Loading...
06-064 (13) November 29, 2016 /41 (�i/_ ' 1° 0 6/1 To: Inspectional Services From: Rachel Bruso—Trinity Solar Subject: Revised Engineer Letter Attached please find the revised engineer letter for the solar installation done at 2 Beaver Brook Loop, property owned by Brad Carmody. If there are any questions, please feel free to let me know. Thank you very much! Rachel B-a ' Rachel.Bruso@trinitysolarsystems.com 413-203-9088 Ext. 1511 Trinity Solar 4 Open Square Suite 410 Holyoke, MA 01040 Richard B. Gordon, P.E. P.O. Box 264•Farmville•VA 23901 Ph: 434.315.5759.E-mail: grichardpe@aol.com November 22,2016 Leeds Building Department Leeds,MA Re: Solar Panels Roof Structural Framing Support To Whom It May Concern: I hereby certify that I am a Licensed Professional Engineer in the State of Massachusetts. Please note the following conclusions regarding framing structure,roof loading,and proposed site location of installation: 1. Existing roof framing: Roof 1 Garage: AJS 20 14"joist 12"o.c.25'span (horizontal rafter projection) Roof 2 House:AJS 20 14"joist 16" o.c. 11'-1"and 18'6"span(horizontal rafter projection). This existing structure is definitely capable to support all of the loads that are indicated below for this photovoltaic project. 2. Roof Loading • 4.33 psf dead load(modules plus all mounting hardware) • 24 psf snow live load(40 psf ground snow live load reference) • 6.75 psf dead load roof materials(2.25 psf AJS 20 framing, 2 psf metal roof,1.5 psf''/:"wood sheathing plywood) • Exposure Category B, 106 mph wind uplift live load of 16.6 psf(wind resistance) 3. Address of proposed installation: Residence of Brad Carmody, 2 Beaver Brook Loop, Leeds, MA This installation design will be in general conformance to the manufacturer's specifications,and is in compliance with all applicable laws,codes,and ordinances,and specifically, International Residential Code/IRC 2009. The spacing and fastening of the mounting brackets is to have a maximum of 64"o.c. between mounting brackets and secured using 5/16"diameter corrosive resistant steel lag bolts. In order to evenly distribute the load across the roof rafters,there shall be a minimum of 2 mounting brackets per rafter&min.3" penetration of lag bolt per bracket,which is adequate to resist all 106 mph wind live loads including wind shear. Seam clamp method being used to mount-attach system on roof, by SnapNrack. Very truly yours, /On Richard B.Gordon,P.E. o Massachusetts P.E. License No.49993 E a CHARs mO e. MECHANICAL ENGINEERING o =wAwcAL m CIVIL ENGINEERING Ones°3 u_ - ELECTRICAL ENGINEERING 90