Loading...
03-027 (9) 595 COLES MEADOW RD 5 BP-2017-0524 GIS 4: COMMONWEALTH OF MASSACHUSETTS Mao:Block: 03 -027 CITY OF NORTHAMPTON Lot:-00I PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: shed BUILDING PERMIT Permit 4 BP-2017-0524 Proiect# JS-2017-000855 Est.Cost: Fee: 530.00 PERMISSION IS HEREBY GRANTED TO: Const,Class: Contractor: License: Use Group: Homeowner as Contractor Lot Size(sq. ft.): 106286.40 Owner: DENHART BRETT C&DEBORAH G Zoning: RR(I00)/WSP(10031 Applicant: DENHART BRETT C & DEBORAH G AT: 595 COLES MEADOW RD 5 Applicant Address: Phone: Insurance: (413) 320-9057 () NORTHAMPTONMA01060 ISSUED ON:10/24/2016 0:00:00 TO PERFORM THE FOLLOWING WORK:10X14 SHED POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeTvpe: Date Paid: Amount: Building 10/24/2016 0:00:00 530.00 212 Main Street, Phone(413)587-1240, Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner File`BP-2017-0524 APPLICANT/CONTACT PERSON DENHART BRETT C&DEBORAH G ADDRESS/PHONE NORTHAMPTON (413)320-9057 O PROPERTY LOCATION 595 COLES MEADOW RD 5 MAP 03 PARCEL 027 001 ZONE RR(1003/WSP(1001/ THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Bee Paid q Building Permit Filled out �'/H/ Fee Paid Tvpeof Construction: 10X14 SHE New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 3 sets of Plans/Plot Plan THE LFOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INF4MATION PRESENTED: ✓✓Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management Demolition Delay /yn/ IFI Signature of uilding 11 Sign • ature Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission, Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. City of Northampton C, Massachusetts - o (r.,t4.4 DEPAR270INT OF BUILDING INSPECTIONS "if 211 Main Street r Municipal Building 'se4 Northampton, 1M 01060 \ ACCESSORY STRUCTURE PERMIT APPLICATION (For freestanding structures less than 200 sq. ft., at least 5 feet from any other structure) Check' (011 PLEASE TYPE� ORPRINT ALL INFORMATION 1. Name of Appplicantt: 12J-64 . _� ,(/yI_lY\ F\rV Address: -3 -3N0—oI� U_ 2. Owner of Property: 'c0y 'DQ, k'iry Address: tAl11L— ` / Telephone: ..._ 3. Status of Applicant: )(Owner /� Contractor K.J.4. Structure Location: _ CoW m aid Parcel ID:Zoning Map# Parcel# District(s) (TO BE FILLED IN BY THE BUILDING DEPARTMENT) 5. Use of Property.Single or Two Family:X Multifamily: Commercial: 6. Description of Proposed Structure: One Story Shed under 200 sq.ft.: V Freestanding Deck under 200 sq.ft.,less than 30"above grade: SIZE OF STRUCTURE: I o Other(describe): 7. Attached Plans:Sketch Plan y Site Plan Plot Plan 8. Does the site contain a brook, \body of water or wetlands?NO X_DON'T KNOW__ YES IF YES: Has a permit been, or need to be, obtained from the Conservation Commission? Needs to be obtained Obtained Date issued CONTINUED ON NEXT PAGE 9. ALLINFORM.. r i . z • „ • r• _. •FNIFn nUF.TO LACK OF INFORMATION. This column to be filled in by the Building Department Existing Proposed Required by Zoning Lot size oc.Ler) Frontage N/A N A N/A ak Front: Setbacks: Side: ,,,,, 7,dr Lf )�V rDf Rear: 5724-e-- Height % Open space: _ .. (Lot area minus bldg and "'moi F(,r`„ I 1 GL/r paved parking) L Hyl,.. 0%9. t0.Certification:I hereby certify that the information contained herein is true and accurate to the �i best ofmy knowledge. DATE: 1U'L''.tl APPLICANT'S SIGNATURE NOTE Issuance of a permit does not relieve an applicant's burden to comply with all zoning requirements and obtain all required permits from the Conservation Commission, Department of Public Works and other applicable permit granting authorities vata • 1.0 to 4". o /kr rN 1 c m` H ^'+ z to .2 ' C N (4 A ci ^ ?n A CO s 0 IC C A W /tel irAl6t 4441114 {l tat fit O4 -N; 0