03-027 (9) 595 COLES MEADOW RD 5 BP-2017-0524
GIS 4: COMMONWEALTH OF MASSACHUSETTS
Mao:Block: 03 -027 CITY OF NORTHAMPTON
Lot:-00I PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS
Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A)
Category: shed BUILDING PERMIT
Permit 4 BP-2017-0524
Proiect# JS-2017-000855
Est.Cost:
Fee: 530.00 PERMISSION IS HEREBY GRANTED TO:
Const,Class: Contractor: License:
Use Group: Homeowner as Contractor
Lot Size(sq. ft.): 106286.40 Owner: DENHART BRETT C&DEBORAH G
Zoning: RR(I00)/WSP(10031 Applicant: DENHART BRETT C & DEBORAH G
AT: 595 COLES MEADOW RD 5
Applicant Address: Phone: Insurance:
(413) 320-9057 ()
NORTHAMPTONMA01060 ISSUED ON:10/24/2016 0:00:00
TO PERFORM THE FOLLOWING WORK:10X14 SHED
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter:
Footings:
Rough: Rough: House# Foundation:
Driveway Final:
Final: Final:
Rough Frame:
Gas: Fire Department Fireplace/Chimney:
Rough: Oil: Insulation:
Final: Smoke: Final:
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REGULATIONS.
Certificate of Occupancy Signature:
FeeTvpe: Date Paid: Amount:
Building 10/24/2016 0:00:00 530.00
212 Main Street, Phone(413)587-1240, Fax: (413)587-1272
Louis Hasbrouck—Building Commissioner
File`BP-2017-0524
APPLICANT/CONTACT PERSON DENHART BRETT C&DEBORAH G
ADDRESS/PHONE NORTHAMPTON (413)320-9057 O
PROPERTY LOCATION 595 COLES MEADOW RD 5
MAP 03 PARCEL 027 001 ZONE RR(1003/WSP(1001/
THIS SECTION FOR OFFICIAL USE ONLY:
PERMIT APPLICATION CHECKLIST
ENCLOSED REQUIRED DATE
ZONING FORM FILLED OUT
Bee Paid q
Building Permit Filled out �'/H/
Fee Paid
Tvpeof Construction: 10X14 SHE
New Construction
Non Structural interior renovations
Addition to Existing
Accessory Structure
Building Plans Included:
Owner/Statement or License
3 sets of Plans/Plot Plan
THE LFOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON
INF4MATION PRESENTED:
✓✓Approved Additional permits required(see below)
PLANNING BOARD PERMIT REQUIRED UNDER:§
Intermediate Project: Site Plan AND/OR Special Permit With Site Plan
Major Project: Site Plan AND/OR Special Permit With Site Plan
ZONING BOARD PERMIT REQUIRED UNDER: §
Finding Special Permit Variance*
Received&Recorded at Registry of Deeds Proof Enclosed
Other Permits Required:
Curb Cut from DPW Water Availability Sewer Availability
Septic Approval Board of Health Well Water Potability Board of Health
Permit from Conservation Commission Permit from CB Architecture Committee
Permit from Elm Street Commission Permit DPW Storm Water Management
Demolition Delay /yn/
IFI
Signature of uilding 11
Sign •
ature
Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning
requirements and obtain all required permits from Board of Health,Conservation Commission, Department
of public works and other applicable permit granting authorities.
*Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of
Planning&Development for more information.
City of Northampton C,
Massachusetts -
o
(r.,t4.4 DEPAR270INT OF BUILDING INSPECTIONS "if
211 Main Street r Municipal Building
'se4 Northampton, 1M 01060 \
ACCESSORY STRUCTURE PERMIT APPLICATION
(For freestanding structures less than 200 sq. ft., at least 5 feet from any other structure)
Check' (011
PLEASE TYPE� ORPRINT ALL INFORMATION
1. Name of Appplicantt: 12J-64 . _� ,(/yI_lY\ F\rV
Address: -3 -3N0—oI�
U_
2. Owner of Property: 'c0y 'DQ, k'iry
Address: tAl11L— ` / Telephone: ..._
3. Status of Applicant: )(Owner /� Contractor K.J.4. Structure Location: _ CoW m aid
Parcel ID:Zoning Map# Parcel# District(s)
(TO BE FILLED IN BY THE BUILDING DEPARTMENT)
5. Use of Property.Single or Two Family:X Multifamily: Commercial:
6. Description of Proposed Structure:
One Story Shed under 200 sq.ft.: V Freestanding Deck under 200 sq.ft.,less than 30"above grade:
SIZE OF STRUCTURE: I o
Other(describe):
7. Attached Plans:Sketch Plan y Site Plan Plot Plan
8. Does the site contain a brook,
\body of water or wetlands?NO X_DON'T KNOW__ YES
IF YES: Has a permit been, or need to be, obtained from the Conservation Commission?
Needs to be obtained Obtained Date issued
CONTINUED ON NEXT PAGE
9. ALLINFORM.. r i . z • „ • r• _. •FNIFn nUF.TO LACK OF INFORMATION.
This column to be filled in by
the Building Department
Existing Proposed Required by Zoning
Lot size oc.Ler)
Frontage N/A N A N/A
ak
Front:
Setbacks: Side: ,,,,, 7,dr Lf )�V
rDf
Rear: 5724-e--
Height
% Open space: _ ..
(Lot area minus bldg and "'moi F(,r`„ I 1 GL/r
paved parking) L
Hyl,.. 0%9.
t0.Certification:I hereby certify that the information contained herein is true and accurate to
the
�i best ofmy knowledge.
DATE: 1U'L''.tl APPLICANT'S SIGNATURE
NOTE Issuance of a permit does not relieve an applicant's burden to comply with all zoning requirements
and obtain all required permits from the Conservation Commission, Department of Public Works and other
applicable permit granting authorities
vata
•
1.0
to
4".
o
/kr
rN 1 c
m`
H ^'+
z to
.2 '
C
N
(4 A
ci ^
?n
A
CO
s
0
IC
C
A
W
/tel irAl6t 4441114
{l tat
fit O4
-N;
0