Loading...
16B-068 98 FERN ST BP-2016-1522 GIS#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 16b-068 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category:New Single Family House BUILDING PERMIT Permit# BP-2016-1522 Project# JS-2017-000351 Est.Cost: $200000.00 Fee: $1265.90 PERMISSION IS HEREBY GRANTED TO: Const.Class: Contractor: License: Use Group: JESSE MONTGOMERY Lot Size(sq.ft.): Owner: MONTGOMERY JESSE Zoning: URB Applicant: JESSE MONTGOMERY AT: 98 FERN ST Applicant Address: Phone: Insurance: 40 OAK ST (413) 585-8482 F LO R E N C E MA01062 ISSUED ON:8/16/2016 0:00:00 TO PERFORM THE FOLLOWING WORK:CONSTRUCT 2 STORY SFH W/ATT GARAGE/DECK/PORCH, 1985 sqft POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 8/16/2016 0:00:00 $1265.90 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner File#BP-2016-1522 , - • I • J APPLICANT/CONTACT PERSON JESSE MONTGOMERY - �� ADDRESS/PHONE 40 OAK ST FLORENCE (413)585-8482 (� PROPERTY LOCATION 98 Fern St 16B-068 co ru 6 f_ Su-aU.) MAP 16B PARCEL 037 001 ZONE URB(100)/ TSEIONI FOR OFFICIALUSE ONLY: NOSE N� AA(1, Fisk°-0 PERMIT ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out Fee Paid Type of Construction: New Single Family 4 bedrm,2 1/2 bath,2 car attached, 1985 soft New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 3 sets of Plans/Plot Plan Fit) LLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INMATION PRESENTED: Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission b745.-7/ --7T / Signature of Building Official Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission, Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A.Contact Office of Planning& Development for more information. • k - Delaartrpen t use only - ,i City of Northampton Status',,ofPgmm 1,0,E L ''"r ' - iB ' ,*' ate uilding Department epeuuorvewayPmf , x. tz 212 Main Street Sewr efeAaraiy 1 1t s Room 100 Wate�4Pte'YfAvalleb� tyE Northampton, MA 01060 ivm Etto€Strpctural Plans t + u phone 413-587-1240 Fax 413-587-1272 PlotrS Plaes v . 'r f OthetreSpec-Lt , Iti ,t tt -�.-_— , _ . _. APPLICATION TO CONSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION - t v .3 40( 1.1 Property Address: This sectiomfo'be complefed by office 'I V Cern �4- Map + Lof Umt CIO CCrCQ yYIA_ U1c76'a. =Zone i� -Overlay Disfnct EI st Dlst id ` ,CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: Sege /fl (n4 c� 0 04 "� , ;nr a ✓ Name(Print) " toe-e- Current Mailing Address: c _��..+' ' Telephone F 2 5JS„ eti 1 "f Signalu 2. uthorized Agent: Name(Print) Current Mailing Address: Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be - Official Use Only completed by permit applicant 1. Building f Ip000 (a)Building Permit Fee 2. Electrical Q0 00O (b)Estimated Total Cost of s Construction from(6) 3. Plumbing ✓D Building Permit Fee /�® � (% 4. Mechanical(HVAC) 5. Fire Protection `� 6. Total=(1 +2+3+4+5) it et. CO' Check Number 33r This Section For Official Use Only _ Building Permit Number: - Date Issued: Signature: - - Building Commissioner/Inspector-off Buildings Date Section 4. ZONING All Information Must Be Completed.Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This cohvnn to be fillet in by �' �'�q''a�'� —�^�. ''�n�-'; Building Department Lot Size 1—sK-.-t..L._ r" r"r t t I----- Frontage L--1[irs..r._$.Q___i!, _•,a39_.� !____ .Q.._....—i Setbacks Front �JFart] Side L: i It LJIRJ, s,5i /S Rear 1-1 e.Lir ra Building Height i [} j 7 Bldg.Square Footage a r--; %= i*I4 lra 1 1 7 Open Space Footage II w ''�_,' % ���l (Lot arca minus bldg&paved � jet LJ Pj 1L�.. t % p park'n6) #of Parking Spaces = .... I Fill: {ro »e Tr',Deaden) _ A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO la DONT KNOW Q YES Q IF YES, date issued:{._...__�._.� IF YES: Was the permit recorded at the Registry of Deeds? NO Q DONT KNOW Q YES Q IF YES: enter Book 1 Pagel 1 and/or Document#1 B. Does the site contain a brook, body of water or wetlands? NO ja. DONT KNOW Q YES Q IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained Q Obtained Q , Date Issued: C. Do any signs exist on the property? YES Q NO la IF YES, describe size, type and location: I D. Are there any proposed changes to or additions of signs intended for the property? YES Q NO er IF YES, describe size, type and location: I _ J 3 E. Will the construction activity disturb(clearing,grading,excavation,or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES Q NO fa' IF YES,then a Northampton Storm Water Management Permit from the DPW is required. a SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House iff Addition ❑ Replacement Windows Alteration(s) n Roofing n Or Doors C Accessory Bldg. ❑ Demolition ❑ New Signs [0] Decks (q Siding[0] Other[0] Brief Description of Proposed Work: & 54ix 4 hedroofin hduSC \S&S Sy f Alteration of existing bedroom Yes No Adding new bedroom Yes No Attached Narrative Renovating unfinished basement Yes No Plans Attached Roll -Sheet Sa If New house and or addition to existing housing, complete thelfollowinq. a. Use of building :One Family Two Family Other e^ b. Number of rooms in each family unit: dt1 Number of Bathrooms • c. Is there a garage attached? Ye 5 d. Proposed Square footage of new construction. I a LI J ti.,Dimensions p icons P oe'4- et-it 5 e. Number of stories? r a: f. Method of heating? c',W+'4 Fireplaces or Woodstoves Alt Number of each =:r g. Enemy Conservation Compliance. • Masscheck Energy Compliance form attached? h. Type of construction W f F i. Is construction within 100 ft.of wetlands? Yes ) No. Is construction within 100 yr. floodplain Yes +c No 1 j. Depth of basement or cellar floor below finished grade t°t k. Will building conform to the Building and Zoning regulations? .)4( Yes No I. Septic Tank City Sewer ✓ Private well City water Supply V''-- SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT , as Owner of the subject property hereby authorize to act on my behalf,in all matters relative to work authorized by this building permit application. Signature of Owner , `c'�'.y' Date I "Sesst! /'.^ose..("'Jal , as Owner/Authorized Agent hereby declare that the stateA{ants and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. Print Name J _ r �• " Signator- Or/Agent , • tate SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicablemst- £ Name of License Holder: Vt:abe it hux^tut OriSMa[• y 0 714' 1 License Number :.,to Osk Si . !OACIVC .ol-4 sa / ' y n Addressr - Expiration Ddte Li kir. c.F5 o.:Li . a „Sj„d6re 'rt;+, Telephone 9.Registered.Home Imprpvement Contractor: _ : Not Applicable f " ca'le Mor ,ati-ncri \ t 4 5 5 Company Name J Registration Number Address Expiration D to Telephone Let". S SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§2506)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes £ No £ 11. -Rome Owner Exemption The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official that he/she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153 (Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature, The Commonwealth of Massachusetts Department of Industrial Accidents i5—: Office of Investigations t. tc�l= 600 Washington Street -ro= 3 Boston, MA 02111 ct„.-• www.mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Legibly t + T Name (Business/Organization/Individual): „Jr tit t" t ��� �MC _ Address: //C)�� ax it W. City/State/Zip: f)tete M4 010 to 8. Phone #: I"1 I ; — Z cY s Ci`{ C 'm Are you an employer? Check the appropriate box: Type of project(required): 1.E I am a er with employer 4. ❑ I am a general contractor and I p y have hired the sub-contractors 6. 1KNew construction employees (full and/or part-time).. _ listed on the attached sheet. 7. ❑ Remodeling 2.17 I am a sole proprietor or partner- ship and have no employees These sub-contractors have g, ❑ Demolition working for me in any capacity. employees and have workers' 9. ❑ Building addition [No workers' comp. insurance omp. insurance.t required.] 5. YI We are a corporation and its 10.0 Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 11.❑ Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.0 Roof repairs insurance required.] t c. 152, §1(4),and we have no employees. [No workers' 13.0 Other comp. insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers compensation policy information. tHo mourners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. tContractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. • Insurance Company Name: Policy#or Self-ins.Lic. #: Expiration Date: Job Site Address: City/State/Zip: Attach a copy of the workers' compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to $250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the rains andjenalties of perjury that the information provided above is true and correct. Si: aNre - —✓' Date: I aa Phone#: l� 58s Official use only. Do not write in this area, to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3. City/Town Clerk 4.Electrical Inspector 5. Plumbing Inspector 6. Other Contact Person: Phone#: City of Northampton /1 . -, y 5 .r2� / Massachusetts '40. i c l''-;;A:,; ;u( * t `FF ( , i,,,�` DEPARTMENT OF BUILDING INSPECTIONS a (i .k �,�n 212 Main Street • Municipal Building \- Northampton, MA 01060 yB, MO‘ INSPECTOR Louis Hasbrouck Chuck Miller Building Commissioner Assistant Commissioner HOME OWNER EXEMPTION ACKNOWLEDGEMENT The State of Massachusetts allows the homeowner the right under 780CMR 108.3.4 to act as his/her construction supervisor. The state defines "Homeowner" as, " Person(s) who owns a parcel on which he/she resides or intends to be, a one or two family dwelling, attached or detached structures accessory to such use and/or farm structures. A person who constructs more than one home in a two- year period shall not be considered a home owner." The building department for the City of Northampton wants any person(s)who seek to use the home owner exemption, to act as their own construction supervisor, to be aware that by doing so you become responsible for compliance with state building codes and regulations. The inspection process requires that the building department be called to inspect work at various stages, which include foundation/footings (before backfill), sonotube holes (before pour), a rough building inspection (before work is concealed), insulation inspection (if required) and a final building inspection. The building department requires these inspections before the work is concealed, failure to secure these inspections can result in failure to obtain a certificate of occupancy until the work can be inspected. If the homeowner hires other trades to perform work (electrical, plumbing & gas) the homeowner will be responsible to make sure that the trades hired secure their proper permits in conjunction to the building permit issued, and that they get their required inspections. Failure of the individual trades to secure the permits and inspections as required can DELAY the project until such time as the proper permits and inspections are made I, understand the above. (Home owner/resident's signature requesting exemption) I will call to schedule all required building inspections necessary for the building permit issued to me. Date Address of work location City of Northampton 212 Main Street, Nor[hampton, MA 01060 Solid Waste Disposal Affidavit In accordance of the provisions of MGL c 40, S54, I acknowledge that as a condition of the building permit all debris resulting from the construction activity governed by this Building Permit shall be disposed of in a properly licensed solid waste disposal facility, as defined by MGL c 111, S 150A. r-� Address of the work: 98 -Gv''m S - i0 Ire. 'flA • The debris will be transported by: _,jeSSC %`^f",1"")orrnet` ( v The debris will be received by: V0. it4'.! {=Jc;—, ,r15 Building permit number: —. Name of Permit Applicant 2C fi'ovtror„u^S Date Signature of Permit Applicant *+•M•.e CITY OF NORTHAMPTON, MASSACHUSETTS DEPARTMENT OF PUBLIC WORKS 125 Locust Street - Y Northampton, MA 01060 - 413-587-1570 a - Fax 413-587-1576 1 _ ASSIGNMENT OF HOUSE NUMBER Street: Fern Street Assessors Map: Map 16B,Lot 68 House Number: 98 Date: April 4,2016 Remarks: Address assigned to a new building lot on Fern Street shown as Lot 2 on an ANR plan entitled Plan of Land Northampton. Massachusetts. surveyed by New England Land Survey, Inc, sealed by George Edward Smith III, PLS, dated October 26, 2015 and endorsed by the Planning Board on November 13, 2015. The number assignment was requested by the owner for permitting ,, purposes for the construction of a single family dwelling. 1{{{ f J.lie Laurila, P.E. Iib Engineer cc: Central Dispatch Board of Health Water Division Tax Collector Sewer Division National Grid Streets Division Verizon Telephone Inspectors Comcast Assessors Columbia Gas of Massachusetts Police Department Post Office (Northampton) James Thompson(GIS Coordinator) Post Office (Easthampton) Registrar of Voters School Department(Joy Winnie) MassGIS Address Management Systems Applicant/Owner: Jesse Montgomery 40 Oak Street Florence, MA 01062 M.Viouse NumbersTem Street\ 98 Fern Street doc MUNICIPAL WATER AVAILABILITY APPLICATION Northampton Water Department 237 Prospect St. Northampton, MA 01060 587-1097 A Department of Public Works Trench Permit shall be required prior to any construction or - connection activity associated with this application. Location: 98 FERN STREET, FLORENCE Inquiry Made By: JESSE MONTGOMERY 585-8482 1 Date of Inquiry: 1,w09 585-8482 Fire Line !Irrigation Domestic X Number of Units: Type of Single Family X Type of Private X 1 Unit(s): Apart. Comm. Ownership: 1 Condo Multi-family Rental tAnnlicant to fill out the ahovel Municipal Water Main in / / Existing service to Front of Location? Yes: No: site? Yes: No✓ Size of Water Main: cs Material: A'6_ Age: ,q Approximate Static Street 5-5—p51 Flow Test Conducted: Yes: No: Pressure: If done attach results , (1 - • Size of Service Connection f {,-c+=/'=6 ft` Suggested Meter Size: {f^ 1/ Comments: The Water Department cannot guarantee adequate water pressure during peak demand times at elevations above 320 feet. • A corresponding water entrance fee shall be paid prior to making any connection to the municipal water system. • Arrangements of such installation shall be made with the Northampton Water Department with a minimum of 5 working days notification. • _ All work shall confo�to�orthampton Water Department specifications. '_ acs *_ iTl2 (eI(PII(n CZ. USW Engineering Dept. r\ 7 e Water EntryS 0700--MeterS /30 — Radios/ \..— N ce: City of Northampton Building Dept. /Commissioner A. Note: If this ava0abfliN is for a new construction, it must be hand delivered to the Building x Inspector. s R.>, )\ L\9 MUNICIPAL SEWER/AVAILABILITY APPLICATION Northampton Streets Department eit 125 Locust Street Northampton, MA 01050 587-1570 A Department of Public Works Trench Permit and Sewer Entry Permit shall be required prior to any construction or connection activity associated with this application. Location: 98 FERN STREET, FLORENCE Date of Inquiry: 6/6/16 JESSE MONTGOMERY 585-8482 Reason for Request: NEW CONSTRUCTION HOOK INTO SEWER Municipal Sewer Main in Front of Location: Yes '4 No Municipal Storm Drain Available: 5I deep Yes No Size of Sewer Main: I Material: J L. Age: 1(1),3 1 t ! Depth of Sewer Main: -4: r Length of Sewer Main: Tit=- tti Z> M*i"u S Tl t;;Z c 1 c> c 9 Ft, t Size of Service Connection: Type of Service Connection: „kV Tie-in to Sanitary Main f j ,, Tie-in to Sanitary Stub Y , -J,,Y Comments: I Ny-- CANnt . My'\A14vL 4 1 rci_ i- jc _ -rte.,--` V ov i b F.-NC:.'tty' ':: ..y 9 r,:":: : ;v E f;.r F' A t:. City Requires 6" cleanout installed at City Property Line `' '` f FJ Note: If this availability is for new construction,this form must be hand delivered to Building Inspector. A corresponding"sewer entrance fee'shall be paid prior to making any connection to the municipal sewer system,Arrangements of such installation shall be made with the Northampton Streets Department with a minimum of 5 working days notification. AU work shall conform to Northampton Streets Department specifications cc: City of Northampton Building Dept. /Commissioner _j� / r,. Permit No. D17-16 CITY OF NORTHAMPTON, MA DRIVEWAY PERMIT Date: 6/13/16 Check#: 593 FEE: 5250.00 Proposed driveway must be staked and address and/or lot number posted. Public Shade Trees are protected by?rIGL Chapter 87. Do not cut, trim or remove any trees on City property. The undersigned respectfully petitions your honorable body for: A new curb cut Permission to install a driveway at: 98 FERN STREET, FLORENCE, MA Fifteen (15)foot maximum width from street line to property line. Gutter drainage not to be disturbed. All drainage shall be directed off the driveway surface to adjacent land and not on the existing roadway. The first one hundred (100) feet of the driveway surface shall be paved as soon as possible if the grade of the proposed driveway exceeds 3% at any point in the first one hundred (100) feet. Homeowners will be held responsible for any costs to the City of Northampton in the event of a washout of this driveway. City is not responsible for culverts installed under driveways in City layout. Code of Ordinances §350-8.8 providing standards for private, individual driveways as most recently amended,must be followed. By: Jesse Montgomery/JCM Home Improvement Telephone: 413-374-2787 _ " Signature: ��— Proposed Location Inspection By:ara ! c,/ r--'E_-tu, • Gravel Base Grade Inspected By: _ Final Approval: _ Director of Public Works Cc: Building Inspector ii (7at Q ci 6-/7--/6 r! (SUBJECT TO ATTACHED CONDITIONS I & 2) Permit No. D17-t6 Conditions: Driveway Permit In lieu of plan approved by the City Engineer I agree to the following added conditions: I will contact the Department of Public Works and have an inspector check and approve the graded gravel base prior to paving to insure compliance with slope and location; 2. I further agree that if in the inspections, any of the permit conditions are not met that I will at no expense to the City remove and replace the driveway as directed by the City Engineer. By: Name: Jesse Montgomery Address: 40 Oak Street, Florence 413-374-2787 Note: The Public Works Department recommends that you provide a plan showing the proposed driveway with grades and location in the future to avoid possible expense which you will incur by not getting approval of actual plans in advance. For Commercial and Industrial applicants, a plan showing the proposed driveway with grades, location and Planning Board permits are required. Cc: Building Inspector PENDING APPROVAL Ma y, CITY OF NORTHAMPTON, MASSACHUSETTS 98 FERN STREET, FLOR 4 DEPARTMENT OF PUBLIC WORKS.4511 125 Locust Street Trench Permit Numb-r: 016-657 tid Northampton,MA 01060 / /- 413-587-1570 Date Approved: 4 VIV J Fax 413-587-1576 Expiration Date: '7/a a// co (for City/Ise Only) • EXCAVATION/TRENCH PERMIT Pursuant to G.L.c. 82A and 520 CMR 14.00 et seq. (as amended) This permit must be fully completed prior to consideration. Submit completed form with permit fee to Northampton Department of Public Works, 125 Locust Street,Northampton,MA 01060. This permit is issued under the provisions of M.G.L.c. 82A,520 CMR 14.00 and applicable sections of the Revised Ordinances of the City of Northampton, including,but not limited to, Section 285-21. • • • Fee: $250 Check#: 593 Date Issued: 6/20/16 Name of Applicant Primary Phone# JESSE MONTGOMERY 413-374-2787 Street Address Emergency Phone# 40 OAK STREET City/Town State Zip Email FLORENCE MA 01062 Name of Excavator Primary Phone# THEROUX BROS. INC. 534-6544 Street Address Emergency Phone# 622 GRANBY RD City/Town State Zip Email S.HADLEY MA 01075 Name of Property Owner(s) Primary Phone# JESSE MONTGOMERY Street Address Emergency Phone# City/Town State Zip Email Insurance Certificate# Policy Expiration Date ON FILE Name&Contact Information of Insurer ON FILE Dig Safe# 2016-231-4998 Pg 1/4,Exavaton/rrench Pe,md " ssI-I Co By signing this form, the applicant, owner and excavator all acknowledge and certify that they are familiar with, or, before commencement of the work,will become familiar with,all laws and regulations applicable to work proposed,including OSHA regulations,M.G.L. c. 82a,520 CMR 14.00 et seq.,and any applicable municipal ordinances,by-laws and regulations,and they covenant and agree that all work done under the permit issued for such work will comply therewith in all respects and with the conditions set forth below. The undersigned owner authorizes the applicant to apply for the permit and authorizes persons duly appointed by the municipality to enter upon the property to monitor and inspect the work for conformity with the conditions attached hereto and the laws and regulations governing such work for the duration of the construction. The undersigned applicant,owner and excavator agree jointly and severally to reimburse the municipality for any costs and expenses incurred by the municipality in connection with this permit and the work conducted thereunder,including but not limited to enforcing the requirements of state law and conditions of this permit,inspections made to assure compliance therewith,and measures taken by the municipality to protect the public where the applicant,owner or excavator has failed to comply therewith,including police details and other remedial measures deemed necessary by the municipality. The undersigned applicant,owner and excavator agree jointly and severally to defend, indemnify,and hold harmless the municipality and all of its agents and employees from any and all liability,causes or action,costs and expenses resulting from or arising out of any injury,death,loss or damage to any person or property during the work conducted under this permit. By signing this form, the applicant,owner and excavator acknowledge that they have read and understand all the information set forth in and referenced within this application package and that they agree to comply in all respects with the requirements therein. '' C, /0 (Co App -•" Date Excavator Signature(if different) Date Owner Signature(if different) Date PF 9110 City of Northampton $ Massachusetts A DEPARTMENT OF BUILDING INSPECTIONS 212 Main Street . Municipal Building 1J Noaampton, MA 01060 pil,B,4 Fee Calculator for Residential Properties Location Square Footage Amount Basement @ .20 8o3 /44 0. eo 1ST Floor @ .50 e03 Lk t l0 2nd Floor @ 50 //d:e? 1/4517/ 1/2 Floors, Finish Attic, Garage @ .20 '/y0 88 Deck / Porches @ .20 /in d i,. p0 Total : // o? 6S, 90 T R E ET \ g'L� �-I 2,• f �j �I I.PIPE I I I (END) i i J1 I / yg „ 1 I �i 1 41 i LOT2 jai 16,279 5F± I w nL l II J1 i W N o . n4 N/F j a go GLEASON ch o a IZ / Q I I 11: ilI "�P'91-----4j__ -----,___ --- Py ;II gig ,® R8 F ER N • I.PIPE (END) 81.80' N8115 15 00 m v 34.1. V ■ W U J {U EJ mm #110 - P LOT 1 7,282 5F± '� catty of Nn4ampton nia� ���� es Com_ � m. ARnssaripxsel3s �• ` y DEPARTMEM1'T OF BUILDING INnPEC1'IONS _� 212 Main Street • Municipal Building -ry ,,,y. Northampton, MA 01060 INSPECTOR Jesse Montgomery June 28, 2016 40 Oak Street Florence, MA 01062 Subject Location: 98 Fern Street Map Block: 16B-068 Mr. Montgomery, Your building permit application with plans dated 6-22-2016 requires additional information before it can be evaluated and approved. Please follow up on the following items: 1. Correct the plan to show what you are going to build, eliminating the walkout basement, fireplace, 2n°floor cantilever, delete canned structural and include the RK Miles structural, produce a foundation plan showing appropriate bearing for all loads. 2. Garage beam is not indicated under joist, is it required? 3. The front of the garage requires a PFH per R602.10.3.3 4. Provide all talc sheets for beams,floor and roof truss. 5. HERS initial ratings. 6. Mark smoke, heat and CO detectors throughout the structure to current building codes. 7. Show basement emergency escape window or bulkhead in the basement and within every bedroom. 8. Show code balustrade on the porch. 9. Show rear egress with landing and steps. 10. Electronic plans must be submitted. Note:The 2012 IECC with MA amendments is the non-stretch energy code and the 9th Edition Building Code and new Stretch Code are expected to begin in July of 2016. As of August 4th 2011 the 8th Edition MA code is the 2009 IRC with MA amendments. In the following are some generic requirements which seem to be problematic. This is not intended to be comprehensive, nor is it a substitute for purchasing and reading the MA codes. Read only international codes are available on line at http://publicecodes.cvberregs.com/icod/one must also consider the MA amendments to these codes which can be found at www.mass.gov/dps/bbrs . The current relevant building codes are: 2009 IBC, 2009 JEBC, 2009 IMC, 2009 IRC, 2009 or 2012 IECC,AA115, MA amendments. 1. Structures shall conform to 780 CMR 8th Edition 1 and 2 family building codes with MA amendments. 2. Grading plan for structures being constructed required. 780 CMR R401.3 for drainage requirements. 3. A basement drainage system is required in all basements 780 CMR R405.2.3. except those in group I soils(table R405.1) 4. Foundations that retain earth and enclose interior space require damp proofing 780 CMR R406.1. or if high water table or severe soils waterproofing 780 CMR R406.2. 5. Through wall form ties must be removed from both faces and patched with hydraulic cement. 780 CMR R406.2 of amendments. 6. Foundation anchor bolts must be%" and be embedded a minimum of 7" into the concrete. 10" bolts! 780 CMR R403.1.6 7. CML)foundations require 3/8" parging before damp proofing. 780 CMR R406.1 see exceptions. 8. Emergency escape is required out of every basement whether habitable or not, each bedroom and walk- in attics. 780 CMR R310.1 9. Crawl spaces can be treated in three different ways,vented (poor idea),exhausted (similar to exhaust only systems), or treating the space with supply and return.See 780 CMR R408 10. Ceiling joist are intended to prevent spread, once raked above the wall plate they become rafters ties and may require up sizing of rafters and increased nailing for example with a 4"slope 8-16nd common are required at each connection. 780 CMR R802.3.1. When there is neither of these a structural ridge is required with a load path to the foundation. 11. Steel straps over the ridge or 1x4 minimum collar ties are required 4'OC in the upper 1/3`d 780 CMR R802.3.1 12. Ridge boards must be the full depth of the cut. 780 CMR R802.3. 13. A complete window and header schedule is required. 780 CMR Table R502.5 for header sizing and number of jack studs required. 14. Wood walls shall be capped with double plates to provide overlapping at corners and intersecting walls with bearing partitions,joints staggered 2' minimum. 780 CMR R602.3.2 a. Exception:A single plate may be used or plates may be excluded over lintels provided the plates/lintels are adequately connected by a 3"x 6" plate .036 galvanized steel nailed to each segment with 6-Sd nails 15. All framing materials which are not code prescriptive must have stamped engineering. a. LVLS b. I-joist and or Floor Truss c. Roof truss 16. All I-Joist need to be protected from fire with%drywall or 5/8 wood structural panel. (R501.3) 17. A braced wall plan identifying appropriate braced wall areas where required (R301.1) and braced wall method being used. 780 CMR 602.10. a. Garage corners and large corner window/door layout may require special solutions. b. All corners must be appropriately attached to the foundation. c. When using PFH (R602.10.3.3) or PFG (R602.10.3.4)the nailing requirement is 4" and 3" respectively using 8d common nails or galvanized box nails. PNEUMATIC nails must be full headed with the temper and shank sizing meeting the strict code requirement. 18. When nailing sheathing make sure your pneumatic nailers' pressure is properly set. Nails set too deep perforate the sheathing weakening it and contribute to building damage in high wind events. 19. Ceiling heights minimum 7'for habitable spaces, 6'S" for bathrooms includes tub/shower area if a shower head is used, 6'8" for basements, 6'4" at beams/ducts. 780 CMR R305.1. MA amended 20. Hazardous glazing locations, within 24"of a door, or within 60" of a stair, or across from hot tubs,spas, bathtubs within 60" if not 60" above the walking surface, and other locations. 780 CMR R308.4 21. Windows over 72" above grade with the opening less than 24 above the finished floor shall meet the 4" sphere rule. Order restrictors. 780 CMR R612.2 22. Egress and emergency escape requirements shall be strictly met. a. Basements, habitable attics, and all sleeping rooms require emergency escape. 780 CMR R310 b. Windows within 44"of floor, DH 3.3 sqft min window size, Casement 20"x41" exception 5 sqft at 1st floor. Minimum clear opening 20"x24" or 24"x20". 780 CMR R310.1.1 c. Two doors remote as possible at the normal level of travel, opening measured from the face of the slab to the stop with door at 90 degrees,one 32" and one 28" minimum 78" high. 780 CMR R311.2 d. Landing at each door 36" out and the width of the door minimum 36", maximum step 7'/<" from the top of the threshold and only in-swinging doors. 780 CMR R311.3 23. Stairs have critical standards, make sure you know the floor finishes when planning. Minimum tread 9", maximum riser 8'/.", maximum overall variance for the run is 3/8",4" sphere rule on risers except where the total rise is 30" or less 780 CMR R311.7.4.3 Exception, 4 3/8" on balustrade, 6" in the triangle. Graspable rail 1'/." minimum and 2" maximum rail, height minimum 34" maximum 38", required for 4 or more risers. Landing to landing constitutes a new run. Minimum 6'8" ceiling height from nosing. Rails must be continuous and returned to the wall if not to newel post. 780 CMR R311.7. 24. Guards 36" minimum height above walking surface, a bench is a walking surface, required for more than 30" above floor or grade within 36",4"sphere rule. 780 CMR R312.1. 25. Floor joist systems that are not equal to 1 'A" nominal dimension must be covered with''/:" drywall or 5/8" wood structural panel or equivalent with some exceptions. 780 CMR R501.3 26. Educate the plumber and electrician about maximum notch and hole sizes, and placement. 780 CMR R502.8 and R602.6. In bearing studs holes not larger than 40%of a stud no closer than 5/8 to the edge, In interior non-hearing studs holes not larger than 60%of a stud no closer than 5/8 to the edge, or holes in joist are a maximum 1/3 the depth not closer than 2"from the top or bottom or to any other hole. Notches are different. 27. Drilling or notching of more than 50% of the wall plate width of an exterior wall or load bearing partition requires a 16 GA 1 Y" strap across the area and 6" beyond each side with 8- lOnd nails. 780 CMR R602.6.1 28. Where dryer ducts penetrate the wall they must be sealed with fire caulk. 780 CMR M504.2 29. Dryer ducts must terminate outside of the building, have a backdraft damper, cannot include a screen, and require 3'clearance from windows.780 CMR M504.4 30. Dryer duct transition is limited to 8'of aluminum flex, must be exposed, and the proper UL listing. 780 CMR M504.6.3 31. Dryer duct maximum equivalent length is 35' less 5' per 90°elbow or per manufacturer's specs. 780 CMR M502.6.4, no screwed connections use foil tape appropriate for the use. 32. Dryer ducts when concealed must have a permanent label or tag within 6' of the duct connection 780 CMR M502.6.5 33. Makeup air is required for dryers exhausting more than 200 CFM. 780 CMR M504.5 34. Makeup air is required for any exhaust hood over 400 CFM. 780 CMR M505.2 35. Fireplaces require all combustion air be provided from the exterior and below the firebox, duct work maintaining 1" clearance for 5' from the duct outlet for all fireplaces and airtight doors. 2009 IECC 402.4.3 36. Fire and draft stopping shall be completed before rough inspection.Typical locations, top (ceiling) and bottom (floor) plates, soffits, and every 10'within enclosed cavities.780 CMR R302. 37. Ignition barriers are required over all thermal plastics and must be in place before final. 780 CMR R316. 38. Dwelling/Garage fire separation.An attached garage (within 3'of main structure) is required to have 'A" drywall on the garage side of the separation wall and if there is a finished space above the garage all walls must have''/:"drywall and the ceiling 5/8" drywall. 780 CMR R302.6 39. Energy aspects shall comply with the stretch energy code. 780 CMR Appendix 115AA or 2009 IECC. a. An initial HERS evaluation is required including insulation levels anticipated. b. A final HERS evaluation confirming code requirements have been met including duct testing. c. A signed copy of the Thermal Bypass Checklist. d. Energy information including mechanical equipment posted on the electric panel. e. Remodeling and Additions can be completed in accordance with IECC 2009 with Energy Star Windows and the Thermal Bypass Checklist. Duct blast testing when practicable. f. All band joist insulation must be enclosed within an air tight cavity,which you must create. 40. Vapor retarders.Although these are still in the code have exceptions, one must understand that there is a difference between a vapor retarder or barrier and an air barrier.An air barrier is intended to stop air flow(convection)a vapor retarder or barrier is intended to stop molecular moisture transfer(diffusion). A vapor retarder or barrier is effective even if there are some holes or gaps, however an air barrier has to be absolute and complete. If air can leak through an electrical device or through a crack it follows the path of least resistance and carries 99%of the moisture in a structure.This is evident every time one exposes fiberglass insulation and finds black insulation, which has filtered dirt out of the air moving through the insulation. 780 CMR R601.2 for vapor retarders and Table N1102.4.2 for air sealing requirements. 41. Unvented attic assemblies. Hot roofs are allowed, but have specific requirements 780 CMR R806.4, 42. Deck ledgers and post must be appropriately attached, bolts or lags. 780 CMR 8502.2.2.1 Note:ThruLoks are engineered for post attachment supporting a railing. Lateral attachment is required for each deck per section 502.2.2.3. 43. Smoke and CO detectors as required. 780 CMR R314 and R315. a. Smokes in each bedroom,within 10' of a bedroom door, and at the bottom of a stair leading to a finished floor above. b. CO within 10'of bedroom doors,at each level,for every 1500 soft,(plumbing code in the mechanical room)Except if there are no fossil burning fuels or attached garage, c. Heat detector in attached garage,and other large unfinished unconditioned spaces. 44, Closets beneath stair which have doors must be drywalled with Xi".780 CMR R302.7 45. If there is mechanical equipment or a combustible roof,30 sqft of space, and 30"measured from top of ceiling joist to bottom of rafters an attic access of minimum RO of 22"x 30" is required to be located in an accessible place. It must be insulated equal to surrounding, Basketed, and secured in place. 46. Clearances above gas stoves and cook tops burners is 24"to non-combustible or 30" to combustibles. Relevant items must he submitted to the building department for approvals before inspections and or Certificates of Occupancy can be issued. Feel free to call if you have any questions. My telephone number is 587-1240 and office hours are Monday through Friday,8:30 am to 4:30 pm,excepting we close for walk-ins at 12:00 noon on Wednesdays. My email address is: cmillertranorthamotonma.gov Thank . .r your coo ration n these matters. huck Miller City of Northampton Assistant Commissioner and Zoning Enforcement ase Tay of Northampton Riassunti/sells �> F DEPARTMENT OF BUILDING INSPECTIONS cuhr4ce-- 212 Main Street • Municipal Building Northampton, MA 01060 INSPECTOR Jesse Montgomery June 28, 2016 40 Oak Street Florence, MA 01062 Subject Location:98 Fern Street Map Block: 1613-068 Mr. Montgomery, Your building permit application with plans dated 7-15-16 has been approved as drawn and per this memo.All work must meet applicable codes whether or not included within this memo. Please follow upon the following items: These items will need to be accomplished as the project moves forward and before rough inspections; 1. All balustrades must meet the 4"sphere rule. 2. The front of the garage requires a PFH per R602.10.3.3 3. Provide final HERS ratings before CO. 4. Several window may require tempering per R308.4 5. Verify no windows require restrictors per R612.2. Note:The 2012 IECC with MA amendments is the non-stretch energy code and the 9th Edition Building Code and new Stretch Code are expected to begin in July of 2016. As of August 41h 2011 the 8th Edition MA code is the 2009 IRC with MA amendments. In the following are some generic requirements which seem to be problematic. This is not intended to be comprehensive, nor is it a substitute for purchasing and reading the MA codes. Read only international codes are available on line at http://publicecodes.cyberregs.com/icod/one must also consider the MA amendments to these codes which can be found at www.mass.gov/dps/bbrs . The current relevant building codes are: 2009 IBC, 2009 IEBC, 2009 IMC, 2009 IRC, 2009 or 2012 IECC,AA115, MA amendments. 1. Structures shall conform to 780 CMR 8th Edition 1 and 2 family building codes with MA amendments. 2. Grading plan for structures being constructed required. 780 CMR R401.3 for drainage requirements. 3. A basement drainage system is required in all basements 780 CMR R405.2.3. except those in group I soils (table R405.1) 4. Foundations that retain earth and enclose interior space require damp proofing 780 CMR R406.1.or if high water table or severe soils waterproofing 780 CMR R406.2. 5. Through wall form ties must be removed from both faces and patched with hydraulic cement. 780 CMR R406.2 of amendments. 6. Foundation anchor bolts must be t/:" and be embedded a minimum of 7" into the concrete. 10" bolts! 780 CMR R403.1.6 7. CMU foundations require 3/8" parging before damp proofing. 780 CMR R406.1 see exceptions. 8. Emergency escape is required out of every basement whether habitable or not,each bedroom and walk- in attics. 780 CMR R310.1 9. Crawl spaces can be treated in three different ways, vented (poor idea), exhausted (similar to exhaust only systems),or treating the space with supply and return.See 780 CMR R408 10. Ceiling joist are intended to prevent spread,once raised above the wall plate they become rafters ties and may require up sizing of rafters and increased nailing for example with a 4" slope 8-16nd common are required at each connection. 780 CMR R802.3.1. When there is neither of these a structural ridge is required with a load path to the foundation. 11. Steel straps over the ridge or 1x4 minimum collar ties are required 4'OC in the upper 1/3"tl 780 CMR R802.3.1 12. Ridge boards must be the full depth of the cut. 780 CMR R802.3. 13. A complete window and header schedule is required. 780 CMR Table R502.5 for header sizing and number of jack studs required. 14. Wood walls shall be capped with double plates to provide overlapping at corners and intersecting walls with bearing partitions,joints staggered 2'minimum. 780 CMR R602.3.2 a. Exception:A single plate may be used or plates may be excluded over lintels provided the plates/lintels are adequately connected by a 3"x 6" plate .036 galvanized steel nailed to each segment with 6-8d nails 15. All framing materials which are not code prescriptive must have stamped engineering. a. LVLs b. I-joist and or Floor Truss c. Roof truss 16. All I-Joist need to be protected from fire with Y drywall or 5/8 wood structural panel. (R501.3) 17. A braced wall plan identifying appropriate braced wall areas where required (R301.1) and braced wall method being used. 780 CMR 602.10. a. Garage corners and large corner window/door layout may require special solutions. b. All corners must be appropriately attached to the foundation. c. When using PFH (R602.10.3.3) or PFG (R602.10.3.4)the nailing requirement is 4" and 3" respectively using 8d common nails or galvanized box nails. PNEUMATIC nails must be full headed with the temper and shank sizing meeting the strict code requirement. 18. When nailing sheathing make sure your pneumatic nailers' pressure is properly set. Nails set too deep perforate the sheathing weakening it and contribute to building damage in high wind events. 19. Ceiling heights minimum 7' for habitable spaces, 6'8" for bathrooms includes tub/shower area if a shower head is used, 6'8" for basements, 6'4"at beams/ducts. 780 CMR R305.1. MA amended 20. Hazardous glazing locations,within 24" of a door, or within 60" of a stair,or across from hot tubs,spas, bathtubs within 60" if not 60" above the walking surface, and other locations. 780 CMR R308.4 21. Windows over 72" above grade with the opening less than 24 above the finished floor shall meet the 4" sphere rule.Order restrictors. 780 CMR R612.2 22. Egress and emergency escape requirements shall be strictly met. a. Basements, habitable attics, and all sleeping rooms require emergency escape. 780 CMR R310 b. Windows within 44"of floor, DH 3.3 sqft min window size, Casement 20"x41" exception 5 sqft at 1"floor. Minimum clear opening 20"x24"or 24"x20". 780 CMR R310.1.1 c. Two doors remote as possible at the normal level of travel, opening measured from the face of the slab to the stop with door at 90 degrees, one 32" and one 28" minimum 78" high. 780 CMR R311.2 d. Landing at each door 36"out and the width of the door minimum 36", maximum step 7%"from the top of the threshold and only in-swinging doors. 780 CMR R311.3 23. Stairs have critical standards, make sure you know the floor finishes when planning. Minimum tread 9", maximum riser S'/<", maximum overall variance for the run is 3/8", 4"sphere rule on risers except where the total rise is 30" or less 780 CMR R311.7.4.3 Exception,4 3/8" on balustrade, 6" in the triangle. Graspable rail 11/4" minimum and 2" maximum rail, height minimum 34" maximum 38", required for 4 or more risers. Landing to landing constitutes a new run. Minimum 6'8" ceiling height from nosing. Rails must be continuous and returned to the wall if not to newel post. 780 CMR R311.7. 24. Guards 36" minimum height above walking surface, a bench is a walking surface, required for more than 30" above floor or grade within 36",4" sphere rule. 780 CMR R312.1. 25. Floor joist systems that are not equal to 1'" nominal dimension must be covered with A" drywall or 5/8" wood structural panel or equivalent with some exceptions. 780 CMR R501.3 26. Educate the plumber and electrician about maximum notch and hole sizes, and placement. 780 CMR R502.8 and R602.6. In bearing studs holes not larger than 40%of a stud no closer than 5/8 to the edge, In interior non-bearing studs holes not larger than 60%of a stud no closer than 5/8 to the edge, or holes in joist are a maximum 1/3 the depth not closer than 2" from the top or bottom or to any other hole. Notches are different. 27. Drilling or notching of more than 50%of the wall plate width of an exterior wall or load bearing partition requires a 16 GA 1 ''/2"strap across the area and 6" beyond each side with 8 - lOnd nails. 780 CMR R602.6.1 28. Where dryer ducts penetrate the wall they must be sealed with fire caulk. 780 CMR M504.2 29. Dryer ducts must terminate outside of the building, have a backdraft damper, cannot include a screen, and require 3'clearance from windows. 780 CMR M504.4 30. Dryer duct transition is limited to 8'of aluminum flex, must be exposed, and the proper UL listing. 780 CMR M504.6.3 31. Dryer duct maximum equivalent length is 35' less 5' per 90°elbow or per manufacturer's specs. 780 CMR M502.6.4, no screwed connections use foil tape appropriate for the use. 32. Dryer ducts when concealed must have a permanent label or tag within 6' of the duct connection 780 CMR M502.6.5 33. Makeup air is required for dryers exhausting more than 200 CFM. 780 CMR M504.5 34. Makeup air is required for any exhaust hood over 400 CFM. 780 CMR M505.2 35. Fireplaces require all combustion air be provided from the exterior and below the firebox, duct work maintaining 1" clearance for 5'from the duct outlet for all fireplaces and airtight doors. 2009 IECC 402.4.3 36. Fire and draft stopping shall be completed before rough inspection.Typical locations, top (ceiling)and bottom (floor) plates, soffits, and every 10'within enclosed cavities. 780 CMR R302. 37. Ignition barriers are required over all thermal plastics and must be in place before final.730 CMR R316. 38. Dwelling/Garage fire separation. An attached garage (within 3' of main structure) is required to have X" drywall on the garage side of the separation wall and if there is a finished space above the garage all walls must have'A" drywall and the ceiling 5/8" drywall. 780 CMR R302.6 39. Energy aspects shall comply with the stretch energy code. 780 CMR Appendix 115AA or 2009 IECC. a. An initial HERS evaluation is required including insulation levels anticipated. b. A final HERS evaluation confirming code requirements have been met including duct testing. c. A signed copy of the Thermal Bypass Checklist. d. Energy information including mechanical equipment posted on the electric panel. e. Remodeling and Additions can be completed in accordance with IECC 2009 with Energy Star Windows and the Thermal Bypass Checklist. Duct blast testing when practicable. f. All band joist insulation must be enclosed within an air tight cavity, which you must create. 40. Vapor retarders.Although these are still in the code have exceptions, one must understand that there is a difference between a vapor retarder or barrier and an air barrier.An air barrier is intended to stop air flow(convection)a vapor retarder or barrier is intended to stop molecular moisture transfer(diffusion). A vapor retarder or barrier is effective even if there are some holes or gaps, however an air barrier has to be absolute and complete. If air can leak through an electrical device or through a crack it follows the path of least resistance and carries 99%of the moisture in a structure.This is evident every time one exposes fiberglass insulation and finds black insulation, which has filtered dirt out of the air moving through the insulation. 780 CMR R601.2 for vapor retarders and Table N1102.4.2 for air sealing requirements. 41. Unvented attic assemblies. Hot roofs are allowed, but have specific requirements 780 CMR R806.4. 42. Deck ledgers and post must be appropriately attached, bolts or lags. 780 CMR R502.2.2.1 Note:ThruLoks are engineered for post attachment supporting a railing. Lateral attachment is required for each deck per section 502.2.2.3. 43. Smoke and CO detectors as required. 780 CMR R314 and R315. a. Smokes in each bedroom,within 10' of a bedroom door, and at the bottom of a stair leading to a finished floor above. b. CO within 10'of bedroom doors, at each level, for every 1500 sqft, (plumbing code in the mechanical room) Except if there are no fossil burning fuels or attached garage. c. Heat detector in attached garage, and other large unfinished unconditioned spaces. 44. Closets beneath stair which have doors must be drywalled with''/:". 780 CMR R302.7 45. If there is mechanical equipment or a combustible roof,30 sqft of space, and 30" measured from top of ceiling joist to bottom of rafters an attic access of minimum RO of 22"x 30" is required to be located in an accessible place. It must be insulated equal to surrounding, gasketed, and secured in place. 46. Clearances above gas stoves and cook tops burners is 24" to non-combustible or 30"to combustibles. Relevant items must be submitted to the building department for approvals before inspections and or Certificates of Occupancy can be issued. Feel free to call if you have any questions. My telephone number is 587-1240 and office hours are Monday through Friday, 8:30 am to 4:30 pm,excepting we close for walk-ins at 12:00 noon on Wednesdays. My email address is: cmiller(a�northamptonma.gov Thank yo r your cooperation on these matters. • r Chuck Miller City of Northampton Assistant Commissioner and Zoning Enforcement LJ-J CENTER FOR U EcoTechnology- we mak green make sense- ENERGY enseENERGY EFFICIENCY PLAN Project Address: 98 Fern St Florence, MA Conditioned Floor Area I.9/1 ft2 Volume 16,788 ft' Building Type Single family detached Bedrooms 4 Assumptions for Preliminary Home Energy Rating CET has completed a Preliminary Home Energy Rating based on the construction plans you have provided. Any energy features not listed below are assumed to meet the prescriptive requirements of the!ECC 2012. Building Envelope Specifications Used in Analysis Cantilevered Floor R-24 High Density Urethane Spray Foam, Grade 2 Garage Ceiling R-30 Fiberglass Balls, Grade 3, held in contact with the subfioor Floor over Unconditioned Basement R-30 Fiberglass Batts, Grade 3, held in contact with the subfioor Rim and Band Joists R-21 High Density Urethane Spray Foam Grade 3 R-24 High Density Urethane Spray Foam, Grade 2,all cavities fully Exterior Walls, including garage and attics enclosed by air barrier on top&both sides(including sheathing &fop plates at attic kneewalls) Basement Stairwell Walls bothsides) R-19 Fiberglass Batts (all cavities fully enclosed by air barrier on top & Windows&Glass Doors U-value=0.29 SHGC=0.25 (predominant values) Exterior Doors R-5/U-0.20 R-36 High Density Urethane Spray Foam with sealed eave wind baffles Flat Ceilings _ Full insulation in with sheetrock ceiling Vaulted: R-36 HigDensity Urethane Spray Foam Grade 3, Vaulted Ceilings Full insulation contact with sheetrock ceiling Attic Hatches R-10+XPS Foamboard, fully gasketed,framed edge dam to height of su rrou ndi ng_in su lation Blower Door Test' 3.0 ACH50 or better' Thermal Enclosure Checklist.sections 2&4 Meet all Checklist Requirements as verified by a HERS rater at pre- drywall and final inspection Mechanical Systems Specifications Used in Analysis • Heating Equipment 90.0 AFUE liquid .ro.ane furnace Coolin Equipment • n/a Water Heating Equipment 40 Gal Indirect Hot Water Tank <6 CFM25 leakage to outdoors per 100 sq ft of finished floor area Duct Leakage" (<118 CFM25);all ductwork thoroughly sealed. All boots and chases sealed to sheetrock/subfloor Duct Location & Insulation 60% Unconditioned Attic R-8 Fiberglass (not bubble wrap);40% Unconditioned Basement R-6(not bubble wrap Continuously operating,variable speed bath exhaust fan <1.0 sones, Whole House Ventilation 58-69 CFM, </=50 watts ENERGY EFFICIENCY PLAN Lighting & Appliances Specifications Used in Analysis Lighting 80% LED. CFL.or pin-based fluorescent Refrigerator n/a Dishwasher Hire Clothes Washer n/a Preliminary Home Energy Rating Results Based on the assumptions described above, we have calculated the following Preliminary Home Energy Rating results. Preliminary HERS Index: 65 Preliminary Improvement Over 2016 Mass. Reference Home v2: 16.8%-Tier I` Note that Confirmed Home Energy Rating results may vary from the Preliminary Home Energy Rating results due to changes in building plans, energy features installed in the home. RESNET standards, software changes, and other factors. * = Mass Save Residential New Construction requirements and incentive amounts can change at any time without notice at the discretion of program sponsors. We expect significant changes to the rebate amounts to occur in late 2016 and/or early 2017. Preliminary Rater:Matt Zarotny Date:8/16/16 Job#:P15695 Page 2 of 2-Please send signed form to the Center for EcoTechnology Tel(413)586-7350 ext.242-Fax(413)586-7351 -greenhome(thoetonline orq