Loading...
23C-083 62 BLISS ST (wrong map block on card) ABBREVIATIONS ELECTRICAL NOTES JURISDICTION NOTES A AMPERE 1. THIS SYSTEM IS GRID-INTERTIED VIA A AC ALTERNATING CURRENT UL-LISTED POWER-CONDITIONING INVERTER. BLDG BUILDING 2. THIS SYSTEM HAS NO BATTERIES, NO UPS. CONC CONCRETE 3. A NATIONALLY-RECOGNIZED TESTING DC DIRECT CURRENT LABORATORY SHALL LIST ALL EQUIPMENT IN CITY OF NORTHAMPTON EGC EQUIPMENT GROUNDING CONDUCTOR COMPLIANCE WITH ART. 110.3. (E) EXISTING 4. WHERE ALL TERMINALS OF THE DISCONNECTING BUILDING DEPARTMENT EMT ELECTRICAL METALLIC TUBING MEANS MAY BE ENERGIZED IN THE OPEN POSITION, FSB FIRE SET-BACK A SIGN WILL BE PROVIDED WARNING OF THE GALV GALVANIZED HAZARDS PER ART. 690.17. GEC GROUNDING ELECTRODE CONDUCTOR 5. EACH UNGROUNDED CONDUCTOR OF THE These plans have been reviewed GND GROUND MULTI WIRE BRANCH CIRCUIT WILL BE IDENTIFIED BY q HDG HOT DIPPED GALVANIZED PHASE AND SYSTEM PER ART. 210.5. And approved. I CURRENT 6. CIRCUITS OVER 250V TO GROUND SHALL _ Imp CURRENT AT MAX POWER COMPLY WITH ART. 250.97, 250.92(8). qG] / Ise SHORT CIRCUIT CURRENT 7. DC CONDUCTORS EITHER DO NOT ENTER / '✓- 6 kVA KILOVOLT AMPERE BUILDING OR ARE RUN IN METALLIC RACEWAYS OR Date LW KILOWATTOADB ENCLOSURES TG THE FIRST ACCESSIBLE DC /'/'Z �/^ LBW LOAD BEARING WALL DISCONNECTING MEANS PER ART. 690.31(E). /// MIN MINIMUM 8. ALL WIRES SHALL BE PROVIDED WITH STRAIN Signature (N) NEW RELIEF AT ALL ENTRY INTO BOXES AS REQUIRED BY NEUT NEUTRAL UL LISTING. NTS NOT TO SCALE 9. MODULE FRAMES SHALL BE GROUNDED AT THE OC ON CENTER UL-LISTED LOCATION PROVIDED BY THE PL PROPERTY LINE MANUFACTURER USING UL LISTED GROUNDING POI POINT OF INTERCONNECTION HARDWARE. PV PHOTOVOLTAIC 10. MODULE FRAMES, RAIL, AND POSTS SHALL BE SCH SCHEDULE BONDED WITH EQUIPMENT GROUND CONDUCTORS. S STAINLESS STEEL STC STANDARD TESTING CONDITIONS TYP TYPICAL UPS UNINTERRUPTIBLE POWER SUPPLY V VOLT Vmp VOLTAGE AT MAX POWER VICINITY MAP INDEX Voc VOLTAGE AT OPEN CIRCUIT W WATT • t.� 3R NEMA 3R, RAINTTGHT a - PV1 COVER SHEET PV2 SITE PLAN C.� 1 PV3 STRUCTURAL VIEWS 27 PV4 THREE LINE DIAGRAM LICENSE GENERAL NOTES 9•N\ Catsheets Attached 1. ALL WORK TO BE DONE TO THE 8TH EDITION r4' - I - GEN #168572 n✓;r'?!(IF f ' 1 ELEC 1136 MR OF THE MA STATE BUILDING CODE. i - 2. ALL ELECTRICAL WORK SHALL COMPLY WITH THE 2014 NATIONAL ELECTRIC CODE INCLUDING MASSACHUSETTS AMENDMENTS. • MODULE GROUNDING METHOD: ZEP SOLAR • AHJ: Northampton REV BY DATE COMMENTS no DATE COMMENTS MEI_ • UTILITY: National Grid USA (Massachusetts Electric) Google ��� , ®� * CONFDENDAL- THE INFORMATION HEREIN .ae MII@Y J B-0102399 00 PROESE owe a5Om1NNB .Dark Cw OITAMED SNAIL NOT BE USED FON THE �a}n BEtEFIT ON ANYONE EX PT SINAROTY INC., MaN1ND SYSTEM: BERTRAND Bertrand RESIDENCE Derrick Olds i•„ SolarCity Nan SHALL I1 BE DISCLOSED N%HOLE OR IN Comp Mount Type C 62 BLISS ST 3.9 KW PV ARRAY tP PART TO OTHERS OUTW'WE THE RECIPIENT'S uaMN� NORTHAMPTON, MA 01062 ORGANIZATION, EXCEPT N CONNECTION 'MM # THE SALE AND USE Dr THE RESPECTK 15) REC RECZ60PEZ zs St Martin Drive,&rbig 2.WO lI SPARSITY EQUIPMENT. MTNWT THE 'MITTEN mum PAGE NONE. SHEET: IST: DATE T: (6W7 Marlborough,638-1028 MA 01752 &IOM PERM SS l OF SCIIRSIIY INC. Delta ; Solida 5.2 TL COVER SHEET PV 1 9/20/2016 (eee}sa-arY(7es-24130) m.ns dt can PITCH:30 ARRAY PITCH:30 MP1 AZIMUTH:184 ARRAY AZIMUTH:189 r-• t:::Irt:F k'>... MATERIAL:Comp Shingle STORY: 2 Stories Digitally signed by Marcus Hann ,..:::.:.,;>.---,✓ S 9\ Marcus DN:cn=Marcus Hann. P1G emxikmhxnn@solaralycnm, 1c., id MARCu$ A) ou=ADOBHr4AATL,c=US, 'l NNIN 47 OU Hann o=Sdaroty Corporation 1" 2y9EY �' N Dale'.3016.092031:11:49-C4'BO' 07 '4K9P0 F61STE4tDaT En' (E) DRIVEWAY i r'' SSlGNAL LY' 'a. N r� l v LEGEND I , D i I ,�/ Oq (E) UTILITY METER & WARNING LABEL � INVERTER W� INTEGRATED DC DISCO Nc & WARNING LABELS e DC DISCONNECT & WARNING LABELS T .7, , h� 1 AC DISCONNECT & WARNING LABELS Front Of Houstl Qe DC JUNCTION�COMBINER BOX & LABELS E.M: �® II. .;I r O° DISTRIBUTION PANEL & LABELS :n -- LOAD CENTER & WARNING LABELS N DEDICATED PV SYSTEM METER mil „ ,„. „- '" [c.a... ��� ® .. x� RAPID SHUTDOWN � 0 STANDOFF LOCATIONS — CONDUIT RUN ON EXTERIOR -�- CONDUIT RUN ON INTERIOR A STRUCTU'I Bir \ - . CANEUIT RU N I _.. OR . _ CHANGE , HEAT PRODUCING VENTS ARE RED r,=, IL=4 INTERIOR EQUIPMENT IS DASHED •• SITE.PLAN . . N Scale: 1/8' = 1' . - % `+ E 0 1' 8' 16' •. — 5 CONFIDENTIAL- TME BFORIAA^BN HERO S9 NInHR JB-0102399 00 PREMISE PSBR DESCRIPTION: OEM C *1 N11 ANYONENOT�UYNFOR WE SCOTT BERTRAND Scott Bertrand RESIDENCE Derrick Olds TA/. BENEFIT CONTAINED 6 MYONS EXCEPT SaMu1 INC, YCorn ]Mau NOR SHALL a BE DISCLOSED IN%HOLE OR IN Com Mount Type C 62 BLISS ST 3.9 KW PV ARRAY �iN PMT TO OTHERS MPODE ME RECIPIENT'S p CRC/AMMON, EXCEPT I CONNECTION EN IxaAE9 NORTHAMPTON, MA O1 D62 TIE SUE AND USE Of THE RESPECNVE (15) REC # REC260PEZ 24 St MnaIb DrN.Bolduc 2,Don Il `AMatt EMINENT, %THOUT THE NPITTOr PACE NAME 91ST: RN.. DATE MV0-1025 NA 01752 PERMISSION Of vN MOIY INC. N1 Delta (650) • N Bolivia 5.2 TL SITE PLAN PV 2 9/20/2016 1: SOL- sae-laze H) wirtae-W2R (858)-SOL-CITY(765-2489) ..NarmxCnn , 4... \ 411111„,................., f. 4".000,„ e 0 ii3„ 1 0_4° � (E) LBW II (E) LBW SIDE VIEW OF MP1B NTS (A) SIDE VIEW OF MP1A NTS (B) MPSA X-SPACING x-CANTIL€v[a V-SPACING r-cA TTILEVER NOTES MP1B X-SPACING X-CANTILEVER Y-SPACING Y-CANTILEVER NOTES LANDSCAPE 72" 24" STAGGERED LANDSCAPE 72" 24" STAGGERED PORTRAIT 48" 19" I PORTRAIT 48" 19 RAFTER 2x6 @ 24" OC ARR�Av F AZI 184 PITCH so sroRIES: 2 RAFTER 2x6 @ 24" OC ROOF AZI 184 PITCH 30 STORIES: 2 ng� ARRAY AZI 184 PITCH 30 Gump Comp Shingle PV MODULE 5/16" BOLT \MTH INSTALLATION ORDER 1 FENDER WASHERS LOCATE RAFTER, MARK HOLE ZEP LEVELING FOOT 00 LOCATION, AND DRILL PILOT ZEP ARRAY SKIRT (6) HOLE. (4) (Z) SEAL PILOT HOLE WITH POLYURETHANE SEALANT. ZEP COMP MOUNT C "+if --410 10.410.1. ZEP FLASHING C ��: glirmt {3} INSERT FLASHING. (E) COMP. SHINGLE ou (4) PLACE MOUNT. / +i(I•FII{rSSH (E) ROOF DECKING {5} INSTALL LAG BOLT WITH // / 1MANK T�n* 5/16" DIA STAINLESS (5) , k ,,y Nr; a ttaVN u STEEL LAG BOLT LOWEST MODULE SUBSEQUENT MODULES INSTALL LEVELING FOOT W11H I No,VMS WITH SEALING WASHER (2-1/2" EMBED, MIN) (6) BOLT & WASHERS. (E) RAFTER 1 STANDOFF Vii. ,< rcxnL� ' ,71 Scale: 1 1/2"= P 1 _ (-4. l a k , ' :( MSE CIXlTAI E0 - THETB[U Ql HaRON11W JCB N.IHR JB-0102399 00 SCOTT BERTRAND Scott Bertrand RESIDENCE Derrick Olds � I£(�'"OI�'. I}" CONTAMED L- NOT BE USED FOR TIC �+ I•r DENEnT OF ANYONE WEPT WORM Ma. MGNINC MTF1b 3.9 KW PV ARRAY hX NOR SHALL If BE DISCLOSED IN Mn!OR IN CompMount Type C 62 BLISS ST PMT TO ons OUTSIDE THE RECIPIENTS NORTHAMPTON, MA 01062 OROMN2AmN.EXCEPT N CONNECNON INN MJ' THE SALE ARO USE a TE e,Espccn�c 15}5) REC / REC260PEZ 24St.*OP Una 800.62 2.Ufa II 9atARCltt EWHRAFNi,MTIC4t INE tYNITiBN PACE NNE SET IGS: DAM NMbearyh,NA 01752 PERYISBIM Of sxwan INC. Delta 8 Solivia 5.2 TL STRUCTURAL VIEWS PV 3 9/20/2016 068)-SOL-CITY( )"�he�"s-z�Eeai�.:.mmr'°.�., my rnNCLarCLA btINtKALNUIts INVERILKSPtLS MODULE SPECS - LICENSE BOND (N) /8 GEC TO TWO (N) GROUND Panel Number:LC4040B1200 Inv 1: DC Ungrounded INV 1 -(1)Della / Solivia 5.2 TL LABEL A (15)REC I REC260PEZ GEN /168572 ROOS AT PANEL WITH IRREVERSIBLE CRIMP Meter Number:55631362 Inverter; 5200W, 240V, 97.5% Inverter; 5200W. 240V/208V, 97.5%, PLC, Zigtee, RGMPV Module; 260W, 236.6W PTC, MC4, 40mm, Black Frame, ZEP Enabled ELEC 1136 MR Overhead Service Entrance INV 2 Voc: 37.8 Vpmox: 30.7 INV 3 Ise AND Imp ARE SHOWN IN THE DC STRINGS IDENTIFIER (E) 200A MAIN SERVICE PANEL E 200A/2P MAIN CIRCUIT BREAKER Inverter 1 IND Delta (E) WIRING CUTLER-HAMMER ^ O A 0 200A/2P Disconnect O Delta / am DC- /--r Solivia 5.2 R I - ,`, MP 1: 1x7 y , (E) LOADS r B u ® Ecc / W „ I CODC+ 30A/2P IV - �✓ rr� oC 0 0 (�I 10 _{, - GE 1� �� a Y�� �/�, MP 1: 1x8 y H DC- _,.,. ‘, GxD we L _ GL W 3 N -3 (I CmYit Kit 3/C FLT ,(EG_GLEL II I I I I1 GELT-y TO 120/240V SINGLE PHASE UTILITY EERWCE II SS PHOTO VOLTAIC SYSTEM EQUIPPED WITH RAPID SHUTDOWN Voc* = MAX VOC AT MIN TEMP POI—(1)MURRAY j MPZJ0 PV BAC%FEEO BREAKER —(DOURER—HARMER I DG221URB /L�* A (2)Oxta I SdIJaI DC Brwwe��eLLher, 30A 2P, 2 spume B Disconnect 30A, 240Vac. Non-Fuetle,NEMA 3R AC Smorf R55 R.pid Shutdown,600V, 20k NEMA 4X, MC4 nd—c 0 A /6, So B0^Copper -(2)Ground (2)5/edex0 Cower -(I)WGro�und/Neutrd Kit 30A, General Duty(W)01303010 -(I)Ground Rot 5/6'•B',Cappr '100 ARRAY GROUND PER 690.47(D). NOTE: PER EXCEPTION NO. 2, ADDITIONAL ELECTRODE MAY NOT BE REQUIRED DEPENDING ON LOCATION OF (E) ELECTRODE • • • ( (DAMN PO. INWN-2,Mab _._ (2)AMC DT PV Woe. 600V, Blob VW' �t�]'' 3196 VDC I =8,5 ADC [[�T�F(2)AWG p0.PV Me,BWV,Blob Voc* 3W.9 VOC 1 =9.01 ADC O NATO 110, IHWN-2, Red 051-(I)AWa/6, Solid Bare Copper EGO Vmp =2456 VX Imp=65 ADC 10L MATT IB Solid Bore Copper ECC Vmp 2149 VDC Imp=8.5 ADC (1)ANG DO. HHYx-2.Green NEUTRAL Vmp =240 VAC Imp=21.6 MC LLLL]]]] ` (1)Ccodult#1 Kit; 3/4'EAT -NAM#8,THWH-2,(iem ECC/GEC-(I)Cmdult Kit 3/4'OAT �ETT(R)AW;/10, PV Wuer 6PoV, E Voc* =214.9 VDc IED =9.01 ADC (2)ANG/IQ PV Mre,6WV, gab V c* =245,6 VDC Lao;9.01 ADC ®I'oF(IJAW;/6, SdM Ban Copper ECC Vmp -214.9 VDC Imp-8.5 ADC 10 E(I)AWO/6, it: 3/4 Iapper EGC Vmp =245.6 VDC Imp=8.5 ADC LLJJ (1)CmMit Kit; 3/4'EMT CONFIOCMI k- NE INFORMAPON HEREIN 309 MOT: J B-010239 9 0 `M" °"°` DESORPTION: 0E901CONTAINED SHA.NOT S USED FOR THE SCOTT BERTRAND ��+XL BENEFIT OE ANYONE EXCEPT SOUAaTY INC. TOURING SY B. Scott Bertrand RESIDENCE Derrick Olds SolarCity. NOR STO O IT BE DISCLOSED IN THOLEOR IN Com Mount Type C 62 BLISS ST ^'d PART TO OTHERS OUTSIDE THE RECIPIENT'S P 3.9 KW PV ARRAY I4A 011CANZATION.ID EXCEPT N CONNECRON VAIN RES; NORTHAMPTON, MA 01062 NE SALE AND us Y OF THE RESPECIIW 05) REC p REC260PEZ 24 St Martin Drive. MABulding72,Unit II MNNCY EQUIPMENT, MTHWT NE WITIEN PEWASSILN a MClARatt INC. xIfRR PAGE NAME: DEM REY. DATE' C' (650)Marlborough, Y 02B 89)w)6]e-Io29 Delta I Solivio 5.2 TL THREE LINE DIAGRAM PV 4 9/20/2016 (666)-SOL-CITY(785-2489) ....reratymm WARNING.PHOTOVOLTAIC POWER SOUK- Label Location: Label Location: Label Location: (C)(CB) WARNING (AC)(POI) WARNING (DC) (INV) Per Code: Per Code: Per Code: ELECTRIC SHOCK HAZARD ELECTRIC SHOCK HAZARD NEC 690.31.G.3 NEC 69035 F DO NOT TOUCH TERMINALNEC 690.17.E . S THF DC CONDL'C TORS OF THIS ( ) Label Location: TERMINALS ON BOTH LINE AND PI 1010 JOI.TaC SYSTEMARE TO BE USED WHEN PHOTOVOLTAIC DC (DC)(INV) LOAD SIDES MAY BE ENERGIZED UNGROUNDED AND MAY BE ENERGIZED INVERTER IS IN THE OPEN POSITION UNGROUNDED DISCONNECT Per Code: NEC 690.14.C.2 Label Location: Label Location: PHOTOVOLTAIC POINT OF (P01) INTERCONNECTION Per Code: MAXIMUM POWER- A (DC) (INV) WARNING. ELECTRIC SHOCK POINT CURRENT(Imp) Per Code: HAZARD. DO NOT TOUCH NEC 690.17.4; NEC 690.54 POINTT VOLTAGE MGE(NNp)OLTAPOWER-_V NEC 690.53 TERMINALS TERMINALS ON BOTH THE LINE AND LOAD SIDE MAXIMUM SYSTEM MAY BE ENERGIZED IN THE OPEN VOLTAGE Woo) POSITION FOR SERVICE SHORT CIRCUITA DE-ENERGIZE ROTH SOURCE CURRENT ;Isc)� AND MAIN BREAKER PV POWER SOURCE LIAXIM1'UM NC A OPERATING CURRENT MAXIMUM AC V Label Location: OPERANNO VOLTAGE WARNING (DC)(INV) Per Code: ELECTRIC SHOCK HAZARD IF AGROUND FAULT IS INDICATED NEC 690.5(C) NORMALLY GROUNDED Label Location: CONDUCTORS MAY BE CAUTION (P01) UNGROUNDED AND ENERGIZED DUAL PD'NVER SOURCE Per Code: SECOND SouRCE IS NEC 690.64.8.4 PHOTOVOLTAIC SYSTEM Label Location: WARNING (DC) (CB) ELECTRICAL SHOCK HAZARD Per Code: Label Location: DO NOT TOUCH TERMINALS NEC690.17(4) CAUTION (D)(P01) TERMINA_S ON BOTH LINE AND Per Code: LOAD SIDES MAY BE ENERGIZED PHOTOVOI TRIC SYSTEM NEC 690.64.B.4 IN THE OPEN POSITION CIRCUIT IS BACKED DC VOLTAGE IS ALWAYS PRESENT WHEN SOLAR MODULES ARE EXPOSED TO SUNLIGHT Label Location: WARNING (PO1) Per Code: INVERTER OUTPUT NEC 690.64.8.7 Label Location: CONNECTION PHOTOVOLTAIC AC (AC)(P01) DO NOT REI OCATE (AC): AC Disconnect Per Code: I HIS OVERCURRENT (C): Conduit DISCONNECT NEC 690.14.C.2 DEVICE (CB): Combiner Box (D): Distribution Panel (DC): DC Disconnect (IC): Interior Run Conduit Label Location: (INV): Inverter With Integrated DC Disconnect mnxl LsuM Ac A (AC)(P01) (LC):Load Center OPERATING cuRReNT Per Code: (M): Utility Meter r.wxuaonl Ac v NEC 690.54 (POI): Point of Interconnection C)PE AII"G VOLTAGE CWRMNBAL— THE INFORMATION HEREIN CONTAINED 91ALL NM BE USED FOR P 3055 flea Mew Way RE BELEM OF ANYONE EXCEPT SO ANUTY INC.,NCR SHALL IT BE MSCLOSED San maim,CA 94481 IN MEM OR M PMT TO OTHERS OUTSIDE THE REOPIENVS OIICAMIATON, Label Set eke T.(6m)638-1018 F:(650)638-1039 EXCEPT IN COMECOION MTH 111E SALE AND USE CF NE RESPECTTE ��•JOI��' J° (888)-sacv(765-2489)www.mlarrttr.rcT SOLARCITV EQUIPMENT, M11MUT NE ARMIFH PERMl OF SCUMMY INC. ` •,SolarCity I Zep SOI.Sf Next-Level PV Mounting Technology rSOlarCity Z pSolar Next-Level PV Mounting Technology 11. Zep System Components for composition shingle roofs _ It '_y Up-roof f p� Leveling Foot L zeernan ` °' Part No.850-1172 IaM_4 ti .. Ell listed muL461 s 4rall'b . iiibliiiiiiiiit I .a / )41. iik Imo mr S < Comp Mount Part No.850-1382 Listed to UL 2582 Mounting Block Lkled to UL 2708 ooxnnrs 49114` 4 Description PV mounting solution for composition shingle roofs . "^w� '?y® • Works with all Zep Compatible Modules \w.,x_ Auto bonding Usted hardware creates structural and electrical bond Zep System has a UL 1703 Class"A"Fire Rating when installed using modules from any manufacturer certified as"Type 1"or"Type 2" Interlock Ground Zep V2 DC Wire Clip DUSTED Specifications Part No.850-1308 Part No.8561511 Part No.8561048 Listed to UL 2703 Listed to UL 467 and UL 2103 Listed to uL 1565 Designed for pitched roofs Installs in portrait and landscape orientations Zep System supports module wind uplift and snow load pressures to 50 psf per UL 1703 Windtunnel report to ASCE 7-05 and 7-1010111 ZeppSystem grounding products are UL listeded toto ULUL 2703 and UL 467 iht kik Zep System orspan productst7canUc ntietler to 03 Zep Engineeredre for enuptouc"and cd to UL 5 up to 24wire wire management products listed to UL 1565 for positioning devices Attachment method UL listed to UL 2582 for Wind Driven Rain Array Skirt,Grip, End Caps Part Nos.850-0113,850-1421, zepsolar.com zepsolar corn 85ted L 6567 8k0-1 tto 6,81 15515 film duaumeot does out wte any am-ass warranty M Zap soar or about its products or serve.zap Boar a sole wamny is contained in the written product warranty for 'ha document ny express warranty by ZapSo oWCtS Or services Zap Sola's sob warrants contained in glia writtenproduct warranlY or each product The end-user documentation shipped withZap Solara products constitutes the sole specifications referred to inthe product wy Tharmy each product The a documentation 'hzp Sol and sots spe[ In caonseferreeothe product Iy.Theis solely responsible for peepingn Suitability of Zep0oler's products mr each use Specifications are subject to mange without notice Patents and Apps pe m responsible fur nrvng the suitability NzpSar a products fuse.Specifications are subbed tochange without notice Patents slid Appss zspatscorn Documentb000.11190-001 kevA Date last exported November 13.20152'.23 PM Document#BW-1090.141 RevA Date lasteepoded. November 13.20152'.23 PM \\ \ ENERGIZING LIFE LZG_1HER e RCC HIGH EI ARtNIANC ,- " i ARPANE 5 v vra nrm Yor REQ PEAK — 3'11 us. rom \ , fid . 2222. ki4e.dfi5 Mf Yye OAYNFG ..V21221 , .. iw*w0slutS Ig a3Yf['c 1d��Peak�f�y2'Link5 &df6r' � morels Ae{(eGC5J3dit'htlAdx'� A ` ` '..�59df5��'�dP �d ..„.4.,„L,...5,14,l .�. N iaowe,a,,,.lwpl 360 � - +kdif �>f Watt a sort�g �wp� •%s prc�d�elhYWISkBP4AveYc�l€R! ' u,. qa h�.fk�dtw� \ ry iaow v a-°,�Ivl 30J w rcetNr+ue RC4combmeshigh ua4�tydesigdend �s° qEk uhm n RdlJJ{ C{tlti5EF1�21Y�5 EbfiFCldf1C4 ad opee ¢vug v M we sMµ -oA4fA%bM ¢+m+ Y peefcxrhmnce .RR�"�Iswitfi � ,� c ini w.re %! e+rvmvwm0`ua) 9Ai $1 4`nW+tPSTntd vricar pfomi9t quelity. SEK , � ha 2 tioxam b, 2* 2 a.! p , 1 �� ` ,t� .ds.ceoeoow�, � : ' . e 2,1922 ef m, o a.°..•„�eC 05! _ fit•. e' �:: I rl' w . . ”, re.41 4 a. v iaower a,�,lwpl ins d7 �. B3 ✓ gh;% �� ♦ y V �� ti IPowerVmlage v,wlvl xeo p},,,,,` di 5 { 69l ^x.Y,�V* ,>rv� rv+ryu a�_ c ev e v 9M1 py V .rexoa� i nv. s. ,„, rc..e „„.,„5,„,„„,(20,4 s �s < 10Vearp a x AMiiM# EYY a x+685 a��., uvea r o o ,.,ecv Ans. =.J?Y61N � • _IiM1f � 1� a ios ,� e eo..c�� Ima..n a ev=no,,,ae�ta7%e a4 y Nppl LbMp pt<Uoit(nK 66ktko{M1ir�” , n m.eyMns • roire .' �A - \\A, \ ‘ uec a yyio n a f ear TWith n yaa i u n m nvny r a REC ill � P tl a E ! p Q tee 8 0 the han tl 6 h [better wxw \ ..t M1 o IQ g p_ pY tl REC.M1 tlq N' N y tll do IeOsb�mckP cM1, gels cker RE60L�.Our1600 • employeesw Id tl ge emteerev nuem115])547m lion i,203 re[gmup.eom a1 car �„ SolarCity f SolarCity '? :iq. 1111 11.1411.111. CI Solar Inverters Transformerless (TL): 3-0 kW, 3-8 kW, S-2 kW, 6.6 kW, 7.6 kW - Wide Operating Voltage flange: 85 — 550V - Wide Operating Temperature Range_ -13 — 158"F (-25 — 7O"C) - High GEC Efficiency: 97.5 - Integrated 'NEC I (Arc Fault Circuit Interruption) - NEMA 4X plus Salt Mist Corrosion Protection Natural Convection Cooling L7ual NAPPY (5-2IcW / 6.610W / 7.61<W) - Compact and Lightweight - 1_11_ 1741 / IEEE 1547 / IEEE 1547. 1 / GEC; SH AELTAII Listed /UL 1699B(Type 1 ) / NEC 690. 11 G SAS • Delta Solar Inverters Oatasheet for SolarCity ....Eon (OG) `. 60o V 360 'V H6 - 550 V 200 - 500 \/ 10.0 A 20.0 A 20-0 A. per MPP tracker 25.0 A par IIAPP tracker 4200 W 5000 W 5000 VV 1.5 Internal 1 2 2 4 OUTPUT (AC) 3000 W 3000 W 5200 W 0600 W VS00 W IMMEIMINIMMINIMMOMMEMI 3000 '' {f9 208 V / 3300 W 0 208 V / 5200 W 02G0 V/ 6600 W 3000 W ( 240 V 3800 Nov (¢ 240 V 5200 W (� 208 V / 6600 W 1i$} 206 V / (� 240 V 660p W 0 240 V 7600 W ( 240 V 183 - 226 V 0 208 V /211 -- 254 V (M 240 V 14_4-2.0 A 208 V / y5.8 15.8 208 24.0 A 0 200 V/ 31_7 A t2.5A ( 240V t5.8A (� 24G V 2t,6A 240V 278 240MaV 31,9 A 022013 V / 31.7 A 0240V 60 Hz 59.3 - 60.5 NY 57.0 - 6 Mz 3 W W 3^h 0.99 0.851 -. ..m0 (A) tv0 soya) GENERAL SPECIFICATION 987 97.5M. [Cy 208V/ 97.89-6 0 240V ,13 - -tars szs-70"0) I aerating above 122`F (50"C I 0 0 - 100%, 2000m above sem level M ECMgNICAL UE91GN 19.5 x 15.8 x 8.5 in (405 x 401 x 210 mm) 2•3_43 z 15.0 x 8.0 In (660 x 401 x 216 min) 43.0 tbs (19.3 kg) 65.0 Ibs (29,5 kg) Nat4ral Convection Spring terminals In connection bax AWG 12 - AWG 6 Copper ( According to NEC 310,18 ) 2 pairs of spring terminals in connection box '4 pairs of spring terminals in connection box AWG 12 - AWG 0 Cooper (According to NEC 090.0 ) ioSee 3 LEDs, 4-Line LCO 0l ecast Aluminum Y4TANOAR05 / OIREOTIVES NEMA 4X. IE4 60068..2-11 Salt mist LIL 1741 Second -Edition. CSA C22.2 No.107.1-01 998 NEC 600,35. N 1741 CRO EEE 1547. IEEE 1547.1 FCC part 15 Class S IlL leone (ryas 1), NEC 000.11 1741 CRC? PVRSS, NEC 090,12 (with SMART RSSi) ANSI C12,1 (meet 2% Accu acy> California Rules 21. RECO Compliant, IEEE1547 WARRANTY 10 years Nana Products Cerocaataan. Lac. 46101 F Fremont(mCA 9453a Sales ail in sctl U PPort Email:va od S d ultaww.com Sales Hotline +1-07-7-4-40-5£151 1-62e-aes eo¢1 S Upport Hotline:-.1-077-4-42-4832 5 l3to ndort le ri - [s_;)6 to T �■ '.,.x� t- nj a t (o t n ey r2e / am to S P.^rsT<ap»res from waloay9) L■ 62 BLISS ST BP-2017-0398 GIS#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 35-040 CITY OF NORTHAMPTON Lot:- PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c142A) Category: SOLAR ELECTRIC SYSTEM BUILDING PERMIT Permit# BP-2017-0398 Project# JS-2017-000658 Est.Cost:$6000.00 Fee:$75.00 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Group SOLARCITY CORP 168572 Lot Size(sq. ft.): 485415.00 Owner: BERTRAND SCOTT Zoning: SR/WSPII Applicant: SOLARCITY CORP AT: 62 BLISS ST Applicant Address: Phone: Insurance: 604 SILVER ST (978)215-2369 O Workers Compensation AGAWAMMA01001 ISSUED ON:9/23/2076 0:00:00 TO PERFORM THE FOLLOWING WORK:INSTALL 15 SOLAR ELECTRIC PANELS TO ROOF - 3.9KW POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 9/23/2016 0:00:00 $75.00 212 Main Street,Phone(413)587-1240,Fax:(413)587-1272 Louis Hasbrouck—Building Commissioner File ft BP-2017-0398 APPLICANT/CONTACT PERSON SOLARCITY CORP ADDRESS/PHONE 604 SILVER ST AGAWAM (978)215-2369 Q PROPERTY LOCATION 62 BLISS ST MAP 35 PARCEL 040 ZONE SR/WSPII THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONFee PlNG aid FORM FILLED OUT a 17 0 q0 i7 Building Permit Filled out ��� fbJ Fee Paid Tvpeof Construction: INSTALL 15 SOLAR ELECTRIC PANELS TO ROOF-3.9KW New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 168572 3 sets of Plans/Plot Plan THE FOLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFQRMATION PRESENTED: Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management Demolition Dela Sig :uildin_ Oflici. Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A.Contact Office of Planning&Development for more information. Department use only City of Northampton Status of Pemlit: 2 Building Department Curb Cut/Driveway Permit s�oa' 212 Main Street Sewer/Septic Availability :c�°pr" Room 100 Water/Well Availability es`:PF Northampton, MA 01060 Two Sets of Structural Plans vie°P phone 413-587-1240 Fax 413-587-1272 Plot/Site Plans Other Specify APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address: This section to be completed by office 62 Bliss St Map Lot Unit Zone Overlay District Elm St District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: SCOTT BERTRAND 62 Bliss St,Northampton MA 01062 Name(PF nt)) � Current Melling Address: (413)585-8898 n I '�s ������f Telephone ` ignature 2.2 Authorized Agent: SolarCity Corp/Kelly Strickland 604 Silver St Agawam MA 01001 Na e(Print) � Current Mailing Address: / Q in/ 978-215-2367 Si!na ure Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by permit applicant 1. Building 2,000 (a)Building Permit Fee 2 Electrical 4,000 (b)EstimatedrcTotal Cost of ns Construction from (6) 3. Plumbing Building Permit Fee 4 Mechanical(HVAC) 5. Fire Protection 6. Total=(1 +2+3+4+ 5) 6,000 Check Number 7J690yQ 76- This Section For Official Use Only Building Permit Number: Date Issued: Signature: Building Commissioner/Inspector of Buildings Date Section 4. ZONING AU Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Depanment Lot Size Frontage Setbacks Front Side L: R: L: R: Rear Building Height Bldg. Square Footage Open Space Footage (Lot area minus bldg&paved parking) #of Parking Spaces Fill: volume&location) A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO DONT KNOW YES IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO DONT KNOW YES IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water or wetlands? NO DONT KNOW YES IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Obtained , Date Issued: C. Do any signs exist on the property? YES NO IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES NO IF YES, describe size, type and location: E. Will the construction activity disturb(clearing, grading,excavation,or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES NO IF YES,then a Northampton Storm Water Management Permit from the DPW is required. SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House Addition Replacement Windows Alteration(s) Roofing gr Doors Accessory Bldg. Demolition New Signs [ ] Decks [ ] Siding[ I Other Brief Description of Proposed v!, ' Work: Install solar electric panels to roof of existing home to be interconnected with home's electrical system. f-�W - Alteration of existing bedroom Yes No Adding new bedroom Yes No 1bf althl.5 Attached Narrative Renovating unfinished basement Yes No Plans Attached Roll -Sheet 5a. If New house and or addition to existing housing, complete the following: a. Use of building :One Family Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft. of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT Scott Bertrand property as Owner of the subject hereby authorize SOLARCITY to act pn my ho alf, in all matters relative to work authorized by this building permit application. gQ�/ !L 09/21/2016 Si (e o wner Date I SOLARCITY CORP/KELLY STRICKLAND , as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. SOLARCITY CORP/KELLY STRICKLAND Print N.y- r//:&a4: 09/21/2016 Sign.ture of er/Agent Date SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Koller SOLARCITY/JEREMY GRAVES 108706 License Number 604 SILVER ST AGAWAM MA 01001 02/23/2019 Address Expiration Date d/ i74-279-7650 Sign Telephone x711 p.Registered Home Improvement Contractor: Not Applicable ❑ SOLARCITY CORP/Kelly Strickland 168572 Company Name Registration Number 604 SILVER ST AGAWAM MA 01001 03/08/2017 Add -ss Expiration Date • f -J Telephone 978-215-2367 SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.C. 152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes 0 No ❑ 11. - Home Owner Exemption The current exemption for`homeowners"was extended to include Owner-occupied Dwellings of one(I) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official that he/she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for whichthis permit is issued. Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153(Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature AThe Commonwealth ofMassachuselts _. Department(industrial Accidents 1/4 -w-' •"a Office eflnvesligalions — "• 600 Washington Street . Boston,MA 02111 • www.massgov/dla Workers' Compensation Insurance Affidavit: BuilderWCootrectors/Electriciaas/Plumbers Applicant Informafon Please Print Legibly Name(Business/Organmdondndividud): SOLARCITY CORP. Address: 3055 CLEARVIEW WAY City/Slale/Zip: SAN MATEO, CA 94402 phone 4: 888-765-2489 Are you an employer? Cheek Ike appropriate hos: Type of projecl (required): 1.0 I am a employer with 5000 4. 0 I am a general contractor and I 6. 0 New construction empioyees(full and/or part-time).' have hired the sub-contractors 2.D I am a sole proprietor or partner- listed on the attached sheet. i 7. 0 Remodeling ship and have no employees These rub-contractors have 8. 0 Demolition olition working for me in any capacity. workers'comp.insurance. 9, 0 Building addition [No workers'romp.insurance 5. 0 We are a corporation and its required.] - officers have exercised their 10.0 Electrical repairs or additions 3.0 lam a homeowner doing all work right of exemption per MGL 11.0 Plumbing repairs or additions myself.[No workers' comp. c. 152,I1(4).and we have no 12.0 Roof repairs insurance required.]' employees.[No workers' comp.insurance required.] 13.0 Oder 'Any mpllowm is decks box a I must also fill out dm wdim below sbm Ing their Matta'comp:a mino policy iorommina s IImim o=who wipe this amdn•s inNalina hey am doisg all ma*and mm his malt awmtlommosutemila mit oflidavd-Mdbh,gautls-- - --kawarmsrhardwetWiebox—Moll-MIO 4 an ddilpx4Ban doping be nm o shin wWnnlnerms and their workers'comp.policy Mfwmnioa. I am en ea 'kyer mat is providing nnrkars'compenmrion baarance for my employees. Below is dm policy and Job sire . . information. 7�� /[ � Tummy=Company Name: W CI CJA1 rie(-1 nal) I vis with Ce- Comp an.) _..._.._._..__�__,.. Policy#a Self-ins. Lk. N: W C - Dig/QL'4 Expiration unto:__01-01- I I__ lob She Address: _City/State/ ip: Attach a copy of the workers'compenaalion policy declaration page(showing the policy number and expiration date). failure to secure coverage as required under Section 25A of MGI.c. 152 can lead to the imposition of criminal penalties of a fine up to 51,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may beforwarded m'the Office of Investigations of the DIA for insurance coverage verification. I do hereby certlfp ander the pains and penalties of perfary that the information provided obove is core and correct •signature: ''-' d. 7.•;>_°Y ` . �',', Dare: K Phone it ' s. Official use only. Do not write In this area,to be completed by city or torus official, __._... _... _ ._ .. .._. . ..._ . . .__.._. ._.. .. ._. . . .. .. I City or Town: Permit/License it laming Authority(Circle one): I Board of Health 2. Building Department 3.City/Town Clerk 4. Electrical Inspector 5. Plumping Inspector 6.Other Contact Person: Phone N: �R CERTIFICATE OF LIABILITY INSURANCE fausavorpr 1 0&71$2016 TRIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT'. lithe isertfiloate holder is an ADDITIONAL INSURED,the PDikgfes)must be endorsed. ITSUBROGATION IS WAIVED,subject to the terms mid conditions of the potty,certain softies inw require an endorsement A statement on this certificate doss not confer Adds tome certificate holder in too of such endorsement(s). nOKTAcr MARSHME& RJRRPNCESBTYICBemir Ip .y. CAI Car X%NC'U 7184 LNT3i%NO.SWIM SAN Fi'ANOSOO CA 04104 AM Manta SO415-7434334 NSURERISIAF£OMSfOCOVERAGE Nate 09001ST1OGAME-1617 .AMUPBe A:Zurich/maims Insurance Comm 7535 SOROS CMPTOMM SJNIIPoS s:NM NA epi Omit Way INSURER c:Ka NM SmMao,CA 84402 mums D:AneIGen Zurblhivam CoiFmry 40142 WDRERE: RAIRER F: COVERAGES CERTIFICATE NUMBER: SEhA 7843 REVISION NUMBER:6 THS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LASTED BELOW HAVE SEEN ISSUED TO THE INSURED NAMED ABOVE FOR INE POLICY PERIOD INDICATED. NOTW1THSrANO(NG MY REQUIREMENT,TERM OR COMMON OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, 'Mk MD CONDITIONS OF SUCH POLICIES LASTSSHOWN MAY HAVE BEEN REDUCEDp�rEBY PAID CLAIMS. L,7q IYI'HaFM&NAM£ pvm'1Tq )gLICYNMMMR .IIpYtlARTYRT. LIMITS A X =elm u4w41Jrt CL001&o1& 1 088U31S oat=7 EADNC $ 1,000,M0 moos To ralito =MS 4nw n OCCUR JAIMENSJALMADEML $ 1000,000 X 818:4250.000 MED! (AN ma NMI $ 0W0 PERSONAL ADV INJURY $ 14000000 eENLAOGFEGATS LIMIT/SPURS PM GENBULAWf2KMTE S 2,0000/0 X pantisPS El LOC PRGOUCTS-WIMP AGG 2,070 43/ A aAP�DTcoom moors BAPo103317-01 R11WA4a MAMMA 4 LISLE WAIT 1 NW�y ANY AUTO ROOST INJURY Pnpgveb MAIN AGAWAM X SONIXIMA.0 BDDO.T NAVY Ino MD�..... Maraldons r UIWPo31A LMP 1000AAA mai Gm-ANANIAS S EXCESS AMR CLNMSAIADE AGGREGATE S TED D YON GGLMWmf ` 11100182014-91490S) 9891/[018 00,01/2017 x1ar�'MrE1 j Me .n D ANY� YIN MY?71WD76-01@W 08919206 CG917AHT EL EACHAWBGJT a 1E0030 O NIA A ttMD1M EXCLUDED? ENS 018201841 pm 090OW (901/2017 EL PSEASE-EA emptITEES 10E000 ' IPibn DF cFERADoNsarow UI,b wham=DM 91Rfa ELDISEASE-POLICY NIT $ 1,000,000 DESCRIPTION OP @MM1TgfSILOCATIONS/VEHICLES/AGGRO 1N,b9amol Nomads SdedaY,—h SYMW If mm space is,gime .ER.RTIFICATE HOLDER CANCELLATION Salacity OIpomfol SHOULD ANY OF THE ABOVE DESCRIBED POLICIES DE CANCELLED BEFORE fly Cleaniew Way THE EXPIRATION DATE THHRBOF, NOTICE WILL BE DELNERED W Sen Mateo,CA 94402 ACCORDANCE WITH THE POLICY PROVISIONS. AUINORIZEDISPRESORATOIE of Iamb Risk S knave,Services Stephanie Guawnl .itan..i S. - • I 4h 1988.2014ACORD CORPORATION. AI rights renewed CORD 25(2014/01) The ACORD name and logo ate,ujiatmut marts of ACORD • (,��r irnnmrroldl njC? ��irrrfr���.:('fj Office of Consumer Allairstand Iiusiness Regulation e.tag; 10 Park Plaza - Suite 517(1 Boston, Massachusetts 02116 Home Improvement Contractor Registration ' Ragistreben: 168572 Type: Supplement Card • SOLAR CITY CORPORATION ` on: 3/8/2017 JEREMY GRAVES - - 3055 CLEARVIEW WAY . . .. - - SAN MATEO,CA 94402 Update Address and cetera cart.Mark reason for Mange. xi, a orae�i Address Renewal , Employment last Card i2. P,nr,,,.,,n..,/J • OBkterCommerABdrs Barhess Regandoa License er regielnM(pn valid for intvidnI.ate only •4•4_MOME IMPROMelENT CONTRACTOR before the<spiratioe data If fond return to: Offen orco saJoer Affairs and MISS Regulation Repkba6on' 169572 TYPEt Park Pisa-Silt*5175 ti•'. . ErNY7ddtc 31872017 Supplement rant Boston,MA 02116 SOLAR CITY CORouRATION JEREMY GRAVES �? 24 ST MARINSTREEr ELO 21W teak, .¢q .i...j "-S9 ithil.BOROI1GIt,Mit 0175E Vod ,Pry 434 valid without signature • Massachusetts-Department of Public Safety ; Board of Budding Regutahcns and Standards ('mo.trunkm Supers h.rt License:G3-706788 JEREMY GRAVES 1 , • 179 BRIGHAM !; . s` .e Madbmnughbfe01 �_'_ ,. Commissioner 0223/2019 '.' ./r. ( ( r /r/ru /r/"Y ((1.204#: :' Office of Consumer Alan'sAand Business Regulation 'as .• 10 Park Plaza - Suite 5170 Boston, Massachusetts 02116 • Home Improvement Contractor Registration Registration: 168572 Type: Supplement Card SOLAR CITY CORPORATION Eaylratimr 3/8/2617 KELLY STRICKLAND 3055 CLEARVIEW WAY SAN MATEO, CA 94402 urine and return card.Mark reason for change. Address Renewal Employment Last Card OOkr affansumer Altars&Mans Madam License or registration valid for iudividnl use only HOME RfiPROVEMENT CONTRACTOR before tlro apinatioo date, if found return to; Office of Consumer Affairs and Business Regulation ReglstrmMn 168577 Type: IO Park Plaza an:201r - ',• Est:aminn. -Suite 5170 BUpplonmM Gard BoslOq MA 02116 SOLAR CITY CORPORA :N KELLY STRICKIAND 24 ST MARTIN SIREEIOLD ZUNI .a2'✓.��.! _. _ :�! . i . . :, , LBOfl {.MA 01752 r i ivitko rsige tore 1'ndeeay.es.rr `. -Nor k&cvkhwn ssgnamre oocuSgn Envelope ID:160623EE-4EFF-4E30-85E9-A7500E0A724C SolarCity Sola rLease Customer Name and Address Installation Location Date Scott Bertrand 62 Bliss Street 9/7/2016 62 Bliss Street Northampton,MA 01062 Northampton,MA 01062 Here are the key terms of your Solarlease Agreement $0 $ 32 . 58 2Oyrs Amount due at contract signing First year mon dkayment Agreeme arm (Est.Price per kWh F rst Year:$01450) 127 Initial her 5th " Initial her 5h The SolarCity Promise DS •We provide a money-back energy performance guarantee. h •We guarantee that if you sell your Home,the buyer will qualify to assume your Agreement. _. Initial here •We warrant all of our roofing work. os •We restore your roof at the end of the Agreement •We warrant,insure and repair the System. -_. _._ Initial her. 5' 1� •We fix or pay for any damage we may cause to your property. •We provide 24/7 web-enabled monitoring at no additional cost. •The rate you pay us will never increase by more than 2.90%per year. •The pricing in this Agreement is valid for 30 days after 9/7/2016. Your SolarCity Lease Agreement Details Your Choices at the End of the Initial Your Prepayment Choices During Amount due at contract signing Term: the Term: $0 •SolarCity will remove the System at no •If you move,you may prepay the Est.amount due at installation additional cost to you. remaining payments Of any)at a $0 •You can upgrade to a new System with discount. the latest solar technology under a new Est.amount due at building inspection contract. $0 •You may renew your Agreement for up to Est.first year production ten (10)years in two(2)five(5)year 2,697 kWh increments. •Otherwise,the Agreement will automatically renew for an additional one (1)year term at 10%less than the then- current average rate charges by your local utility. 3055 Clearview Way,San Mateo,CA 94402 1888.765.2489 I solarcity.com 2145500 Sola rLease Agreement,version 73.1.August 2,2016 SAPC/SEFA Compliant o 0 CDocument License MA HIL 168577/2016 Etd 136MR Document generated on 9/)/2016 ❑ Copyright 2008-2015 SolarCity Corporation,All Rights Reserved DocuSign Envelope ID:180623EE4EFF4E30.85E0-AMOBEOA724C 1. INTRODUCTION 3. SYSTEM DESCRIPTION This SolarLease(this"Lease"or"Agreement")Is the Lease and installation of a 2.915 kW DC photovoltaic agreement between you and SolarCity Corporation system consisting of PV modules,corresponding (together with its successors and assigns,"SolarCity"or inverter(s)and a mounting system designed for "we"),covering the lease to you of the solar panel installation and operation at your Home. system(the"System")described below.The System will be Installed by SolarCity at the address you listed REST OF PAGE INTENTIONALLY LEFT BLANK. above.This Lease will refer to this address as the "Property'or your"Home."This tease is up to thirteen (13)pages long and has up to three(3)Exhibits depending on the state where you live.This Lease has disclosures required by the Federal Consumer Leasing Act and,where applicable,state law.SolarCity provides you with a Performance Guarantee and Limited Warranty (the"Limited Warranty").The Limited Warranty is attached as Exhibit 2.SolarCity will also provide you with a System user manual entitled"Solar Operation and Maintenance Guide"(the"Guide"),that contains important operation,maintenance and service information.This is a legally binding agreement,so please read everything carefully including all of the exhibits.If you do not meet your contract obligations under this Lease,you may lose your rights to the System. If you have any questions regarding this Lease,please ask your SolarCity sales consultant. THIS AGREEMENT SUPERSEDES ALL PRIOR EXISTING CONTRACTS BETWEEN YOU AND SOLARCITY THAT PERTAIN TO THE"SYSTEM"DEFINED IN THIS AGREEMENT. 2. LEASE TERM Solarcity agrees to lease you the System for 20 years (240 full calendar months),plus,if the Interconnection Date is not on the first day of a calendar month,the number of days left in that partial calendar month, including the Interconnection Date.We refer to this period of time as the"Lease Term."The[.ease Term begins on the Interconnection Date.The Interconnection Date is the date that the System is turned on and generating power. SolarCity will notify you by email when your System is ready to be turned on. SSartease Agreement version 731,August 7.2016 IlA5500 ❑r • DowSgn Envelope ID:160623EE-4EFF-4E30-65E9-A7500E0A724C 4. LEASE PAYMENTS;AMOUNTS A. Amounts Due at Lease Signing,Installation and Building B. Monthly Payments: Inspection: Your first monthly payment is$32.58, Payments Due at Signing: followed by 11 monthly payments of$32.58 each, Amount Due at Lease Signing: $0.00 followed by 12 monthly payments of$33.52 each, Delivery/Installation Fee: 9ft,00 followed by 12 monthly payments of$34.49 each, Total Due at Lease Signing $0.00 followed by 12 monthly payments of$35.49 each, followed by 12 monthly payments of$36.52 each, Payments Due at Installation: $0.00 followed by 12 monthly payments of$37.58 each, followed by 12 monthly payments of$38.67 each, Payments Due after Building Inspection: $0.00 followed by 12 monthly payments of$39.79 each, followed by 12 monthly payments of$40.94 each, followed by 12 monthly payments of$42.13 each, followed by 12 monthly payments of$43.35 each, followed by 12 monthly payments of$44.61 each, followed by 12 monthly payments of$45.90 each, followed by 12 monthly payments of$47.23 each, followed by 12 monthly payments of$48.60 each, followed by 12 monthly payments of$50.01 each, followed by 12 monthly payments of$51.46 each, followed by 12 monthly payments of$52.95 each, followed by 12 monthly payments of$54.49 each, followed by 12 monthly payments of$56.07 each. Your total lease payments,excluding tax,are$10,396.56.Your estimated average monthly tax payments are$0.00. Your first Monthly Payment is due on the first day of the first full calendar month following the Interconnection Date. After your first Monthly Payment,future Monthly Payments(and any applicable taxes)are due on the first day of the calendar month. :21❑� 2145500 a Agreement,version L31,August 2,2016 45500 CIy DoanSign Envelope ID: 160623EE4EFF4E30-85E9-A750BEOA924C C. Other Charges: D. Total of Payments(A+B+C)=$10,396.56 This is the total amount you will have paid by the end of this If you make your Monthly Payments by allowing us to Lease by making 240 payments in total.It includes the automatically debit your checking or savings account,then Monthly Payments stated above and estimated taxes of$0. you will receive a discount of$7.50 on your Monthly Payments.The Monthly Payments listed above reflect this discount. If you do not allow the automatic debit,this discount will not be applied to your Monthly Payments and each Monthly Payment will be$7.50 greater. E. Purchase Option At End of Lease Term: F. Other Important Terms: You do not have an option to purchase the System at the end See Section 2 above for additional information on the Lease of the Lease Term. Term and also see below for additional information on termination, purchase options,renewal options,maintenance responsibilities,warranties,late and default charges and prohibition on assignment without SolarCitys consent. Payments due upon installation are due immediately prior to commencement of installation. 5. LEASE OBLIGATIONS (vi) not remove any markings or identification (a) System,Home and Property Maintenance tags on the System; (vii) permit Solarcity,after we give you You agree to: reasonable notice,to inspect the System for (i) only have the System repaired pursuant to proper operation as we reasonably determine the Limited Warranty and reasonably necessary; cooperate when repairs are being made; (viii) use the System primarily for personal,family (ii) keep trees,bushes and hedges trimmed so or household purposes,but not to heat a that the System receives as much sunlight as swimming pool; it did when SolarCity installed it; (ix) not do anything,permit or allow to exist any (iii) keep the panels clean,pursuant to the condition or circumstance that would cause Limited Warranty and the Guide; the System not to operate as intended at the (iv) not modify your Home in a way that shades Property; the System; (x) notify SolarCity if you think the System is (v) be responsible for any conditions at your damaged or appears unsafe;if the System is Home that affect the installation(e.g. stolen;and prior to changing your power blocking access to the roof or removing a tree supplier; that is in the way,prior work you have done (xi) have anyone who has an ownership interest on your home that was not permitted); in your Home sign this Lease; SolarLease Agreement,version 7.3.1.August 2,2016 O 2145500 DocuSign Envelope ID:160623EE-4EFF-4E30-85E9-A750RE0A724C (xii) return any documents we send you for (viii) repair the System pursuant to the Limited signature(like incentive claim forms)within Warranty and reasonably cooperate with you seven(7)days of receiving them;and when scheduling repairs; (xiii) maintain and make available,at your cost,a (ix) create a priority stream of operation and functioning indoor Internet connection with a maintenance payments to provide enough router,one DHCP enabled Ethernet port with cash flow in our financing transactions to pay Internet access and standard AC power outlet for the Limited Warranty obligations andthe close enough and free of interference to repair and maintenance of the System in enable an internet-connected gateway accordance with this Lease even if SolarCity provided by SolarCity to communicate ceases to operate;and wirelessly with the system's inverter(typically this is 80 feet,but may depend on site (x) not put a lien on your Home or Property. conditions).See Section 2(c)(ii)of the Limited (c) Home Renovations or Repairs Warranty for details;and If you want to make any repairs or improvements to (xiv) if your home is governed by a home owner's the Property that could interfere with the System association or similar community organization, (such as repairing the roof where the System is obtain all approvals and authorizations for the located),you may only remove and replace the System System required by that organization and pursuant to the Limited Warranty. advise us of any requirements of that (d) Automatic Payment;Fees;Late Charges organization that will otherwise impact the System,its installation or operation. In addition to the other amounts you agree to pay in this Lease,you agree to pay the following: (b) System Construction,Repair,Insurance and SolarCity's obligations: (i) Automatic Payment Discount:If you make your Monthly Payments by allowing us to SolarCity agrees to: automatically debit your checking or (i) schedule the installation of the System at a savings account,then you will receive a mutually convenient date and time; discount of$7.50 on your Monthly Payments.The Monthly Payments listed in (ii) construct the System according to written Section 4 of this Agreement reflect this plans you review; discount.If you do not allow the automatic (iii) provide you with a web-enabled meter to debit,this discount will not be applied to accurately measure the amount of power the your Monthly Payments and each Monthly System delivers to you; Payment will be$7.50 greater; (iv) notify you if the System design has to be (ii) Returned Check Fee:$25(or such lower materially changed so that you can review amount as required by law)for any check any such changes; or withdrawal right that is returned or refused by your bank;and (v) clean up after ourselves during the construction of the System; (iii) Late payments:accrue interest at twelve (vi) insure our actions,covering damages to your percent(12%)annually or the maximum property caused by faulty installation,System allowable by applicable law. malfunction or manufacturing defects; (e) Insurance (vii) not be a loss payee(or named insured)on the insurance policy covering your Home; SolarCity shall insure the System against all damage or loss unless(i)that damage or loss is caused by your SolarLease Agreement,version 73A,August 2,2016 2145500 DucaSign Envelope ID:160623EEdEFF-0E3985E9A750BEOA724C gross negligence;or(ii)that damage or loss is caused Term.SolarCity shall provide you with by ball strikes;or(iii)you intentionally damage the reasonable notice of its need to access the System. Property whenever commercially reasonable. (f) Estimated Taxes (II) During the time that SolarCity has access You agree to pay any applicable sales or use taxes on rights you shall ensure that its access rights the Monthly Payments due under this Lease.If this are preserved and shall not interfere with or Lease contains a purchase option at the end of the permit any third party to interfere with such Lease Term,you agree to pay any applicable tax on the rights or access. You agree that the System is purchase price for the System.You also agree to pay not a fixture,but SolarCity has the right to file as invoiced any applicable personal property taxes on any UCC-1 financing statement or fixture the System that your local jurisdiction may levy.The filing that confirms its interest in the System. total estimated amount you will pay for taxes over the Lease Term is$0. (i) Indemnity To the fullest extent permitted by law,you shall (g) No Alterations indemnify,defend,protect,save and hold harmless You agree that you will not make any modifications, SolarCity,its employees,officers,directors,agents, improvements,revisions or additions to the System or successors and assigns from any and all third party take any other action that could void the Limited claims,actions,costs,expenses(including reasonable Warranty on the System without SolarCity's prior attorneys'fees and expenses),damages,liabilities, written consent.If you make any modifications, penalties,losses,obligations,Injuries,demands and improvements,revisions or additions to the System, liens of any kind or nature arising out of,connected they will become part of the System and shall be with,relating to or resulting from your negligence or SolarCity's property. willful misconduct;provided,that nothing herein shall (h) Access to the System require you to indemnify SolarCity for its own {i} You grant to SolarCity and its employees, negligence or willful misconduct.The provisions of this paragraph shall survive termination or expiration of agents and contractors the right to reasonably access all of the Property as this Lease. necessary for the purposes of(A)installing, (j) Monthly Payments constructing,operating,owning,repairing, The Monthly Payments section(Section 4(8)) removing and replacing the System or making describes your monthly payment obligations under any additions to the System or installing this Lease.YOU AGREE THAT THIS IS A NET LEASE AND complementary technologies on or about the THE OBLIGATION TO PAY ALL.MONTHLY PAYMENTS location of the System;(B)enforcing AND ALL OTHER AMOUNTS DUE UNDER THIS LEASE SolarCity's rights as to this Lease and the SHALL BE ABSOLUTE AND UNCONDITIONAL UNDER System;(C)installing,using and maintaining ALL CIRCUMSTANCES AND SHALL NOT BE SUBJECT TO electric lines,inverters and meters, necessary ANY ABATEMENT,DEFENSE,COUNTERCLAIM,SETOFF, to interconnect the System to your electric RECOUPMENT OR REDUCTION FOR ANY REASON system at the Property andjor to the utility's WHATSOEVER,IT BEING THE EXPRESS INTENT OF THE electric distribution system;or(0)taking any PARTIES THAT ALL AMOUNTS PAYABLE BY YOU other action reasonably necessary in HEREUNDER SHALL BE AND CONTINUE TO BE PAYABLE connection with the construction, IN ALL EVENTS INCLUDING BY YOUR HEIRS AND installation,operation,maintenance,removal ESTATE AND,EXCEPT AS SET FORTH BELOW IN or repair of the System.This access right shall SECTIONS 6,23,24,AND ON THE ATTACHED EXHIBIT continue for up to ninety(90)days after this YOU HEREBY WAIVE ALL RIGHTS YOU MAY HAVE TO Lease expiresto provide SolarCity with time REJECT OR CANCEL THIS LEASE,TO REVOKE to remove the System at the end of the Lease OtQ Soiartease Agreement version 731,August 2,2016 2145500 • DocuSign Envelope ID: 180623E9.4EFFAE30.8$E9-A75OBEOA724C ACCEPTANCE OF THE SYSTEM,OR TO GRANT A necessary to enable SolarCity to safely install SECURITY INTEREST IN THE SYSTEM. the System);and (k) You authorize SolarCity,or its designee,to obtain your credit report now and in the future,check your credit (viii) if your home is governed by a home owners and employment history,answer questions others association or similar community organization, may ask regarding your credit and share your credit your receipt of all approvals and authorizations Information with SolarCity's financing partners.You for the System required by that organization certify that all information you provide to us in and advising us of any requirements of that connection with checking your credit will be true and organization that will otherwise impact the understand that this information must be updated System,its installation or operation. upon request if your financial condition changes. SolarCity may terminate this Lease without liability if,in its reasonable judgment,any of the above listed conditions(i) 6. CONDITIONS PRIOR TO INSTALLATION OF THE SYSTEM through(vi)will not be satisfied for reasons beyond its (a)Solarcitys Obligation to Install and tease reasonable control, Once SolarCity starts installation, however,it may not terminate this Lease for the failure to SolarCity's obligations to install and lease the System are conditioned on the following items having been completed satisfy conditions(i)through(vi)above. to its reasonable satisfaction: (b)Amendments,Your Right to Terminate for Material Changes. (i) completion of(A)the engineering site audit (a thorough physical Inspection of the Both parties will have the right to terminate this Lease, Property,including,if applicable, without penalty or fee,if SolarCity determines after the geotechnical work),(B)the final System engineering site audit of your Home that it has design,and(C)real estate due diligence to misestimated by more than ten percent(10%)any of(i)the confirm the suitability of the Property for the System size,(ii)the System's total cost or(iii)the System's construction,installation and operation of annual production.Such termination right will expire at the the System; earlier of(A)one(1)week prior to the scheduled System installation date and(B)one(1)month after we inform you (ii) approval of this Lease by SolarCity's financing in writing of the revised size,cost or production estimate. partite*); If neither party exercises their right to terminate this Lease following a greater than 10%change to the System's (iii) your meeting the applicable credit score; estimated annual production or total cost,then such change(s)will be documented in an amendment to this (iv) confirmation of rebate,tax credit and Lease. You authorize SolarCity to make corrections to the renewable energy credit payment availability utility paperwork to conform to this Lease or any in the amount used to calculate the Monthly amendments to this Lease we both sign. Payment amounts set forth in this Lease; 7. WARRANTY (v) confirmation that SolarCity will obtain all YOU UNDERSTAND THAT THE SYSTEM IS WARRANTED applicable benefits referred to in Section 9; SOLELY UNDER THE LIMITED WARRANTY ATTACHED AS (vi) receipt of all necessary zoning,land use and EXHIBIT L,AND THAT THERE ARE NO OTHER building permits;and REPRESENTATIONS OR WARRANTIES,EXPRESS OR IMPLIED,AS TO THE MERCHANTABILITY,FITNESS FOR ANY (vii) completion of any renovations, PURPOSE,CONDITION, DESIGN,CAPACITY,SUITABILITY OR improvements or changes reasonably PERFORMANCE OF THE SYSTEM OR ITS INSTALLATION. required at your Home or on the Property (e.g.removal of a tree or roof repairs B. TRANSFER 214350 se Agreement version 7.3.1.august?,20Th 214i5W :�MT DocuSign Envelope ID: I6O623CE-4EFF-4E30-85E9-A75OBEOA724C SolarCity works with banks,large companies and other You understand that solar renewable energy credits significant financing partners to finance your System. As a (SRECs)and associated data cannot be generated without result,SolarCity will assign this Lease to one of its financing internet. As such,you agree to maintain and make partners. SolarCity may assign,sell or transfer the System available,at your cost,a functioning indoor Internet and this Lease,or any part of this Lease or the exhibits, connection with the understanding that Wi-Fl hotspotting, without your consent,Assignment,sale or transfer tethering and intermittent Internet connection will not generally means that SolarCity would transfer certain of its satisfy this obligation, You also agree to cooperate with rights and certain of its obligations under this Lease to SolarCity as necessary to provide any other information another party. This assignment does not change required to generate SRECs and troubleshoot monitoring SolarCity's obligation to maintain and repair your System issues. Your failure to cooperate with SolarCity with as set forth in the Limited Warranty. respect to Internet requirements will result in your obligation to compensate SolarCity for all lost SREC 9. OWNERSHIP OF THE SYSTEM;TAX CREDITS AND revenue and related costs,subject to a monthly charge of REBATES no less than$10,00(ten dollars)per month until adequate You agree that the System is SolarCity's personal property Internet monitoring is implemented or restored, under the Uniform Commercial Code. You understand and agree that this is a lease and not a sale agreement 10. PURCHASING THE SYSTEM PRIOR TO THE END OF THE SolarCity owns the System for all purposes,including any LEASE TERM data generated from the System.You shall at all times You do not have an option to purchase the System at the keep the System free and clear of all liens,claims,levies end of the Lease Term. and legal processes not created by SolarCity,and shall at your expense protect and defend SolarCity against the 11. RENEWAL same. If you are in compliance with your Lease,you have the YOU UNDERSTAND AND AGREE THAT ANY AND ALL TAX option to renew your Lease for up to ten(10)years in two CREDITS,INCENTIVES,RENEWABLE ENERGY CREDITS, (2)five(5)year renewal periods.We will send you GREEN TAGS,CARBON OFFSET CREDITS,UTILITY REBATES renewal forms three(3)months prior to the expiration of OR ANY OTHER NON-POWER ATTRIBUTES OF THE SYSTEM the Lease Term,which forms shall set forth the new ARE THE PROPERTY OF AND FOR THE BENEFIT OF Monthly Payments due under the renewed Lease,based SOLARCITY,USABLE AT ITS SOLE DISCRETION.SOLARCITY on our assessment of the then current fair market value SHALL HAVE THE EXCLUSIVE RIGHT TO ENJOY AND USE ALL of the System.If you want to renew,complete the SUCH BENEFITS,WHETHER SUCH BENEFITS EXIST NOW OR renewal forms and return them to us at least one(1) IN THE FUTURE. YOU AGREE TO REFRAIN FROM ENTERING month prior to the expiration of the Lease Term, In the INTO ANY AGREEMENT WITH YOUR UTILITY THAT WOULD event that you respond that you do not agree to the new ENTITLE YOUR UTILITYTO CLAIM ANY SUCH BENEFITS. Monthly Payments,the Lease shall expire by its terms on YOU AGREE TO REASONABLY COOPERATE WITH SOLARCITY the termination date. If you don't send us anything in SO THAT IT MAY CLAIM ANY TAX CREDITS,RENEWABLE writing after we send you the renewal forms,then this ENERGY CREDITS,REBATES,CARBON OFFSET CREDITS OR Lease shall renew for an additional one(1)year term at ANY OTHER BENEFITS FROM THE SYSTEM.THIS MAY ten percent(10%)less than the then-current average rate INCLUDE,TO THE EXTENT ALLOWABLE BY LAW, ENTERING charged by your local utility and shall continue to renew INTO NET METERING AGREEMENTS,INTERCONNECTION for one(1)year terms at that same rate until(i)you give AGREEMENTS,AND FILING RENEWABLE ENERGY/CARBON us notice at least thirty(30)days prior to a renewal term OFFSET CREDIT REGISTRATIONS AND/OR APPLICATIONS that you do not wish to renew;or(ii)we send you a FOR REBATES FROM THE FEDERAL,STATE OR LOCAL notice terminating the Lease. GOVERNMENT OR A LOCAL UTILITY AND GIVING THESE TAX CREDITS,RENEWABLE ENERGY/CARBON CREDITS, 12. SELLING YOUR HOME REBATES OR OTHER BENEFITS TO SOLARCITY. (a) If you sell your Home you can: r CP SWahedSe AQieeme',L usrSion'31 August 1,2916 ❑ 2145500 4❑ DocuSign Envelope ID:160623EE-4EFFAE30-85E9-A7506E0A724C (i)Transfer this Lease and the Monthly Payments. your approved buyer and SolarCity shall execute a The person buying your Home(the"Home written transfer of this Lease.Unless we have Buyer')can sign a transfer agreement assuming released you from your obligations in writing,you are all of your rights and obligations under this still responsible for performing under this Lease.If Agreement by qualifying in one of three ways: your buyer defaults on this Lease and we have not yet signed the transfer agreement,you will be f) The Home Buyer has a FICO score of 650 responsible for their default. We will release you or greater; from your obligations under this Lease in writing 2) The Home Buyer is paying cash for your once we have a signed transfer agreement with the Home;or 3) If the Home Buyer does not qualify under person buying your Home(provided such person has been approved as a transferee by SolarCity in (1)or(2),the Home Buyer qualifies for a writing). mortgage to purchase your Home and either you or the Home Buyer pays us a (c) If you sell your Home and can't comply with any of $250 credit exception fee. the options in subsection(a)above,you will be in default under this Lease. Section 12(a)includes a (U) Move the System to Your New Home. Home sale by your estate or heirs. If you are moving to a new home in the same (d) Free Assumability.This agreement is free of any utility district,then where permitted by the local restrictions that would prevent the homeowner from utility,the System can be moved to your new freely transferring their Property. In the event of a home pursuant to the Limited Warranty.You will foreclosure on the Property,your lender has the right need to pay all costs associated with relocating (but not the obligation)to do ONE of the following: the System,execute and provide the same (i) terminate this Agreement and require SolarCity access and ownership rights as provided for in to remove the System subject to your this Lease and provide any third party consents obligations under Sections 15 and 16; or releases required by SolarCity in connection with the substitute premises. (ii) become a beneficiary(but not obligor)of your (Ili) Prepay this Lease and Transfer only the Use of Agreement free of charge i.e.,receive power from the System and enforce the Limited the System. Warranty but not have the obligation to make At any time during the Lease Term,if the person payment,which obligation will remain with you buying your home does not meet SolarCity's —if you don't make timely ypayment you will be credit requirements,but still wants the System, in default under Section 15 and SolarCity can then you can(A)prepay the payments remaining terminate,remove the System and take all on the Lease(See Section 16(i)li)and(ii)),(B)add other remedies it has under Section 16); the cost of the Lease to the price of your home; and(C)have the person buying your Home sign a (iii) enter into a new Agreement with SolarCity on transfer agreement to assume your rights and terms no less favorable than the current non-Monthly Payment obligations under this Agreement;or Lease.The System stays at your Home,the (iv) require transfer of the Agreement under person buying your Home does not make any Section 12 to a subsequent purchaser of the Monthly Payments and has only to comply with Property. the non-Monthly Payment portions of this Lease. SolarCity will not prohibit the sale,conveyance or (b) You agree to give SolarCity at least fifteen(15)days refinancing of the Property.SolarCity may choose to but not more than three(3)months'prior written file in the real estate records a UCC-1 financing notice if you want someone to assume your Lease statement("Fixture Filing")that preserves their rights obligations. In connection with this assumption,you, in the System.The Fixture Filing is intended only to Solarl ■ ease Agreement,version 7.3.1,August 2,2016 21455 2145500 0 OoceSign Envelope ID:I6O623E£-4EFF-E30$5£9-AI5OBEOA724C give notice of Its rights relating to the System and is the maximum amount that could be payable by you not a lien or encumbrance against the Property. under Section 16(i).Damages to your Home, SolarCity shall explain the Fixture Filing to any belongings or property resulting from the installation subsequent purchasers of the Property and any or operation of the System are covered In Section related lenders as requested.SolarCity shall also 6(c)of the limited Warranty. accommodate reasonable requests from lenders or title companies to facilitate a purchase,financing or 15. DEFAULT refinancing of the Property. You will be in default under this Lease if any one of the (e) EXCEPT AS SET FORTH IN THIS SECTION,YOU WILL following occurs: NOT SUBLEASE,ASSIGN,SELL,PLEDGE OR IN ANY (a) you fail to make any payment when it is due and such OTHER WAY TRANSFER YOUR INTEREST IN THE failure continues for a period of ten(10)days; SYSTEM OR THIS LEASE WITHOUT OUR PRIOR WRITTEN CONSENT,WHICH SHALL NOT BE (b) you fail to perform any material obligation that you UNREASONABLY WITHHELD. have undertaken in this Lease(which includes doing something you have agreed not to do,like alter the System)and such failure continues for a period of fourteen(14)days after written notice; 13. LOSS OR DAMAGE (a) Unless you are grossly negligent,you intentionally (c) you or your guarantor have provided any false or misleading financial or other Information to obtain damage the System,or damage or loss to the System this Lease; is caused by ball strikes,Solarcity will bear all of the risk of loss,damage,theft,destruction or similar (d) you assign,transfer,encumber,sublet or sell this occurrence to any or all of the System. Except as Lease or any part of the System without SolarCiWs expressly provided in this Lease,no loss,damage,theft prior written consent;or or destruction will excuse you from your obligations (e) you or any guarantor makes an assignment for the under this Lease,including Monthly Payments. benefit of creditors,admits in writing its Insolvency, (b) If there is loss,damage,theft,destruction or a similar files or there is filed against you or it a voluntary occurrence affecting the System,and you are not in petition in bankruptcy,is adjudicated bankrupt or default of this Lease,you shall continue to timely insolvent or undertakes or experiences any make all Monthly Payments and pay ail other amounts substantially similar activity. due under the Lease and,cooperate with SolarCity,at SolarCib/s sole cost and expense,to have the System 16. REMEDIES IN CASE OF DEFAULT repaired pursuant to the Limited Warranty. if this Lease is in default,we may take any one or more of the following actions.If 1 the law requires us to do so,we 14. LIMITATION OF LIABILITY will ivenotice and wait any you period of time required (a) No Consequential Damages before taking any of these actions,We may: SOLARCITY'S LIABILITY TO YOU UNDER THIS I FRSE (a) terminate this Lease and your rights to possess and SHALL BE UMITED TO DIRECT,ACTUAL DAMAGES use the System; ONLY.YOU AGREE THAT IN NO EVENT SHALL EITHER PARTY BE LIABLE TO THE OTHER FOR (b) suspend our performance under this Lease; CONSEQUENTIAL,INCIDENTAL,PUNTHVE, (c) take any reasonable action to correct your default or EXEMPLARY,SPECIAL OR INDIRECT DAMAGES. to prevent our loss;any amount we pay will be added (b) Actual Damages to the amount you owe us and will be immediately due; Except for claims under Section 5(i),neither party's liability to the other will exceed an amount equal to 4i1 Soamease 43r€€mert,wnon>s 1,August 2,2015 21455 W • DaceSign Envelope lD: 160623EE4EFF-4E30-85E9-A750BE0A724C (d) require you,at your expense,to return the System or We may submit to credit reporting agencies(credit make it available to us in a reasonable manner; bureaus)negative credit reports that would be reflected (e) proceed,by appropriate court action,to enforce on your credit record if you do riot pay any amounts due performance of this Lease and to recover damages under bis Lease as required. for your breach; 17. SYSTEM REMOVAL:RETURN (f) disconnect,turn off or take back the System by legal At the end of the Term or the termination of this Lease,if process or self-help,but we may not disturb the you have not renewed this Lease or exercised your peace or violate the law; purchase option Of any)and you have not defaulted,then (g) report such non-operational status of the System to within ninety(90)days you agree to call SolarCity at the your utility,informing them that you are no longer telephone number listed in Section 7 of Exhibit 2 to net metering; schedule a convenient time for SolarCity to remove the (h) charge you a reasonable reconnection fee for System from your Home at no cost to you. reconnecting the System to your utility or turning 18. APPLICABLE LAW;ARBITRATION your System back on after we disconnect or turn off the System due to your default; PLEASE READ THIS SECTION CAREFULLY.ARBITRATION REPLACES THE RtGHT TO GO TO COURT,INCLUDING THE (i} recover from you Wail accrued but unpaid Monthly RIGHT TO A JURY AND THE RIGHT TO PARTICIPATE IN A Payments,taxes,late charges,penalties,Interest and CI ASS ACTION OR SIMILAR PROCEEDING.IN ARBITRATION, all or any other sums then accrued or due and owing, A DISPUTE IS RESOLVED BY AN ARBITRATOR INSTEAD OF A plus(ii)the unpaid balance of the aggregate rent, JUDGE OR JURY. each payment discounted to present value at 5%per annum,plus(RI)reasonable compensation,on a net The laws of the state where your Home is located shall after tax basis assuming a tax rate of 35%,for the loss govern this Lease without giving effect to conflict of laws or recapture of(A)the investment tax credit equal to principles.We agree that any dispute,claim or thirty percent(30%)of the System cost,including disagreement between us(a"Dispute"}shall be resolved installation;and(B)accelerated depreciation over exclusively by arbitration. five(5)years equal to eighty five percent(85%)of the The arbitration,including the selecting of the arbitrator,will System cost,including installation,and for the loss of be administered by JAMS,under Its Streamlined Arbitration any anticipated benefits pursuant to Section 9 of this Rules(the"Rules")by a single neutral arbitrator agreed on Lease(SolarCity shall furnish you with a detailed by the parties within thirty(30)days of the commencement calculation of such compensation if such a claim is of the arbitration. The arbitration will be governed by the made);or Federal Arbitration Act(Title 9 of the U.S.Code).Either R} use any other remedy available to us in this Lease or party may initiate the arbitration process by filing the by law. necessary forms with JAMS.To learn more about arbitration,you can call any JAMS office or review the You agree to repay us for any reasonable amounts we pay materials at www.jamsadr.com.The arbitration shall be to correct or cover your default.You also agree to held in the location that is most convenient to your Home. reimburse us for any costs and expenses we incur relating If a JAMS office does not exist within fifty(50)miles of your to the System's return resulting from early termination.By Home,then we will use another accredited arbitration choosing any one or more of these remedies,SolarCity provider with offices close to your Home. does not give up its right to use another remedy.By deciding not to use any remedy should this Lease be in If you initiate the arbitration,you will be required to pay default,SolarCity does not give up our right to use that the first$125 of any filing fee. We will pay any filing fees in remedy in case of a subsequent default. excess of$125 and we will pay all of the arbitration fees and costs. if we initiate the arbitration,we wig pay all of the filing fees and all of the arbitration fees and costs. We Solartease Agreement,version 7.3.1,August 2.2016 re 9 2145500 0 L DocuSign Envelope ID:160823EE-4EFF-E30$5E9-A75OBEQA724C will each bear all of our own attorney's fees and costs ENTERED AND ENFORCED IN ANY COURT HAVING except that you are entitled to recover your attorneys fees JURISDICTION,EXCEPT TO THE EXTENT IT IS SUBJECT TO and costs if you prevail in the arbitration and the award you REVIEW IN ACCORDANCE WITH APPLICABLE LAW receive from the arbitrator is higher than SolarCitys last GOVERNING ARBITRATION AWARDS.OTHER RIGHTS THAT written settlement offer. When determining whether your YOU OR WE WOULD HAVE IN COURT MAY ALSO NOT BE award is higher than SolarCitys last written settlement AVAILABLE IN ARBITRATION. offer your attorney's fees and costs will not be included. Only Disputes involving you and SolarCity may be addressed 19. WAIVER in the arbitration.Disputes must be brought in the name of Any delay or failure of a party to enforce any of the an individual person or entity and must proceed on an provisions of this Lease,including but not limited to any individual(non-class,non-representative)basis.The remedies listed in this Lease,or to require performance by arbitrator will not award relief for or against anyone who is the other party of any of the provisions of this Lease,shall not a party.If either of us arbitrates a Dispute,neither of not be construed to(I)be a waiver of such provisions or a us,nor any other person,may pursue the Dispute in party's right to enforce that provision;or(ii)affect the arbitration as a class action,class arbitration,private validity of this Lease. attorney general action or other representative action,nor may any such Dispute be pursued on your or our behalf in 20. NOTICES any litigation in any court.Claims regarding any Dispute and All notices under this Lease shall be in writing and shall be remedies sought as part of a class action,class arbitration, by personal delivery,facsimile transmission,electronic private attorney general or other representative action are mail,overnight courier,or certified,or registered mail, subject to arbitration on an individual(non class,non- return receipt requested,and deemed received upon representative)basis,and the arbitrator may award relief personal delivery,acknowledgment of receipt of electronic only on an individual(non-class,non-representative) basis. transmission,the promised delivery date after deposit with This means that the arbitration may not address disputes overnight courier,or five(5)days after deposit in the mail. involving other persons with disputes similar to the Notices shall be sent to the person identified in this Lease Disputes between you and SolarCity. at the addresses set forth in this Lease or such other The arbitrator shall have the authority to award any legal or address as either party may specify In writing.Each party equitable remedy or relief that a court could order or grant shall deem a document faxed or sent via PDF as an original under this agreement.The arbitrator,however,is not document. authorized to change or alter the terms of this agreement or to make any award that would extend to any transaction 21. ENTIRE AGREEMENT;CHANGES other than yours.All statutes of limitations that are This Lease contains the parties'entire agreement applicable to any dispute shall apply to any arbitration regarding the lease of the System. There are no other between us. The Arbitrator will issue a decision or award in agreements regarding this Lease,either written or oral. writing,briefly stating the essential findings of fact and Any change to this Lease must be in writing and signed by conclusions of law. both parties.Only an authorized officer of SolarCity may BECAUSE YOU AND WE HAVE AGREED TO ARBITRATE ALL execute any change to this Lease on behalf of SolarCity.if DISPUTES,NEITHER OF US WILL HAVE THE RIGHT TO any portion of this tease is determined to be LITIGATE THAT DISPUTE IN COURT,OR TO HAVE A JURY unenforceable,the remaining provisions shall be enforced TRIAL ON THAT DISPUTE,OR ENGAGE IN DISCOVERY in accordance with their terms or shall be interpreted or EXCEPT AS PROVIDED FOR IN THE RULES.FURTHER,YOU re-written so as to make them enforceable. WILL NOT HAVE THE RIGHT TO PARTICIPATE ASA REST OF PAGE INTENTIONALLY LEFT BLANK REPRESENTATIVE OR MEMBER OF ANY CLASS PERTAINING TO ANY DISPUTE.THE ARBITRATOR'S DECISION WILL BE FINAL AND BINDING ON THE PARTIES AND MAY BE Se-40_442e Agreement,version Z3A g 2. ust w 1015 24550 2145500 ❑ i ' DocuSign Envelope ID:160623EE-4EFF-4E30-85E9-A750BE0A724C 22. PRIVACY/PUBLICITY You grant SolarCity the right to publicly use,display,share, I have read this Lease and the Exhibits In their entirety and I and advertise the photographic images,Project details, acknowledge that I have received a complete copy of this price and any other non-personally identifying information Lease. of your Project.SolarCity shall not knowingly release any personally identifiable information about you or any data associating you with the Project location.You may opt-out Customer's Name:Scott Bertrand of these publicity rights by giving us written notice and mailing it to:SolarCity Corporation,Attention: Publicity Opt wousq..d or: Out,3055 Clearview Way,San Mateo,CA 94402. Signature: C7e.Fi D ( 3C37FOQ5B4!S444 23. NOTICE OF RIGHT TO CANCEL Date: 9/7/2Q26 YOU MAY CANCEL THIS LEASE AT ANY TIME PRIOR TO MIDNIGHT OF THE THIRD BUSINESS DAY AFTER THE DATE YOU SIGN THIS LEASE.SEE EXHIBIT 1 THE ATTACHED Customer's Name: NOTICE OF CANCELLATION FORM,FOR AN EXPLANATION OF THIS RIGHT. Signature: 24. ADDITIONAL RIGHTS TO CANCEL Date: IN ADDITION TO ANY RIGHTS YOU MAY HAVE TO CANCEL THIS LEASE UNDER SECTIONS 6 AND 23,YOU MAY ALSO CANCEL THIS LEASE AT NO COST AT ANY TIME PRIOR TO SolarLease Agreement COMMENCEMENT OF CONSTRUCTION ON YOUR HOME. 25. Pricing SolarCity The pricing in this Lease is valid for 30 days after 9/7/2016. If you don't sign this Lease and return it to us on or prior to approved 30 days after 9/7/2016,SolarCity reserves the right to reject this Lease unless you agree to our then current —� pricing. Signature: Lyndon Rive, CEO Date: 9/7/2016 SolarLease Agreement, 3 version 7- 1,August 2,2016 ❑t 2145500 • Version#63.5-TBD SolarCity P September 20, 2016 k OF 4, RE: CERTIFICATION LETTER Project/Job#0102399 'w MARCUS M Project Address: Bertrand Residence `� HANN w 62 Bliss St No.29911) Northampton, MA 01062 4s i .o a�0 FGIS�E+M1 AW Northampton SlONAL./3"- SC Office Springfield Design Criteria: c < F-� -Applicable Codes= MA Res.Code,8th Edition, ASCE 7-05,and 2005 NDS - Risk Category = II -Wind Speed = 90 mph, Exposure Category C -Ground Snow Load=40 psf -MPIA: 2x6 @ 24"OC, Roof DL = 12.5 psf, Roof LL/SL = 28 psf(Non-PV), Roof LL/SL= 18.8 psf(PV) -MP1B: 2x6 @ 24"OC, Roof DL= 12.5 psf, Roof LL/SL = 28 psf(Non-PV),Roof LL/SL = 18.8 psf(PV) Note: Per IBC 1613.1; Seismic check is not required because Ss =0.22424 < 0.4g and Seismic Design Category(SDC)= B < D To Whom It May Concern, A jobsite survey of the existing framing system of the address indicated above was performed by a site survey team from Solaraty. Structural evaluation was based on site observations and the design criteria listed above. Based on this evaluation, I certify that the existing structure directly supporting the PV system is adequate to withstand all loading indicated in the design criteria above based on the requirements of the applicable existing building and/or new building provisions adopted/referenced above. Additionally,I certify that the PV module assembly including all standoffs supporting it have been reviewed to be in accordance with the manufacturer's specifications and to meet and/or exceed all requirements set forth by the referenced codes for loading. The PV assembly hardware specifications are contained in the plans/docs submitted for approval. Sincerely, Marcus Hann, P.E. Professional Engineer Marcus Hann , IDK-^--•si- T: 888.765.2489 email: mhann@solarcity.com Version#63.5-TBD SolarCity HARDWARE DESIGN AND STRUCTURAL ANALYSIS RESULTS SUMMARY TABLES Landscape Hardware-Landscape Modules'Standoff Specifications Hardware X-X Spacing X-X Cantilever Y-Y Spacing Y-Y Cantilever Configuration Uplift DCR MP1A 72" 24" 39" NA _ Staggered 43.7% MP1B 72" 24" 3g" NA Staggered 43.7% Portrait Hardware-Port It Modules'Standoff Specifications Hardware X-X Spacing X-X Cantilever Y-Y Spacing Y-Y Cantilever Configuration Uplift DCR MP1A _ 98" 19" 66" NA Staggered 49.0% MP1B 98" 19" 66" NA Staggered 99.0% StructureMounting Plane Framing Qualification Results Type Spadng Pitch Member Evaluation Results MP1A Vaulted Ceiling 24"O.C. 30° Member Impact Check OK MP1B Vaulted Ceiling 24"O.C. 30° Member Impact Check OK Refer to the submitted drawings for details of information collected during a site survey. All member analysis and/or evaluation is based on framing information gathered on site.The existing gravity and lateral load carrying members were evaluated in accordance with the IBC and the IEBC. ,C .. .;e dingy . IAf. r J - I i Pba!"vv t 5^ of + =rdtyccm STRUCTURE ANALYSIS- LOADING SUMMARY AND MEMBER CHECK- MP1A Member Properties Summary MP1A Horizontal Member Spans Rafter Properties Overhang 1.16 ft Actual W 1.50" Roof System Properties Span 1 10.29 ft Actual D 5.50" Number of Spans(w/o Overhang) 1 Span 2 Nominal Yes Roofing Material Comp Roof Span 3 A(in^2) 8.25 Re-Roof No Span4 Sx(in.^3) 7.56 Plywood Sheathing Yes Span 5 Ix([n^4) 20.80 Board Sheathing None Total Rake Span 13.22 ft TL Def'n Limit _ 180 Vaulted Coigne Yes PV 1 Start 1.92 R Wood Species SPF Ceiling Finish 1/2 Gypsum Board PV 1 End 10.58 ft Wood Grade #2 Rafter Slope 30° PV 2 Start Pb(psi) 875 Rafter Spacing 24"O.C. PV 2 End Fv(psi) 135 Top lot Bracing Full PV 3 Start E(psi) 1,400,000 Bot Lat Bracing Full PV 3 End E-min(psi) 510000 Member Loading Summary Roof Pitch 7/12 Initial Pitch Adjust Non-PV Areas PV Areas Roof Dead Load DL 12.5 psf x 1.15 14.4 psf 14.4 psf PV Dead Load PV-DL 3.0 psf x 1.15 3.5 psf Roof Live Load RLL 20.0 psf x 0.85 17.0 psf Live/Snow Load LL/SLr'E 40.0 psf x 0.7 I x 0.47 28.0 psf 18.8 psf Total Load(Governing LC) TL 42.4 psf 36.7 psf Notes: 1. ps=Cs*pf; Cs-roof,Cs-pv per ASCE 7[Figure 7-2] 2. pf=0.7(Ce)(CO(Is)p9; Ce=0.9,4'1.1,Is=1.0 Member Design Summary(per NDS) Governing Load Comb CD CL(+) I CL(-) CF Cr D+S 1.15 1.00 f 1.00 1.3 1.15 Member Analysis Results Summary Governing Analysis Pre-PV Moment (lb-In) Post-PV Moment Net Impact Result Gravity Loading Check 1,743 1,488 0.85 Pass CALCULATION OF DESIGN WIND LOADS - MP1A Mounting Plane Information I Roofing Material Camp Roof Roof Slope 30° Rafter Spacing - 24"O.C. Framing Type/Direction V-V Rafters PV System Type SolarCity SleekMount" Zep System Type ZS Comp Standoff(Attachment Hardware) Camp Mount Tee G Spanning Vents No Wind Design Criteria Wind Design Code IBC 2009 ASCE 7-05 Wind Design Method Partially/Fully Enclosed Method Basic Wind Speed V 90 mph Fig. 6-1 Exposure Category C Section 6.5.6.3 Roof Style Gable Roof Fig.6-11B/C/D-14A/B Mean Roof Height h 25 ft Section 6.2 Wind Pressure Calculation Coefficients Wind Pressure Exposure K, 0.95 Table 6-3 Topographic Factor Ka 1.00 Section 6.5.7 Wind Directionality Factor Ka 0.85 Table 6-4 Importance Factor I 1.0 Table 6-1 Velocity Pressure qh qh = 0.00256(Kz)(Kat)(Kd)(VA2)(I)16.7 psf Equation 6-15 Wind Pressure Ext. Pressure Coefficient(Up) GCp(Up) -0.95 Fig.6-11B/C/D-14A/5 Ext.Pressure Coefficient(Down) GCp(Down) 0.88 Ng.6-11B/CJD-14A/B Design Wind Pressure p p=qh(GCp) Equation 6-22 Wind Pressure Up Poo . -15.8 psf Wind Pressure Down Paseo) 14.6 psf ALLOWABLE STANDOFF SPACINGS X-Directlon 5-Direction Max Allowable Standoff Spacing Landscape 72" 39" Max Plowable Cantilever Landscape 24" NA Standoff Configuration Landscape Staggered Max Standoff Tributary Area Trib 20 sf PV Assembly Dead Load W-PV 3.0 psf Net Wind Uplift at Standoff T-actual -278 lbs Uplift Capacity of Standoff T-allow 637 lbs Standoff Demand/Capacity DOR 43.7% X-Direction Y-Direction Max Allowable Standoff Spacing Portrait 48" 66" Max Allowable Cantilever Portrait 19" NA Standoff Configuration Portrait Staggered Max Standoff Tributary Area Trib 22 sf PV Assembly Dead Load W-PV 3.0 psf Net Wind Uplift at Standoff T-actual -312 lbs Uplift Capacity of Standoff T-allow 637 lbs Standoff Demand/Capacity DCR 49.0% STRUCTURE ANALYSIS - LOADING SUMMARY AND MEMBER CHECK- MP1B Member Properties Summary . MPi6 Horizontal Member Spans Rafter Properties Overhang 1.16 ft Actual W 1.50" Roof System Properties Span 1 6.26 ft Actual D 5.50" Number of Spans(w/o Overhang) 1 Span 2 Nominal Yes Roofing Material Comp Roof Span 3 A([n^2) 8.25 Re-Roof No Span4 Sx(in.^3) 7.56 Plywood Sheathing Yes Span 5 Ia(in^4) 20.80 Board Sheathing None Total Rake Span 8.57 ft TL Dern Limit 180 Vaulted Ceiling Yes PV 1 Start 0.67 ft Wood Species SPF Ceiling Finish yr Gypsum Board PV 1 End 6.50 ft Wood Grade #2 Rafter Slope 30° PV 2 Start Fb(psi) 875 Rafter Spacing 24"O.C. PV 2 End Fv(psi) 135 Top La anteing Fut PV 3 Start E(psi) 1,400,000 ,Bot Lat Bracing Full PV 3 End E-min(psi) 510,000 Member Loading Summary Roof PNch 1/12 Initial , Pitch Adjust - Non-PV Areas PV Areas Roof Dead Load DL 12.5 psf x 1.15 14.9 psf 14.4 psf PV Dead Load PV-DL 3.0 psi x 1.15 3.5 psf Roof Live Load RLL 20.0 psf x 0.85 17.0 psf Live/Snow Load a/%4r 40.0 psf x 0.7 I x 0.47 28.0 psf 18.8 psf Total Load(Governing LC) TL 42.4 pre 36.7 psf Notes: 1. ps=Cs'pf;Cs-roof,Cs-pv per ASCE 7[Fgure 7-2] 2. pf=0.7(Ce)(Q)(1s)p,; Ce=0.9,G=1.1,1,1.0 Member Design Summar/(per NDS) Governing Load Comb CD CL(+) CL(-) CF Cr D+S 1.15 1.00 1.00 1.3 1.15 Member Analysis Results Summary Governing Analysis Pre-PV Moment, (lb-hi) Post-PV Moment Net Impact Result Gravity Loading Check 621 533 0.86 Pass f CALCULATION OF DESIGN WIND LOADS - MP1B Mounting Plane Information I Roofing Material Comp Roof Roof Slope 300 Rafter Spacinq 24"O.C. Framing Type/Direction Y-Y Rafters PV System Type SolarCIty SleekMount" Zep System Type ZS Comp Standoff(Attctlment Hardware) Cane Mount Tvoe G Spanning Vents No Wind Design Criteria Wind Design Code IBC 2009 ASCE 7-05 Wind Design Method Partially/Fully Enclosed Method Basic Wind Speed V 90 mph Fig.6-1 Exposure Category C Section 6.5.6.3 Roof Style Gable Roof Fig.6-11B/C/D-14A/B Mean Roof Height h 25 ft Section 6.2 Wind Pressure Calculation Coefficients Wind Pressure Exposure l6 0.95 Table 6-3 Topographic Factor Ka 1.00 Section 6.5.7 Wind Directionality Factor Ila 0.85 Table 6-4 Importance Factor I 1.0 Table 6-1 Velocity Pressure ch qh= 0.00256(Ks)(KA)(Rd)(VA2)(I) Equation 6-15 16.7 psf Wind Pressure Ext. Pressure Coefficient(Up) GCp(Up) -0.95 Fig.6-118/C/D-14A/B Ext.Pressure Coefficient(Down) GCp(Down) 0.88 Hg.6-11e/c/D-14rye Design Wind Pressure p p=qh(GCp) Equation 6-22 Wind Pressure Up Prwr -15.8 psf Wind Pressure Down PiO.m 14.6 psf ALLOWABLE STANDOFF SPACINGS X-Direction Y-Direction Max Allowable Standoff Spacing Landscape 72" 39" Max Allowable Cantilever Landscape 24" NA Standoff Configuration Landscape Staggered Max Standoff Tributary Area Trib 20 sf PV Assembly Dead Load W-PV 3.0 psf Net Wind Uplift at Standoff T-actual -278 lbs Uplift Capacity of Standoff T-allow 637 lbs Standoff Demand/Capacity DCII 43.7% X-Direction Y-Direction Max Allowable Standoff Spacing Portrait 48" 66" Max Allowable Cantilever Portrait 19" NA Standoff Configuration Portrait Staggered Max Standoff Tributary Area Trib 22 sf PV Assembly Dead Load W-PV 3.0 psf Net Wind Upift at Standoff T-actual -312 lbs Uplift Capacity of Standoff 1 T-allow I 637 lbs Standoff Demand/Capacity DCR 49.0%