Loading...
32C-078 (5) 3,2_c -a1-7Y Initial Construction Control Document To be submitted with the building permit application by a � I ,� t?ur Registered Design Professional r 1for work per the 8`h edition of the i Massachusetts State Building Code, 780 CMR, Section 107.6.2 Project Title: 3-Family House Renovation 14 Conz Street Date: 9/2/16 Property Address: 14 Conz Street.Northampton. MA 01060 Project: Check(x)one or both as applicable: New construction X Existing Construction Project description: Renovation and repairs of the structural framing of an existing 3-Family house, some of which was damaged by a fire. The details of the structural repair and reinforcement will be determined as conditions are uncovered and I can more clearly evaluate the existing structural conditions and prepare the necessary structural details. I, David Vreeland, MA Registration Number: 46317, Expiration date: 6/30/18 , am a registered design profession[, and hereby certify that I have prepared or directly supervised the preparation of all design plans. computations and specifications concerning': Entire Project Architectural X Structural Mechanical Fire Protection Electrical X Other: Construction Control for the above named project and that such plans,computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR),and accepted engineering practices for the proposed project. I understand and agree that I(or my designee)shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review, for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17.as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. When required by the building official, I shall submit field/progress reports(see item 3.)together with pertinent comments, in a form acceptable to the building official. Upon completion of the work. 1 shall submit to the building official a `Final Construction Control Document'. OF.64 Enter in the space to the right a"wet"or ,y,%��M 'r`Sf� electronic signature and seal: .2 DAVID A. SG i VREELAND S CJ CIVIL w No.46317 9 C \solve 07 Phone number:413-624-0126 Email: dvreeland@verizon.net �' V -- Building Official Use Only Building Official Name: Permit No.: Date: Note 1.Indicate with an'x'project design plans,computations and specifications that you prepared or directly supervised.If'other' is chosen, provide a description. Trial Version 10_09_2012