25A-139 (7) COMcheck Software Version 4.0.5.1 A Envelope Compliance Certificate Project information Energy Code: 2012IECC Project Title: Montessori Upper Scheer Location Northampton, Massachusetts Climate Zone: 5a Project Type: New Construction Vertical Glazing/Wall Area: 14% Construction Site: Owner/Agent: Designer/Contractor 42 Bates Street Montessori School of Northampton Jody Barker Northampton,MA 31 Bates Street jody Barker,AIA(Architecture+ Northampton,MA Design.LLC 32 Willow Street Florence, MA 617,216,5988 jodyba rker.a i a@g mail.corn Building Area Floor Area 1-Montessori Upper School (School/university):Nonresidential 7400 Additional Efficiency Package On-site Renewable Energy Envelope Assemblies Assembly Gross Area Cavity Cont. Proposed BudgetU- ar R-Value R-Value U-Factor Factor.) Perimeter Roof 1:Attic Roof with Wood Joists,(Bldg.Use 1-Montessori Upper 1856 38.0 7.0 0-023 0.027 School] Roof 2:Attic Roof with Wood Joists,[Bldg.Use 1-Montessori Upper 601 19.0 28,0 9.021 0.027 School] Roof 3:Attic Roof with Wood Joists,[Bldg.Use 1 -Montessori Upper 1684 38.0 7.0 0.023 0.027 School] Basement Wall wrest 1:Solid Concrete:101 Thidmess,Medium Density, 176 11.0 100 0.064 0.108 Furring Metal,Wall Ht 8.0,Depth B.G.4.0,(Bldg.Use 1-Montesson Upper School] Basement Wall west stairs:Solid Concrete:10"Thickness,Normal 153 11.0 10.0 0.066 0.108 Density,Furring:Metal,Wall Ht 8.0,Depth B.G.0.0,[Bldg.Use 1 - Montessori Upper SchOolj Door 1:Glass(>50%glezing)Nonmetal Frame,Entrance Door,Pert. 20 — — 0,550 0.770 Type:Energy code default,Double Pane with Low-E,Clear,SHGC 0.70![Bldg.Use 1 -Montessori Upper School] Basement Wall west 2:Solid Concrete:10"Thickness,Normal Density, 122 11.0 10.0 0066 0.108 Furring:Metal,Wall Ht 8,0,Depth B.G.4,0,[Bldg.Use 1-Montessori Upper School] Door 2:Glass(>50%glazing):Nonmetal Frame,Entrance Door,Pert. 20 -- --- 0.550 0.770 Type:Energy code default,Double Pane with Low-E,Clear,SHGC 0]0[Bldg.Use 1 -Montessori Upper School] Project Title: Montessori Upper School Report date: 11/22/16 Data filename: C\Users\Jabar\Documents\Projects\2016\16-002 Montessori\2 Documents\code\montessori sch Page 1 of 24 comcheck.cck Assembly Gross Area Cavity Cont. Proposed Budget U- or R-Value R-Value U-Factor Factorhi Perimeter Basement Wall east 1:Solid Concrete:10"Thickness,Normal Density, 233 11.0 10.0 0.065 0.108 Furring:Metal,Wali Ht 8.0.Depth B.G.60,[Bldg.Use 1-Montessori Upper School] Basement Wall east lobby:Solid Concrete:10"Thickness,Normal 100 11.0 10,0 0.066 0.108 Density,Furring:Metal,Wall Ht 8.0,Depth B,G.8.0,[Bldg.Use 1 - Montessori Upper ScnooI] Basement Wall east 2:Solid Concrete:10"Thickness,Normal Density, 233 11.0 10.0 0.066 0.108 Furring:Metal,Wall Ht 8.0,Depth B.G.6.0,(Bldg.Use 1-Montessori Upper School] Basement Wall north wing north:Solid Concrete:10"Thickness,Normal 447 11.0 10.0 0.086 0,108 Density,Fuming:Metal,Wall Ht B.O.Depth B.G.4.0,[Bldg.Use 1- Montesson Upper Schadt Window 1:Wood Frame:Operable,Pert.Specs.:Product ID Marvin 12 - - 0.280 0.450 Integrity Awning,SHGC 0,30,[Bldg.Use 1 -Montessori Upper School](b) Basement Wall south wing,north:Solid Concrete:10"Thickness. 67 11.0 10,0 0.066 0.108 Normal Density,Furring:Metal,Walt HI 8,0.Depth B.G.t3.0.(Bldg.Use 1-Montessori Upper School] Basement Wall south wing,south:Solid Concrete:10"Thickness, 447 11.0 10.0 0.066 0.108 Normal Density,Fumng:Metal,Wall Ht 8.0,Depth B.G.4,0(Bldg.Use 1 -Montessori Upper School] Window 2:Wood Frame:Operable,Pert.Specs,:Product ID Marvin 12 - - 0.280 0.450 Integrity Awning,SHGC 0.30,[Bldg.Use 1-Montessori Upper School](b) Basement Wall 10:Solid Concrete:10"Thickness,Normal Density, 60 11.0 10.0 0.066 0.108 Furring:Metal,Wall Ht 4,0,Depth B.G.0.0,[Bldg.Use 1 -Montessori Upper School] Door 3:Glass(>50%glazing):Nonmetal Frame,Entrance Door,Pert 10 - - 0.5:0 0.770 Type:Energy code default,Double Pane with Low-E,Clear,SHGC 0.70,[Bldg.Use 1 -Montessori Upper School] Exterior Wall west 1:Wood-Framed,16"c.c.,[Bldg.Use 1-Montessori 526 21.0 7.0 0.041 0,064 Upper School] Wi rduw 3:Wood Frame:Operable,Pert Specs.:Product ID Marvin 79 - - 0.280 0.450 Integrity Casement,SHGC 0,30,[Bldg.Use 1-Montessori Upper School](b) Window 4:Wood Frame:Operable,Pert,Specs.:Product ID Marvin 49 -- - 0,280 0.450 Integrity casement,SHGC 0.30,[Bldg.Use 1-Montessori Upper School](b) Exterior Wall west stairs:Wood-Framed,16"c.c.,[Bldg.Use 1- 137 21.0 7.0 0041 0.054 Montessori Upper School] Window 5:Metal Frame with Thermal Break:Fixed,Pert Type:Energy 64 -_ - 0.650 0.380 code default,Double Pane with Low-E,Clear,SHGC 0.70,[Bldg.Use 1 -Montessori Upper School) Door 4:Glass(>50%glazing):Metal Frame,Entrance Door,Pert.Type: 21 - - 0.800 0,770 Energy code default,Double Pane with low-E,Clear,SHGC 0.70, [Bldg.Use 1 -Montessori Upper School] Exterior Wall west 2:Wood-Framed,16"ox„[Bldg.Use 1 -Montessori 572 21.0 7.0 0.041 0,064 Upper School] Window 8:Wood Frame:Operable,Pere.Specs.:Product It)Mervin 79 -- - 0.280 0450 Integrity Casement,SHGC 030,[Blg.Use 1-Montessori Upper School](b) Window 7:Wood Frame:Operable,Pert.Specs.:Product ID Marvin 40 -- -- 0.280 0.450 Integrity Casment,SHGC 0.30,[Bldg. Use 1-Montessori Upper School]PP Exterior Wap east 1:Wood-Framed,16'o c.,(Bldg.Use 1-Montessori 456 21.0 7.0 0.041 0.064 Upper School] Window 8:Wood Frame:Operable,Pert.Specs.:Product ID/Marvin 47 - -_ 0.280 0.450 Integrity Casement,SHGC 0.30,[Bldg.Use 1-Montessori Upper School](h) Project Title: Montessori Upper School Report date: 11/22/16 Data filename: C\Users\obar\Documents\Projects\2016\16-002 Montessori\2 Documents\code\Montessori sch Page 2 of 24 comcheck,cck Assembly Gross Area Cavity Cont. Proposed Budget U- or R-Value R-Value U-Factor Fasters Perimeter Exterior Wail east entry:Wood-Framed,16"c.c.,(Bldg.Use 1- 126 21.0 7.0 0041 0.064 Montessori Upper School] Window 9:Metal Frame with Thermal Break:Fixed,Pert.Type:Energy 48 -- - 0650 0.380 code default,Double Pane with Low-E,Clear,SHGC 0,70,[Bldg.Use 1 Montessori Upper School] Window 10:Metal Frame with Thermal Breek:Fixed,Pert.Type:Energy 12 - - 0.650 0.380 code default,Double Pane with Low-E,Clear,SHGC 0,70,[Bldg.Use 1 -Montessori Upper School] Door 5;Glass(>50%glazing):Metal Frame,Entrance Door,Pert.Type: 42 - - 0.800 0.770 Energy code detauft,Double Pane with low-E,Clear,SHGC 0.70! [Bldg.Use 1 -Montessori Upper School] Exterior Wall east 2:Wood-Framed,15"o.c,(Bldg.Use 1-Montessori 466 21,0 7.0 0.041 0064 Upper School] Window 11:Wood Frame:Operable,Pert.Specs.:Product ID Marvin 24 - - 0280 0.450 Integrity Awning,SHGC 0.30,[Bldg.Use 1-Montessori Upper School](b) Exterior Wait North Wing.North Face:Wood-Framed, 16"o.c..[Bldg. 507 21.0 7.0 0 041 0.064 Use 1 -Montessori Upper School] Window 12:Wood Frame:Operable,Perf.Specs.:Product ID Marvin 8 - - 0.280 0.450 Integrity Awning,SHGC 0.30,[Bldg.Use 1-Montessori Upper School(b) Exterior Wall North Wing South Face:Wood-Framed,16"c.c.,(Bldg. 675 21.0 7.0 0.041 0.064 Use 1 -Montessori Upper School] Window 13.Wood Frame:Flxed,Peri.Specs.:Product ID Marvin 27 - -- 0.290 0.380 Integrity Picture Window,SHGC 0,34,(Bldg. Use 1-Montessori Upper School](b) Window 14:Wood Frame:Operable,Pert.Specs.:Product ID arvin 0.280 0.450 Integrity Awning,SHGC 0.30,[Bldg.Use 1 -Montessori Upper School)(b) Window 15:Metal Frame with Thermal Break:Fixed,Pert.Type:Energy 6 -- - 0.660 0.380 code default.Double Pane with Low-E,Clear,SHOO 0.70,(Bldg.Use 1 -Montessori Upper School] Door6:Glass(>50%glazing)Metel Frame,Entrance Door,Pert.Type: 21 -- - 0.800 0.770 Energy code default,Double Pane with Low-F,Clear,SHGC 0.70, [Bldg.Use 1 -Montessori Upper School] Exterior Wall South Wing North Wall:Wood-Framed,16"0,0.,[Bldg. 472 21.0 7.0 0.041 0.064 Use 1-Montessori Upper School] Window 16:Wood Frame:Fixed,Perf Specs.:Product ID Marvin 36 - - 0.290 0.380 Integrity Picture Window,SHGC 0,34,[Bldg.Use 1-Montessori Upper School]lb) Exterior Wall South Wing South Wall:Wood.Framed.16"a a,(Bldg. 512 21.0 7.0 0.041 0.064 Use 1 -Montessod Upper School] Wvnow 17:Wood Frame:Operable,Pert.Specs.:Product ID Marvin 32 -- - 0.280 0.450 Integrity Casement,SHGC 0,30,[Bldg.Use 1-Montessori Upper Schoo0(b) Window 18:Metal Frame with Thermal Break:Fixed,Pert Type:Energy 6 - - 0.650 0.380 code default,Double Pane with Low-E,Clear SHGC 0,70,(Bldg.Use 1 -Montessori Upper School) Door 7:Glass(>50%glazing):Metal Frame,Non-Entrance Door,Ped. 21 - -- 0.800 0.770 Type:Energy code default,Double Pane with low-E,Clear,SHGC 010,[Bldg.Use 1-Montessori Upper School] Floor 1-tower levet slab on grade:Slab-On-Grade:Unheated, 286 - 10D 0.360 0.540 Horizontal with vertical>a 4 ft.,[Bldg.Use 1 -Montessori Upper School](c) (a)Budget U-factors are used for software baseline calculations ONLY,and are not code requirements. (b)Fenestration product pertormance must be certified in accordance with NFRC and requires supporting documentation. (c)Slab-On-Grade proposed and budget V-factors shown in table are F-factors. Project Title: Montessori Upper School Report date: 11/22/16 Data filename: C AUsersyobarlDocuments1Projects12016116-002 Monte=-s0ri42 Docuttentsicode\montessori sch Page 3 of 24 comcheck,cck Envelope PASSES:Design 8%better than code Envelope Compliance Statement Compliance Statement: The proposed envelope design represented in this document is consistent with the building pians, specifications,and other calculations submitted with this permit application.The proposed envelope systems have been designed to meet the 20121ECC requirements in COMcheck version 4.0.5.1 and to comply with any applicable mandatory requirements listed in the Inspection Checklist, Name-Title Signature Date Project Title: Montessori Upper School Report date: 11/22/16 Data filename C:\Users,JobanDocuments\Projects\2016\16-002 Montessori\2 Documents\code\montessori sch Page 4 of 24 come heck.cck COMcheck Software Version 4.0.5.1 A Interior Lighting Compliance Certificate Project Information Energy Code: 2012(ECC Project Title: Montessori Upper School Project Type: New Construction Construction Site: Owner/Agent Designer:Contractor 42 Bates Street Montessori School of Northampton Jody Barker Northampton,MA 31 Bates Street Jody Barker,AIA(Architecture+ Northampton, MA Design, LLC 32 Willow Street Additional Efficiency Package Florence, MA 617.216,5988 jodyba rker.aia@g mail,Com On-site Renewable Energy Allowed Interior Lighting Power A B C 0 Area Category Floor Area Allowed Allowed Watts (ft2) Watts/ft2 (BXC) t-entry lobby(Common Space Types:Lobby) 571 1.10 628 2-upper elementary(Common Space Types:Classroam/Lecture/Training} 1314 130 1708 3-middle school(Common Space Types:Classroom/Lecture/Training) 867 1.30 1127 4-kitchen(Common Space Types:Classroom I Lecture(Training) 259 1.30 337 5-gids room(Common Space Types:Restroom) 134 1.00 134 6-boys room(Common Space Types:Restroom) 59 1.00 59 7-tutoring room(Common Space Types:Office-Enclosed) 76 1.10 84 8-corridor(Common Space Types:Corridor/Transition) 101 0.70 71 9-tower level common(Common Space Types:Lobby) 364 1.10 400 10-undeveloped l(Common Space Types:Storage) 1133 0.80 906 11-undeveloped 2(Common Space Types:Storage) 862 0.80 690 12 storage(Cote)on Space Types:Storage) 02 0.80 50 13-mechanical(Common Space Types:Electrical6nechanical) 217 1.10 239 14-utilities(Common Space Types:Electrical/mechanical) 147 1.10 162 15--mans(Common Space Types:Resaown) 47 1.00 47 16-womens{Common Space Types:Restroom) 47 1.00 47 17-elevator mach rm(Common Space Types:Electrical/mechanical) 51 1.10 56 18-corridor(Common Space Types:Corridor I Transition) 85 0.70 60 19-corridor(Common Space Types:Corridor/Transition) 87 0.70 61 20-janitor closet(Common Space Types:Storage) 15 0.80 12 Total Allowed Watts= 6876 Proposed Interior Lighting Power Project Title: Montessori Upper School Report date: 11/22/16 Data filename: C:Wsers\obaADocumentswrojects12016\16-002 Montessori12 Docomentslcode1mcntessari soh Page 5 of 24 comcheck,cck A B C D E Fixture ID :Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) Fixture Fixtures Watt. 1-entry lobby(Common Soace Tvoesaobbvl LED 3:P3:Teron Pendant:LED A Lamp 11W: 3 6 33 198 LED 5:R2:Halo Spotlight Other 1 3 12 36 LED 4:Rt:Halo Downright:Other: 1 3 15 44 - -I-.la-r... . . un, - . . Broom/Lecture/Trainingl LED 2:P2:Coreiite Jaya:in:Other I 16 39 624 -n'.• - •u. . •- - I. ssrnom/)entire/1raininol LED 2:P2:Corelite Jaylum:Other: 1 12 39 468 sunt ..unm •- tvc L,.. snt 1 »mr=. ,ills LED L A2:Metalux 22CZ:Other: 1 3 33 IOU 5-girls morn(Commgg$Qace Tvoes-Restroom) Linear Fluorescent 1:Al:22115 14W:Electronic: 2 2 28 56 6-boys room(Common Soace Tvoes:Restroom) Linear Fluorescent 1:Al:22"1514W:Electronic: 2 1 28 28 Linear Fluorescent 1'Al:22'15 2 2 28 56 8-corridor(Common Soace Tvoes'Corridor I Transition) Linear Fluorescent 1:Al:22"T5 14W1 Electronic: 2 3 28 84 9-lower level common(Common Soace Tvoee'I pbbv) LED 5:R2:Halo Spotlight:Other: 1 6 12 72 LED 4:R7:Halo Downlight:Other: 1 6 15 89 16-u ndevelooea) (Common Soace Tvnes:Storaael LED 9:KEY:Keyless Fixture:LED A Lamp 7W: 1 18 7 126 Z-undtYejQped 2(Common Soace Tvnes:Storaael LED 9:KEY:Keyless Fixture:LED A Lamp 7W: 1 16 7 112 i2-storaae(Common Soace TvoesStoraoe) LED 9:KEY:Keyless Fixture:LEDA Lamp 7W: 1 2 7 14 1 -t - .t-.[ •u1Pt - r1- a LED 9:KEY:Keyless Fixture:LED A Lamp 7W: 1 8 7 56 14-utilities(Common Soace Tvoes:Fiectricatimechanicall LED 9:KEY:Keyless Fixture:LED A Lamp 7W: 1 4 7 28 n-t .uua " ern Linear Fluorescent 1:Al:Donated fluorescent:2?T5 14W:Electronic: 2 1 28 28 16-womens(Common Soace Tvoec:Restrooml Linear Fluorescent 1:Al:Donated fluorescent:2r 15 14W:Electronic: 2 1 28 28 17-elevator roach rm(Common Soarp Tvmfl�c-d 1(5aljmechzn cal} LED 9:KEY:Keyless Fixture:LED A Lamp 7W: 1 1 7 7 18-corridar(Cominnn Sneer,.Types'Corrldor I Transiionl LED 4:R1:Halo Downlight:Other: 1 3 15 44 19-corridor(Cominnq Soace Tvoes'Qnrrtdor/Transition) Linear Fluorescent 1:Al:Donated fluorescent:221 TB 14W:Electronic: 2 2 28 56 20-janitor Gtl - -su•+ •- - - '.Stnragel LED 9:KEY.Keyless Fixture:LED A Lamp 7W: 1 1 7 7 Total Proposed Watts= 2362 Interior Lighting PASSES:Design 66%better than code Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting design represented in this document Is consistent with the building plans, specifications,and other calculations submitted with this permit application.The proposed interior lighting systems have been designed to meet the 2012 tECC requirements in COMcheck Version 4.0.51 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Project Title: Montessori Upper School Report date: 11/22/16 Data filename: C:\UsersJobar\DocumentslProjects\2016116-902 Montessod\2 Oocumentsicodelmontessori sch Page 6 of 24 comcheck.cck COMcheck Software Version 4.0.5.1 íA' Exterior Lighting Compliance Certificate Project Information Energy Code: 2012 IECC Proied Tito: Montessori Upper School Project Type: New Construction Exterior Lighting Zone 2(Residential mixed use area) Construction Site: Owner/Agent Designer/Contractor: 42 Bates Street Montessori School of Northampton Jody Barker Northampton, MA 31 Bates Street Jody Barker, AIA(Architecture + Northampton,MA Design,LLC 32 Willow Street Florence, MA 617 216.5988 jodybarker.a is g made= Allowed Exterior Lighting Power A B C D E Area/Surface Category Quantity Allowed Tradable Allowed Watts Watts/Unit Wattage (B X C) front door(Main entry) 1 ft of door 20 Yes 20 side door(Other door(not main entry)) 5 ft of door 20 Yes 100 front entry(Walkway>=10 feet wide) 1 ft2 0.14 Yes 0 lower terrace(Walkway>=10 feet wide) 112 0.14 Yes 0 porch(Plaza area) 1 62 0.14 Yes 0 Total Tradable Watts(a)= 120 Total Mowed Wstts= 120 Total Allowed Supplemental Wads(b)= 600 (a)Wattage tradeoffs are only allowed between tradable areas/surfaas. (b)A supplemental allowance equal to 600 watts may be applied toward compliance of both non-tradable and tradable areas/surfaces. Proposed Exterior Lighting Power A B C D E Fixture ID:Description!Lamp/Wattage Per Lamp/Ballast Lamps! #of Fixture (C X D) Fixture Fixtures Watt. front door(Main egtra 1 ft of door width).Tradable Wattage LED 6:S2:Oxygen Sconce:Other: 1 2 8 16 r ..r 0 u.'rla, r . • ..rr . . rte. 1 <.... . •LED 6:52:Oxygen Sconce:Other: 1 5 8 41 PI 'f x - = f -- ..•- I ..... - 1 ..t..p LED 7:53:CSL Step Light:Other: 1 11 6 66 Jowet terrace(Walkway a= 10 feet wide 1 Rep Tradable Wattaor LED 8:EXTR:NE Lighting Flood:Other 1 2 14 28 LED 6:S2:Oxygen Sconce:Other: 1 2 8 16 Total Tradable Proposed Watts= 168 Project Title: Montessori Upper School Report date: 11/22/16 Data filename: C:Wsersyobar1Documents\Projects12016\16-002 Montessori\2 Documents\code\montessori sch Page 8 of 24 comcheck cck Exterior Lighting PASSES: Design 77%better than code Exterior Lighting Compliance Statement Compliance Statement: The proposed exterior lighting design represented in this document is consistent with the building plans, specifications,and other calculations submitted with this permit application.The proposed exterior lighting systems have been designed to meet the 2012 IECC requirements in COMcheck Version 4.0.5.1 and to comply with any applicable mandatory requirements listed In the Inspection Checklist. Name-Title signature Date ProjectTitle: Montessori Upper School Report date: 11/22/16 Data filename: C:\Users\Jobar'Documents\Projects\2016\16-002 Montessori\2 Documents\code\Montessori sch Page 9 of 24 comchecck.cck COMcheck Software Version 4.0.5.1 Aft rA Mechanical Compliance Certificate Project Information Energy Code: 2012 IECC Project Title: Montessori Upper School Location: Northampton,Massachusetts Climate Zone: 5a Project Type: New Construction Construction Site: Owner/Agent Designer/Contractor 42 Bates Street Montessori School of Northampton Jody Barker Northampton,MA 31 Bates Street Jody Barker,AIA I Architecture+ Northampton, MA Design,LLC 32 Willow Street Additional Efficiency Package Florence, MA 617.216.5938 jodybarker.a i a @gma itcom On-site Renewable Energy Mechanical Systems List Quantity System Type&Description 1 HVAC System 1 North Wing(Single Zone): Heating: 1 each-Other,Propane,Capacity=80 kBtu/h No minimum efficiency requirement applies Cooling: 1 each-Other,Capacity=60 ketu/h,Air-Cooled Condenser,Air Economizer No minimum efficiency requirement applies Fan System: RTUI l North Wing—Compliance(Motor nameplate HP method):Passes Fans: FAN 1 Supply,Single-Zone VAV, 1000 CFM, 1.0 motor nameplate hp 1 HVAC System 2 South Wing(Single Zone): Floating:1 each-Other,Propane,Capacity:120 kBtuih No minimum efficiency requirement applies Cooling:1 each-Other,Capacity=72 kBN/h,Air-Cooled Condenser,Air Economizer No minimum efficiency requirement applies Fan System: RTU2 l South Wing—Compliance(Motor nameplate HP method):Passes Fans: FAN 2 Supply,Single-Zone VAV,2000 CFM, 10 motor nameplate hp 1 Water Heater 1: Electric Storage Water Heater,Capacity:50 gallons Proposed Efficiency:245 EF,Required Efficiency:0.86 EF Mechanical Compliance Statement Compliance Statement: The proposed mechanical design represented in this document is consistent with the building plans, specifications,and other calculations submitted with this permit application.The proposed mechanical systems have been designed to meet the 201.21 ECC requirements in COMcheck Version 4,0.5.1 and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Name-Title Signature Date Project Title: Montessori Upper School Report date: 11/22/16 Data filename: C'.Wsers8obar\Documents\Projects\2016116-002 Montessori12 Documentslcodetmontessori sch Page 10 of 24 comcheck.cck litrtCOMcheck Software Version 4.4.5.1 Inspection Checklist Energy Code: 2012 IECC Requirements: 93.0% were addressed directly in the COMcheck software Text in the"Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed.Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review Complies? Comments/Assumptions &Req.lD „ C103.2 Plans and/or specifications provide all OComplles Requirement will be met. (PR1p information with which compliance ODoes Not can be determined for the building ONot Observable envelope and document where exceptions to the standard are ONot Applicable claimed. C103.2 Plans,specifications,and/or Ocomplies Requirement will be met, (PR2p calculations provide all Information ODoes Not with which compliance can be determined for the mechanical ONot Observable systems and equipment and ONot Applicable document where exceptions to the standard are claimed.Load calculations per acceptable engineering standards and handbooks. C103.2 Plans,specifications,and/or OComplies [PR37' calculations provide all Information Oboes Not with which compliance can be determined for the service water ONot Observable heating systems and equipment and ONot Applicable document where exceptions to the standard are claimed.Hot water system sized per manufacturer's sizing guide. ��_.. C103.2 lies IPR4I' Plans, spections provide,ainfo DCoes Not Requirement will be met, (PR4T with whichchs provide all information Oboes Not with compliancetinterior lighting be DNet Observable determined for the ms equipment and electrical systems and ONot Applicable and document where exceptions to the standard are claimed.Information n provided sd includinterior lightingpower calculations,wattage of f bulbs and ballasts, t2nsformesand control devices. C103.2 Plans, specifications, and/orOComplies Requirement will be met. [PR31' calculations provide all information aloes Not with which compliance can be ONot Observable determined for the exterior lighting and electrical systems and equipment 'ONot Applicable and document where exceptions to the standard are claimed.Information provided should include exterior lighting power calculations, wattage of bulbs and ballasts,transformers and control devices. C406 Plans,specifications, and/or DComplies Requirement will be met, [PR9]' calculations provide all information Oboes Not with which compliance can be determined for the additional energy ONot Observable efficiency package options. DNot Applicable LLJHigh.Impact(Tier 1) 2 Medium Impact flier 2} 3 Low Impact(Tier 3) Project Title: Montessori Upper School Report date: 11/22/16 Data filename: C:\UsersUobar\Docurnents\Projects\2015116002 Montessori12 Documents\code\montessori sch Page 11 of 24 comcheck,cck Section # Plan Review Complies? Comments/Assumptions & Req.10I C406.4 On-site renewable efficiency package. .Oconlplies Requirement will be met, [FI4911 One of the following levels of Oboes Not renewable energy must be satisfied: ONot Observable provide>= 135 Utu!h,or>=0.50 [Nat Applicable watts per square foot of conditioned Floor area or provide>= 3 percent of 'the energy used within the building for mechanical and service water heating equipment and lighting. C402.3.1 The vertical fenestration area<=30 OCamplies Requirement will be met. [PR1011 percent of the gross above-grade wall ODoes Not area. [Not Observable ONot Applicable C402.3.1 The skylight area <=3 percent of the [Complies Requirement will be met. (PR1111 gross roof area. [hoes Not ONot Observable ONot Applicable C402.3.2 In enclosed spaces> 10,000 ft2 [Complies Exception:Requirement does not apply. [PR1421 directly under a roof with ceiling Oboes Not heights>15 ft.and used as an office, ONot Observable lobby, atrium,concourse.corridor, ONoA Applicable storage,gymnasium/exercise center, pP convention center, automotive service,manufacturing,non- refrigerated warehouse, retail store, distribution/sorting area, transportation.or workshop,the following requirements apply: (a)the daylight zone under skylights is>_ half the floor area; (b)the skylight area to daylight zone is >= 3 percent with a skylight VT>=0.40;or a minimum skylight effective aperture >= 1 percent. C402.32. Skylights in office, storage, OComplies Exception: Requirement does not apply. 2 automotive service,manufacturing, ODoes Not [PR15I1 non-refrigerated warehouse, retail ONot Observable store,and distribution/sorting area have a measured haze value>g0 '.ONot Applicable percent unless designed to exclude direct sunlight. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Montessori Upper School Report date: 11/22/16 Data filename: C:\UsersgobarWDocument5\Projects\2016\16-002 Montessori\2 Documents\codetmontessori sch Page 12 of 24 comcheck.cck Section Footing t Foundation Inspection Complies? Comments/Assumptions & Req.ID C402.2.4 Below-grade wall insulation R-value, OComplies See the Envelope Assemblies table for values. (F0112 Does Not :Not Observable ONot Applicable C303,2 Below-grade wall insulation installed OComplies Requirement will be met, [F02)f per manufacturer's instructions, ODoes Not :Not Observable ONot Applicable 0402.2.6 Slab edge insulation R-value. OComplies See the Envelope Assemblies table for values. (P031' ODoes Not ',. ONot Observable ONot Applicable C303.2 '.Slab edge insulation installed per OComplies Requirement will be met. [F0412 manufacturers instructions. Oboes Not ONat Observable ONot Applicable C402.2.6 Slab edge insulation depth/length. OComplies See the Envelope Assemblies table for values. IF 0512 Slab insulation extending away from ODoes Not building is covered by pavement or ONot Observable >= 10 inches of soil. ONot Applicable C4032.8. Exterior insulation protected against IDComplies Requirement will be met, 1 damage, sunlight, moisture, wind, Oboes Not [FO€11 landscaping and equipment ONot Observable maintenance activities, ONot Applicable C403.2.4. Freeze protection and snow/ice OComplies Requirement will be met. 5 melting system sensors for future ODoes Not [F09[3 connection to controls, ONot Observable ONot Applicable C402.2.6 Bottom surface of floor structures OComplies Exception: Requirement does not apply. (F012H incorporating radiant heating DDoes Not insulated to>=R-3.5. ONO(Observable See the Envelope Assemblies table for values. Diet Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium impact Mop?) 3 Low Impact(Tier 3) J Project Title: Montessori Upper School Report date: 11/22/16 Data filename: CAUsersyobar\Oocuments\Projects\2016\16-002 Montessori12 Documentsicode\montessori soh Page 13 of 24 comctieck.cck Section Framing/Rough-in inspection Complies? Comments/Assumptions & Re..ID C402.4.1, The building envelope contains a °Complies Requirement will be met, C402A.2 continuous air barrier that is sealed In °Does Not IFR16)1 an approved manner and either °Not Observable constructed or tested in an approved manner. Air barrier penetrations are ONot Applicable sealed in an approved manner, C402.4.3, '..Factory-built fenestration and doors °Complies Requirement will be met, C402.4.4 are labeled as meeting air leakage °Does Not (FR18i3 requirements. :Wet Observable °Not Applicable C402.4.7 Vestibules ate installed on all building °Complies Exception: Requirement does not apply. (FR1713 entrances. Doors have self-closing ODoes Not devices. ONot Observable ONot Applicable 0402.3.3, Vertical fenestration U-Factor. °Complies See the Envelope Assemblies table for values. C402.3.4 ODoes Not (FRO DNot Observable DNot Applicable C402.3.3 Vertical fenestration SHGC value, °Complies See the Envelope Assemblies table forvalues. [FR10)r °Does Not °Not Observable DNot Applicable C3031.3 Fenestration products rated in OComplies Requirement will be met. (FR12j2 accordance with NFRC. 'DDoes Not DNot Observable ONot Applicable C3031.3 Fenestration products are certified as DComplies Requirement will be met. [FR13J' to performance labels or certificates ODoes Not provided. DNot Observable DNot Applicable 0402.2.7 U-factor of opaque doors associated DComplies See the Envelope Assemblies table forvalues. iffl.1417 with the building thermal envelope ODoes Not meets requirements. 'DNot Observable ONot Applicable Additional Comments/Assumptions: 1JHighImpact(Tier it 2Medium Impact(Tier 2) 3 flow Impact(Tier 3) Project Title: Montessori Upper School Report date: 11/22/16 Data filename: C\Usersgobar\Docurnents1Projects\2016116-002 Montessori\2 Documents\code\montessari sch Page 14 of 24 comcheck.cck Section # Plumbing Rough-In Inspection Complies? Comments/Assumptions & Re..ID ..._.. C404.3 Temperature controls installed on OComplies [PLSI° service water heating systems(110 F ODoes Not for dwelling units and lavatories in Not Observable public restrooms and 90 F for other occupancies.) ONot Applicable 0404.2 Heat traps installed on noo-circulating Dcompties [PL4]a storage water tanks. ODoes Not ONot Observable DNot Applicable Additional Comments/Assumptions: 1 High impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact mer 3) Project Title: Montessori Upper School Report date: 11/22/16 Data filename: C:\Usersgobar\Uocuments\Projects\2016\16-002 Montessori\2 Documents\code\montessori soh Page 15 of 24 comcheck.cck Section Mechanical Rough-In inspection Complies? Comments/Assumptions C403.2.3 HVAC equipment efficiency verified. 'DComplies See the Mechanical Systems list for values. [ME5512 Dories Not ONot Observable DNot Applicable C402.4.5. ..Stair and elevator shaft vents have DComplies Requirement will be met. 1 motorized dampers that automatically Oboes Not [MEW close, ONot Observable DNot Applicable C402.4.5. Outdoor air and exhaust systems have DComplies Requirement will be met, 2 motorized dampers that automatically .Deoes Not [ME58[3 shut when not in use and meet ONot Observable maximum leakage rates.Check gravity dampers where allowed, ONot Applicable C403.2.5. '..Demand control ventilation provided DComplies Requirement will be met. 1 for spaces>500 sq.ft.and >25 Opoes Not (M559)1 people/1000 sq.tt,occupant density DNot Observable and served by systems with air side economizer,auto modulating outside Duet Applicable air damper control, or design airflow >3,000 cfm 0403.2.7 HVAC ducts and plenums insulated. DComplies Exception:Requirement does not apply. (ME601z Where ducts or plenums are installed Dories Not In or under a slab, verification may DNot Observable need to occur during Foundation Inspection. ONot Applicable C403.2.8. Piping Insulation exposed to weatherDComplies Requirement will be met 1 is protected from damage(due to sun. DDoes Not [MEW moisture, wind,etc.). DNot Observable Dhot Applicable C403.2.8 Thermally ineffective panel surfaces of DComplies Requirement will be met. [ME411a sensible heating panels have ODoes Not insulation>e R-3.5. ONot Observable DNot Applicable C403.2,7 Ducts and plenums sealed based on DComplies Requirement will be met. (ME10j3 static pressure and location. Deoes Not DNot Observable ONot Applicable C403.2.7. Ductwork operating >3 in.water DComplies Exception:Requirement does not apply. 1.3 column requires air leakage testing. Oboes Not (ME11P DNot Observable ONot Applicable C403.2.7. Ductwork operating>3 in. water DComplies Requirement will be met. 13 column requires air leakage testing. DDoes Not (MEIl]a DNot Observable ONot Applicable C4033,1, Air economizers provided where OCompiies Requirement will be met. 0403.3.1. required, meet the requirements for DDoes Not 1 design capacity,control signal, ONot Observable (M8621 ventilation controls, high-limit shut-off, rONotA Applicable economizer control, and pP cable provide a means to relieve excess outside air during operation. 1 High Impact frier 17 i 2JMedium Impact(Tier 2) 3 Low Impact(Tier 3) 7 Project Title: Montessori Upper School Report date: 11/22/16 Data filename: C1UsersliobaADocuments\Project512016116-002 Montessori12 Decumentsicodetmontessori soh Page I6 of 24 comcheck.cck Section -"--'^— # Mechanical Rough-In Inspection Complies? Comments/Assumptions & Re•.ID _ C403,3.1, Air economizers provided where °Complies Requirement will be met. C403.3.1. required,meet the requirements for °Does Not design capacity,control signal, ONot Observable (ME62P ventilation controls,high-limit shut-off, integrated economizer control, and ONot Applicable provide a means to relieve excess outside air during operation. C408.2.2. Air outlets and zone terminal devices °Complies Exception:Fans with fan motors of 1 hp(0.74 kW)or less. 1 have means for air balancing. °Does Nat: (ME5313 ONot Observable °Not Applicable C403,4.2 :VAV fan motors>=7.5 hp to be driven °Complies Exception: Requirement does not apply. IME664' by variable speed drive,have a vane- °Does Not axial fan with variable pitch blades, or ONot Observable have controls to limit fan motor __.demand, ONot Applicable 0403A.2 VAV fan motors>=7,S hp to be driven °Complies Exception: Requirement does not apply. (ME66j' by variable speed drive,have a vane- °Does Not axial fan with variable pitch blades,or have controls to limit fan motor °Not Observable demand. °Not Applicable 0403.4.2 VAV fan motors>6.7.5 hp to be driven °Complies (ME6612 by variable speed drive, have a vane- °Does Not axial fan with variable pitch blades,or ONot Observable have controls to limit fan motor demand. °Not Applicable C403.2.6 Exhaust air energy recovery on °Complies (ME571' systems meeting Table C403.2.6 °'Does Not °Not Observable ONot Applicable C403.211.Unenclosed spaces that are heated DComplies Exception: Requirement does not apply. (ME71)Y use only radiant heat. ODoes Not °Not Observable DNot Applicable Additional Comments/Assumptions: nhigh impact(Tier 1) 1-2-1 Medium Impact(Tier 2) 3 jLow Impact(Tier 3)• Project Title: Montessori Upper School Report date: 11/22/16 Data filename: C:1UsersdobarDocuments\Project612016116-002 Montessori\2 Documentsicodelmontessori 5ch Page 17 of 24 comcheck,cck Section ._. �.._ ._..�..—...—..�._.�. i Rough-In Electrical inspection Complies? Comments/Assumptions C405.2.2. Automatic controls to shut off all OComplies Requirement will be met. 1 building lighting installed in ail Oboes Not (EL22(' buildings. ONot Observable Location on plans/spec: Reflex Lighting submittal package ONot Applicable 0405.2.1. Independent lighting controls installed OCompiies Requirement will be met. 1 per approved lighting plans and all ODoes Not (EL23(' manual controls readily accessible and ONot Observable Location on plans/spec:Reflex Lighting submittal package '..visible to occupants. ONot Applicable C405.2.1, Lighting controls Installed to uniformly OComplies Exception:Areas that are controlled by an occupancy sensor. 2 reduce the lighting load by at least ODoes Not (ELM' 50%. ONot Observable Location an plans/spec: Reflex Lighting submittal package ONot Applicable C405.2.2. Daylight zones provided with OComplies Requirement will be met. 3 individual controls that control the Oboes Not IEL16j' lights independent of general area ONot Observable Location on plans/spec:Reflex Lighting submittal package renting. Slept Applicable 0405,2.3 Sleeping units have at least one Ocomplies Exception: Requirement does not apply. (EL1773 master switch at the main entry door Oboes Not that controls wired luminaires and ONot Observable switched receptacles. ONo[Applicable C405.2.2. Occupancy sensors installed in OComplies Requirement will be met. 2 required spaces. Oboes Not (6118ll ONot Observable Location on plans/spec:Reflex Lighting submittal package ONot Applicable 340122. Primary sidelighted areas areiOComplies Not Requirement will be met. 3 equipped with required lighting ODaes Not [EL20111 controls. ONot Observable acgstsped Reflex Lighting submittal packageReflex Lighting submittal package ONot Applicable 0405.2.2. Enclosed spaces with daylight area OComplie5 Exception:Requirement does not apply. 3 under skylights and rooftop monitors ODoes Not (EL21]' are equipped with required lighting ONot Observable controls. ONot Applicable C405.2.4 Automatic lighting controls for exterior OComplies Requirement will be met. (E12512 lighting installed. DL oes Not ONot Observable ONot Applicable C405.23 Separate lighting control devices for OComplies Requirement will be met. (EL4]' specific uses installed per approved ODoes Not lighting plans, ONot Observable Location on plans/spec: Reflex Lighting submittal ONot Applicable packageReflex Lighting submittal package C4053 Fluorescent luminaires with odd OComplies Exception:Requirement does not apply. (EL19]x numbered lamp configurations that ❑Does Not are within 10 feet center to center(if ONot Observable recess mounted)or are within 1 foot • edge to edge(if pendant or surface ONot Applicable mounted)shall be tandem wired, C405.4 Exit signs do not exceed 5 watts per OComplies Requirement will be met. (EL6]' face, Oboes Not ONot Observable ONot Applicable 1 High Impact(Tiers) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) J Project Title: Montessori Upper School Report date: 11/22/16 Data filename: CAUsers'obar\Oocuments\Projects\2016\16-042 Montessod12 Documents\code\rnontessori 5ch Page 18 of 24 comcheck,cck Section Stough-in Electrical Inspection Complies? Comments/Assumptions & Re•.ID 0405.6 Exterior grounds lighting over 100 W DCornplies Requirement will be met. (EL24]' provides>60 im/W unless on motion ❑Doe=_Not sensor or fixture is exempt from scope []Not Observable of code or from external LPD. ONot Applicable _ C405.2.3 Additional interior lighting power ❑Complies Requirement will be met IEL8]' allowed for special functions per the Does Not approved lighting plans and is ONot Observable automatically controlled and separated from general lighting_ ONot Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) I 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Montessori Upper School Report date: 11/22/16 Data filename: C\Usersllobar\DocumentsIProjects12016\16-002 Montessori12 Cocumentslcodeimontessori sch Page t9 of 24 corn check.cck Section ti Insulation Inspection Complies? Comments/Assumptions Re•.10 C402.4.1, All sources of air leakage in the DComplies Requirement will be met. 1. building thermal envelope are sealed. ODoes Not NNW caulked, gasketed.weather stripped ONok Observable or wrapped with moisture vapor- permeable wrapping material to ONot Applicable minimize air leakage. C402.4.2. Roof R-value. For some ceiling Ocomplies See the Envelope Assemblies table for values. systems,verification may need to ODOes Not 0N211. occur during Framing Inspection. []NM Observable ONot Applicable C303.2 Roof insulation installed per DComplies Requirement will be met. (IN3]r manufacturer's instructions. Blown or ODoes Not poured loose-fill insulation is installed ONot Observable only where the roof slope is<=3 in 12, ONot Applicable (:303.2 Above-grade wall insulation installed DComplies Requirement will be met. bleep per manufacturer's instructions. ODaes Not ONot Observable ONot Applicable C402.2.5 Floor insulation R-value. DComplies See the Envelope Assemblies table for values (MP ODoes Not ONot Observable DNot Applicable C303.1 Building envelope insulation is labeled OComplies Requirement will be met lIN1012 with R-value or insulation certificate DDoes Not providing R-value and other relevant data. ONot Observable ONot Applicable C303.2.1 Exterior insulation is protected from DComplies Requirement will be met. ((Niel.) damage with a protective material. Oboes Not verification for exposed foundation ONot Observable insulation may need to occur during Foundation Inspection. DNot Applicable C402.2.1 Insulation intended to meet the roof DComplies Requirement will be met, [IN1]1s insulation requirements cannot be DDoes Not installed on top of a suspended ceiling. Mark this requirement DNot Observable compliant if insulation is installed ONot Applicable accordingly. Additional Comments/Assumptions: + High Impact(Tier 1) 2 Medium Impact(Tier 2) ' Low Impact(Tier 3) Project Title; Montessori Upper School Report date: 11/22/16 Data filename: CitUserslJobar\Documentsterojectst2016116-002 Montessori\2 Documents\codeimontessori soh Page 20 of 24 comcheck.eck Section Yt Final Inspection Complies? Comments/Assumptions & Req.ID C402,4.6 Weatherseals installed on all loading C1Complies Exception: Requirement does not apply. [F131p dock cargo doors. ()Does Not ONot Observable ONot Applicable C403.2.4. Heating and cooling to each zone is OComplies Requirement will be met, 1 controlled by a thermostat control. ODoes Not [F14713 Minimum one humidity control device ONot Observable per installed humidification/dehumidification Chloe Applicable system. C403.2.4, Heating and cooling to each zone is C�Compiies Requirement will be met, 1 controlled by a thermostat control. ODoes Not (F14717 Minimum one humidity control device ONot Observable per installed humidification/dehumidification ONot Applicable system. C403.2.4. Thermostatic controls have a 5°F OComplies Requirement will be met, 2 deadband. Oboes Not [Fi3811 ONot Observable ONot Applicable C403.2.4. Temperature controls nave setpoint OComplies Requirement will be met. 2 overlap restrictions. ODoes Not [FI2013 ONot Observable ONot Applicable 0403.2.4. Each zone equipped with setback 0Complies Requirement will be met. 3 '.controls using automatic time clock or Oboes Not [113913 programmable control system. ONot Observable ONot Applicable C403.2.4. Automatic Controls:Setback to 55°F OComplies Requirement will be met, 3 (heat) and 85°F (cool); 7-day clock, 2- ODoes Not (FI4013 hour occupant override. 10-hour ONot Observable backup ONot Applicable C403.2.4. Systems include optimum start OComplies Requirement will be met. 3.3 controls, ODoes Not (FI411f ONot Observable ONot Applicable C403.2.4, Systems include optimum start OComplies Requirement will be met. 3.3 controls. Oboes Not [F141j3 • ONot Observable ONot Applicable C408.2.5. Furnished HVAC as-built drawings OComplies Requirement will be met. 1 submitted within 90 days of system Oboes Not [FI7]3 acceptance. ONot Observable ONot Applicable C3033, Furnished O&M manuals for HVAC ()Complies Requirement wilt be met. C408.2,5. systems within 90 days of system Oboes Not 3 acceptance. IF1813 ONot Observable ONnt Applicable C408.2.5. An air and/or hydronic system OComplies Requirement will be met. 3 balancing report is provided for HVAC Oboes Not [FI43p systems. ONot Observable ONot Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 1Low Impact(Tier 3) ' Project Title: Montessori Upper School Report date: 11/22/16 Data filename: C:\Users'obar\Documents1Projects12016116-002 Montessoril2 Documents\codetmontessori sch Page 21 of 24 corn check.cck Section ^^^ tl Final Inspection Complies? Comments/Assumptions & Re•.ICI C408,2.3, HVAC control systems have been OComplies Requirement will be met. 2 tested to ensure proper operation, Oboes Not EFI10)1 calibration and adjustment of controls. ONot Observable ONot Applicable C404.3 Public lavatory faucet water OCompties )FI11)3 temperature<u110°F. ODoes Not ONot Observable ONot Applicable C404.5 First 8 ft of outlet piping is insulated OComplies (F14512 ODoes Not ONot Observable ONot Applicable C402.4.8 Recessed luminaires in thermal OCompiies Exception:Requirement does not apply. 1r126j3 envelope to limit infiltration and be IC ODoes Not rated and labeled,Seal between ONot Obse„,rvabI e '..interior finish and luminaire housing. ONot Applicable C403.2.2 HVAC systems and equipment ElComplies Requirement will be met. (Fl2TP capacity does not exceed calculated Oboes Not loads. ONot Observable ONot Applicable C408.2.5. '.Furnished as-built drawings for OComplies Requirement will be met. 7. electric power systems within 30 days Oboes Not (F116)3 of system acceptance. ONot Observable ONot Applicable C303.3, Furnished 0&M instructions for OComplies Requirement will be met. C408.2.5. systems and equipment to the ODoes Not 2 building owner or designated ONot Observable (FlR ) representative. ONot Applicable C405,5.2 Interior Installed lamp and fixture OComplies See the Interior Lighting fixture schedule for values. [MO lighting power is consistent with what °Does Not is shown on the approved lighting ONat Observable plans, demonstrating proposed watts are less than or equal to allowed ONot Applicable watts. C405.6.2 Exterior lighting power is consistent OComplies see the Interior Lighting fixture schedule for values. 1Fl19]1 with what is shown on the approved ODoes Not lighting planb demonstrating phot Observable proposed watts are less than or equal to allowed watts. ONot Applicable 0408.2.1 Commissioning plan developed by OComplies Requirement will be met. CF12811 registered design professional or ODoes Nat approved agency. ONot Observable ONot Applicable C408.2.4 Preliminary commissioning report OComplies Requirement will be met. I F129p completed and certified by registered Oboes Not design professional or approved ONot Observable agency. ONot Applicable C400.2,5. Final commissioning report due to OComplies Requirement will be met. 4 building owner within 90 days of Oboes Not (F13011 receipt of certificate of occupancy. ONot Observable ONot Applicable 11 High Impact(Ter 1) 2 Medium Impact(Tier 2) r3 Law Impact(Tier 3) Project Title: Montessori Upper School Report date: 11/22/16 Data filename: C:Wsers\lobar\Documents\Projectst2016116-002 Montessori\2 Oocumentstcode\montessori soh Page 22 of 24 comcheck.cck Section Final Inspection Complies? Comments/Assumptions A Re•AD C408.2.3, HVAC equipment has been tested to OComplies Requirement will be met. 1 ensure proper operation. ODoes Not (F1311' ONot Observable ONot Applicable C408.23. Economizers have been tested to OComplies Requirement will be met. 3 ensure proper operation. Oboes Not (f1328 ONot ONot Observable ONot Applicable C406.3 Lighting systems have been tested to OComplies Requirement will be met. 14133E ensure proper calibration,adjustment, Duces Not programming,and operation. ONot Observable ❑Not Applicable 0408.3 Lighting systems have been tested to OComplies Requirement will be met. (F148i' ensure proper calibration, adjustment. °Does Not programming,and operation. ONot Observable ONot Applicable_ C406 Efficient HVAC performance, efficient OComplies Requirement will be met. 1F134p lighting system,or on-site supply of ODaes Not renewable energy consistent with ONot Observable what is shown the approved pians. ONot Applicable Additional Comments/Assumptions: IlHigh Impact(Tier 1) flI Medium Impact(Ter 2) .4 Low Impact(Tier 3) Project Title; Montessori Upper School Report date: 11/22/16 Data filename: CAUsers'Jobar\Documents\Projects12016116-002 Montessori\2 Documentslrode\montessori sch Page 23 of 24 corn check.cck