32C-078 (2) 14 CONZ ST BP-2016-1206
GIS#: COMMONWEALTH OF MASSACHUSETTS
Map:Block: 32C-078 CITY OF NORTHAMPTON
Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS
Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A)
Catep,ory: renovation BUILDING PERMIT
Permit# BP-2016-1206
Project# JS-2016-002073
Est. Cost: $2000.00
Fee: $100.00 PERMISSION IS HEREBY GRANTED TO:
Const. Class: Contractor: License:
Use Group: LEITER BUILDERS 102457
Lot Size(sq.ft.): 7579.44 Owner: KOLB BARBARA K&AUGUST 2009 REVOCABLE TRUST
Zoning: URC(100) Applicant: KEITER BUILDERS
AT. 14 CONZ ST_
Applicant Address: Phone: Insurance:
35 MAIN ST (413) 586-8600 O WC
FLORENCEMA01062 ISSUED ON.•4/21/2016 0:00:00
TO PERFORM THE FOLLOWING WORK.-INSTALL NEW POST & PIER
POST THIS CARD SO IT IS VISIBLE FROM THE, STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter:
Footings:
Rough: Rough: House# Foundation:
Driveway Final:
Final: Final:
Rough Frame:
Gas: Fire Department Fireplace/Chimney:
Rough: Oil: Insulation:
Final Smoke �-A 0
Final: � �` ��G
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REG IO c4" /7� (av cL
Certificate of Occu anc i nature:
FeeType: Date Paid: Amount:
Building 4/21/2016 0:00:00 $100.00
212 Main Street,Phone(413)587-1240,Fax: (413)587-1272
Louis Hasbrouck—Building Commissioner
Final Construction Control Document
N To be submitted at completion of construction by a
W
x d Registered Design Professional
for work per the 8th edition of the
Y'v
Massachusetts State Building Code, 780 CMR, Section 107.6.4
Project Title: Enclosed Second Floor Entry Porch Pier and Post Replacement Date:4/26/16 Permit No.
Property Address: 14 Conz Street,Northampton, MA 01060
Project: Check(x)one or both as applicable: New construction X Existing Construction
Project description: Temporarily supported second floor entry porch, temporarily removed stair, removed existing 6x6
post,excavated and removed existing concrete pier, installed new precast pier(24"x 24" footing intergrated with
tampered 12"square to 8" square pier)with the base of the footing 4' below grade, installed new 6x6 P.T. post with
Simpson #ABW66Z post base anchor, top of post secured to entry porch floor framing with TimberLok screws and
Simpson 90 deg bracket.
I, David Vreeland, MA Registration Number: 46317, Expiration date: 6/30/16 , am a registered design professional, and
hereby certify that I have prepared or directly supervised the preparation of all design plans, computations and
specifications concerning':
Entire Project Architectural X Structural Mechanical
Fire Protection Electrical X Other: Construction Control
for the above named project. I certify that 1, or my designee, have performed the necessary professional services and was
present at the construction site on a regular and periodic basis to determine that the work proceeded in accordance with
the requirements of 780 CMR and the design documents prepared by me and approved as part of the building permit and
that I or my designee:
1. Have reviewed, for conformance to this code and the design concept, shop drawings, samples and other submittals
by the contractor in accordance with the requirements of the construction documents.
2. Have performed the duties for registered design professionals in 780 CMR Chapter 17, as applicable.
3. Have been present at intervals appropriate to the stage of construction to become generally familiar with the
progress and quality of the work and to determine if the work was performed in a manner consistent with the
construction documents and this code.
Enter in the space to the right a"wet"or kN OF kq s
electronic signature and seal: o'�� DAVID A.
VREELAND
U CIVIL. y
No.46317
9FGISTEAf���ti"
Phone number: 413-624-0126 Email: dvreeland(&
,verizon.net
Building Ofti ial Use Only
Building Official Name: Permit No.: Date:
Note 1. Indicate with an `x'project design plans,computations and specifiations that you prepared or directly supervised. If'other' is chosen,
provide a description.