Loading...
17D-055 (10) 116 STRAW AVE BP-2017-0895 GIS#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 17D-055 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: SOLAR ELECTRIC SYSTEM BUILDING PERMIT Permits BP-2017-0895 Project# JS-2017-001521 Est.Cost: $9376.00 Fee: $75.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: LEARY BUILDING COMPANY 104806 Lot Size(sq. ft.): 14723.28 Owner: MARK JASON N&CHRISTINE H& ERIK L STONE&MARLENE F RYE zoning: URBUS!)/ Applicant: LEARY BUILDING COMPANY AT: 116 STRAW AVE Applicant Address: Phone: Insurance: 1039 EAST MOUNTAIN RD (413) 336-2611 WESTFIELDMA01085 ISSUED ON:1/30/2017 0:00:00 TO PERFORM THE FOLLOWING WORK:INSTALL 13.395 KW ROOF TOP SOLAR ARRAY POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Cas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 1/30/2017 0:00:00 S75.00 212 Main Street,Phone(413)587-1240, Fax: (413)587-1272 Louis Hasbrouck-. Building Commissioner File n BP-2017-0895 APPLICANT/CONTACT PERSON LEARY BUILDING COMPANY ADDRESS/PHONE 1039 EAST MOUNTAIN RD WESTFIELD (413)336-2611 PROPERTY LOCATION 116 STRAW AVE MAP 17D PARCEL 055 001 ZONE URB(18UU/ THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONINGFORM FILLED OU FeeeePaidPaid 4 Buildmy*Permit Fj(egoat Fee Paid Typeof Construction: INSTAL a.' - W RQOF TOP SOLAR ARRAY New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 104806 3 sets of Plans t Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFO ATION PRESENTED: ApprovedAdditional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit _ Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management ii“m Intim D� . f' 1 Y '2_ emu ding ficial Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A.Contact Office of Planning&Development for more information. Department use only r-,. ) B. of Northampton Status of Permit B ilding Department Curb Cut/Driyeway Permit 2 C all 212 Main Street Sewer/SepticAvailabiliy J W/ Room 100 Water/Well Availability / II:IIhamPton, MA 01060 Two Sets of Structural Plans p 41 -587-1240 Fax 413-587-1272 Plot/Site Plans Other Specify APPLICATION TO CONSTRUCT,ALTER, REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Properly Address: This section to be completed by office 116 Straw Ave Map Lot Unit Florence, MA 01062 Zone Overlay District Elm St.District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: Jason Mark 116 Straw Ave Florence, MA 01062 Name(Print) Current Mailing Address: 413-575-8449 Jason Mark Telephone Signature 2.2 Authorized Aoeot: Timothy Lea 1039 East Mountain Rd Westfield, MA 01085 Name(Pi• gra� Current413Mailing6611 � Address: / 413-336-2611Signaturd� ! Telephone SECTION 3-E'$TRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by permit applicant 1. Building 47,....4—.1C—, (a)Building Permit Fee 2. Electrical ,y� (b) ConstructiTotalon Cost of ///'''4 I S _ C timate dfrom(6) 3. Plumbing Ste, e 4aCC Building Permit Fee 4. Mechanical(HVAC) -a 4 6- 5. Fire Protection _ £ 6� 6. Total=(1 +2+3+4+5) �� / Check Number q r This Section For Official Use Only Building Permit Number Date Issued: Signature: Building Commissioner/Inspector of Buildings Date X75 fwa `? 6etii(y Section 4. ZONING All Information Must Be Completed.Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage Setbacks Front Side I; R: L: R: Rear Building Height Bldg.Square Footage Open Space Footage (lot area minus bldg&paved poking) #of Parking Spaces Fill: (volume&Location) A. Has a S al Permit/Variance/Finding ever been issued for/on the site? NO DONT KNOW O YES a IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO 0 DONT KNOW O YES O IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water or wetlands? NO \J DONT KNOW O YES O IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained O Obtained Q , Date Issued: C. Do any signs exist on the property? YES O NO Q/ IF YES, describe size, type and Location: D. Are there any proposed changes to or additions of signs intended for the property? YES O NO Gy- IF YES, describe size, type and location: E. Will the construction activity disturb(clearing,grading,excavation,or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YE: O NO a IF YES,then a Northampton Storm Water Management Permit from the DPW is required. SECTION 5-DESCRIPTION OF PROPOSED WORK fetlock all applicable) New House n Addition ❑ Replacement Windows Alteration(s) n Rooting n Or Doors CI Accessory Bldg.0 Demolition ❑ New Signs f=1 Decks ® Siding p1 Other wBioerfk Descsttaafiornotl 13.395 KW Roof Mount Solar Array Alteration of existing bedroom Yes No Adding new bedroom Yes No Attached Narrative Renovating unfinished basement Yes No Plans Attached Roll -Sheet 6a.If New house and or addition to existing housing,complete the following a. Use of building One Family Two Family Other b. Number of moms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dknensions e. Number of stories? f. Method of heating?_ Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft.of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or miler floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No. I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT 1, Jason Mark ,as Owner of the subject property hereby authorize Timothy Leary to act on my behalf, in all matters relative to work authorized by this building permit application. Jason Mark 01/24/2017 Signature of Owner Date I, Timothy Leary ,as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. Timothy Leary Print 01/24/2017 Sign Date SECTION B-CONSTRUCTION SERVICES 8.1 Licensed Construction Suceryiwr: Not Amercable 0 Name of License Holder: Timothy Leary CS-104806 License Number 1039 E,„�f _unt.. n '.S'2f MA 01085 02/17/2018_, j. i/arf/a, Fxpcaton Date iiii.iiiii '"/�°'�/ 413-336-2611 Sgn. Lire Telephone 9.Reoletened Home lmpmvement Contractor: Not Applicable 0 Leary Building Inc 181065 Company Name Registration Number 1039 East Mountain Rd 02/2072017 Address Expiration Date Westfield, MA 01085 Telephone 413-336-2611 SECTION 10-WORKERS°COMPENSATION INSURANCE AFFIDAVIT(M.G.L c.152,§25C(8)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit Signed Affidavit Attached Yes Li Na_... ❑ 11.- Home Owner Exemption The current exemption for"homeowners"was extended to include Owner.ccunied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who docs not possess a license,provided that the owner acts as supervisor,CMR 788, Sixth Edition Section 18832.1. ¢efmition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is.or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shall not he considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such were Performed under the building.permit. As acting Con$nstffin Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153(Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Loring Laws and State of Massachusetts General Laws Annotated. Homeowner Signature ROSSConnecticut Office www.RossSolarGroup.com SOLAR 38 Beaver Brook Road Danbury,CT 06810 Info/tt7RossSolarGroup.Com Phone:(203)512-4500 Fax:(866)271-3016 GROUP Attn: Building Department Official I, Christine Mark , authorize Ross Solar Group to install the Rooftop, ground mount or pole mount solar array and to file a building permit, zoning, wetland & health departments on my behalf. I grant Ross Solar Group permission to access a copy of this property's survey, site plans and building plans. Should you have any questions, or require additional de]eI lase all Ross Solar Group at 203-512-4500. � 4 Home Owners Signature Christine Mark Print Name 162017 2275%12-Mark-Conditional Approval to Interconnect 22759912 - Mark-Conditional Approval to Interconnect From: Distributed.Generation Sent: Wed, Sep 28, 2016 at 10:00 am To: 'kat@rosssolargroup.com' Cc: 'customer40741@yahoo.com' image001.png(9.7 KB) image005.png(< 1 KB) image003.1pg(3 KB) 22759912-Mark-Signed SIA.pdf(3.2 MB) —Download all Greetings, • Your Simplified Interconnection Application (22759912 )has been conditionally approved for construction, meaning that you are authorized to construct and test the new system, but not to leave it online. National Grid will provide an "Authority to Interconnect' letter only after all requirements and standards, as detailed below, have been met, and after your standard meter has been replaced with a bi-directional net meter. This is especially important, as operating a generation system behind a standard meter may cause billing errors. ****This Conditional Approval is not authorization to perform a service upgrade, service relocation, parallel service, or service drop replacement. Any modification to the existing service will require approval under a separate work order and is subject to existing ESB requirements. **•A bi-directional meter MAY be set at your location per our discretion once Conditional Approval has been issued but you are not authorized to operate your system until National Grid has provide an "Authority to Interconnect"letter. The bi-directional meter may be in place but it will not bill correctly until the"Authority to Interconnect'has been issued. Next Steps • Please use the Simplified Checklist to ensure that you provide all necessary documentation. Note: The project completion documentation on the checklist may need to be submitted at different times. Any • documents not attached to this email are available at I htto://www.nationalgridus.com/masselectric/home/enemyeff/4 interconnection-documents.asp. '.. • For your records: Please find attached a scanned copy of the approved Simplified Interconnection Application (SIA)and Service Agreement (and Exhibit H if applicable)for your • generator installation. • For technical requirements:The National Grid's Electric System Bulletin ESB756"Requirements for Parallel Generation Connected to a National Grid-Owned EPS"applies to this distributed generation system. In Massachusetts, Appendix C of ESB756 should be referenced for all distributed generation projects that operate in parallel with National Grid's EPS. For single-phase generators>10kW As part of the new Net Metering System of Assurance in Massachusetts, the attached documentation must be submitted to the Cadmus Group's MassACA system as part of the registration process. This system is managed by Cadmus on behalf of the Massachusetts Department of Public Utilities (DPU) per order 11-11A (issued 10/25/2012). Therefore, all questions regarding the Net Metering System of Mq>J/rossmail rosssdargrow.mn/versias/avebmail/12.7.1-RC1/popuprasid-482920471D2cOaca9dte4aaa0u994500824c7a3ri485181655003 1/3 1123/20/17 22759912-Mak-Cardiupw Approval to Interconrtect Assurance must be directed to either Cadmus or the DPU. http:/twww.massaca.oq/. You must • ! supply your Cadmus approval with your completion documents so the customer account can receive the proper credit. • Please be aware that single-phase generators>10kW that do not receive approval through the Net Metering System of Assurance will be setup as qualifying facilities and will only be eligible to receive wholesale rate credits for any excess monthly generation (not the full retail rate like net metering credits). Also, qualifying facilities are not eligible to transfer credits to other accounts. Notes Note about Net Metering: You will be eligible for net metering credits as long as there is still capacity under the limit to accommodate the full rating of your facility at the time you receive your"Authority to fntemonnect"letter Remaining net metering capacity for National Grid customers can be found at http://www massaca.orgy Note about Qualifyina Facilities: While the Company is required to purchase output from a customer- owned generator as a Qualifying Facility(QF), the price the Company is authorized to pay is the hourly wholesale clearing price at the ISO-NE. Unlike net-metering, where a customer can assign credits to other customers, or'bank'excess powerovera billing month, payments for QFs are calculated for every hour there is export back to the Company's system. Customers receiving payments as a QF are not able to transfer these payments to other accounts. It is important Customers understand how their electric usage profile compares to their proposed generation profile in order to properly assess the • particular economics of any installation. Please refer to the below links on the ISO-NE website for further information; httpl/wwwi • no.comhnuketsth -index. Note about Witness Testing: National Grid reserves the right to request a witness test before the Authorization to Interconnect is granted. Interconnection Data Validation "'No data validation response is required, unless the information provided below is incorrect."'" To improve our process and comply with a directive from the Massachusetts Department of Public Utilities,we seek to verify and record our processing of your interconnection application and the amount of company time(in full business days)that it took for us to provide you with the conditional approval to interconnect Based on the timeframes in the interconnection tariff, M.D.P.U. No. 1248("Tariff), our records show that: 1. The interconnection application was reviewed as a Simplified application. Pursuant to the Tariff, the allowable time to process this application is 25 business days. 2. We received your application on 09/23/2016. 3. National Grid is sending you this conditional approval to interconnect on 00128/2016 . 4. Accordingly,we calculate that National Grid processed your application within 3 business days. It is important to note that we are measuring only company processing time and not any time when your project was on a customer hold, including any time that you may have needed to complete or update your application with requested information, signatures, or payments. If you agree with all of the above, no further action is required from you; however, if you disagree, then • you have 10 business days(from the date of this email)to reply to this email, notifying us of your questions or disagreement about this data validation. Once all other items have been satisfactorily completed, National Grid will request the installation of a new meter(if applicable). A new meter installation could take up to two weeks for installation after all documentation is provided. Then, National Grid will provide the Interconnecting Customer with the Authorization to interconnect(after the new meter has been installed). In order to help facilitate the timely installation of your bi-directional net meter(after all other requirements are met), please notify National Grid of any changes to your anticipated online date. rap://rossmailrasssdargaq.cpm/versios,Wetmait/12.7.1-Rel/popylphp?wsitkbe292b47102c0bc 09 29cia3r4851816Wal 2/3 I/2312017 22759912-Mark-CRMfnloml Approval to Interconnect •"A bidirectional meter MAY be set at your location per our discretion once Conditional Approval has been issued but you are not authorized to operate your system until National Grid has provided an "Authority to Interconnect"letter. The bi-directional meter may be in place but it will not bill correctly until the"Authority to Interconnect has been issued. If anything changes with the project please let me know. All communications to National Grid should be sent to me, with a copy to Distributed.$eneration(ffinationaIand.com. Thank you and best of luck with the construction of your new system. • Regards, • Distributed Generation • nationalgrid • 40 Sylvan Rd, Waltham, MA 02451-1120 Distributed.Generation( NationalGrid.corn Please select the appropriate link below for the latest information on: Interconnection Standards -MA, RI Net Metering-MA, RI Wholesale Energy Procurements This e-mail, and any attachments are strictly confidential and intended for the addressee(s)only.The content may also contain legal, professional or other privileged information. If you are not the intended recipient, please notify the sender immediately and then delete the e-mail and any attachments. You should not disclose, copy or lake any action in reliance on this transmission. You may report the matter by contacting us via our UK Contacts Page or our US Contacts Page(accessed by clicking on the appropriate link) Please ensure you have adequate virus protection before you open or detach any documents from this transmission. National Grid plc and its affiliates do not accept any liability for viruses. An e-mail reply to this address may be subject to monitoring for operational reasons or lawful business practices. For the registered information on the UK operating companies within the National Grid group please use the attached link: htto://www.nationalgrid.com/comorate/legal/registeredoffces.htm hep://rossmail.rosssdargrap.amm/versiashvrbnail/12.].1-RC1/popp.php?wsid=48292b4 4c7a3a148518165,013 3/3 The Commonwealth of Massachusetts Deparbacm ofIJrdasrral Accidents office of Investigations =41-=.7< 600 Washington Street gosww,MA 02111 www mass.goWdia Workers'Compensation Insurance Affidavit &oitderWContractors/Electtteians/P(ambers Applicant information Please Print Legibly Name(Busineworpaieumonthsaieidualy. Edmond Becquerel Address:toss East Momma Rd . City/StaWZip: Westfield, MA map phone#: 413336-2611 Are you an employer?Cheek the appropriate bort Type of Pagel(required): 1.0Iamamptoyerwith 4. OI am a generalc®tactor and) 6. II 6.266660,606 (M andior parttime)* have hired the athconkscmxg employees 2.0 I am a sole proprietor or pacbnu- listed ore the attached sheet 7. []Remodeling ship andbavc no employees 'these nub-coNmctwa have 8. 0 Demolition waking for ma is any capacity. employees and have workers' 9. []Building addition (No workers'comp inseam= coup.msumnee.l rimed.] • 5.g We are a cogmnrfon and its IRO Ekcha.al repaint or additions 3.0 I am a homeowner doing all work officers have exercised their 11.0 Platinising repairs or additions myself.thio workers'comp. tight of exemption per MGL 12.0 Roof repairs insurance rerptirel.]t c.152,§1(4),and we have no y Roof Top Solar employees.(No workers' 3.[q Older comp.insurance required] 'My mama&ech eb lox NI mint We fill out the C.<tionbelow showing ibdr codas'congmwtion Policy mfwoatim t Hnnwwpa tetra submit thth etNNrit ieaotme they me doing el nwk W thon bite outside eethelate nmtwbeit a new'arldaNtsdiwline-- teomAnrm that deck We box mat nclwd et additional sleet sbawdng lbs nine ofrte rutrewaaCten mid stare whghn or nal those eadda have err loya It the sWsoatractm hash mptoyaa.they nu.tpaelat stir waken'coag.pogcyawnber. Zara an owployerthat isprovidingworkers'emnpensetion huarencefor ray eanptapees. Below to the policy and fob site information_ • Insurance Company Name:_ Policy#or Self-ins.Lim.#: Expiration Date:, Joh Site Adams: City7Stata'Zip: • Attach a copy of the workers'mmpaosation policy declaration page(showing the policy number and espiradon date). Failure to secure coverage as required under Section 25A of MGL c.152 can lead to the imposition of criminal peoaltiea of a fru tip to$I.500.00 andtor one or iaptisoumeat,as well as civil penalties in the form ofa STOP WORK ORDER and a foto of vp to 3250.00 a day against the violator. Be advised that a copy of this stammer tray be forwarded to the Office of Investiestom of the DIA for mamma°egvemaee va cation fdi,bewby ee a / andpen die information provided above b(reload correct. Sisaahue: ../( % Date: _ Pie#: 413336-2611/ `r official use only. Do not write los sub area,to completed by city or town of/kial City or Town:_..... Per WUatise#_. _.. Issuing Authority(Mae sae): 1.Board of Health 2.Building Department 3.City/town Clerk 4.Electrical Inspector S.Plumbing Inspector 6.Other Contact Person: Phone#e The Official Website of the Office of Consumer Affairs & Business Regulation (OCABR) Consumer Affairs and Business Regulation Home Consumer Rights and Resources Home Improvement Contracting HIC Registration Complaints Registration # 181065 Registrant LEARY BUILDING, INC. Name TIMOTHY LEARY Address 1039 EAST MOUNTAIN RD City, State Zip WESTFIELD, MA 01085 Expiration Date 02/20/2017 Complaints Details No complaints found for this registrant. You can also view arbitration and Guarant Fund histo Back Tech G 2012 Commonwealth of Massachusetts. Mass.Gov® is a registered service mark of the Commonweal of Massachusetts. Sia .; v achusetts Department of Public Safety �f Building Regulations and Standards CS-1048,6pikt ri x n Supervisor ' yM k; ARY ;. AIN RO 'akk S;i+ wMnrw� j Fta • : Expiration : • missioner 02/1712018 • • UTAH OFFICES ECTORSandy Layton Ell Bin E E R s St. George Project Number: U1850-0239-161 December 16.2016 Ross Solar Group 38 Beaver Brook Rd Danbury,CT 06810 A I I ENTION: Roberto Cabral REFERENCE: Jason Mark Residence:116 Straw Avenue,Florence,MA 01062 Solar Panel Installation Dear Mr.Cabral: Per your request, we have reviewed the attached layout and photos relating to the installation of solar panels at the above-referenced site.The following materials and components are proposed in the installation of the solar panels. Roof Structure in Area of Panels:2x8 Rafters(a) 16 in O.C. Roof Material:Composite/Asphalt Shingles Solar Panels:0 L03 15NIC-G4 Panels Rail Connection System:IronRidge Solar Mount Rail with I,Foot Based upon our review, it is our conclusion that the installation of solar panels on this existing roof will not adversely affect the structure of this house.The design of solar panel supporting members and connections is by the manufacturer and/or installer. The adopted building code in this jurisdiction is the Massachusetts State Building Code, 8th Edition (2009 IBC) and ASCE 7-05. Appropriate design parameters which must be used in the design of the supporting members and connections are listed below: Ground snow load:40 psf per MA IRC amendments(verify with local building department) Design wind speed for risk category II structures:90 mph(3-sec gust)per MA IRC amendments Wind exposure:Category C Our conclusion regarding the adequacy of the existing roof is based on the fact that the additional weight related to the solar panels is less than 3.5 pounds per square foot.In the area of the solar panels,no 20 psf live loads will be present. Regarding snow loads,it is our conclusion that since the panels are slippery and dark,effective snow loads will likely be reduced in the areas of the panels.The attached calculations verify the capacity of the connections against wind,the governing load case.The rails shall be attached at 48"O.C.maximum with adjacent rails attached to alternating rafters using 5/16"diameter lag screws with a minimum of 1-1/2"thread penetration into the rafter.Solar panels will be flush- mounted,parallel to and no more than 6"above the roof surface.Thus,it is our conclusion that any additional wind or seismic loadings related to the addition of these solar panels is negligible. During design and installation,particular attention must be paid to the maximum allowable spacing of attachments and the location of solar panels relative to roof edges. The use of solar panel support span tables provided by the manufacturer is allowed only where the building type, site conditions, and solar panel configuration match the description of the span tables.Attachments to existing roofjoist or rafters must be staggered so as not to over load any existing structural member. Waterproofing around the roof penetration is the responsibility of others. All work performed must be in accordance with accepted industry-wide methods and applicable safety standards. Vector Structural Engineering assumes no responsibility for improper installation of the solar panels. Please note a representative of Vector Structural Engineering has not physically observed the roof framing. Our conclusions are based upon information regarding the existing roof framing provided by Ross Solar Group. From that information it appears that all structural roof components and other supporting elements are in good condition and free of damage and deterioration. Very truly yours, VECTOR STRUCTURAL ENGINEERING,LLC i • ROGER T. A bhigir . Roger T.Alworth,P.E. 1 / Principal �� RTA/dkc i' s a 12/16/2016 9138 S. State St., Suite 101 /Sandy. UT 84070 /T(801) 990-1775 I F (801) 990-1776/www.vectorse.com JOB NO.: U1850-0239-161 E rl G I m E E R S PROJECT: JASON MARK RESIDENCE SUBJECT: WIND PRESSURE Components and Cladding Wind Calculations Label: solar Panel Array Note: Calculations per ASCE 7-05 SITE-SPECIFIC WIND PARAMETERS: Basic Wind Speed [mph]: 90 Notes: Exposure Category: C Occupancy Category: II Importance Factor, I: 1.00 ADDITIONAL INPUT&CALCULATIONS: Height of roof, h [ft] 20 (Approximate) Comp/Cladding Location' GaideMeRog4srcif 52F Enclosure Classification Enclosed Buildings Zone 1 GC OS Figure 6-11C (enter largest abs. value) Zone 2 GCp: 1.7 (enter largest abs. value) Zone 3 GCp: 2:6: (enter largest abs. value) a: 9.5 Table 6-2 z9 [ft]: 900 Table 6-2 Kh: 0.902 Table 6-3 Ka: 1 Equation 6-3 Ka: 0.85 Table 6-4 Velocity Pressure, qh [psf]: 15.9 Equation 6-15 GCp;: 0 Figure 6-5 (largest abs. value) OUTPUT: p=qi,KGCp)—(GCp, Zone 1 Pressure, p [psf]: 14.31 psf(1 OW, Interior Zones') Zone 2 Pressure, p [psf]: 27.02 psf(1.0W, End Zones') Zone 3 Pressure, p [psf]: 41.33 psf(1.0W, Corner Zones'within a) ('a=assumed=3') Z/ECTOR JOB NO.: 01850023&161 E m O I m E E R s PROJECT: JASON MARK RESIDENCE SUBJECT: CONNECTION CAPACITY Lag Screw Connection Capacity: Demand: Lag Screw Size: 9i6 Cd: 1.8 Pressure Max Max. Trib. (1.0 Wind) Spacing Area Max. Uplift Embedment: in (Ps0 (ft) ( ) Force(lbs) Grade: .(z =f:;•a Capacity In Ibsfin. emb. Zone 1: 14.3 4 12 172 Number of Screws: assi Zone 2: 27.0 "412 324 Total Capacity: 820 lbs Zone 3: 41.3 ` ".4'- 12 496 Demand< Capacity: CONNECTION OKAY %VECTOR JOB NO.: U1850-0239-161 E n G I n E E R S PROJECT: JASON MARK RESIDENCE SUBJECT: GRAVITY LOADS CALCULATE ESTIMATED GRAVITY LOADS Increase due to Original DEAD LOAD (D) pitch loading Roof Pitch/12 (: 24 >.: . Composite/Asphalt Shingles 4.1 1.02 4.00 psf 1/2" Plywood 1.0 1.02 1.00 psf Framing 3.0 psf Insulation 0.8 psf 1/2" Gypsum Clg. 2.2 psf M, E & Misc 1.5 psf DL 12.6 psf PV Array DL 3.0 psf ROOF LIVE LOAD (Lr) Existing Design Roof Live Load [psf] 20 ASCE 7-05, Table 4-1 Roof Live Load With PV Array [psf] `.0 2015 IBC, Section 1607.12.5 SNOW LOAD (5): Existing With PV Array Roof Slope (12): Roof Slope [1: 12 12 Snow Ground Load, py [psf] 40, { 40 ASCE 7-05, Section 72 Terrain Category: ; - (- ?:- ,' , - ASCE 7-05, Table 7-2 Exposure of Roof: FuWE rpbsed `FUNy Exposed ` ASCE 7-05, Table 7-2 Exposure Factor, Ce: 0.9 0.9 ASCE 7-05, Table 7-2 Thermal Factor, Ct: .1.1 x ; 1.t ASCE 7-05, Table 7-3 Risk Category: It 0 ASCE 7-05, Table 1-1 Importance Factor, Is: 1.0 1.0 ASCE 7-05, Table 7-4 Flat Roof Snow Load, pr[psf]: 28 28 ASCE 7-05, Equation 7-1 Minimum Roof Snow Load, pm [psf]: 20 20 ASCE 7-05, Section 7.3.4 Unobstructed Slippery Surface? No (Yes ASCE 7-05, Section 74 Slope Factor Figure: Figure 7-2b Figure 7-2b ASCE 7-05, Section 7.4 Roof Slope Factor, Cs: 1.000 0.967 ASCE 7-05, Figure 7-2 Sloped Roof Snow Load, ps [psf]: 28 27 ASCE 7-05, Equation 7-2 Design Snow Load, S [psf]: 28 27 Eta F. E., B TO Abbrev GRADES (PS IP l (M9 IIba2 JOB MO.:utBixw23atat Druz OFLU t�0000 3 E I"t P n E E R 9 a z t.e000w u r1(5%) SPLf 5x6 n uFOEa 1.350 170 1400.000 v g unPFnz 34 a PROJECT;JASON MARK RESIDENCE SUBJECT: BEAMS SPn poo 125 1,40400340 575 44 I ].aW 240 1.50[.0[0 32 j1($ibN LOADA: Load Type('. Saw/ Live Oead - nve 2,400 240 11700.000 40 RoD 2B 20 13 CRITERIA(Lq Dm DLL Do, Let(IS) Lm_0-0.410eE) 2.800 2175 400(000 40 Solar 30 A®µrvq 120 100 et(20) LVL(20%IOOE) 22000,000 42 B 240 450 LSL 9L(405106E) 400 1,700000 G C, JO. I 2C0 AD_ vat O OXIOKJ 247£ AO 1,30000 42 4410.'0 must be tess Mac or equal to'l3 Pant Point Ott Du44„ o Adel Adel d' Live Dead 0n) (ii) Rod Fbor wall Live Dead Point li4y nisi Load Load c 2 (SEE (SEE 1.50L Length Ttib Tdb Tib Load Load Load 3 'a' 'FIL Poi 9 M„u Mn.. vmp Va.. D11 Dews. GOND GOND GLB Label 'L'Kitt (fr) (R (Q) (pd} IM} FRm s (ft) (Ib} (Ib) (Rade zie a �C, Co Cry R 0b} Ra(t) (Mb) (bIB) Gb) (@) (in) GO 'C) V) Canb Chock 12.58 1.833 3.690 , taPPf2 be 1.15 1.15 120 sal 303 1023 1521 3231 1126 048* 1258 022& 0839, O75 R1-1 C�� � �y Plan Review City of Northampton 5 , 3 Q -/ ' f Building Department /� !! ew - ��� 212 Main Street tV�rthamptan, MA 01060 ,)LG 28 W IRON RIDGE ROSS BOTTOM OF MODULES [ RAILW/'LFOOT N ' ROSS / ROOF RIDGE CAP , 1.,r <.,..I �' , . t I 459.00^— ;� r ' ROUP • I:R;r .. _— - )95A0' -...—_ - 7t.q'—.. ..- • 36 BEAVER BROOK RD rDANIN IRY CT 06810 � .. w^ WroWm _ ——_ p lc natml .w h., J •i 1 4 L•S..w ••1 Z i• —. 'Mk III X1:1.5124510 " FX 866.271.3016 ` _.--. ▪ —--——T.-+T•i.4-1 1-.T•T T FR rZ Ti T———— i T -r.-- N`)MBER DATE: ISSI IFD FOR T -f ...i.66.56'••. • •------L•r "Ig —_ r- �� ► ' CONSULTANT: k °' SKYE.RIIO'S AND y 8 , PIPE TO REMAIN �d1y w ti. ___. ,...i_T„..,....„. .,,_..„,„,......,.....,..„.„,.,.4.„,„: ., ... -F- , ..'.t L u.L.. 9t _ BITE ADDRESS. 6 I T T.l---r r: 3 PROPOSED ARRAY VIEW F to Straw Avenue � - Florence-MA � PV-1 SCALE:MB 01062 k I k;---- -R r T1 1 ROOF I LAYOUT4 , ON PV-I SCALB:3/16^ I0 (7)LG 285W , IRONRIDGE N MODULES RAIL W/'L'FOOT5 00 ag4o • J y t,js� 21109'447.00 4 f., ' ••1 °440 1514 - _ 47.77'-4. ..0 l/') �T. 4-)o m © /a . , o I U ..... 0.,100ailL6049 wx a. — WEBSITE IMAGE _ nWNBY•. 4 PROPOSED ARRAY VIEW h ^ DxTPC PV-1 SCALE:N S "- DRAWING TTTLE: TECHNICAL DATA ARRAY LAYOUT GU l I ER Irr ROOF 1-'107 ROOF 2=167 ROOF 3-20' AND TECHNICAL DATA ( PITClr ROOF 1-32°/ROOF 2-.281 ROOF 3=12° I ROOF MATERIAL ASPHALT SHINGLES SOLAR MODULE (47)LG285SIC-G4(13.395kW) 435.00" DAIS. MODULE DIM. 39.37"x 64.57" 11/07/2016 RACKING SYS. fRONRIDGE RAIL W/'L'FEET INVERTER SOEAREDGE SE I0000A-US W/P300 OPTIMIZERS(x47) DATA MONITORING WervIONITOR 2 ROOF 2 LAYOUT SIIEKR NUMBER AZIMUTH ROOFS I&2-102%R00F 3=28r PV-1 SCAIB 3116"=10 THIS DEMON SHALL BE VIEWED AS AN ADDENDUM TO CUSTOMER'S ORIGINAI.CONTRACT:INVERLERSANITUII PAWLS MAY IIAVEREED MODIFIED FROM YOUR ORIGINAL CONTRACT.THESECRANUES MAY IIAVE TU OCCURRED TO ADDRESS:SHADING,STRUCRAL,ELECTRICAL PRODUCTION UR EQUIPMENT + • 1` AVAILABILITY THESE EQUIPMENT MODIFICATIONS DO NOT CHANGE THE CON IRACI PRICE.'IY SIGNING THIS DOCUMENT YOU AGREE TO TREAUOVE SYSIEM DN.HUN ANI)ANY EQUIPMENT MODIFICATIONS TO THE ORIGINAL CONTRACT.CONTRACT(RICE DOES NOF CIIANiF IMIXSS AGREED TO IN WRTDNO BY BOTH THE CUSTOMER AND ROSS SOLAR GROUPIE YOU HAVE ANY QIIFSTION8 OR CONCERNS PLEASE CONTACT GLENN SIMUNS AR 203.512 4500 EXT 70040R OLENN4IROSSSOLAIOROUP.COM' _ .4� (16)LG 285W IRONRIDGE—` BOTTOM OF MODULES RAIL ON FOOT ROOF RIDGE CAP --- - 437.00- - - - OU P R 38 BEAVER IIRom RD 7.0p- 201« ANBURY CT 06110 16217'- f 6t.SQ'—e—__ . -201117'_- --t-. .m°w°lu musce e _- —— Y F III:2017124700 FX 866.271.2016 r •••11 RI VISION 1.... NUMBER DATE: ISSUED POR ° • 1,51 §. I'LTAM: p h..-r--...-ice�• i—t. .—•.L.A-7... .- _1 _—________y SITTADRSS gyp, :;22'6•:— ..-....-4. ® 116 Straw Avenue x rrl T Flo/1 ence-MA Ill RIMAIN 01062 l ROOF 3 LAYOUT PV-1 SCALE:3/16'-IV vN „r t�}. 0 LG - IAnnVAbOo rn, I! Od . aBetter Life C4 tri U ^ ' �' / \ , ,.., L-i-I - _ OE >17:1 ii LG MonoXER n WEBSITE IMAGE U Yi8"'- ,"L• _ DRAWN SY: _— _/ �' .,... .../ -aK� '~ - TPC TECHNICAL DATA URAWINO TITLE GUTTER HT ROOF I-107 ROOF 2=167 ROOF 3=20' PITCH Nog.I-321 ROOF 2=28°/ROOF 3 12° ,.. . ARRA Y LAYOUT ROOF MATFRIAI. ASPHALT SHINGLES AND TECHNICAL DATA SOLAR MODUI.E (47)L0285S I C•G4(13.395kW) MODULF,DIM 39.37'A 64.57" RACKING SYS IRONRIDGE RAIL W/1.;FEET 1}} INVERTER SOLARLDGE SE I0000A•US W/PNOOOPTIMIZERS(A47) 2 PROPOSED ARRAY VIEW 11/07/2016 DATA MONITORING WEB MONITOR NrS AZIMU I H ROOFS I&2-102°:ROOF 3=282° PV-I SCALE SHEET NUMBER TIM DESIGN SHAT L BE VIERIED AS A•1 ADDENDUM TO CUSTOMERS ORIGINAL CON TRACT INVERTERS AND OR PANELS MAY HAVE BEEN M1UDIW lIROM YOUR l 1NI/:INAI.LIM I RAC' III/Sl.CilANGES MAY RAVL MAURREE,ILI ADDRESS SI i RI SI IA51RUCIURA.El ICTRICAI PROIII TN OR FQ11RMFlll PV 1 B AVABABILITY THESE EQUIPAEY:T MODIFIlA1RJN3110 MN CHANGE 1111.CONI RACI IRRT TIT SIGNING TIM IRRIIMENT TOIl AGREE TO INF ABOVE SYSTEM DEVON AND ANY EQUIPMENT MODDKATIUNS TO SHE ORIGINAL CONTRACT CONTRACT PRICE DOES NOT CHANGE UNLESS AORFUD TO IN WRITING BY 110111 TIP'II!STOW'B AND WAS 501 AR GRAR IP lE YOU HAVE ANY QUESTIONS OR CONCERNS PLEASE CONTACT GLENN SUMS AT 204S12 4./00 EXT 1001 OR OLF2I)E4ROMEO ARIiRW MOW _ _1 ROSS , 'XIII WIXiE WARD �\.. ;�' SOLAR XL)RAFTER 16'O.C. 1 S - 'v- '� - GROUP —YS'MCFATI MO WI ASR IALT �: �` SHINGLE TYPE ss MAXI II MAIN NI) \ ww pwOANBURYCT 06110 ♦` `� "L � w I'll-203.SI24SNI / SKYLIGHT FX.B66.271.3016 `\ [CONSULTANT: \ ALO 28SW MODULE ! ` t i IRCEWIXIF y ,_`` RAIL Wit FOOT —2X6 C®.Id0 JOIST VAUL TED \ I6•CIC. GARAGE EXTERIOR IMAGE GARAGE EXTERIOR IMAGE(ROOF 1 AREA) AREA [-PLATE DOUBLE (ROOF I AREA) \..x N11MIR.R' IWO.. ISSUED IOR'. A •+ - 149.72' __._ -1 9.06• _IIMI 10.0• O p i,�� :� I` DOUBLE]XI2 CARRIER -F BEAM 4 CENTER --'O LALLY COLUMN*CENTER 41111 .14 t ROOF 1 SECTION ct R(XH,2 VAI TIED AREA ROOF VAULTED AREA PV-2 318'-1-0' IMAGE IMAGE ry Ili / .1—,1 Q I N vz `= u0 t------, ) U 1- a.) 0 mum , r `n 0 SOLAR PALM ,-22C10RM CIO OE M.1111*-- SOIARIAENT RAIZ. �� _BOARD J1CRRAFTER0IWOC __-- 5 - L>~ SBRRATTSO 1.FFF.T • • SHEATHING 147 ATI Lvl.I cn `� -`_ ---I SI NULL 7 YPE PASTIIlIRS'AS WiOUIREIY �I • ire CG _ Ixunn.E zxlo- '� ISXIKITNO ROOF'ASRISMII. � 1`� -� um. RXISTINOKTRI If'II lin N\ RIDOF.FPAM _�� ,_r N\ LG 2RSW MODULE • IRIS ' >` DRAWN IlY RAIL RONRIDOT .• 1?p TPC 3 INSTALLATION DETAIL 1RONRIDOE / „e'' T u• A p PV-2 SCALES 11/2:1'0' .'XB RAFTER 16'0.C. -�y` i ROOF SECTION PLATE h AND DETAILS --1- IR X /✓' i , , 0,5: CLOSET YAC ,,r 1I/072016 •- cLOSEr AREAA I., G6 liar I AREA J r _-. pai. —a MOUNT SYSTEM ROOFS 2&3 1 -S'n• _4 .x. �mve ,XIJPa6rs 7Jc6 CF]I.INO PV-2 EN-2 Sok:NIS 2 SECTION 2X1 WALLS--- ' (6 170.C. JOIST ®16'O.C. — PV-2 w-'.o N / ``_ / ROSS SOLAR TREE LINE DANBURY CI 6)110 i \_,, ,,,,, 81:107 www.rmacirRMR0 PX:/1664714016 1r ' ., �' (I5)LG 285W �_,�.a.t MODULES COpLaULTAM: j > D,� DIM nil FOR 1 (14)I(;285W \1OD111.ES a - I it �- • z ARRAY LOCATION / ,,4 SP-1 tars / PROPERTY LINE Q ., r ' 4/tv Q 1 N _o .: T,,.. (IS)LG285W !c'd ! 11 ::::-..........„.., ��\:\ MODULES h � ad I Q CIR4TWAY 'u,Awn"r TPC lMtAWi!I(i T1TI.E L „_, \,_, PROPOSED ARRAY --) Q MAP VIEW UTILITY METER AND LAYOUT SP-1 NTS AC DISCONNECT LOCATION OUTSIDE WITHIN 10' .. Q OF THE.METER— —_ 09/20/2016 Note: Solar Array (47)LG285SIC-G4 Modules(13.395kW) 1 SITE PLAN CT�+ On IronRidge rails w/"L”Feet Vp soak ins 141 - 1 Inverter SolarEdge SE10000A-US w/P300 Optimizers(x47) t- cO'she t —D-Conduit runs ' _ t I ` inside garage to T ROSS t'1I Ca Utility Meter area Mr ' .1-box on roof •7i'• i'..' .r �.. (under panels) i 711 III AVER Imam YI I pil Utility mctcr and °„NB,,:a,CT P��, ii!, : " I•Icm,si2,sm proposed FRa66.2T1.7°16 13 pl., ,. Fused AC Disconnect and Solar-Log NIIMDI:R DA II ISSUED PM 0 .,1 _(see Image 4) Aft °' 1.7.16 epnP.I OC rli. Existing Sub Panel _ r - (basement) 11* -:. ...7 A OTT ADDRESS j 1-box on roof 116 Straw Avenue f; Florence-MA 0�; :. (under panels) 01062 - - --� .1-box on roof B-Conduit runs--— �, (under panels) and 4 `•dal ?li� on roof,off° / / a down on exterior wall next to chimney,then A-Conduit runs under eave to on roof to back a) "Zr a , penetrate garage... roof... -P 00 see Images es 2A&2B) (see Image 1) 0tn CD• U � M - ..AI / • IIII 4/iii Proposed location of Inverter (� next to Main Service �' Panel in garage C-Conduit runs © (see Image 3) on roof,into crawl U Q '''''''-,., \.; F 'qtg _ - space,drops through I1wwN lY ceiling into garage, TPC - then along ceiling to equipment ITRAWDx1T'TUI:- CONDUITS AND EQUIPMENT '`` LOCATION J-box on roof _ I (under panels) __ DA1E I1/onzol6 _ I nSITE PLAN D SP-E s�rrts S P-Lr � LIDS DIMGN SARA or VTPWFD A5 AN ADDENDUM TOCTJSMERTcRIDMAL CONTRACT:INVERTERSANDOR PANELS MAY HAVE BUN IALIVIII,U ILIUM Tom CRN'ANAI.(TRCTRACT THESE CHANCIER MAY HAVE O(YTIRRED TO ADDRESS.SMADINQ STRUCTURAL-ELECTRICAL PRO0U0I0170R FgNPMEIR ARAN ABILITY TIlYYE EQIIPMENT MOOLEKATKWS co NUT CHANGE THE CYINTRACT NIM.'IIY SXNLVO 1NLS Don I W NT will AIMEF TO Tiff ABOVE SYSTEM DESIGN AND ANY EQUIPMENT MODIFICATIONS TO THE ORIGINAL CONTRACT.CONTRACT PRICE DOES NOT CHANGE UNIFSS AGPJ.LU 10 IN NSD 1Moo Y BUlll THE CUSTOMER AND 8066 SOLAR GRCIL'P II mu IIAVI'ANT pi RYTNMIS OR CTRICTRNS PLEASE CONTACT OLENN SIMONS AT MI-312 116 6 EXT T6M OR OIANNARosSSO ARGROVP COM' (24)LG 285W BOTTOM OF MODULES IRONRIDGE . ,,, SOLAR ROOF RIDGE CAP RAIL W/ L FOOT � f as9.00^ — — I z`, GROUP -^-37.17 --- -_ - .:.-- 393.40'-- _ - F 3250'4 - ' _ 34 BEAVER BROOK RD — 4——- DAN III IRV CT AMUR �, ! w....mw°IwAUP.°°m $ 1•• 1 PH:203.512.45® REVISION ... .T. T ......... ... . .. ' NUMBER DATE: ISSUED Eau . • . .. .... .... •... IC- __.:: . ... .... CONSULTANT: Lp __ SK VI KNITS AND _ ___ G 6 ... PIPE.TO REMAIN _ .. .... S - $ __ S-2(15) SIIT.ADDRESS • • 116 Straw Avenue . .• * PROPOSED ARRAY VIEW Florence-MA r._ S-1(16) r. 01062 r -. .... ..� SCALE NIS CC ROOF 1 WIPMAP 4- 2 oN WM- scALEan6^-In^ (7)LG 285W IRONRIDGE MODULES RAIL W/'L'FOOT Z.: 447.00" Ln _.:�.i-if '0i •+^ • -. --_ . •C" IIM.I1" • 251A9• ! n.Tl .r -__ ..I ea so ®-I,L. , 7 ' y ,+..i • ® ,. ' en u • r C y , ti L6 MoroX'.w. 0 WEBSITE IMAGE DRAWN DY: PROPOSED ARRAY VIEW 1TPC 0 SCALE:NTS 15 DRAWING TITLE: w TECHNICAL DATA STRINGS GUTTER HT ROOF I=10'/ROOF 2 16'/ROOF 3 m 20' LAYOUT PITCH ROOF I^32°1 ROOF 2=28°/ROOF 3-12° ROOF MATERIAL ASPHALT SHINGLES - SOLAR MODULE (47)L0285SIC-04(13.395kW) • 435.00" MI . MODULE DON. 39 37"x 64.57• RACKING SYS. 1RONRIDGE RAIL WI I...'FEET 11/26/2016 INVERTER SULAR!DGE SEI0000A-US W/P300 OPTIMIZERS(x47) © ROOF 2 WIPMAP DATA MONITORING WEB MONITOR / SHEET NUMBER A7.IMl1TH ROOFS I&2=102%ROOF 3-282° SCALE:3/16"-I'0" 1 T1115 DESIGN SHALL BE VIEWED AS AN ADDENDUM TO CUSTOMER'S ORIGINAL CONTRACT:INVER I ERS ANI.UR PANELS MAY IIAV E BEEN MODIFIED FROM 1•01114 ORIGINAL CO CONTRACT TIIF.SF.CIIANOFS MAY HAVE.OCCURRED TO ADDRESS.SHADING.STRUCTURAL.ELECTRICAL PRODUCTION OR EQUIPMENT 1 AVAIIABII.RY THESE EQUIPMENT MODIFICATIONS INH NOT CIIANOE THE CONTRACT PRICE'BY SIGNING THIS DOCUMENT YOU AGREE TO TIIE ABOVE SYSTEM DESIGN AND ANY EQUIPMENT MODIFICATIONS TO THE ORIGINAL CONTRACT.CONTRACT PRICE DOES NOT CHANGE UNLESS AGREED To IN W RI I INE,BY 110111 THE CUSTOMER AND ROSS SOLAR GROUP-IF YOU HAVE ANY QUESTIONS OR CONCERNS PLEASE CONTACT GLENN SIMONS AT 203412 4500 EXT 7504 UR GLENNACROSSSOIARGROUPCUM" �� (16)LG 285W IRONRIDGE - ROSS - BOTTOM OF ROOF RIDGE CAP MODULES RAIL W/'L'FOOT SOLAR GROUP --- 437.00'-- 36 WAVER MOOR RD 2.Wa 2 m• DANBURY CT 06110 -. —._1637-- - - 63.92'------, - 20167' • wwwnmW3muw '‘ • P0 ` ,, PH.201.312.4700 FT:366-27/-3016 _-- --a—T—..-Jit�.1•—t la. REVISION HOMER DATE. ISSUED MON'. f.1 .. .. .. //9: • S-3(16) CONSULIANI: LIIIMNI T . 3 —-- SITE ADDRESS n ;2;6..___--: ;.- 116 Straw Avenue SIT Florence-MA TO RIMAM 01 062 1 CHIMNEY' ROOF 3 WIPMAP SCALE:3/IV-IV ...4 o. .,.. N4 ®LG I�,� , - o1 • 1llot I rr l:.i .« • . K' .scR?; U kr) 44. x`.11 - / \1 . t ; '. _ 1 .�'"' _ t • o — , ... LG MonoX'Pk. - - WEBSITE IMAGE • I IRANN DV' TPC TECHNICAL DATA DRAWING TIRE: GUTTER HT ROOF I-107 R(X)F 2=167 ROOF 3-20' PITCH ROOF I-32°/ROOF 2-28°/ROOF 3-12° STRINGS ROOF MATERIAL. ASPHALT SHINGLES LAYOUT SOLAR MODULE, (47)LG285SIC•G4(13.395kW) - MODUI.F.DIM 39.37'A 64.57" RACKING SYS IRONRIDGE RAIL W/'L'FEET IIATE INVEK'I ER SOLAREDGE SE10000A-US W/P300 0YI'IMIZERS(,47) Q PROPOSED ARRAY VIEW 11/26/2016 DATA MONITORING WEB MONITOR AZIMV I H ROOFS 1R2-102°/ROOF 3=282° SCALE:NTS ',WET'411/348ER�'�//R`, /•/�/ THIS DESION SHALL BE VIEWED AS AN ADDENDUM TO CUSTOMER'S ORIGINAL CONTRACT.INVERTERS ANDOR PANELS MAY HAVE BEEN 130DIIII.11 ROM YVU6 ORIUBIAL I:UN 1 IAC I OUSE MAY HAVE UL'CORRLG)((I ADOR1_SS SIIAISN(L STRUCTURAL.111A.'TEJCAI.PROM/CONMI FQRRPMI 41 ,`7 • 1.- LI AVNLABILIIY THESE IARJU'MEN I MOUIL0.'AI ZONE 11066)1(1760641 I IIEI:UNI KALI MKT •HY 50.01146 OILS TKILIMFNT YOU ACiFF TOME ALES SYSTEM DESIGN AND ANY EQUIPMENT 1.10061CAT1ON3 TO THE 01100IAL CONTRACT.CONTRACT PRICE 00ES NOTCHANOE UNLESS AGREED TO IN 611111314,in Ito III T76'CUSTOMER AND ROSS SOLAR GROUP IF YOU HAVE ANY QUESTIONS OR CONCERNS PLEASE CONTACT GLEAM SIMONS AT203-1120700 EXT 7001 OR GLFNNQROSSSOIARGROUP COM' 38 Beaver Brook Road Danbury,CT 06810 ROSS P:203.512.4500 F:866.271.3016 SOLAR Date: 9/14/16 GROUP To: Jason Mark 116 Straw Ave Florence,MA NOTES:47 premium LG 285watt blk/wht Solar Panels on mulitple roofs, with a SolarEdge inverter in order to reduce effects due to shade and Dear: Jason offers panel level monitoring. Use Solar Loan to let solar pay for itself! Once again we thank you for your Interest in working with the Ross Solar Group. We have put together a brief summary of the product components,financials,environmental benefits,and savings pertaining to the installation of your solar electric system. System Details Solar Panel Make and Model LG 285watt blktwht Quantity of Solar Panels 47 Total System Size in kW 13.395 Inverter Type and Model SolarEdge 10kW TL with Mounting System Unirac Solarmount Data Monitoring System Solarlog Financial Summary Total System Value $44,605 State tax credit $1,000 30%Federal Income Tax Credit $13,382 10 years of Monthly SRECs $27,647 Total Cost After All Incentives $2,576 Monthly SREC payment(to homeowner,from MA Dept of Energy for next 10 years) $230.39 Savings and Benefits of Going Solar Your Demonstrated Electrical Need 8,800 kw,hear Estimated Solar Production 12,323 a myear Your Monthly Electrical Bill Before Going Solar $151 remmonm Your Monthly Electrical Bill After Going Solar $4 perrmontn Percentage of Annual Electrical Needs Provided by Solar 140%annually Monthly Savings Provided by Solar $147 peJmomtl Year 1 Electrical Savings $2,218 Year 1 Return on Your Investment(if not financed) 15.0% Electrical Savings Over 25-year Warrantied Life of the Solar Panels $80,874 t—i1m^o=00% Inn-al"°=^•l Lifetime cost per kWh with Solar(estimated) $ 0.089 Environmental Impact Metric Tons Of CO2 Offset By Your Solar System 8.52 Cars Off the Road Per Year 1.67 Barrels of Oil Not Burned Per Year 19.80 *This quote assumes shading is constant The Ross Solar Group,LLC is fully licensed and insured.We employ a local crew of highly certified and experienced installers.We use industry leading practices to ensure the highest quality work.We have a NABCEP and licensed PV-1 installer on site throughout the duration of the installation.Our installers have over 2000 residential and commercial installations of experience.We will see the project through until the very last inspection has been completed and passed. Customer Initial: .<7:7-- package includes all labor,equipment,engineering,incentive applications,utility interconnection agreements,permitting requirements,scheduling of all inspections,and utility witness testing. Terms and Conditions Customer understands that the SREC amount of $230 monthly is estimated. The Mass SREC monthly payment will be deposited into the homeowners bank account each month,provided you choose to use Sungage's monthly SREC program. Included in your proposal is the cost for certified engineers to evaluate the feasibility of your solar installation. In the event an engineer recommends enhancements to the home or affected infrastructure to properly and for safely install and operate this PV system,the homeowner may be responsible for cost+labor($55.00@our)as well as any third party contracted costs that may be required. Homeowner will be notified if upgrades are recommended and a written Change Order will be submitted for approval by customer. All parties requiring Inspections of the PV system installed shall have the right of access with proper notification. Contrador and Homeowner acknowledge that the Massachusetts Clean Energy Center maintains the right to inspect all residential PV systems prior to disbursement of final Rebate payment Homeowner should make reasonable effort to coordinate with Massachusetts Clean Energy Center and any Solar PV The Homeowner has until midnight of the third day that contract is signed to withdraw acceptance of said contract,at which time the full deposit will be returned within 10 days. '(the Homeowner)fully agree to comply with the necessary procedures and actions that will take place on my property during the planning and construction phase of my Photovoltaic System. The Contractor will comply with national,state and local codes and standards,obtain all required permits and approvals associated with the PV system installation,complete utility interconnection applications,and collaborate with MA Clean Energy Centers third-party inspectors. The Contractor and Homeowner agree to install a revenue grade meter on the PV system. This is included in the price of your solar system. — Upon delivery of equipment and hardware to homeowners home or business location,the Homeowner shall be fully responsible for the solar electric system against theft and/or damage caused by negligence and/or acts of nature.The Ross Solar Group strongly recommends that the Homeowner add the equipment and hardware to their insurance policy upon arrival of equipment and hardware.This will be disclosed to Homeowner prior to delivery of equipment and hardware. Estimated Start Date of Project Management planning,designing and permitting is 14 days from contract signing or pre-approval of financing,whichever sumes 2nd. Completion 8 Energizing of system expected from 150 to 180 days from signing.Delays are possible due to permitting related issues,weather or pplier delays.Customer will be notified if delay is expected. Payment Terms (if self-financed): Down payment due at time of contract signing $1,000 Amount Applied to Same As Cash(not out of pocket) 30%minus deposit due upon Rebate Confirmation $8,067 60%upon completion of installation(before inspection) $18,134 10%due upon approval by local municipality $3,022 Please Sign Here if You Elect to Self-Finance This olar Project: (You will e ave Accesto our Same As Cash progr - — Payment Terms (if Using Solar Loan) Down Payment Applied at Contract Signing(write in): S (Go Solar For Zero Down onurtner reduce your minimum monthly payments by providing a down payment-ask your rep for details) Your Preferred Loan Term(write in): See caenrew for payment dotted). We can setup a wee hmk for to apply Please Sign Here if You Elect to Apply for the Solar Loan: v (we'll send you a link to apply for your chosen loan term) A (For Ross Solar Use) Amount of Down Payment Received: 8Y. I(the Homeowner)understand and agree to all of the terms stated in this contract: Homeowner Names(print) Jason Mark Phone Number 413 575 8449 Homeowner Signature Date:9/16/2016 Ross Solar Group Authorized Rep. David Tarnfc Date: 916/16 0196093-El 0194500-PVI