECC requirements in REScheck Version 3.7.3 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. Builder/Designer company Name Date Page 1 of 4 0 REScheck Software Version 3.7.3 Inspection Checklist Date:05702/07 Ceilings: U Ceiling 1:Flat Ceiling or Scissor Truss,R-30.0 cavity insulation Comments: Above-Grade Walls: U Wall 1:Wood Frame.16'o.c,,R-19.0 cavity insulation Comments: 3 Wag 2:Wood Frame,16'o.c.,R-11.0 cavity insulation Comments: Windows: 3 Window 1:Vinyl Frame:Double Pane with low-E,U-factor.0.300 For whitlows without labeled U4actors,describe features: Wanes_Frame Type Thermal Break?_Yes No Comments:_.... Doors: U Door 1:Solid,U-factor:0.300 Comments:_. ,..., Floors: 3 Floor 1:All-Wood Joist/Truss:Over Unconditioned Space,R-19.0 cavity Insulatlon Comments:_.... 3 Floor 2:All-Wood Joist/Truss:Over Unconditioned Space,R-11.0 cavity insulation Comments: Heating and Cooling Equipment: U Furnace 1:Forced Hot Air:94 AFUE or higher Make and Model Number: Alr Leakage: 3 Joints,penetrations.and all other such openings in the building envelope that are sources of air leakage must be sealed. U Recessed lights must be 1)Type IC rated,or 2)Installed inside an appropriate air-tight assembly with a 0.5'clearance from combustible materials.If non-IC rated,the from must be instanced with a 34 clearance from Insulation. Vapor Retarder. 3 Required on the warm-in-winter side of all non-vented framed ceilings,walls,and flows. Materials Menggcatton: al Materials and equipment must be installed in accordance with the manufacturers installation instructions. U Materials and equipment must be identified so that compliance can be determined. U Manufacturer manuals for all Installed healing and Coding equipment and seMte water heating equipment must be provided. • insulation R-values,glazing U-factors,and heating equipment efficiency must be clearly marked on the building plans or specifications. Duct insulation: Page 2 of4 O Ducts in unconditioned spaces must be insulated to R-5.Ducts outside the building must be insulated to R-6.5. Duct Construction: U All joints,seams,and connections must be securely fastened with welds,gaskets,mastics(adhesives). masfc-plus-embedded-fabric,or tapes.Tapes and mastics must be rated UL 181A or UL 181B. Exception:Continuously welded and locking-type longitudinal joints and seams on duds operating at less than 2 in.w.g.(500 Pa). LI The HVAC system must provide a means for balandng air and water systems. Temperature Controls: U Thermostats are required for each separate HVAC system.A manual or automatic means to partially restrict or shut off the heating and/or cooling input to each zone or floor shall be provided. Service Water Heating: U Water heaters with vertical pipe risers must have a heat trap on both the inlet and outlet unless the water heater has an integral heal trap or is part of a circulating system. • Insulate dreulaling hot water pipes to the levels in Table 1. Circulating Hot Water Systems: • Insulate circulating hot water pipes to the levels in Table 1. Swimming Pools: ❑ NI heated swimming pools must have an on/off heater switch and require a cover unless over 20%of the heating energy is from non-depletable sources.Pool pumps require a time dock. Heating and Cooling Piping Insulation: ❑ HVAC piping conveying fluids above 105 degrees F chilled fluids below 55 degrees F must be insulated to the levels in Table 2. Page 3 of 4 Table 1:Minimum Insulation Thickness for Circulating Hot Water Pipes Insulation Thickness In Inches by Pipe Sizes Non-Circulating Runouts Circulating Mains and Runouts Heated Water Temperature('F) Up to 1" Up to 125' 1.5"to 2,0" Over 2" 170-180 0.5 1.0 1.5 2.0 140-169 0.5 0.5 1,0 1.5 100-139 0.5 0.5 0.5 1.0 Table 2:Minimum Insulation Thickness for HVAC Pipes Fluid Temp, Insulation Thickness In inches by Pipe Sizes Piping System Types Rarpie('F) 2'Runouts 1'and Less 125'to 2.0' 2.5"to 4" Heating Systems Low Pressure/Temperature 201-250 1.0 1.5 1.5 2.0 Low Temperature 120-200 0.5 1.0 1,0 1.5 Steam Condensate(for feed water) My 1.0 1.0 1.5 2.0 Cooling Systems Chilled Water,Refrigerant and 40-55 0.5 0.5 0.75 1.0 Brine Below 40 1.0 1.0 1.5 1.5 NOTES TO FIELD:(Building Department Use Only) Page 4 of 4 N/13/2007 08:56 4135846789 PAT MELNIK LAW OF PAGE 01 MELNIK LAW OFFICES Attorneys At Law 110 King Street Northampton,Ma 01060 Telephone(413)584-67S0 Fax(413)584-6789 Patrick J.Melnik,Esq, emSi:pmolnik@vcrimn.net Patrick J. Melnik Jr.,Esq. patinelnUcjr@verizon.net April 13, 2007 Building Inspector's Office-via fax Re: Route 9/ 310 Haydenville Road Building permit application Dear Mr. Patillo, Attached is the well report and water quality inspection for the above pending building permit application. I believe that Heritage Surveys have given Doug MacDonald and Carolyn Misch the revised information they need for the storm water detention plan. Please let me know if there is anything else I need to get to your office to have this permit issued. Sine y, Patrick J. Melnik 04/13/2007 88:56 9135846789 PAT MELNIK LAW OF PAGE 02 Howard Laboratories 62 Main Street- Hatfield, MA 01038 Tel. (413) 247-5533 Fax (413) 247-9599 WATER ANALYSIS REPORT Henshaw Well Drilling Invoice Number: 12960 Sample Location: Rt.9 Haydenvhe Rd. Northampton, Client: Pat Mead* MA Sampled By: HWD Date Sampled: 04/10/07 Date Received: 04/11/07 Parameter. - Results limits Comments Total Conform Bacteria 0 colonies/ 100ne 0 colonies/ 100mi OK Color 98 PtCo Color Ones 15 PLCO Calor Units Iron 0.43 mg/I 0.3 mg/I Manganese 0.011 mg/I 0.05 mg/I OK ?Beate 1.4 mg/l 10 mg/t OK Nitrite - 0.018 mg/I 1 mg/I OK PH. 7.95 pH Units 6.5 - 8.5 Ph units OK Sodium 11 mg/I 28 mg/I OK Conductivity 0.19 mS/an No Standard No Standard Turbtdlty, - 4.4 NIU 5 MU 01( Chloride 33 mg/I 250 mg/I OK Hardness 45 mg/I No Standard <50 soft >100 hard NO= None Detected Recommendations: This samplemeets acceptable standards of potability. the parameters with an asterisk which are over the limit should go down alter a few weeks as the water and materials floating In the well settle. Analyst: MMM Date: 44/12/07 MA Certification: M-00851. N/13/2007 08:56 4135846789 PAT MEL..NIK LAW OF lJ PAGE 03 ^_ Massachusetts Department of Conservation and Recitation • Office.of Water Resources 153712 TYPE OR PMNT ONLY Well Completion itoportWiliii -. an(fleee'red) Norm _./...c. :,.�... Y_A.. west .3..._,.' .__\,... XI2 O .T2. Mama at wall txaaen \t NI ''.."c$r'v \\e 6t?i Property Omer/Client: `tativ\c',.c k '"S 'tot t\.k Sq.. Subtavirean Name: Module Address : \\Qi k >1‘1,‘ S'i. CAy?own: tWo3/4,'C\e.4l+.cnp\'M.e cnrrtolvo _._ *SC\\ izs, CC N Pit, CA14‘dTh Assessors Map Assessors Lot a:.. : NOTE: Asaeseom Map and Lot ft mandatory if ro dbaiiadaase available uuBi.o�ya�rda.oyffy�Health point obtained Yes ( Not Required 0 - Perms Number (Yib Issued • . of c' . {e) To(R) 'T a Thickness Diameter l �� II II I k1 Cs MilflalliVantli a :._ ,. ■moo unto oar searing - • r Form To da Cale- Cpim .- . - ... Slam "' cVtf..rye__ .�:.�,r_ . . . .. _._ - •_ _ \q i :�ILINIMI® Y / N .Y 'S;9, Da❑❑ a 111,11.1.111111m. IIIIIMIII NEN. Y / " ® ■p■ r7-.A.,Il -� rwrc(m To(g) . .MeteAef Desorption , � purpose o0 0I 0 ❑d ❑0 Min{n}....le Atm Code Comment Stem - pi 1 SC `b\tNYIZ-Atliitc\` NF ii7 ' .4.---"S....2.4....4.4.:2.-2.d...�. d .-en t,.n... . � ., .,.. <.:.I. am: j?aa. I. ..."km..a...c-! 'AN Torsi Pumping Levet Tore to Ramer la ceery Maule Data d (al'N) ` Rie) (R,W3S) (As A MN (FL RMeasuredGS Date Measured ma 4;0Y \ '.,;_ fe `dam la4 =1 ` q osir uinp Der'ipton Horsapowar Developed(.�� Sodom Fracture Entrancement Y only Intake r . (R)NottsCapacity ... Pump (geM) Dissected'J N SwfaSed Type LI irk r f ;A Total wee Depth 9 Depth to Bedrock '‘:. ..r,' ti .;; ". Tea visa was dated,altered,and/orstemso ed-underaysupeaMion.arson leg to amicable Mies end regukalona,and thh report Is endplate and correct to The best of my NowwAgpe. Akin ; ,. .14t�... +C.. SWarviasr8 LMIMe. +.. .... i � , M1.i. Ragisbalon tin �i �\11 It. iI na: CYC 4:,� y"^. e',.Y>�'a__ Date Complete: -__at\L -I--�RIg Permit#: I ( les-sty-=f . ,,.. mal303307. nwrbe She t . ...a9aPR,w, ilitroMM--30-Asg.!qtry.8srnuiplappir ' "r: SPQ 4 Permit}I Pmm t Dale REScheck Software Version 3.7.3 Compliance Certificate _ ____ __, „.. Report Date:05/02/07 Data filename:Ungsed.rrk , , Energy Code: 2000 IECC • Location: Northampton,Massachusetts Construction Typo: Single Family - - - Gluing Area Percentage: 12% Healing Degree Days: 6404 .. , Construction Site: Owner/Agent: Designer/Contractor HAYDENVILLE ROAD RT 9 PAT MELINIK LEEDS,MA Ceing 1:Flat Ceiling or Scissor Truss: 764 30.0 0.0 27 Wall 1:Wood Frame,16'o.0.: 674 19.0 0.0 33 Window 1:Vinyl Frame:Double Pans with Low-E: 126 0.300 36 Wall 2:Wood Frame,16•o.0: 352 11.0 0.0 28 Door 1:So&d: 35 0.300 11 Floor 1:All-Wood JoisHTmss:Over Unconditioned Space: 242 190 0.0 11 Floor 2:All-Wood Joist/truss:Over Unconditioned Space: 558 11.0 0.0 40 Furnace 1:Forced Hot Air 94 AFUE Comp/lance Statement The proposed btadivE design described Frere is consistent with the build'ng plans,specifications,and other calculations submitted with the permit application.The proposed building has been designed to meet the 2000 IECC requirements in REScheck Version 17.3 and to comply with the mandatory requirements listed in the REScheck Inspection Checklist. BuiderlDeaigner Company Name Data Page 1 of 4 REScheck Software Version 3.7.3 Inspection Checklist Cil Date:05/02707 Callings: Q Ceiling 1:Flat Ceiling or Scissor Truss,R-30.0 cavity insulation Combs:s,ts- AboveGrade Walls: Q Wall 1:Wood Frame,16"o.c.,R-19.0 cavity insulation Comments: -. Q Wa8 2:Wood Frame,1W n.c.,R-11.0 cavity insulation Comments:_............_ Windows: ❑Window 1:Vinyl Frane:Doubie Pare with Low-E.U-factor 0.300 For windows without labeled U-factors,describe features: #Panes_Frame Type Thermal Break?_Yes_No Comments: - .. Doors: Q Door 1:Solid,U-factor:0.300 Comments: Floors: Q Floor 1:All-Wood Joist/ russ:Over Unconditioned Space,R-19.0 cavity insulation Comments: _. Q Floor 2:NI-Wood Joistrtmss:Over Unconditioned Space,R-11.0 cavity insulation Comments:_.. Heating and Cooling Equipment: Q Furnace 1:Forced Hot Air:94 AFUE or higher Make and Model Number: Air Leakage: Q Joints.penetrations,and all other such openings in the building envelope that are sources of air leakage must be sealed. Q Recessed lights must be 1)Type IC rated,or 2)Installed inside an appropriate air-tight assembly with a 0.5'clearance from combustible materials.If non-IC rated,the fixture must be installed with a 3'clearance from insulation. Vapor Retarder: Q Required on the warm-in-winter skis of all non-vented framed ceilings,walls,and floors. Materials Identification: Q Materials and equipment must be installed in accordance with the manufactur.t s installation inst uchons. Q Materials and equipment must be Identified so that compliance can be determined. Q Manufacturer manuals for all installed heating and cooling equipment and service water heating equipment must be provided, Q Insulation R-values,glazing U-factors,and heating equipment efficiency must be clearly marked on the building plans or spedfirations. Duct insulation: Page 2 of 4 U Ducts in unconditioned spaces must be insulated to R-5.Ducts outside the building must be insulated to R-8.5. Duct Construction: U All joints,seams,and connections must be securely fastened with welds,gaskets,mastics(adhesives), mastic-plus-embedded-fabric,or tapes.Tapes and mastics must be rated UL 181A or UL 1818. Exception:Continuously welded and locking-type longitudinal joints and seams on ducts operating at less than 2 in.w.g.(500 Pa). U The HVAC system must provide a means for balancing air and water systems. Temperature Controls: U Thermostats are required for each separate HVAC system.A manual or automatic means to partially restrict or shut off the heating and/or cooling input to each zone or floor shall be provided. Service Water Heating: U Water heaters with vertical pipe risers must have a heat trap on both the inlet and outlet unless the water heater has an integral heat trap or Is part of a circulating system. U Insulate circulating hot water pipes to the levels in Table 1. Circulating Hot Water Systems: U Insulate circulating hot water pipes to the levels in Table 1. Swimming Pools: U All heated swimming pools must have an on/off heater switch and require a cover unless over 20%of the heating energy is from non-depletable sources.Pool pumps require a time clock. Heating and Cooling Piping Insulation: U MVAC piping conveying fluids above 105 degrees F or chilled fluids below 55 degrees F must be insulated to the levels in Table 2. Page 3 of 4 Table 1:Minimum Insulation Thickness for Circulating Hot Water Pipes Insulation Thickness in Inches by Pipe Sizes Non-Circulating Runouts Circulating Mains and Runouts Heated Water Temperature("F) Uplo1' Up to 1.25' 1.5"to2.0" Overt" 170-180 0.5 1.0 1.5 2.0 140-169 0.5 0.5 1.0 1.5 100-139 0.5 0.5 0.5 1.0 Tabic 2:Minimum Insulation Thickness for WAG Pipes Fluid Temp. insulation Thickness In Inches by Pipe Sizes Piping System Types Range(F) 2"Runouts 1"and Less 1.25"to 2.0" 2.5"to 4" Heating Systems Low Pressureltemperature 201-250 1.0 1.5 1.5 2.0 Low Temperature 120-200 0.5 1.0 1.0 1.5 Steam Condensate(for feed water) My 1.0 1.0 1.5 2.0 Cooling Systems Chilled Water.Refrigerant and 40-55 0.5 0.5 0.75 1.0 Brine Below 40 1.0 1.0 1.5 1.5 NOTES TO FIELD:(Building Department Use Only) Page 4 of 4 330 HAYDENVILLE RD BP-2007-0856 GIS#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 06-062 : ;TY OF NORTHAMPTON Lot:-001 PERSONS COI\FIRACT:N(WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCr.SS TO THE GUARANTY FUND (MGL c.142A) Category: BUILDING PERMIT Permit# BP-2007-0856 Project# JS-2007-001411 Est. Cost:$228000.00 Fee: $2013.90 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Group: RENE LUCIER 034964 Lot Size(sq. ft.): Owner: MELNIK PATRICK J Zoning: SR Applicant: RENE LUCIER AT: 330 HAYDENVILLE RD Applicant Address: Phone: Insurance: 42 PHEASANTS CROSSING (413) 330-1112 WC WEST SPRINGFIELDMA01089 ISSUED ON:5/2/2007 0:00:00 TO PERFORI? THE FOLLOWING WORK:CONSTRUCT 2 STORY 3 UNIT TOWNHOUSE W/GARAGES/PORCHES(CONSERVATION RESTRICTION LINE WAS MOVED BASED ON PB DEC) POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector -,e g/A ,67 Underground: Service: ! ' Meter: 8/.24o Footings:Q3ej Rough:? )!- 4,R, Rough: f,S O House# Foundatione,r r 9 ( h'1 Driveway Final: ® 7 Final:(3.. 10_0 Final: tV3// , '41‹ 07l st( T L .4 - Rough Frame: Ot< fft3DI(t o7/lo( 7 • (t.uho13t�, 1 JtezVe Loai3 Gas: Fire Department Fireplace/Chimney: Rough:e..j/ . 6.74 Oil: Insulation: ° • ( - BPt FINAL. �iuC r< rogi,M5 Final: �0-07Smoke: g`2q ‘01 ,.� 0� OK. SKIN Off - jv i TGO AlSo P6NDi,yAP PT Na5 THIS PERMIT MAY BE REVOKED BY THE ITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGUL ION Certificate of Occupancy Signature: FeeTvpe: Date Paid: Amount: Building 5/2/2007 0:00:00 52013.90860/872 212 Main Street,Phone(413'•587-1240,Fax: (413) 587-1272 Building Commissioner-Anthony Patillo C 0 '4C/ PWMING ' Cop l IsJ e3:1 wiin pr