Loading...
24D-075 (4) aK17 - 1S Tg\. THAYER STREET ASSOCIATES , INC . JJ Trine Millwork and Cabinetry 4 July 6.2012 ,�a\1 ' To. Loins Hasbrouck Building Commissioner 1� ` Town of Northampton \rge cjjSys City Hall, 210 Main Street `t Northampton,MA 01060 Re: ACME Automotive 220 Kim_ Street Northampton.MA 01060 Louis: On July 5. 2012. Phil Baunsgard from Northeast Solar contacted me and requested that 1 visited the above address to observe the progress of construction of this project. Construction is underway to install a series of new Photo Voltaic Arrays on the roof of this existing structure. At the time of my observation tradesmen from Northeast Solar were in the process of setting connection anchors that will attach new aluminum tube array supports to the existing north roof structure. Phil informed me that he was concerned about the location of the array labeled H . I arrived on site and meet Phil on the roof It became obvious that a large roof top H.V.A.C. unit would conflict with the proposed location of the'H"array. We decided that the best solution was to shift the entire array 12'-6" to the south.The"H"array is located over an area of roof that is supported by WI 8x40 steel dropped beams located roughly 12'-0" o.c. The dropped steel beams support(4) 2x10 purlin beams and roughly 6'-3' o.c. By shifting the"H" array 12'-6' to the north the array support frames will fall nearly above the W I8x40 dropped sled beams. This mimics the original design intent and provides sufficient room to clear the roof top H.V.A.C. unit. 1 have reviewed the proposed new array "H" location and the existing dropped W 18x40 steel beams have sufficient strength to support this assembly with Massachusetts 81h edition code prescribed snow loads. Phil and his tradesmen .were also having difficulty installing the specified self-drilling and self-tapping array boot anchors into the angle bar trusses located at the north end of the building. These anchors have been specified by the solar array support frame manufacture. I tried to locate an alternate anchor that might be more efficient to install. However due to the required 5 inch length of the anchor I could not locate an alternate anchor. Phil will discuss this issue with the photo array support frame manufacture. It is my impression that construction is proceeding as specified in the contract documents produced by Silverback Solar dated 412/12. Li Please do not hesitate to contact nig el ar1vT. .,'. .ons. K'...K dnc�'e r. m Sineercly. _µ7,4 ,.. Thayer reel Ane aces, Inc. A` N.O 47430 acob F. Smith. P E - . 3t,onc.Afire..South Deerfield,MA 01373 -4 £13 665-1018 t .frx•:,4I3)o65-1I42 -+ bnan@drayerv¢ceassoiareacom