Loading...
31B-049 (14) 3, ,e - city 007 Initial Construction Control Document To be submitted with the building permit application by a Registered Design Professional for work per the 8th edition of the e ^J Massachusetts State Building Code, 780 CMR, Section 107 Project Title. ThG &OP 01•1& jP1,7T ' NCl-lUl _.. IL03 Date: S .2 I l Property .Address: [:•221: ' x l • L+11;1 e f aNi 'k11j— _ Q I 0 Project. Check one or both as applicable: I- New construction Existing Construction Protect description- g00f 1-11.7e ✓, rv1, 1J i' f MAL:, r-p ) lfia O01 _aS � J 42 Up, Sr. ._.. . _-.. [ \16)./ MA Registration Number. .0127q)IT: Expiration date: (22 30I am a regLsiered design professional, and I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning. t'ct Architectural [ ] Structural [ ] Mechanical [ ] Fire Protection [ ] Electrical [ ] Other for the above named project and that to the best of my knowledge, information, and belief such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code, (780 CMR) and accepted engineering practices for the proposed project I understand and agree that I(or my designee) shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to. 1. Review,for conformance to this code and the design concept, shop drawings, samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17, as applicable. 3 Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. Nothing in this document relieves the contractor of its responsibility regarding the provisions of 780 CMR 107. When required by the building official, I shall submit field/progress reports(see item 3.)together with pertinent comments, in a form acceptable to the building official. Upon completion of the work, 1 shall submit to the • { Construction Control Document'. AtEnter in the space to the right a"wet"or electronic signature and seal: V. .. j `r • q C1 � a Phone number. 2i IJ • S I V aiC l - • �-_4 (.1}'Vtd�'Lg1 Building Official Use Only Building Official Name_ Permit No.. Date. • Version 06_11_2013 3i — ° `{g — 00/ J.D. Rivet & Co., Inc, ROOFING•aHEETMETAL 1638 PAGE BOULEVARD SPRINGFIELD.MA “no,. . P.O.BOX 51066 INDIAN ORCHARD,MA 01161 .Y June 22,2016. TEL (413)6433600 FAX(41J{6419573 1\ To: Hampshire Property Management Group .61� nr -045 4.5/4>„, Attn: Richard Madowitx Project: Trident Realty Property. Location: 139 King Street Northampton, MA BASE BID PRICE: Sections Included;, Roofing&Flashing Base Bid- - Remove and properly dispose of existing modified bitumen and I/" insulation down to plywood deek. - Furnish and install 60 mil TPO mechanically attached single ply membrane roof system.R-25 (2 layers 2.2"polyiso Insulation) - Furnish and Install TPO clad edge metal,2"x 6" blocking. • Provide owner with 20 yr manufacturer's warranty, Alternate Prices: Alt,#l-Furnish and install 80 mil TPO membrane in lieu of 60 mil. -- - A14#Z-Go over existing roof system in lieu of ripping to deck. Deduct from base bid Unit Prices - - Furnish and install TPO walk pads,72"'•• - - Plywood deck replacement T' Exclusions: -HVAC units - removal and replacement by others. - Cutting and raising gas lines to accommodate new roof insulation height by others. - Owner to repair wall and siding at front. - Owner to repair masonry as required. Addenda: N/A Sales Tax: Yes Date of Specs:6-10-16 Bonds: N/A Special Insurance: N/A Requirements:Open shop wages Contact: James Trask,President Gary Brown, Senior Estimator ,,exvicing Came etat ne4e6 Angie 4960 ow')e. // Oen/ t'co5 ( J' P /fd /n4n' 5hect> s_. W..�,t ,ap,B,,y 68'6 /ve,A—,,,4; /fid ©vasa (#.) 6 5)-6(92C" Initial Construction Control Document e-mg1c/: A e.A 1' tri E/ To be submitted with the building permit application by a Aler�fa,,,{C , al Registered Design Professional I ;l c 5 for work per the 8th edition of the 'sX�77 :,.,�,44 Massachusetts State Building Code, 780 CMR,Section 107.6.2 / Project Title: -ie IJ sr,-/- /ew �y! Date: g ' \ O / 74, , Property Address: 13 1 K t ,,, 54-re-el- 714,- A,�„1�,,, ,/{-4 0/060 Project: Check one or both as applicable: 0 New construction PrExisting Construction / Project description: �(9m r - 4«,n b 5 i n i i rete/�+e ^e0 • pr.mducvL, e wa recta-e.,.,.Ac /ar 20 FI' c I MA Registration Number: Expiration date: am a registered design professional, and hereby certify that I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: [ ] Entire Project [ ] Architectural [ ] Structural [ ] Mechanical [ ] Fire Protection [ ] Electrical [ ] Other for the above named project and that such plans,computations and specifications meet the applicable provisions of the Massachusetts State Building Code,(780 CMR), and accepted engineering practices for the proposed project. I understand and agree that I(or my designee)shall perform the necessary professional services and be present on the construction site on a regular and periodic basis to: 1. Review,for conformance to this code and the design concept,shop drawings,samples and other submittals by the contractor in accordance with the requirements of the construction documents. 2. Perform the duties for registered design professionals in 780 CMR Chapter 17,as applicable. 3. Be present at intervals appropriate to the stage of construction to become generally familiar with the progress and quality of the work and to determine if the work is being performed in a manner consistent with the approved construction documents and this code. When required by the building official, I shall submit field/progress reports(see item 3.)together with pertinent comments,in a form acceptable to the building official. i Upon completion of the work,I shall submit to the building official a 'Final Construction Control Document'. Enter in the space to the right a"wet"or electronic signature and seal: Phone number: Email: , Building Official Use Only . Building Official Name: Permit No.: Date: I Trial Version 10_09 2012 31 0 - ©gi9-oc/ I