32C-281 (7) Home Energy Dating Certificate HIS :.
Property R
Wes Malzone rl ype: Confirmed Certified Energy Rater: Adin Maynard HERS
100 Williams rr Rating Date: 03J26/2016 Rating Number:
Northampton MA 01060, Registry ID:.j 54Q141611
Estimated Annual Energy Cost
Use MMBtu Cost Percent
HERS Index: 50 Heating 23.6 $723 44%
General Information Cooling 3.4 $52 3%
Conditioned Area 1607 sq.ft. House Type Single-family detached Hot Water 3.1 $144 9%
Conditioned Volume 19010 cubic ft. Foundation Unconditioned basement Lights/Appliances 16.0 $688 42%
Bedrooms 3 Photovoltaics -0.0 $.0 -0%
Service Charges $33 2%
Mechanical Systems Features Total 46.1 $1639 100%
Air-source heat pump: Electric,Htg:12.5 HSPF.Cig:26.1 SEER.
Water Heating: Heat pump,Electric,3.24 EF,50.0 Gal. Crlte!Ta
Duct Leakage to Outside NA This home meets or exceeds the minimum criteria for the following:
Ventilation System Balanced:HRV,40 cfm,23.0 watts.
Programmable Thermostat Heat=Yes;Cool=Yes
Building Shell Features
Ceiling Flat R-49.1 Stab None
Sealed Attic NA Exposed Floor R-0.0
Vaulted Ceiling R-40.0 Window Type U-Value:0.200,SHGC:0.230
Above Grade Waits R-21.0 infiltration Rate Htg:984 Clg:989 CFM50
Foundation Walls R-21.0 Method Blower door test TITLE
Company
Lights and Appliance Features Address
Percent Interior Lighting 100.00 Range/Oven Fuel Electric City,State,Zip
Percent Exterior Lighting 5.00 Clothes Dryer Fuel Electric Phone#
Refrigerator(kWhtyr) 448 Clothes Dryer EF 2.75 Fax#
i
Dishwasher(kWh/yr) 260 Ceiling Fan(cfm/Watt) 0.00
REM/Rate-Residential Energy Analysis and Rating Software 04,6.1
This information does not constitute any warranty of energy,cost or savings.0 1985.2015 Noresco,Boulder,Colorado.
The Home Energy Rating Standard Disclosure for this home is available from the rating provider.
ENERGY STAR Qualified Homes
EM=77 Thermal Bypass Inspection Checklist
Home Address: 100 Williams St City. Northampton State:MA
Thermal Bypass Inspection Guidelines Corrections Builder Rater N/A
Needed Verified I Verified
1. Overall Air Barrier Requirements:
and Thermal Insulation shall be installed in full contact with sealed interior and exterior air barrier except for alternate to interior air barrier
Barrier Alignment under item no.2 Walls Adjoining Exterior Walls or Unconditioned Spaces)
All Climate Zones:
1.1 Overall Alignment Throughout Home ❑ ❑ 0 ❑
1.2 Garage Band Joist Air Barrier(at bays adjoining conditioned space) ❑ ❑ ❑ 0
1.3 Attic Eave Baffles Where Vents/Leakage Exist ❑ ❑ ❑ El
Only at Climate Zones 4 and Higher:
1.4 Slab-edge Insulation(A maximum of 25%of the slab edge may be ❑ ❑ ❑ ❑
uninsulated in Climate Zones 4 and 5.
Best Practices Encouraged,Not Re 'd.:
1.5 Air Barrier At All Band Joists(Climate Zones 4 and higher) ❑ ❑ ❑
1.6 Minimize Thermal Bridging(e.g.,OVE framing,SIPs,ICFs) ❑ ❑ ❑ ❑
2. Walls Adjoining Requirements:
Exterior Walls or . Fully insulated wall aligned with air barrier at both interior and exterior,OR
Unconditioned • Alternate for Climate Zones 1 thru 3,sealed exterior air barrier aligned with RESNET Grade 1 insulation fully supported
Spaces • Continuous top and bottom plates or sealedblocking
2.1 Wall Behind Shower/Tub ❑ ❑ 0 ❑
2.2 Wall Behind Fireplace ❑ ❑ ❑ 0
2.3 Insulated Attic Slopes/Walls ❑ ❑ 0 ❑
2.4 Attic Knee Walls ❑ ❑ ❑ Q
2.5 Skylight Shaft Walls ❑ ❑ ❑ ED
2.6 Wall Adjoining Porch Roof ❑ ❑ ❑
2.7 Staircase Walls ❑ ❑ 0 ❑
2.8 Double Walls ❑ ❑ ❑ 0
3. Floors between Requirements:
Conditioned and • Air barrier is installed at any exposed fibrous insulation edges
Exterior Spaces • Insulation is installed to maintain permanent Contact with sub-floor above including necessary supports(e.g.,staves for
blankets,netting for blown-in)
• Blanket insulation is verified to have no gaps,voids or compression.
• Blown-in insulation is verified to have proper density with firm packing
3.1 Insulated Floor Above Garage ❑ ❑ ❑ (�
3.2 Cantilevered Floor ❑ ❑ ❑
4. Shafts Requirements:
Openings to unconditioned space are fully sealed with solid blocking or flashing and any remaining gaps are sealed with
caulk or foam(provide fire-rated collars and caulking where required)
4.1 Duct Shaft ❑ ❑ ❑
4.2 Piping Shaft/Penetrations ❑ ❑ 0 ❑
_4.3 Flue Shaft ❑ ❑ 0 ❑
5. Attic/Ceiling Requirements:
Interface • All attic penetrations and dropped ceilings include a full interior air barrier aligned with insulation with any gaps fully sealed
with Caulk,-foam or tape _ -
• Movable insulation fits snugly in opening and air barrier is fully gasketed
5.1 Attic Access Panel(fully gasketed and insulated) ❑ ❑ ❑ 0
5.2 Attic Drop-down Stair(fully gasketed and insulated) ❑ ❑ 0 ❑
5.3 Dropped Ceiling/Soffit(full air barrier aligned with insulation) ❑ ❑ ❑ 0
5.4 Recessed Lighting Fixtures(ICAT labeled and sealed to drywall) ❑ ❑ 0 ❑
5.5 Whole-house Fan(insulated cover gasketed Ito the opening) ❑ ❑ ❑ 0
6. Common Walls Requirements:
Between Dwelling Gap between drywall shaft wall(i.e.,common wall)and the structural framing between units is fully sealed at all exterior
Units boundary conditions
6.1 Common Wall Between Dwelling Units ❑ ❑ ❑
Home Energy Rating Provider: ERM Rater Inspection Date: 3/24/2016 Builder Inspection Date:
Home Energy Rater Company Name: HIS&HERSEnergyEfficiency Builder Company Name:
Home Energy Rater Signature: Builder Employee Signature: