32A-162 (4) Ci f Northampton
ty o
r Massachusetts
DEPARTMENT OF BUILDING INSPECTIONSi
t 212 Main Street • Municipal Building �� �
Northampton, MA 01060sR
INSPECTOR
Louis Hasbrouck Fax: 413-587-1272 Chuck Miller
Building Commissioner Phone: 413-587-1240 Assistant Commissioner
SECONDARY CONSTRUCTION CONTROL DOCUMENT
(For professional Engineers/Architects responsible for aop rtion of a controlled project)
Project Title: Northampton Arts Trust- Phase One Date: March 23, 2016
Project Location: 33 Hawley Street Map: Parcel: Zone:
Scope of Project: Demolition, Roof, Walls, Elevator, Electrical Service
In accordance with the Eighth edition Massachusetts State Building Code, 780 CMR Section 107.6:
Julia G. Weatherby Mass. Registration# 40031
being a registered professional Engineer/Architect hereby CERTIFY that I have prepared or directly supervised
the preparation of all design plans, computations and specifications concerning:
[ ] Fire Protection [ ]Architectural [ ] Structural [xI Mechanical [ ] Electrical
[ ]Other(specify)
for the above named project and that to the best of my knowledge, such plans, computations and specifications
meet the applicable provisions of the Massachusetts State Building Code, all acceptable engineering practices
and all applicable Laws for the proposed project.
Furthermore, I understand and AGREE that I shall perform the necessary professional services to determine that
the above mentioned portions of the work proceed in accordance with the documents approved for the building
permit.
Upon completion of the work, I shall submit to the building official a final report as to the satisfactory
Completion of the above mentioned work. u
Signature and Seal of Regi%ereo Professional ;
A ,d r
N.
2 rd Day of March 20 6 �n
(seal)
City of Northampton
Massachusetts
wY
DEPARTMENT OF BUILDING INSPECTIONS _
212 Main Street • Municipal Building
Northampton, MA 01060
INSPECTOR
Louis Hasbrouck Fax: 413-587-1272 Chuck Miller
Building Commissioner Phone: 413-587-1240 Assistant Commissioner
SECONDARY CONSTRUCTION CONTROL DOCUMENT
(For professional Engineers/Architects responsible for aop rtion of a controlled project)
Project Title: Northampton Arts Trust-Phase One Date: March 23, 2016
Project Location: 33 Hawley Street Map: Parcel: Zone:
Scope of Project: Demolition, Roof, Walls, Elevator, Electrical Service
In accordance with the Eighth edition Massachusetts State Building Code, 780 CMR Section 107.6:
Joel R. Patruno Mass. Registration# 52329
being a registered professional Engineer/Architect hereby CERTIFY that I have prepared or directly reviewed
the preparation of all design plans, computations and specifications concerning:
[ ] Fire Protection [ ]Architectural [ ] Structural [ ] Mechanical [xI Electrical
[ ]Other(specify)
for the above named project and that to the best of my knowledge, such plans, computations and specifications
meet the applicable provisions of the Massachusetts State Building Code, all acceptable engineering practices
and all applicable Laws for the proposed project.
Furthermore, I understand and AGREE that I shall perform the necessary professional services to determine that
the above mentioned portions of the work proceed in accordance with the documents approved for the building
permit.
Upon completion of the work, I shall submit to the building official a final report as to the satisfactory
Completion of the above mentioned work.
�TtH OF 4fAS
Sign r a d S of ist nal ��c?' �c
o� JOEL R tiG
PATRUNO
O ELECTRICAL
43rd_Day of March 2016 V NO.52329
rsTEa``0� �
(seal)
WEATHE"YDESIGN & CO. ENGINEERS
772 Union Street�PO Box 976_ West_S ringfi_eld}MA01090 0976
MECHANICAL ELECTRICAL PLUMBING
March 23, 2016
City of Northampton
Department of Building Inspection
212 Main Street
Northampton, MA 01060
Attn: Inspector Louis Hasbrouk
Re: Northampton Arts Trust
33 Hawley Street
Dear Inspector:
Please find attached the mechanical and electrical secondary construction control affidavits
for Phase One of the Northampton Arts Trust building renovation at 33 Hawley Street.
Please feel free to contact us by telephone at 860-335-2373 or by email to
iweatherby(a�-wdcoengineers.com with any questions or if additional documentation is
needed.
Sincerely,
r tA#��IJ941
Julia G. Weatherby, P.E., LEED AP BD+C
President