06-022 (10) DEPT. 9F BI ,LDING INSPECTIONS BUILDING =o j { Oe
J/
t Northampton,Mn 01060 PERMIT :"
6 - 22 VALIDATION
PATE May 13, 14 86 PERMIT NO, 237
APPLICANT Echo Village Corp. ADDRESS Y.O. box 46, Amherst U33987
OM.) WNW" aoWTR•S N CLNSE)
PERMIT TO 3 New Buildings 1_I STORY Residential NUMBER OF +48
DWELLING UNITS
(TYPE OP IWNwEMENT) No. omoPoSto ma
AT ILOCATIONI Evergreen RoadZONING URA
iso.) uTNEEn -- DISTRICT
BETWEEN AND
(CROSS EYNEE9 (CROSS STREET(
LOT
SUBOIVISIQN LOT BLOCK SEZE
BUILOiNG I5 TO BE FT. WIDE BY FT, LONG BY FT. I N HEIGHT AND SHALL CONFORM IN CONSTRUCTION
TO TYPE USE GROUP BASEMENT WALLS OR FOUNDATION
(TTO
REMARKS:. permit for the construction of 3 new buildings (residential use) with 48
new dwelling units (total). Controlled Construction Article 127. ZBA
approvalY� required E� Mf\
VOLUME 56 000 ESTIMATED COST .p 1,125,ap.00 Ff EMIT 4,000.0(7
ICu$ttesouARE PEETI %�',�'Lf//E/J $
OWNER P� Richard 0. Johnson & Jerald U. Gates 0t ! t �a,
ADDRESS P.O. Box 46, Amherst, P9F4XX Mass. BBY ILD
WHITE - FILE COPY • GREEN - FIELD COPY • CANARY - APPLICANT COPY • PINK - ASSESSORS COPY vW{'
a `:4i� e CITY OF NORTHAMPTON
' MASSACHUSETTS
` )11
il
e`t °=,I �:I OFFICE of th& INSPECTOR of BUILDINGS
_��,... i ^�
�`.'''� � PageAPPLICATION FOR
-.�,,y�� Plot ac;-
INSPECTOR ZONING PERMIT AND
BUILDING PERMIT
IMPORTANT - Applicant to complete all items in sections: I, II, III, IV, and IX. O
AT (LOCATION) E✓eR GeeaA) POA-4 oONNGGTXE
LOCATION INOJI (STREET'
OF BETWEEN AND
BUILDING )CROSS STREET) ICRoSS STREET)
LOT
SUBDIVISION LOT BLOCK SIZE
II. TYPE AND COST OF BUILDING - All applicants complete Ports A - D -4
A. TYPE OF IMPROVEMENT D. PROPOSED USE - For"Wrecking" most recent use m
Ill
-I
IZ Ne., building Residential Nonresidential
2 P1 Addition/If residential. enter number 12' 1 One family I6 Amusement, recreational
0/ new housing units added, if any, 13 Two or more family - Enter 19 Church, other
in Part D. 13) �� religious
umber Of untie-- -- y� 20 i Industrial
3 A• lteration (See 2 above) 14I I Transient hotel, motel, -__vv 21 —I
H Parking garage
4 [H R• epair, replacement or dormitory - Enter number
5I _] Wrecking (I/multifamily residential, of units y 22 ' _1 Service station, repair garage
enter number of units in building in 15 1.19 Gauge 23❑ Hospital, institutional
Part D 13)
161 I Carport 24( II Office, bunk, professional
6 I I Moving (relocation)
17I I Other - Specify 251 I Public utility
7 L I F• oundation only
26 School, library, other educational
B. OWNERSHIP 27I I Stores, mercantile
B,(Priva e (individual, corporation, 28 Tanks, tower,
nonprofitin etc.) 29 U Other - Sped/y
9 I Public(Federal'State, or
local government)
C. COST (Omit cents) Nonresidential - Describe in detail proposed use of buildings, e.g., food
1 �J/, processing plant, machine shop, laundry building at hospital, elementary
10. Cost of improvement § if 144g41204. school, secondary school, college, parochial school, parkr,
partying garage fo
department store, rental office building, office building at industrial plant.
To be installed but not included If use of existing building is being changed, enter proposed use.
the abovecost pp ff�� �,%/�'f
;a.n eeabov a 9o�xis✓ 2 i a . � I tic? ' " -
b. Plumbing /25;41y /q}�dl� ♦ (�1,� � //p/ y l/
c. Heating, /trV�//V��//W�//�� l!/{( 7.t.�W L.6�L �! - /�7
i. conditioning �634XJGr 74472 // 2(2nd zytte,a8C
d. Other (elevator, etc ) !�
I1. TOTAL COST OF IMPROVEMENT E / /2.C/Qoo
III. SELECTED CHARACTERISTICS OF BOILDIHG - For new buildings and additions, complete Parts E - L;
for wrecking, complete only Part J, for all others skip to IV.
E. PRINCIPALINTYPE OF FRAME G. TYPE OF SEWAGE DISPOSAL J. DIMENSIONS 7
30I :Masonry (wall bearing) 40 Publico private company48. Number of stories 3
31 Wood lrome 41 I Private (septictank, etc.) 49. Toru) square leer of exterioriis
all efloors, based onS6,coO. eD
32 ) Structural steel dimensions
331 I Reinforced concrete H. TYPE OF WATER SUPPLY
34 ❑ Other - specify 42(Public ar pi!vote company 50. Total land area, sq. it 31/4 o yo
4317 Private (well, cistern) K. NUMBER OF OFF-STREET
PARKING SPACES
F. PRINCIPAL TYPE OF HEATING FUEL I. TYPE OF MECHANICAL 51. Enclosed O
35)LII Gas Will there be central air 52 Outdoors 96
36 7 pit conditioning' L. RESIDENTIAL BUILDINGS ONLY
37 VElectrinty 44 H Yes 45 e No 53. Number of bedrooms 9.6
38❑ Coal �'J
39 LJ Other- Specs/y wal there be an elevator' Ful'
}� 54. Number of
46 H Yes 4J;k1 rvo bathrooms Partial Ye
IV. IDENTIFICATION — To be completed by all applicants
Name Moiling address - Number, srrret, cin, and Stam t - ZIP code Te I. No.
I.
or gchnan D S�/�r•C401u Bo. Box S/6 At /es1/Ztcr_ oioo y a.sv 85x0
Les —3-tem-i_4 /74/�- ) � 1�9A5/s� n e tr s .'l f6 trt-ev
2. L ejt) Vl eAlfF' ( tO/91 ,r ,, c, L.rense No.
Balder.
Contractor 0332.57
3. 7110/2945 /Y Ka lei IC11-utite-u izv� /2�a. ola� 5*7-/o St
Architect or / y
Engineer
I hereby certify that the proposed work is authorized by the owner of record and that I have been authorized by the owner to
make this application as his authorized agent and we agree to conform to all applicable laws of this jurisdiction.
Signature of licant Address ApPLcat on date
,u �9/ -ese
t- I' 0r l�x�/ce�z J 4k `very 56.7344
00 NOT WRITE BELOW THIS LINE
V. PLAN REVIEW RECORD — For office use
te Pla
Plans Review Required Check Plan Feeview D Startedns By DAAte pprom Plands By Notes
BUILDING $
PLUMBING $
MECHANICAL $
ELECTRICAL $
OTHER $
VI. ADDITIONAL PERMITS REQUIRED OR OTHER JURISDICTION APPROVALS
ote ate
Permit or Approval Check Obtained Number By Permit or Appravol Check Obtained Number By
BOILER PLUMBING
CURB OR SIDEWALK CUT __-- ROOFING
ELEVATOR SEWER
ELECTRICAL ■--. SIGN OR BILLBOARD
FURNACE _--- STREET GRADES
GRADING USE OF PUBLIC AREAS
OIL BURNER WRECKING
OTHER OTHER
VII. VALIDATION
Buildingr��']_, FOR DEPARTMENT USE ONLY
Permit number (Y4, 1
Buildingpp Use Group
Permit issued 10.71 /3 19 150
Building Fire Grading
Permit Fee $ X/a/)reZ) Live Loading
Certificate of Occupancy $ Occupancy Load
Approved b /� � /�J � �
Drain Tile $ jiz,a.*A.�9 (,/t.✓ Lit
Plan Review Fee $ C�
TITLE
NOTES and Data — (For department use)
VIII. ZONING PLAN EXAMINERS NOTES
DISTRICT
USE
FRONT YARD
SIDE YARD SIDE YARD
REAR YARD
NOTES
IX. SITE OR PLOT PLAN - For Applicant Use
:x : Lapnel" e
ama. •
usli g: r» t r.•••:::: x::e8? : :xx: x . »..e... .... d.
se!S::E!?•m! e"t:lxs».».........»•...»..�•x: :::»:: I
I?Egea••E••9ixaa:::x: r•::::tee::x::ss s••••••:""»
:::..s•.•.s:..x: ::r...:s ss:e::x::::
;ssss:x•••:rgfi .sr••;•s•:::::xa.... ::::I:u s»
r .. . . »
:e s irli?�:-Uilinu Se ?heti:??e? = s e
mu:
:::s're.:?!??.....Iz :::l :s»»...»......=tl x.....:::s....»...».........a:Er=rr:
r•se .:::: :e : e s
: u. -•....s:s: s ss . . . .:........a...»... .an
x.: :a • • :xs..... ••• »:e:.e. a::x ::xx:ss::
»x xxx:xxx ; rrsrar•»»s:r:sr s
.. »..
tutu::
ggss:xx »...» :•. gun s
•»•••s:s :::s r s
.axxe:!?e.:.;•,sxe::x;:--i-i....1....:..... ...»1........»...».....»».......x::x
an ::uuu:u:::'sa ..n.....»».: • .....»•.:. :
x:x :xxs»s....».......g::::s :......»..x
.:gei?s?s :»x re r
s»...grr•3r°:•••••••12:••••rss•rsss : •
)111
..sn »x;,Eixssi .:'. . . .r:::ss s
Islg ..li.....•°:!° iuiueil::?::gls :: us s Pisces.
Thins :xx=sax;.. . . .. s».......s»rug: s
ineire:::g.Iyue...... s.y xs::: ° :
agt iialuex sxxaxss=l;gg..a...;; z»..a»;;x ° e
Yx: :: ssx g sl x::silg:.s.:.s.es ' s• !» ss s
g;seasasg»liigEnhu::x:i::91.10 :x:ce:::s:ss ii.... 1.....11... I 1111111131»
sr::: aire::ui'l: •l:::s:gge:•;:: . a:;
s'»"! a xr•••r
se rss=ffl: ::xs:e num::: s . .x
xe : I I :
! fieggu.s»:wliea !: . : :. s s
xx.;;iis .• :u: ur ? s : u: s• :a: ;»: a=
rii ussx !! ! ?: ! ::xsse::e•••sss
xs e:s• s;. sx:s• • !i! ""?sss s::ss:�s:ss:::s: s . . :•s:•s:::ess:..... : 11:1111131111
ilii iee :::ssss?:sisss• :er;:ag:r•"s.xs: ?!slshi:°e? • •;:s:i:::....s...s......x»••••••.sx:i:ss s
::....
� a°sis� l1i::ieii :gg:e= ,auxss iu 3! r.::s::E=;�is�ga�e:::::....:sx,s:sr:rsss:i°r::srs
,n�•g�s-u- •eq: xsgs� } 1_ #s ,s� s.ssss» rise:?eeilss:! xrss:':••••:l;s••»»
x il3�13!>:i elEA glRlWi'� I::xs� ...-..::!!???:i?g?i:sass:e!'ss::xxs s?ss::xxex:sss:se s
•. ss g s ::s s: ;a••s. .. ;;iisses »s x•:::ss:::::ss:::
i ssx INI :x :ss ::;s !..•!E!ull:ue?ls:lE:si:sss::i:ig!!'si:sjs...hs•se:
gEu1 r
l s lm x i usiiinissl
lg xes•: s:
s:x :s:
::: :: x
:: :111111111M1111111••••••• .•. xx: xxx
BHrraill: : ! Eu. eIIi.. : . .: g: . . 3 : rrye� �a -1ii 4flaiiii ¢ ila ..fP - • I---------------
P
CITY OF NORTHAMPTON, MASS.
May 6, 19 86
THE BOARD OF PUBLIC WORKS
The undersigned respectfully petiition your honorable body for
o
Permission to instal driveway/at the proposed condominiums on Evergreen Road.
Fifteen (15) foot maximum width at the street line. Gutter drainage not to be
disturbed. All drainage shall be directed off the driveway surface to
adjacent land and not on the existing roadway. Driveway surface to be
paved if the grade of the proposed driveway exceeds 3% or more.
By: /rl'ldry
ry Gates
Echo Village Corp.
Box 46, Amherst
Proposed Location 2A., ) 2 _
Inspected by: �-" �rr.- / -� �% - 49‘'
Richard Stone
Gravel Base Grade
Inspected by:
Final Approval:
THE BOARD OF PUBLIC WORKS
Voted that petition be granted.
Paul 0. Hadsel, Director of Public Works/
City Engineer
(SUBJECT TO ATTACHED CONDITION 1 & 2)
Conditions: Driveway Permit
In lieu of plan approved by City Engineer
I agree to the following added conditions:
1) I will contact the Department of Public Works and have
an inspector check and approve the graded gravel base
prior to paving to insure compliance with slope and
location;
2) I further agree that if in the inspections any of the
permit conditions are not met that I will at no expense
to the City remove and replace the driveway as directed
by the City Engineer. %
By:
VPetitioner
NOTE: The Public Works Department recommends that you provide a
plan showing the proposed driveway with grades and location
in the future to avoid possible expense which you will incur
by not getting approval of actual plans in advance.
�((MP0RTg111T MESSAGE) l _
FOR (a — .01;, her
A.M. W L,1 € Al h-C:LA aJ
DATE / [e' rTIME7 P.M. ,E ,, �1 /�. ,,, ,, ' - p �� `�.
M C ziki.A-(/�iJPlln./ (� dlef/J(J (�TcC''/LL'r�.-�- tedk� tt �A /1/4a " " 1-A-CL
OF 1f�lJ11µ• J -I LL 1 Jam.L _ "4�711 {. "r Q �^ '6V�^9', .e{�},'-'�` 4- ' . "'' ,L,
PHONE V SSS— a l(V V n „Vvl V�.WWI-V S ' ' " c
AREA CODE�� NOMSER EXTENSION W V II Y
SPotit
TAMETQ le
0. BlP4CALLA ; ^ - � 4
� n � LU� Wa,u.
GnMET4 Ml P5,,,i�Ik 01, -a—
FE';70 Ep^YGURCAYirr •.. tx� ,IA4$4
ME'SAGE 9���u`zo N_\l .XAR`-.I • _ c An-N-0 t
mom-.- o
., '. l I, I
i 99
SIGNED
` LITNO INUSA. '
TOPS 9 FORM 3002P
� City of Northampton ,. *
k > "nat asetla 1� E/.
'Cary. DEPARTMENT OP BUILDING INSPECTIONS `r�
G
'
212 Main Street ' Municipal Building
INSPECTOR Northampton, Mase. 01060 »"-
Edward J. Tewhill 'imr"
February 14, 1986
Mr. Jerald H. Gates
Gates/Johnson
P.O. Box 46
Amherst, Mass. 01004
Dear Mr. Gates:
Reference your letter dated February 11, 1986, also the site plan that was
enclosed. Please be advised that the site plan is acceptable to this office.
Sincerely,
Edward J. Tewhill
Building Inspector
FJT/ld
GATES/JOHNSON
U 3 rBox 46
term- Amherss t, MA 61004
�� �,/'✓5 • 413-256-8500
February 11 , 1986
Mr. Ted Tewhill
Building Inspector
City Hall
Northampton , MA 01060
Dear Mr. Tewhill:
I am enclosing a copy of the site plan for the
Yankee Hill Condominium off Evergreen Road in Leeds.
A preliminary meeting has been held with the city
engineer , and he has approved the locations for water
and sewer and storm drains on a preliminary basis un-
til he receives the engineering plans.
We have increased the parking lot capacity per your
suggestion to two cars per unit which changes the con-
figuration a little bit.
Please let me know if this preliminary site plan
is acceptable so that we can proceed with the engineer-
ing layouts and building drawings.
Very truly
/yours ,
Jerald H. Gates
JHG/amz
Enclosure
A
yv `ito, QIitq of Northampton
siasinicktrotHs
> r :'d Office of the )nspeetoe of PaiiDings r i�r ii
Ev 1
.. �t3 212 Main Street•Municipal Building
Northampton, Mass. 01060 -•, _
a
BUILDING #1 #237
CERTIFICATE OF OCCUPANCY
July 8, 1987
Page No. 6 Plot _ 22
Building (Name) Evergreen Village Address Evergreen Road
Owner Echo. Village Corp. Address P O. Box 46, Amherst
Applicant Richard Johnson & Jerald Gates Address Same
Use: 1st Residential Occupancy
2nd Residential occupancy
3rd Residential Occupancy
4th Occupancy
Zone District URA
Required Inspections:
New Building X Existing Building
1
Elevator Electrical ...is •- \ s .• p.
Plumbing /- ---„ -r - Al `�j' Fire -®
Building JJ UA A. .� Other
r �
Q ' �p
/�,e, cL�
Inspector of Bi ilpings
?' . (ritR of Northampton .,
�nuo¢mM• 1 • j
,A " dt
Wirt of the Ynapedaz of ailDings .' ,Ig
mn2,. - 212 Main Street•Municipal Building • i elm
Northampton. Mass. 01060 ��
#237
CERTIFICATE OF OCCUPANCY
BUILDING #2
August 21 , 1987
Page No. 6 Plot 22
Building (Name) EVERGREEN VILLAGE Address EVERGREEN ROAD
Owner ECHO VILLAGE CORP. Address P.O. BOX 46, AMHERST
Applicant RICHARD JOHNSON & JERALD GATES Address P.O. BOX 46, AMHERST
Use: 1st RESIDENTIAL Occupancy
2nd RESIDENTIAL Occupancy
3rd RESIDENTIAL Occupancy
4th Occupancy
Zone District URA
Required Inspections:
New Building X Existing Building
Elevator Electrical (21‘ Ji
Plumbing r--/ -7/ - 7 S.D. Fire .-t
L,-
Building
Building -'. Other
Zjct t- it gs (�-E/_
Inspector of Buil gs
Tap of Northampton
�.a�.1j11imi hmrns 111 ,
'r .v. Office of the Insperfor of Aailhings -%:1.4.).-f
iroPIP %;--11111r
151= 212 Main Street•Municipal Building F�
Northampton. Mass. 01060 r =#
#237
CERTIFICATE OF OCCUPANCY
BUILDING #3 LEFT SIDE ONLY
SEPTEMBER 30, 1987
Page No. 6 Plot 22
Building (Name) EVERGREEN VILLAGE Address EVERGREEN ROAD
Owner ECHO VILLAGE CORP. Address P.O. BOX 46, AMHERST
Applicant RICHARD JOHNSON & JERALD GATES Address P.O. BOX 46, AMHERST
Use: 1st RESIDENTIAL Occupancy -
2nd RESIDENTIAL Occupancy
3rd RESIDENTIAL Occupancy
4th Occupancy
Zone District URA
Required Inspections:
New Building _IL_ Existing Building
Elevator Electrical\\ f
/
Plumbing ; _ ' S.D.
Fire
v • �
Building r ' Other
Inspector of Buildings
id
:an . Qtitg of Northamptona
r- "
Mk
Va.t�t!,
Office of tilt � C nsyufoc of �nilDings E Ia�
" � 41
212 Main Street•Municipal Building -'i'�ei
Northampton, Mass. 01060
CERTIFICATE OF OCCUPANCY #237
BUILDING #3 RIGHT SIDE ONLY
OCTOBER 7, 1987
Page No. 6 Plot 22
Building (Name) EVERGREEN VILLAGE Address EVERGREEN ROAD
Owner ECHO VILLAGE CORP. Address P.O. BOX 46, AMHERST
Applicant RICHARD JOHNSON & JERALD GATES Address P.O. BOX 46, AMHERST
Use: 1st RESIDENTIAL Occupancy
2nd „ Occupancy
3rd �� �� Occupancy
4th Occupancy
Zone District URA
Required Inspections:
New Building X Existing Building
Elevator Electrical y 2� L� �;' c
Plumbing C; c-, / S.D. Fire ji7/ r/Lv ( �'J
/
Building l) :-/-- ((�' Otther�j v7/
na.r- ��////jj ti
Inspector of Buil BIngs
THOMAS A . KIRLEY
ARCHITECT A I A DIAL 549-1044
P. 0. SOX 645, NORTH AMHERST, MASS. 01059
71617177.717:771
�f`,11)15 / 0 936
September 9, yC ,.; _._, ;
20)
Mr. Edward J. Tewhill
Building Commissioner
212 Main Street
Northampton, MA 01060
Dear Edward,
Please fine enclosed, copies of the site reports for
Yankee Hill Condominiums up to August 28, 1986. Also roof
truss details with engineers seal .
I will be inspecting the job site again this week and
will keep in touch.
5 ' cerely,
p►. _
Thomas A. Kirley
TAK: am
enclosures
0. OIL
MGM_ AF : B my : 2 VECEIYEDAj6/dt9-1386
X 5' 10 5/16' 0111 V 5' 10 5/16' 5' 4 13/16' 5' 6 1/4' 11
i1 3I�Tn�\
I'
23.6 41 .8 -! i e °� rorx+ �
2X4 S_P.F t3_) x P J
41.8 --- 48.. � 3 lir �.I
DIRGOIYL If : 10.66 Oty : 2 4 ,
7' 7 12' 011iT 7 I/2' 7 ' 5 3'16" 4' \4'l� l. �'
40
8.8 I 2X4 S.P.F 13 _J24.6 11-i
24.6
VERTICIL W : 5.333 Sty : I
X 7' 9 1/16' O11L �7' 9 I/16' 7' 8 174' 7' 8 I/4'
.
[NP TYPE HEIGHT HEEL SCARF OVERHANG
LEFT Std . 4 3/16" 5/16" 6 15/16" 9"
RIGHT Std. 4 3/16" 5/16" 7" 9"
Rise= 8' 4 7/16" Span= 35'
- sa -aitY
2a2 . :9:
rFe
i =s 8G - -
PREL POINT SPLICE PLATING 14E8 : - a e c y3.
SPLICE PLATES Ale u s?E xLRTE 801 FORCE RATE roacE6 S
L 1X4 j LY6 M -3357 3%4 ej 3052 3.55105 L; -41% je 187 % % 2 : 14 - 1 :'
e• 3.5X5 h 8X4 cd 2101 3X9 it a+98 3.539 88 3.5X4 H 1. -2Be eh 98700 df 1 ;e . . y p q
4- 154 de -2181 33.9 hp 3E82 3.5X1P5 hi' -931 yy 5 E. 5 . $
et -38H3 C.4 1 _ . 5 i
43 -13S7 3+:9 X X ul 3 t ^ 5
3
Ia ;3' S' l2' .� .
2 . 7.a' f
e 3%3� . 35e5 . — 'r YY q
`-`:\r` _3X3 , . .. Q ^ i
Ira \\ 1k-4y .
12 9n tie/ 1X3 -.115
5.52--- . s • �5 t5
N e 3.5833 j; I' 'a' ; 1
WEDGE j3 NEucL £ai - ,. X.
a
i Il31
8' 9' B' 9' 8' 9' 8' 3• iHY • •
35' Sp ail
/Op CHDRO 2X1 1858F 1.3E 13331 LONOCI¢CM.merr mu. REACTION ticr.LcAo L. B.
wits CHORD 2X2X4 S.P F 1'3 7-17/86 G -Ii9B Dol 32 le
8 le
TRUSS ENGINEERING 24.0'C Isk1NC
N1. b8; L-3.5 R-3.9 rri-toln 2.0®e.a,
• DV .D[AGONti : 1x.s6 �yI�E�CEIVED AUG 1 9 i98
`/ 6' 8 3/4' OBL V 6' 8 3/4' 6' 3 1/4' 6' 4 11/16' i�
3.54 -X141 .9 r-1 1-e -t:!` o
in OF
'A".
( 2%4 S.P_F id / AN
1.9 - 48.1 crs3axEB '�,
BIIX�OtA IF : 13.33 Gty : 2 +' 71:0:114x
mi
566
X 8' 9 1/16' O8L A/ 8' 9 1/16' 8' 6 3,4' ' 8' 5 9/16' NCE ' yl
tt i,:.,L E '.,
8.012X4 S.P.F 13 , 24.6 J-1 `—
24.6
VERTICAL BF : 6.666 Ot.y : 1
X 8' 1.1 13/16' 881_ vat la 13/16• a' 10' 8' 15'
END TYPE HEIGHT HEEL SCARE OVERHANG
LEFT Std. 4 3/16" 5/'c" S I -„ t -7,.. ,-
RIGHT Std. 4 3/16” 5/ 16" 6 1S/ 16" 9"
Rise- 9' 6 3/16" Span= 40 ' Tell iill3
�
. 14
PANEL POINT SPL/CC PLn3INa MED 2 rre
y'€ Vt g 9 3
EPLICC PLRIES TOP (d1CC ROTE FPLATE FORCES i
!X4
FZL ab -3012 J 5.44 ]515I5 3X1=5N bJ 582- jc DED R j F
, aj 4
3.5X5 1 1 5Xe Ec -34S6 3I 43]1 3 5:+- N q2 . di 1351
x4 h dn. Je -4413 34-4 cid 2413 '1 1 p -.5,5 ; L411� i I '.aa.n 424 '•h 5E9 �Y , t ? 3Ix
i -,456 344 X
fp -386. 3.SX4 3 i
e -
6. 6. 6. 8• 2• B. ,1. 0. [, B.. 1 2 o ' • 1 -
1 5>\-.A 5
c 3X3 .4„.------ 33-.._\.. : a
3`� 3X3
b 1X3 % }C\ I 1.2,‘
12 \9 o i
5.51242.„4.44 / 1 °c ' \ ��`�.. I Z3 v 3 i 2 p
a 5113
1 , ♦ 0� " r 3. 3. 3a
Ni \ 0 3X8 "a_= ' ; ; it
X . i v
3 3X3 + 1.526 n 313 WEDGE Z S 3 p g 3 1
3 i�il . 1
19' ID' IB' 18'
CI-tI 2x4 21043E 1.9E CP CI lom}rgD:H.rprau c214 rrftTION 1WIF.LBBB L. D.
CHORS 2x4 1650F 1.3E 1. 1/336 a -21143 Top 32 18
a 2x4 6.P.4- 13 TRUSS FNGIIIEENINC 8 -2E158 Bal a ID
Bnn 1444114:4
Wei1 ..:1 R +A 1P1-Wm RAVlhoe
1
THOMAS •
A . KJRLEY
A R CHI TEC T OPAL 549-1044
P. O. BOX 645, NORTH AMHERST, MASS. 01059
INSPECTION REPORT � /�
PROSECT /ru�
,, /1 ( �/r/mss ,
PHASE OF CONSTRUCTION Alt, . `�. ! - < ,ia.
DATE • g, 7
INSPECTED BY /\ /-f � �j
-f
COMMENTS
'h
---S Q[o-U\c I . "--
lcrfs�r5 i , wra I 'fit l�n.ce� ' c.,-t6 k-t pQa«---, .
9-r c T"
zek itis yesle- C �sgcl�a7c.a�,� 6c 4`
y'��er�.��.iciL — (��
��
, fffi
�
�j v
J ,,,,, k
Copies to : file , owner , contractor , building inspector
THOMAS A . KIRLEY
ARCHITECT DIAL 5491044
P. O. BOX 645, NORTH AMHERST, MASS. 01059
INSPECTION REPORT
PROJECT 4014. . Y/ // h/_ • 47
,t' / n
PHASE OF CONSTRUCTION \ '✓ . j /
.DATE
Ci
INSPECTED BY rt
I7)
COMMENTS
g
rage
:' k -e
•
CJI �5• _ 4 ` : iatAlek
nt
Copies to : file , owner , contractor, building inspector
�• afileft7Ceeleir
THOMAS A . KI R L E Y
A R CHI T EC T DIAL 549.1044
O. BOX 645, NORTH AMHERST, MASS. 01059
INSPECTION REPORT
PROJECT _ QD
'et'
PHASE OF CONSTRUCTIONc cie rt G//u-<t( raZitc y/
DATE
INSPECTED BY CS' -�.�� \
COMMENTS-yet ILS-W
c
1� V 1 41 c`.Y i4.I`AWA, v W Ir
By : is
Copies to : file , owner , contractor, building inspector
THOMAS A . KIRLEY
ARCHITECT DIAL 549-1044
P. O. BOX 645, NORTH AMHERST, MASS. 01059
INSPECTION REPORT
PROJECT
(rah
PHASE OF CONSTRUCTION
m
20444 , e, -40,
DATE
iG
INSPECTED BY T:Jsei
COMMENTS 7
L67
4
:e6aeiaae--t ,e-7tA--r
=Y / NTier
Copies to : file , owner , contractor , building inspector
THOMAS A . KIRLEY
ARCHITECT DIAS 5494044
P. O. BOX 645, NORTH AMHERST, MASS. 01059
INSPECTION REPORT
PROJECT i L _ ,e- �pJ
PHASE OF CONSTRUCTION vf�„o41.�.J , ] d-richieTh
DATE ..
INSPECTED BY j_!
COMMENTS c.
/(v "�� '� is/Ui ��' • �iGc
a G ,.' :c9;, :'_F ' e
•
, rc✓ AL1 rz s �.;t4' ti ,,
�✓ .ice! <c�-ca CL' 2�:✓ _[az.” _ /;~'l „"
✓i {a-_ems- \
der ! C
Copies to : file , owner , contractor, building inspector
THOMAS A . KIRLEY
A R C H 1 TECT - DIAL 549-104
P. O. BOX 645, NORTH AMHERST, MASS. 01059
INSPECTION REPORT
PROJECT Yankee Condo' s
PHASE OF CONSTRUCTION
DATE
INSPECTED BY Thomas Kirley
COMMENTS
October 15, 1986 through January 5, 1987:
Framing crews returned to Randolph Place--little carpentry
done, ground work and rough grading complete--footing drains and
water proofing on foundation inspected and approved--plumbing
rough under slabs of all 3 buildings inspected and approved.
Engineering for roof and floor trusses received and approved--
filed.
•
Copies to : file , owner , contractor , building inspector L///
THOMAS A . KIRLEY
ARCHITECT DM & 5494046
P. O. BOX 645, NORTH AMHERST, MASS. 01059
INSPECTION REPORT
PROJECT Yankee Condo s
PHASE OF CONSTRUCTION Foundations Drainage & Framing
DATE September 16, 1986
INSPECTED BY Thomas Kirley
COMMENTS
Building A
P. T. sill plates - termite shields
Studs up on South side.
up to 1st floor plates.
Building B
Rough plumbing in, drains and rough plumbing in.
Back filling, footings in for bearing walls. Floor not poured.
Building C
Concrete foundation walls in - installing drains
around building.
Water storage tank poured.
Copies to : file , owner , contractor, building inspector=' /
THOMAS A . KIRLEY
ARCHITECT cam 549-1044
P. O. SOX 645, NORTH MWERST, MASS 01059
INSPECTION REPORT
PROJECT Yankee Condos
PHASE OF CONSTRUCTION Foundation & Framing
DATE September 24. 1986
INSPECTED BY Thomas A. Kirley
COMMENTS
Building A
Stud walls up to 1st floor.
Joist set on center section
Setting joists on North end
Asked to solid bridge, Studs on bearing walls.
Building B
Backfilling conc. foundation walls.
Concrete floor and rough plulming in
Drainage also in.
Building C
BAckfilling and doing rough plumbing.
BY : r, z�ti✓�7- <e77Oj
Copies to : file , owner , contractor, building inspect
4
r 7-
uDimas A. Kirley
44' s� � hitect
- PO Box 645
North Amherst, MA 01059
October 24, 1986
Mr. Edward J. Tewhill
Building Commissioner
212 Main St.
Northampton, MA 01060
Dear Edward,
Please find enclosed, copies of the site reports for Yankee Hill
Condominiums up to October 10, 1986.
I will be inspecting the job site again this week and will keep in touch.
Sjncerely
Thomas A. Kirley /
TAK:am
THOMAS A . KIRLEY
ARCHITECT DIAL 549-1044
P. 0, BOX 645, NORTH AMHERST, MASS. 01059
INSPECTION REPORT
PROJECT Yankee Condo's
PHASE OF CONSTRUCTION Foundation & Framing
DATE October 10 1986
INSPECTED BY Thomas A Klrley
COMMENTS
Building A
Ready to go up to 3rd floor.
Building B
Concrete floor poured.
Bearing footings poured.
Building C
Routh plumbing being installed.
BY •
Copies to : file , owner , contractor , building inspector
YMInMq[ 41H1-1a1
1111 Y91 9,v.1t 9NI8331II 9N3 551181 0'1 8 1'', I .8..a •i4
Of O %00 nes- B CI J'4 9 1012
58,1 I,r 3E'1 JB, se31
'a '81 1 000-1•_um 12011.211-1 1 I J1:.ia. HWuasflo1 191u ]I 4x2 OS -I3 Lel
U.d .u. a'I JBnlz Yx2 Bwtn dot
tgl
Ifl!1 ,38 31031 _ En 4 3.1/6'I I r
� � �,s �3. '' r dZf \` fXE __ 79031
j ] P c LA �\ ex;
•i t CYE `'--
' \\\ EXE
5
f 'Y
P
_ .8 .9 .9 .9
x
LYS E 9BE'- 9y
7.6 954— oe
E5a ] ` ., 6- . H.: .L._ " Ir1 . i rl ,c ty I a;ta- r:
` X 3 Isfi iv ti- H '.5-E lIO I
Ft: CI Y. . pa 9119 4 S%SSE 9
1 `. BM of SOS' rq X5F[ZE sISE N 11E 991E- t ]Z:XI 1 p*Xi q
' £ 5 931M]J 1114 F []BF- Qt 'JX] 1' Ie q
! ♦ Y. 4 71tl1d 71104 10d 31ldS 1'JMIJ SOL
6 Z T`i 3 i L Q]fi 9]1tlV b[b3
4.^ v :Xi1LBld 311115 1NIOd l-... .
'yat{,s : . a
C = 1EZ i
Cr11 " 4
_ , O4 =urdg
..51/E 9 ,6 =05i21
„6 ..91 /SI 9 .91 /S ..91/E 4 1345 IH9IH
..r; ..= 1 , c „
!
91JHH213AU idUDS 1331i 1H91 4 P75 1J31
H:113H 3dA1 (1113
Al V
e, 2% ,F .3;/Ci of ,8, : ldu .91/E1 01 .8 /1
I : Alb 999'9 : 1'2112131
-P 9'67 E! J'd'S PX? 0'0
4
„,,„..,.,,
„:, _ , 4
1, 9951 9 .91/6 5 ,8 . .b%E 9 .8 .91/1 6 8X
',t, X996 ' V 2 : Alb E:'EI : _ t '00 .9V1 6 .8
%. E3Hdms;. i _ Z-►df79U 111
t\`'- l'86 --
'WJOHOr'P \' a_I I_,i F• 16 F_� _J d_S IQ S'EZ
icki .91/11 6 .9 .6/1 E ,9 .6/E 8 .9 % t.6i£ 8 .9 t
461 6 t 9^1.' 03A139524: An"!
: j8 ,1818
e•no
.
? (', CA4 a.r.r 1,3 / 60. 1
DIRGONII. DF : 8 Oty : 2 RECEJYEp,;UG/J.�-9 1986
'V 5' 10 5/16' OWL /1/5' 10 5/16' 5' 4 13/16' 5' 6 1/4' I/741
4a .�
St'% MPH I c,
23.6 2X4 S_P.F A.t 41 .8 e / e Y 7-
41.8 — -- 48.2 y
DIRCOIai OF : I0.66 Oty : 2 4
7' 7 I'2' 0HL i 7' 7 V2' 7 5 3.' 16" 4' \ 1 <E., '
}/ { 4� ,4ALE/
11.01 2X4 S.P.F 13 124'6 d- I
29.6
VERTICAL DF : 5.333 Oty : I
if 7' 9 1'16. ORL Y 7' 9 1:16' 7' 8 1'4' 7' 8 1i4'
IND TYPE HEIGHT HEEL SCARF OVERHANG
LEFT Std . 4 3/16" 5/16" 6 15/16" 9"
RIGHT Std. 4 3/16" 5/ 16" 7" 9"
Rise= A ' 4 7/16" Span= 35'
' >I
24 "s4 $
la !•.-7.4,�_-
4,F4 = 385' e
r � " GPHEL POINT �PI.ICE PLATING FEB
SLICE LR !roe
`RCEirt Del rope. PLATE rORCE6 itaGuqt #
L JGE6 ee O3X4j 30'52 3.5%305 bj -4 ? jr 407
e 3.535 14.5X6 be -31383 3X4 II 249e 3.5X4 H ct -000 dl 1261 R /9-3.111 .1
e 3.5%5 h GX6 cd --2IOt OX4 I L =4 e9 3.5%4 II is -?De eh 48? 02 i 3
ll
f 4X4 de -2101 3X4 hp 3N52 3.5X185 hf -43? &L U R '- a i 3
et -_,2lH3 04 S - - :. 'd
43 -735' 3x4 111 :: a ^ 3
710. 7
- - ,
. e
2.1 - 7; “
S' lu' 5- 1d` s ta' :a
z e 17....,..,/-. %\ e O b°e, r t : 3 .
13
, . 3.5X: ggy :: 'a XB
N %
e 0-22-_996 TR.S eoa C2R=2R'Ti6. _ ^ !3:53::8
Saieser's No. : xxxxx Saiesrar s Narre: OAS's- .1-80..504 Saes:fier: 6_u_RY SYS-EYE
E -ate No.: Sc"atc, Pao o_ Bete: YOBREE .. LL COWS Pa:E 'Ale: .T FLO"u3. JOIST
Wo ems{ ripe A
RE F.0-3R Stress: 103; :ive Loa:: 40.e as; Dead Load: i0.e osf Partition: e.e osf Glue:: Floor
Re:
Barr., Series Prc. Dena o.c. hem R.
1 125 Ride 11.8 24.0 Y 162
Des:CT: Allox. Cont.
V 979 ! @39 111% err
e S% 1 v :er 102% stress C _ 1oa:
37333 f 4C,P ::€i c n err 5+x I __. 1e2* stress _;4_ iva
c
G 2.22E f @.522 i/5' PA'. : yds- LIVE Lx:
-
17'- 3.02 171- 3.Be
36.6 3.9 535.8
LW: -_ .. 7.;,52-1Cr
1 1 2.222 cs•\' of MgS'-'4
-L C9 P r E: i t Flt Sc R :62t ., GARY R. i
SGH'slEIZER ;
v 647 -1r76 I07e -647 STRUCTURA- '�. ,
R 647 2156 647 ,C Na27371
219_ 2€32 yp4 STEP W
2 -"3720 e 'SSW , �.' 7
C 8.275 0 .275 ''T. fa
- . ,c F: _ :zit i O.
:L * "
-2_ -9r 222. -4 1
2_ ._. 43
2 4.4_ ___ -x.__.
G.,_- 5:O• ..n3.0.; Os EJEs ; C'_ERE: cul 5-ESE = 1231 •
r 43 -321 93E -733
4 1274 733
M 45 2687
0 -2232 @
D 4.12e 6:426
DEF:, Lbw
V 129 -216 216 -129
R 125 431 125
G 418 418
e -744 0
TJI as kiCRXAr are registered tradecares of TRJE JOIST CORPORATION.
TP: ircicates a trasemarx of NUS JDIS' f3RPORATIO1.
"THESE DESIGNS ARE IN ACCORDANCE WITH CURRENT
TR US JOIST CORPORATION SPECIFICATIONS. MATERIALS
AND ALLOWABLE DESIGN VALUES FOR THE LOADS AND
DIMENSIONS SHOWN HEREON."
: - , _
L z< . rnr x Sa esrer's \re Koa ✓y __e` 5vE t ..1:22
voRJ5or1�(.,,a, wlts '.e ,7s e
Es a e t,, , E . . ._. flare. vR\ CRASH. 1 Fa_= -..,e ,yrs ° 0_t rt?':\o
R �R press: :22% ve _sac: 42.2 s` : :2.2 s Pa .tion: 02'ss �6e2 Floor
Re:
San. Serres - _. L.- W_]t' c.c. 4er -_
rrac 24.2 1 22
D-r. G-.Mrol:
V E. :2ei�• :57% R:S e'c c•31 1 en_er :Z % st"es=_ =-t :ca_
70_ i 4€32 24-2% r ens 5:R' r :22% stress TT:TR'_ :aa:
0 8.L` : 2.444 J999- S' ' : _~se- -:r: LDEZ
- GZII
2.:.: -2.2:-
EL - _'' c__ _:_ : :_ ' & s €2% r�PrroF�NEV✓ ,q",
",�,H� c��
e % I.
c 'v I �:
e.,,,-• 5IU
fly A
°o, ESSt
nnn u�,
0. "t'
2 ov ,
f C: e.22•O\ 44 '
Cy
/moo GARY R. \G��...
RC a .3
_ t * . mE r_ _ s..,..:: _. ,, I� SCHWEIZER w _
✓ Tai <yc - STRUCTURA:_
R fr E15 - 9 Ne P?:7 O
+'' :ti E �t FGVSTEPtO/a
e _ _ a SSIOxAI j=
SEP: _DET
V :23 -159 ..T, -44
I' I2`_ 224 r 44
y "-72 48
2 :4: 2
arc r..ERC=fiv are re;:Strec tracesae s o TRJ2 :STET SR:CRC'_0\.
TR 1, ^are_ a t a c Hari o' -Y $ CO:3__RCT:Ce\.
"THESE DESIGNS ARE IN ACCORDANCE WITH CURRENT
TAUS JOIST CORFCR11101J SPECIFICATIONS. MATERIALS
AND ALLOWADLE DESIGN VALUES FOR THE LOADS AND
DIMENSIONS SHOWN HEREON:'
_"
5e ear's 5c. : xxxxr Sa.esa-'s Na^. 4f6c7.1 f.'Lu_a-/Mt RK Jr00F3 S:e e i_ ciE _ - _
ate ke. : 5 at_-. :a: : ',are: YAR+ :3 - :E - - Y,=-N_
1-tt
5t. _ _. !22% r_ _cat: 42,2 Tee. . .2.s _ e.r s _-_.. -._..•
Warr Ser.e5 Gro. Der-, o.:. 9e" _
1E5 DARR .1.8 c<.2 x :2i
eceeecs 22e ::s. for uroa'_a'es: hay
Desi:-. =:"cos. Coatrc::
V 597 '. 1¢a: 15E% 9.25.- err ERR` I Ace- 122 stress ' .:ac
5 :732 . 4F+E 237% r e-c ERR% c -ce- 12€' stress .727:2 :082
._8_
G ¢.:14 ( @,pu 2/999. S:AN : _,:ev _ .2 _ca:
_3'- =.22 4'- 5.22 -.
._ 52.2 LE.9 67.`_
e E :0 a NEW ,"
�. , PtcH c%i .fir%
V 927• r _ _ u PP; ce
� -.. : n: E" :.ate •
223
- . tr..:
. inn µ
3F.
c 12% N rct.
s yc Wognn .ay
= t ,
o 44. 2 of
e -16E1 . 2 r? \.
5 0 ac 4.239 V GARY P tiV�,
`I C r14 ER Iv ,.
A saGN 1:9421' 3t REN * != c RS RUR c-RES0. i STRUCTURE )
v 129 -:63 3:e
R iek r73 EE \ttoF` iS /2� F��
c: 5E ' UNAt Ej
e -3,5 e
6.@E3 -e.ee:
D'e9D ND-
V :27 -:S :21
o
A :e7 2_9 -34
r, 25; e
e -345 e
7.21 arc C:CR LFY. are reristere: tradexarks e` 732.5 70:E" CORRD318::\,
re ir:icates a tracecark of TP 5 ?C:S- CCRR R7':Ox,
"THESE DESIGNS ARE IN ACCORDANCE WITH CURRENT
TRUS JOIST CORPORATION SPECIFICATIONS. MATERIALS
AND ALLOWAPLE DES:ON VALUES FOR THE LOADS AND
DIMENSIONS SHOWN HEREON."
:d7e F ^2 S . 14:48:2%
c e= a s kc. : xx%xr Sa =5'xr'5 Nam YLk..t.�a4 J Eoer: F Li_ SVS-E'S
__:SR2:E 5:. : Srrarcr Dar Jot tette: !RAVE :__ _-ti'E Pa_e Title: TYPE E-
FS Stress: :06 ye 48.t EsE Dee: It e osr ta^tirlor: 0.8 x` Na:ier. Floor
-y:e ::ve _,e: Stress Derr ;a: :i: r. S`.ar:[c: %c .
UC° 4S2 as` !00% 12e x- :4'- LtP e e'- tee `ror _r: Re:;a P:o:icatior. -oat
0% P @ e'- tee fr>_ 5.., ;n Rt.acicn to 4:81,r2- cr _oa:
"ark Ser:es oro. Gs. ''J Mc::-. Dot .
1 K:CK=_4*R BE-0S xR: 2820 2 1.75x :1.8 :E.0 1 Bee
V 362 ( 7229 215% _E en: Sa52! : _ er 103% street 'D'"P_ isa:
r :4547 :922: 28% CD cx•, cxa• :F%% ave__ -_ :cac
2.48: 8 '7 _/345 5-C% _ erre- v
22.02
3.2 2.4 3.2
EANA
_;1E __.E 222_22-:E9
r . : r p 3 FOR E7RGES _ :&t% Of
4:7 4271 ��,p�pN M4Sf5Cy+ r
4 '. F� GARY R. GN.
_-{.c �E SC' WEIZER ‘9's
2 d STRUCTURFr.
9pF�r'ASTE <c,c)c`c TT
DEPT. -ND FSS/ONAI t, iv
5911 -3:1 /r• i(/
5:_ 5:.
3187 q•P
0
.J? arc 0.:C3C=-Ry. are recistereo traceea^ks of 'RAS JOIST CORP]RPTID .
TO inmates a tradetark of TR„'S TC?S' CDRP3RF7:2A.
"THESE DESIGNS ARE IN ACCORDANCE WITH CURRENT
TRUS JOIST CORPORATION SPECIFICATIONS. MATERIALS
AND ALLOWABLE DESIG" W.LUES FOR THE LOADS AND
DIMENSIONS SHOWN HEREON."
ac
d, .. 3 =553 -3536 -13'. -661 3
-:. 25 2.0,22 -2.234 2.00,4 a.ia3
J -M1 _3PD \G 3wES S632109a 4 3r-,3 37:E55 = ote%
v 1375 -1649 666 -443 -315 -22278 2622 9E6E5 333 369
R 275 E335 -473 3357 3562 -369
536 3`ie a 1852 a
0 -261 9225 -:953 2
2.213 2.0,24 -3.204 0.0,20, 4.005
DJ Elk. _:90156 :v23 5.:7J' . 5 sOR C 232 = :2.2%
v -3991 -964 2650 -2759 E35 -47 2652 -2766 2145 -575
S -333 3653 9394 •` 2729 4915 5+5
2 1939 -:2:24 1852
a -1344 -2951 -2110 361 :C
-2.206 a,329 -3.206 2.2E13 -3.303
39:3 3343
,-25_
-�_. l4: -. _ 5.6 :70, 0,44 -.22
83 .2.-
55 ,:4 ii2
li 3.79 33
-
3.2
- _ - E -445 -485 2
"THESE DESIGNS ARE IN ACCORDANCE WITH CURRENT
TRUS JOEST CCR.FCNsTION `.'ECI ICATIDNS. MATERIALS
AND 1 LOy/AS VALUES FOR THE LOACS ANL e1HOFggZr
qDIMENS6'G S u 1 d E931 zS �y/4� GARY R. �
.6E.;.\-
:ft, SCHWEIZER , A ":
STRUCTUR; ) ,!
_oi'G7ST?�T •r/
'2 /
-. - S35- 229 _c. 2=%2- 33.57 EE6- 59E-
=0' - -" b 232 3 * S 6322c :_NT.CS37nn:3
920' -2'1 :12'2- 2.32'2 .310'0- .
2 6202- Sdc 2::2- :9E3- 0
0 SSE; ±833- ?1St 3r.
85E- £;9£ '7562 62[2 5356 ;LS .
r
Ea£ 16 2692- ELF k?- L, 3697.- 852.2 64t?- SLS 1
z20t = S? .s eO, 2 t .}'',-,--5 SY..) 95:ctq,'- W.'S 3:7
300.0- ST?30 322.2- 72'2 5$2'.- _
2 LW?- 3£22- 94"- 5+23- 2
? 9967 E537- 595: r
'29- 3S52 56992 9582 5S923 135- .
:29 596 E697.- 23;.L2 3.92 ;L2- 3E5. 595- 2y_ '
2.223. = SSELS 4 3.213.4.13. * '923 NO 32N1idS- 'U25 _-7
%&22 730'2 220 ? 59'2 _
2 5 L- EtP- 33_3 ?LL- 0
535 ,E - EL? 695
.
E9- 9S9 -937- ` C ::•€.2- - . - 4?['
'c eT _ : .: . . .c 3232.2.33
`.2323 _7?
i"'z- HT 2 @';- ':2T 120.2- .
2 _-12- 729'.- : ^"- 2
.7£97 - :"
.-__ _ _ _337 - :
.12_5 333 5233.34 7-2 l 323"
°-2'L a:22- - 2.0 722'0-
.231_3733.33 :233 =r.
32
_ .`"9•, __ _ .- . - 3'E-'?': _ _
32'0 -.E 22.2 -.9 .700'5 -." 212-2 - 9 20'0 -.3
:_. .:4
f.
2:- , C.7 Ese...S't > : -lie E:E % 2° E9 -2'J' n
#347 r.reay 40Y2 Q'.'^e@ A :a:.e".c.r : 2...,003. s:aac;a 23,22.5
205 t 223. 's'S xSL': . 239'7 5. c?n S..7.3.33223:.
-C ra%' i •,.:e; •.u . . _ - sa:.e a.:T1
:aF
:2c- :2::e225cc. 2_ _ an,,,,,, 23'2 - 2 ; 2 3.2 2
:pc- ':ot:ea 23.22e2:ab 2,7 _ ac. P2 -2 ; ?r•: -.,. _. '42.?; A 2'L :"ns
_. 2::2 1.2 +' .._ 22a1 ssa..:; :2r it-- SSA
_ :aq:Sn ,' 2.2 .AZ::"_,?: T. .:P,:- 22ec :22 2'2. - an:_ 2:. szSa.e.5 -
1- :5-:2._ a_ec - 7: __ 5E- :a.a.. .�, - _ - •.‘ a:8_
p _ 5
.5n _ rC3C6 "-0swwl )h+TM '.a. __s. PE
`_" 72-7? 3[.:
9 -
THOMAS A . KIRLEY
ARCHITECT - out 549-104
P. O. BOX 645, NOUN ANNERST, MASS. 01059
INSPECTION REPORT
PROJECT Yankee Condo' s
PHASE OF CONSTRUCTION
DATE January 10, 1987
INSPECTED BY Thomas Kirley
COMMENTS
Building A
Framing, floor joists ok - 3rd floor
termite shield in place
Buildings B & C
No work
Copies to : file , owner , contractor, building inspector
THOMAS A . KIRLEY
ARCHITECT nim 519-1011
P. O. BOX 645, NORTH AMHERST, MASS. 01059
INSPECTION REPORT
PROJECT Yankee Condo' s
PHASE OF CONSTRUCTION
DATE January 17, 1987
INSPECTED BY Thomas Kirley
COMMENTS
Building A
Framing, stairwell headers ok
Buildings B & C
No work
/L////
Copies to : file , owner , contractor, building inspector
1
THOMAS A . KIRLEY
ARCHITECT DIAL 549-1044
P. O. BOJ( 645, NORTH AMHERST, MASS. 01059
INSPECTION REPORT
PROJECT Yankee Condo' s
PHASE OF CONSTRUCTION
DATE January 24, 1987
INSPECTED BY Thomas Kirley
COMMENTS
Building A
Framing headers checked
Buildings B & C
No work
Copies to : file , owner , contractor, building inspector
THOMAS A . KIRLEY
ARCHITECT DIAL 549-1044
P. O. BOX 645, NORTH AMHERST, MASS. 01059
INSPECTION REPORT
PROJECT Yankee Condo' s
PHASE OF CONSTRUCTION
DATE January 31, 1987
INSPECTED BY Thomas Kirley
COMMENTS
Building A
Framing, trusses ok
Rough plumbing
Buildings B & C
No work
i
BY
Copies to : file , owner , contractor, building inspector
T H O M A S A . KIRLEY
ARCHITECT DIAL 549-1044
P. O. BOJ( 645, NORTH AMHERST, MASS 01059
INSPECTION REPORT l'� & ? yl
t
PROJECT Yankee H Condde MAOLc__ _.
PHASE OF CONSTRUCTION Wood Framing Etc.
DATE February 3 , 1987
INSPECTED BY Tom Kirley
COMMENTS
Building A, B, and C
Building A Windows and doors in place. Working on
plumbing inside.
Building B Building up, roof on.
Building C. Front section second floor on, outside
walls. Plywood.
A
CI
V`
Ni.lir
BY :A / _ _
Copies to : file , owner , contractor, building inspector
THOMAS A . KIRLEY
ARCHITECT DIAL 549-1044
P. O. BOX 645, NORTH AMHERST, MASS. 01059
INSPECTION REPORT
PROJECT Yankee Condo' s
PHASE OF CONSTRUCTION
DATE February 7, 1987
INSPECTED BY Thomas Kirley
COMMENTS
Building A
Roofing, rough plumbing, framing
Patio Doors
Building B
Framing started
Building C
No work
BY :� > aQ,/, O -(
Copies to : file , owner , contractor, building inspector
4
THOMAS A . KIRLEY
ARCHITECT DIAL 549-1044
P. O. BOX 645, NORTH AMHERST, MASS. 01059
INSPECTION REPORT
PROJECT Yankee Condo' s
PHASE OF CONSTRUCTION •
DATE February 14 , 1987
INSPECTED BY Thomas Kirley
COMMENTS
Building A
Roofing, rough plumbing
Building B
Framing
Building C
No work
BY : G�,y le-ZQ Y �L
Copies to : file , owner , contractor , building/ inspector
THOMAS A . KIRLEY
ARCHITECT DIAL 549-1o4e
P. O. BOX 645, NORTH AMHERST, MASS. 01059
INSPECTION REPORT r1H1
9i
PROJECT Yankee Hill Condo - --
PHASE OF CONSTRUCTION Wood framing and plumbing
DATE February 18, 1987
INSPECTED BY Tom Kirley
COMMENTS
Building A Window and doors in place, working on
plumbing inside, putters and trim outside
Building B 40% of windows in place. Roof and shingles
on.
Building C Building up and plywood on roof in Place 80%
I l�
Copies to : file , owner , contractor, building inspector
THOMAS A . KIRLEY
ARCHITECT DIAL 549-1004
P. 0. DCX 60, NORTH AMHERST, MASS. 01059
INSPECTION REPORT
PROJECT Yankee Condo' s
PHASE OF CONSTRUCTION
DATE February 21, 1987
INSPECTED BY Thomas Kirley
COMMENTS
Building A
Rough plumbing, windows
Patio Door
Building B
Framing
Building C
No work
7
BY: fJ/b>-rte,, '"G i- , Coo'.
Copies to : file , owner , contractor, building inspector
THOMAS •
A . KIRLEY
ARCIHITECT - DIAL 549-1044
P. O. BOX 645, NORT , MASS. 01059
p h1' 10 t
INSPECTION REPORT
eCt�,
PROJECT Yankee Hill Condos
PHASE OF CONSTRUCTION Wood framing & plumbing •
DATE February 25 , 1987
INSPECTED BY Tom Kirley
COMMENTS
Building A Work progressing on plumbing and outside
trim and gutters.
Building B Windows in place on 2nd and 3rd floors.
Working on partition studding.
Building C Roofing completed. Building closed in with
plywood.
A,l\
Q c
BY : St. �L . �.
Copies to : file , owner , contractor , building inspector
THOMAS A . KIRLEY
ARCHITECT - DIAL 549-1044
P. 0. BOX 645, NORTH AMHERST, MASS. 01059
INSPECTION REPORT
PROJECT Yankee Condo' s
PHASE OF CONSTRUCTION
DATE February 28, 1987
INSPECTED BY Thomas Kirley
COMMENTS
Building A
Rough plumbing, dryer vents
Fire wall attic
Building B
Framing
Building C
No work
BY . • O
i
Copies to : file , owner , contractor, building inspector
1
THOMAS A . KIRLEY
ARCHITECT DIAL 549-104
P. D. BOX 645, NORTH AMHERST, MASS. 01059
INSPECTION REPORT
PROJECT Yankee Condo' s
PHASE OF CONSTRUCTION
DATE March 7, 1987
INSPECTED BY Thomas Rirley
COMMENTS
Building A
Framing, rough plumbing and electrical
Right side ok to insulate
Building B
Framing
Building C
No work
Copies to : file , owner , contractor, building inspector
THOMAS A . KIRLEY
ARCHITECT DIAL 549-1014
P. O. SOX 645, NORTH AMHERST, MASS. 01059
INSPECTION REPORT
PROJECT Yankee Condo' s
PHASE OF CONSTRUCTION
DATE March 14, 1987
INSPECTED BY Thomas Kirley
COMMENTS
Building A
Dry wall started right side
Insulation complete, siding
Building B
Framing stairway headers
Building C
No work
BY :("4 `_",--7 p_77)
Copies to : file , owner , contractor, building inspector
1
THOMAS A . KIRLEY
ARCHITECT - DIAL 549-1044
P. O. BOX 645, NORTH AAHERST, MASS. 01059
INSPECTION REPORT
PROJECT Yankee Condo' s
PHASE OF CONSTRUCTION
DATE March 21, 1987
INSPECTED BY Thomas Kirley
COMMENTS
Building A
Insulation, dry wall, rough plumbing
and electrical
Building B
Framing, trussed ok
Building C
No work
: ig% Ci/)
Copies to : file , owner , contractor , building inspector
THOMAS A . KIRLEY
ARCHITECT - DIM 549-1044
P. 0. BOX 645, NORTH AMHERST, MASS. 01059
INSPECTION REPORT
PROJECT Yankee Cnndn' c
PHASE OF CONSTRUCTION
DATE March 28 . 1987
INSPECTED BY Thomas Kirlev
COMMENTS
Building A
Siding, rough plumbing and electrical
Insulation
Building B
Framing, headers ok
Building C
No work
EY : " e.`
-C-4°.-11-at- .v
9
Copies to : file , owner , contractor, building inspector
THOMAS A . KIRLEY
ARCHITECT DIAL 549-1044
P. 0. BOJ( 645, NORTH AMHERST, MASS. 01059
INSPECTION REPORT
PROJECT Yankee Condo' s
PHASE OF CONSTRUCTION
DATE April 4, 1987
INSPECTED BY Thomas Kirley
COMMENTS
Building A
Insulation, dry wall, rough electrical
and plumbing
Building B
Framing and roofing, stairways rough
Building C
No work
1\X:1
•
BY S �a--3' -8-14---2.
Q
Copies to : file, owner , contractor, building inspector
THOMAS A . KIRLEY
ARCHITECT - DIAL 5@do4
P. O. BOX 645, NORTH AMHERST, MASS. 01059
INSPECTION REPORT
PROJECT Yankee Condo' s
PHASE OF CONSTRUCTION
DATE April 11, 1987
INSPECTED BY Thomas Kirley
COMMENTS
Building A
Insulation complete on right side
Dry wall siding
Building B
Roofing framing
Building C
No work
Copies to : file, owner , contractor, building inspector
THOMAS A . KIRLEY
ARCHITECT - DIM 549-1044
P. O. BOX 645, NORTH AMHERST, MASS. 01059
INSPECTION REPORT
PROJECT Yankee Condo' s
PHASE OF CONSTRUCTION •
DATE April 18, 1987
INSPECTED BY Thomas Kirley
COMMENTS
Building A
Siding, dry wall, left side
inspected for insulation
Building B
Siding, rough plumbing, framing
Building C
Framing started, pressure tested
Sills o.k.
BY : (>L.),,t ,-',P"k_c 1^�/1/
Copies to : file , owner , contractor, building inspector `
THOMAS A . KIRLEY
ARCHITECT DIAL 549-1044
P. O. PDX 645, NORTH PMHERST, MASS 01059
INSPECTION REPORT
PROJECT Yankee Condo' s
PHASE OF CONSTRUCTION
DATE April 24, 1987
INSPECTED BY Thomas Kirley
COMMENTS
Building A
Porch roofs, exterior paint
Dry wall, interior finish
Building B
Framing right side
Rough plumbing and electrical
Siding
Building C
Framing
BY : _ „of
Copies to : file , owner , contractor , building inspector
1
THOMAS A . KIRLEY
ARCHITECT - DIAL 549-1044
P. O. BOX 645, NORTH AMHERST, MASS. 01059
INSPECTION REPORT
PROJECT Yankee Condo' s
PHASE OF CONSTRUCTION •
DATE May 1, 1987
INSPECTED BY Thomas Kirley
COMMENTS
Building A
Decks installed, porch roofs
Exterior and interior paint
Drywall
Building B
Left side framing inspected
Ready to insulate
Building C
Framing, joist blocking ok
BY :�> .ate' /
Copies to : file , owner , contractor , building inspector
THOMAS A . KIRLEY
ARCHITECT DIAL 519-1044
P. 0. BOX 515, NORTH AMHERST, MASS. 01059
INSPECTION REPORT
PROJECT Yankee Condo' s
PHASE OF CONSTRUCTION
DATE May 8, 1987
INSPECTED BY Thomas Kirley
COMMENTS
Building A
Interior trim, interior paint
Exterior paint, porch railings
Building B
Siding, rough plumbing and electrical
Building C
Framing, inspected headers
Copies to : file , owner , contractor, building inspector
THOMAS A . KIRLEY
ARCHITECT - ONu 549-1044
P. O. BOX 645, NORTH AMHERST, MASS. 01059
INSPECTION REPORT
PROJECT Yankee Condo' s
PHASE OF CONSTRUCTION •
DATE May 15, 1987
INSPECTED BY Thomas Kirley
COMMENTS
Building A
Exterior painting, interior trim
Dry wall, insulate attic
Building B
Siding, rough plumbing, electrical
Building C
Framing
BY :(\j'LA O4v�
Copies to : file , owner , contractor, building inspector ///
THOMAS A . KIRLEY
ARCHITECT - mu 549-lou
P. O. BOX 645, NORTH AMHERST, MASS. 01059
INSPECTION REPORT
PROJECT Yankee Condo' s
PHASE OF CONSTRUCTION
DATE May 22, 1987
INSPECTED BY Thomas Kirley
COMMENTS
Building A
Exterior painting, interior trim, dry wall
Building B
Siding, rough plumbing
Rough electrical
Building C
Framing, roofing, windows
BY : eI
Copies to : file , owner , contractor, building inspector
THOMAS A . KIRLEY
ARCHITECT DIAL 549-1044
P. O. BOJ( 645, NORTH AMHERST, MASS. 01059
INSPECTION REPORT
PROJECT Yankee Condo' s
PHASE OF CONSTRUCTION
DATE May 29, 1987
INSPECTED BY Thomas Kirley
COMMENTS
Building A
Dry wall, interior trim painting
Building B
Rough plumbing and electrical
Building C
Framing, roofing, painting doors
BY : Y-2....-2„,„
Copies to : file, owner , contractor, building inspector
THOMAS A . KIRLEY
ARCHITECT - Diu u9-1o4
P. O. BOX 645, NORTH AMHERST, MASS. 01059
INSPECTION REPORT
•
PROJECT Yankee Condo's
PHASE OF CONSTRUCTION •
DATE June 5, 1987
INSPECTED BY Thomas Kirley
COMMENTS
Building A
Dry wall, interior trim on left side
Painting on right side
Grading around building
Building B
Rough plumbing and electrical
Decks installed, exterior paint
Building C
Siding and interior finish
Grading paved area `
BY : /� g. Sit y ,
Copies to : file, owner , contractor, building inspector v
THOMAS A . KIRLEY
ARCHITECT D1M 549-1044
P. O. BOX 645, NORTH AMHERST, MASS. 01059
INSPECTION REPORT
PROJECT Yankee Condo' s
PHASE OF CONSTRUCTION
DATE June 12, 1987
INSPECTED BY Thomas Kirley
COMMENTS
Building A
Dry wall complete on left side
Utility room sheetrock
Meters installed
Building B
Dry wall on left side
Electrical rough on right side
Building C
Rough plumbing on right side
Siding
Rough frame right side
BY : ` va 4.4 / 1
Copies to : file , owner , contractor, building inspector L/////
1
THOMAS A . KIRLEY
ARCHITECT DIAL 549-1044
P. 0. BOX 645, NORTH AMHERST, MASS. 01059
INSPECTION REPORT
PROJECT Yankee Condo' s
PHASE OF CONSTRUCTION •
DATE June 19, 1987
INSPECTED BY Thomas Kirley
COMMENTS
Building A
Complete interior trim, ranges
Hot water tank set - finish electrical
on right side
Landscaping put in
Building B
Dry wall complete on left side
Insulation complete on right side
Building C
Dry wall to add on left side
Insulation started on left side
Siding in process - taped all joints in ,(yA d>
plywood sheathing <'J` 4'7 'C/ - C
Black top installed BY :
Copies to : file , owner , contractor, building inspector
THOMAS A . KIRLEY
ARCHITECT OIAi 519-0014
P. o. BOX 645, NORTH AMNERST, MASS 01059
INSPECTION REPORT
PROJECT Yankee Condo' s
PRASE OF CONSTRUCTION
DATE June 26, 1987
INSPECTED BY Thomas Kirley
COMMENTS
Building A
Carpeting, finish plumbing and electrical
open house, alarm system
Building B
Interior - finish painting dry wall
Building C
Siding and dry wall on left side
Rough plumbing complete on right side
Fire Department tested storage tank
<1--)4Arz
Copies to : file , owner , contractor, building inspector v
1
THOMAS A . KIRLEY
ARCHITECT - DIAL 549-1044
P. O. BOX 645, NORTH AMHERST, MASS. 01059
INSPECTION REPORT
PROJECT Yankee Condo' s
PHASE OF CONSTRUCTION
DATE July 3 , 1987
INSPECTED BY Thomas Kirley
COMMENTS
Building A
Complete ready for C.O. next week
Railing needs to be installed in first hall
Building B
Dry wall - painting and interior finish
Walks complete
Building C
Siding complete, deck on dry wall on left
side
BY : —3 = L ,i_c_t n c�
Copies to : file , owner , contractor, building inspector