Loading...
06-062 (4) STORMWATER MANAGEMENT PERMIT '144 cAPI ij % ' S APPLICATION City of Northampton on DECISION Department of Public Works b` Project!'Site Name: Beaver Brook Condo'Multifamily Development for Parcel 24 Project Street or Location/Assessor ID: Haydenvilie Rd.,Leeds,MA/Map 06 Parcel 62 Applicant Name: Patrick J. Melnik Applicant Address/Phone: 311 Chesterfield Rd., Leeds, MA/ 584-6750 Application Submission Date: 3,/21/2006 Total Lot Size(f')_ 244,398 _ Estimated Area to he Disturbed (ft2):25,600 THE FOLLOWING DECISION BY THE NORTHAMPTON DEPARTMENT OF PUBLIC WORKS HAS BEEN MADE ON THIS WAIVER APPLICATION BASED ON INFORMATION PRESENTED: X Disapproval of the Stormwater Management Permit Waiver Application based upon a determination that the proposed project shall require an approved Stormwater Management Permit as specified in the Northampton Stormwater Management Ordinance(Chapter 22 Article 5). Approval of the Stormwater Management Permit Waiver Application subject to any conditions required by the Northampton Department of Public Works (see conditions below). The Northampton DPW has determined that the project described above is exempt from meeting the stormwater performance standards as outlined in the Northampton Stormwater Management Ordinance(Chapter 22 Article 5)for the following reason: Signature of City Engineer Date cc. Planning Board c/o Office of Planning and Development Building Department Conservation Commission c/a Office of Planning and Development E:\Stomtwater Permits\Stonnwater Permits\Waiver Decisions\Haydenville Rd._Waiver Decision doe Page 1 of 1 0 C (off -i c STORMWATER MANAGEMENT PERMIT APPEIC, ION DECISION City of Northampton Department of Public Works --' i li 2008 s Project/Site Name: Beaver Brook Estates— Multifamily Development Plan for Parcel 24 Project Street/Location: Haydenville Road—Route 9 _ Applicant Name: Patrick J. Melnik Es.. Applicant Address/Phone: t t l King Street, Northampton, MA/584-6750 Application Submission Date: 4/4/2006 THE FOLLOWING ACTION BY THE NORTHAMPTON DEPARTMENT OF PUBLIC WORKS HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRESENTED: X Disapproval of the Stormwater Management Permit Application based on a determination within seven days of the receipt of the application that the application is administratively incomplete (see attached documentation). Approval of the Stormwater Management Permit Application. _ Approval of the Stormwater Management Permit Application subject to any conditions, modifications or restrictions required by the Department of Public Works. Disapproval of the Stormwater Management Permit Application based upon a determination that the proposed plan,as submitted,does not meet the purposes set forth in the Northampton Stormwater Management. J2 h/°‘ Signature of City Engineer Date cc. Planning Board do Office of Planning and Development Building Department Conservation Commission do Office of Planning and Development NORTHAMPTON DEPARTMENT OF PUBLIC WORKS NOTICE OF INCOMPLETE APPLICATION STORMWATER MANAGEMENT PERMIT Project/Site Name: Beaver Brook Estates—Multifamily Development Plan for Parcel 24 Project Street/Location: Haydenville Road—Route 9 Applicant Name:Patrick J. Melnik-.Esq. Applicant Address/Phone: 111 King Street Northampton, MA / 584-6750 Application Submission Date: 4/4/2906 The Northampton Department of Public Works (DPW) is in receipt of the application for a Stormwater Management Permit for the above referenced project. The application has been found to be incomplete.The timeline for application review and final action by the Northampton DPW will begin once a complete application has been submitted. The application is incomplete fot the following reason(s): X The Stormwater Management Permit Application is not complete and/or signed. X The Permit Review and Inspection Fee is not paid. The Operation, Maintenance, and Inspection Agreement was not submitted and/or is not complete. The Stormwater Management Plan and Erosion and Sediment Control Plan are not complete.The following information has not been submitted and/or is not complete: Identify all operators for the project site and the potions over which each operator has control. All plans submitted have been prepared and stamped by a professional engineer licensed by the Commonwealth of Massachusetts The applicant has certified on the drawings that all clearing,grading,drainage, construction,and development shall be conducted in strict accordance with he plan Locus map The existing zoning, and land use at the site The proposed land use The location of existing and proposed casements The location of existing and proposed utilities The site's existing&proposed topography with contours at 2 foot intervals Soils investigation (by a Certified Soil Evaluator or Certified Professional Soil Scientist)including borings or test pits, to a depth greater than 4 ft. below estimated seasonal ground water for areas where construction of infiltration practices will Occur. Estimated seasonal high groundwater elevation (November to April) in areas to be used for storm water retention,detention,or infiltration (by a Certified Soil Evaluator or Certified Professional Soil Scientist). _. A description&delineation of existing stormwater conveyances,impoundments, and wetlands on or adjacent to the site or into which storm water flows. A delineation of 100-year flood plains,if applicable. The existing and proposed vegetation and ground surfaces with runoff coefficient for each. _ _ A drainage area map showing pre and post construction watershed boundaries, drainage area,storm water flow paths,and receiving water. A description and drawings of all components of the proposed drainage system including; 1) the structural details for all components of the proposed drainage systems and storm water management facilities (including size,inverts,and grade); 2) all measures for the detention,retention or'infiltration of water; 3) all measures for the protection of water quality; 4) notes on drawings specifying materials to be used,construction specifications, and ttpicals; 5) the existing and proposed site hydrology-with supporting drainage calculations (including the 1,2,10,and 100 year NRCS design storms); 6) proposed improvements including location of buildings or other smtaures, impervious surfaces,and drainage facilities,if applicable; 7) location,cross sections,and profiles of all potentially impacted brooks, streams, drainage swales and their method of stabilization;and 8) proposed ownership of drainage system structures. Estimate of the total area expected to be disturbed b-excavation,grading or other construction activities. A description and location of all measures (i.e., Best Management Practices) that ryill be implemented as part of the construction activity to control pollutants in storm water discharges.A description of when each control measure will be implemented in the construction schedule,which operator is responsible for the implementation of each control measure and a maintenance and inspection schedule for each control measure during construction. _ A description of construction and waste materials expected to be stored tar-sire,and a description of controls to reduce pollutants from these materials including storage practices to minimize exposure of the materials to storm water,and spill prevention and response. Timing, schedules, and sequence of development including clearing, snipping, rough grading,construction,final grading,and vegetative stabilization_ Please submit the necessary items to the Northampton Department of Public Works as soon as possible to start the application review process. For additional information contact Doug McDonald at 413-587-1582 x308 or e-mail at dmcdonald@nohodpw.org.