Loading...
12C-130 (7) 37 CLOVERDALE ST BP-2016-1041 GIs#: COMMONWEALTH OF MASSACHUSETTS Map:Block: 12C- 130 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Buildinq DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: SOLAR HOT WATER SYSTEM BUILDING PERMIT Permit# BP-2016-1041 Project# JS-2016-001765 Est. Cost: $17200.00 Fee: $75.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: DONAVIN GRATZ 104454 Lot Size(sq. 1): 80063.28 Owner: STIEBEL FRANK Zoning: RI(100)/URA(100)/WSP(100)/ Applicant: DONAVIN GRATZ AT. 37 CLOVERDALE ST Applicant Address: Phone: Insurance: 90 LINSEED RD (413) 588-8560 WC WEST HATFIELDMA01088 ISSUED ON:2/29/2016 0:00:00 TO PERFORM THE FOLLOWING WORK.-INSTALL SOLAR HOT WATER SYSTEM POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 2/29/2016 0:00:00 $75.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner File 4 BP-2016-1041 APPLICANT/CONTACT PERSON DONAVIN GRATZ ADDRESS/PHONE 90 LINSEED RD WEST HATFIELD01088(413)588-8560 PROPERTY LOCATION 37 CLOVERDALE ST MAP 12C PARCEL 130 001 ZONE RI(100)/URA(100)/WSP(100)/ THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid &V _ _ Building Permit Filled out Fee Paid Typeof Construction: INSTALL SOLAR HOT WATER SYSTEM New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 104454 3 sets of Plans/Plot Plan THE FOLL WING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFO ATION PRESENTED: Approved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management ion lay Signature o B di ficial Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A.Contact Office of Planning&Development for more information. Department use only ity of Northampton Status of Permit: ilding Department Curb Cut/Driveway Permit FEB 2 5 2016 212 Main Street Sewer/Septic Availability Room 100 Water/Well Availability DEH i_ BUIv lh G INSPECTI�ON o ampton, MA 01060 Two Sets of Structural Plans NCH- Al��T� - 7-1240 Fax 413-587-1272 Plot/Site Plans Other Specify APPLICATION TO CONSTRUCT,ALTER, REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION 1.1 Property Address: This section to be completed by office ` ( � L IJL�� �C�(C �1 r��l Map Lot Unit L)Y-I' urn %h MAT 0b-G Zone Overlay District Elm St.District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: Name(Print) Current Mailing Address: Telephone Signature 2.2 Authorized Agent: Don avi,n' V-CA_t-L_ -t-!n ��ee( L Name(Print) ' Current Mailing Address: X qI 2 Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by permit applicant 1. Building (a)Building Permit Fee 2. Electrical (b)Estimated Total Cost of Construction from 6 3. Plumbing Building Permit Fee 4. Mechanical (HVAC) 5o 5. Fire Protection yyl 6. Total=(1 +2+3+4+5) ( 7 Check Number This Section For Official Use Only Building Permit Number: Date Issued: Signature: Building Commissioner/Inspector of Buildings Date SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable) New House Q Addition ❑ Replacement Windows Alteration(s) F­1Roofing Or Doors ❑ Accessory Bldg. ❑ Demolition ❑ New Signs [O] Decks [❑ Siding[O] Other[[SIJ F�rSt =l�cr S I be, et d ecS rAC i V% c- - ;'n �;;;� �,1�r e�, (�t Brief Description of Proposed ` p 1 i Work: Solar Hot Water and Heating Installation \ 6' ' A 1 S �SS I S� Moon &1t I S K+CX 1�S ni ked - e u m p s, Alteration of existing bedroom Yes X No Adding new bedroom Yes K No 1 Attached Narrative Renovating unfinished basement Yes _�C No Plans Attached Roll -Sheet 6a. If New house and or addition to existing housing, complete the following: a. Use of building :One Family \,-,/ Two Family Other b. Number of rooms in each family unit: Number of Bathrooms_ c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Wrwiri, i `r Fireplaces or Woodstoves–� Number of each g. Energy Conservation Compliance. r Masscheck Energy Compliance form attached? f h. Type of construction i. Is construction within 100 ft.of wetlands? Yes ly—LIZ No. JIs construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade L M/ k. Will building conform to the Building and Zoning regulations? �)< Yes No. I. Septic Tank ?- City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT as Owner of the subject property hereby authorize nVA CA to act on my b If, i matters relative to work authorized by this building permit application. Signature of ner Date I, 0A AV I as Owner/ orize ge hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penaltiea of perjury. 0 CI ON I ,,01-PrintName Signature of caner Agent Date SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction jSupervisor: (� Not Applicable ❑�--� j Name of License Holder: 1 / `o� L' (/� �S �/��Z ' o L ' —I �— License Number 10 11�6q.Rd 04t q -IK- 169 Address Expiration Date l3- C Signature Telephone 9.Renistered Home Improvement Contractor: Not Applicable ❑ 174�n i Company Name TO I n � Registratioh Number Ad``drelss ,A/6- / i� � � Expiration Date ,(0�¢5� ,�`U ����1S o Telephone 1(���� "[[�O SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... No...... ❑ 11. - Home Owner Exemption The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two fancily dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the building permit.' As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153 (Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature The Commonwealth of Massachusetts Department of Industrial Accidents Office of Investigations I Congress Street, Suite 100 Boston,MA 02114-2017 s° www mass.gov/dia Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers Applicant Information Please Print Le ibl Name (Business/Organization/Individual): r�Jl K aeLed Address: ,I City/State/Zip: &- AM Q 0 Phone#: 412 Are you an employer?Check theappropriate box: Type of project(required): 1.❑ I am a employer with 4. ❑ I am a general contractor and I employees (full and/or part-time).* have hired the sub-contractors 6. New construction 2.0 I am a sole proprietor or partner- listed on the attached sheet. 7. ❑Remodeling ship and have no employees These sub-contractors have g. ❑Demolition working for me in any capacity. employees and have workers' [No workers' comp.insurance comp.insurance.# 9. E] Building addition required.] 5. ❑ We are a corporation and its 10.❑Electrical repairs or additions 3.❑ I am a homeowner doing all work officers have exercised their 11.❑Plumbing repairs or additions myself. [No workers' comp. right of exemption per MGL 12.❑Roof repairs insurance required.] t c. 152,§1(4),and we have no c -J employees. [No workers' 13.IX Other r 1 I� i\S'�4 k comp.insurance required.] *Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. $Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: V rt F'1 C _ Policy#or Self-ins. Lic. #: W C L �S aj �j 0)4 Expiration Date: ( 2— Job Site Address: Zi (, �" ���LA fJs � City/State/Zip: NO rl Oyt Attach a copy of the workers' compensation policy declaration page(showing the policy number and ex iration date). Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a fine up to$1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under a ains and penalties of perjury that the information provided above is true and/correct. Simature: (-- Date: -2J I > Phone#: �W— J i� 1 — r 5 L o Official use only. Do not write in this area,to be completed by city or town official. City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#: SSOL 27 Premium S' OL 27 Premium S SOL 27 Premium S SOL 27 Premium S' IIL Ii ' SOL 27 Premium S :SOL 27 Premium S p I�-r STIEBEL ELTRON STIEBEL ELTRON USA � 17 WEST STREET —S3 S4 WEST HATFIELD,MA 01088 413.247.3380 'sBi3 400DRAWN BY: - - ERNIE WILSON DHW S2 S4 STIEBEL ELTRON USA 17 WEST STREET I WEST HATFIELD, MA 01088 PROJECT: Frank's New House Valved Design T-1 DRAWING: SII REVISION:1 DATE:02/24/15 WWW . S T I-E B E L - E L T R 0 N--USA C O M Thermal-Grid DL2 Installation Guide (Solar Wave Enhancement of the Resol DL2 v.1) SolarWave Energy, Inc. SITE: SW-29929 solarwave.com MAC ID: 00:1E:66:04:2E:06 VERSION:SW-DL2-V3.0.2 7 Included: 1-(rAAJ\,5f%r_W 37 Gloverio"' a s' • DL2 Data Logger with power supply and VBUS cable connected • Ethernet cable (1 meter) • Mounting Hardware • VBUS Cable Extender • RESOL Service Center Software and discovery tool software • Resol Firmware update documentation. Warning, installing RESOL firmware will erase all Solar Wave firmware. • Service Center Quick Start Documentation • Solar Wave Enhanced DL2 Installation Guide(this guide) • DL2 Installer Information Form (information to be emailed to support@solarwave.com) To be provided on-site: Flat blade screwdriver with a 0.10 inch wide blade to connect VBUS cable to Controller #2 Philips blade screwdriver to mount DL2 and remove cover of controller for VBUS cable connection Internet Connection: For proper operation the Solar Wave DL2 must be connected to the internet via a 100 Mbps Ethernet based local area network (LAN). For further information view the Internet section of Troubleshooting, in this document. Installation Instructions: 1. Remove DL2 from box. Make note of the MAC ID on back side of DL2. Note: MAC ID may also be found on the label on this sheet. 2. Mount the DL2 in a location close enough that the VBUS cable can reach the Controller to which it will be connected. Cable may be extended if needed. 3. Connect the VBUS cable to the Controller. Polarity does not matter. 4. Connect an Ethernet cable from the local firewall, router, or switch to the DL2. Find the correct Power Supply attachment and connect it to the Power Supply. Plug in the ,ver Supply. T AL2 will take about 1 - 2 minutes to initialize once power is connected. When initialized, Phc 717-242-2150 E-mail: support@solarwave.com Page 1 the circular button on the DL2 will be lit an amber color. If the DL2 is properly connected to a controller the USED MEMORY LED will begin blinking. This means that data from the controller is being stored on the DL2. 6. If the DL2 is setup correctly it will automatically begin sending data to the Solar Wave servers. Please call or e-mail with the MAC ID of the device from step 1 so that we may 1.) Identify which DL2 has been connected 2.) Confirm that the connection is fine, and 3.) Set up a site on which data may be viewed. 7. Please fill out the "DL2 Installer Information Form" and return to Solar Wave. How to Tell If a DL2 is Connected: First step once the DL2 is installed is to login at http://www.thermal-_rid.com/ using your email and Password. (If no registered Email and Password is set up contact your installer or Solar Wave.) Once logged in, all available sites will be listed under the Site Portfolio section. This section may only contain one site if the user only has access to one site. The DL2 can be identified by the `Site' name located on the label on the first page of this manual. To tell if a site is connected User.email fl.address.Com ❑A site with turquoise blue or white around a site name indicates that the site is online. ..__.__.. site 1 z Site A site with gray around the site name indicates 4 site that the site is not yet connected. If a site has been selected or there is only one site available, the site name will be highlighted. To the left of the site name is a connection status bar. Green means connected, red means disconnected, and gray means disconnected for more than 2 days. Click on the site name to bring up the timeline which shows DL2 connection status, data broadcast health status, and alarms. Click on the report link to view the reports. A report will be created once all of the information needed for the site is received. --------------- ------- - - --- Timeline Report Phone: 617-242-2150 E-mail:support@solarwave.com ,e 2 Trouble Shooting: _ 1. USED MEMORY LED 2. Circular LED Power If the USED MEMORY LED and Circular LED's do not come on after the initialization period of 1 - 2 minutes, test the power outlet to make sure it is supplying power. Also test any power strip or surge protector it is connected to. Controller Connection If the Circular LED is tit, but the USED MEMORY LED is not blinking then check the connection of the VBUS cable. Some controllers have small terminals which make it difficult to connect the VBUS cable. Master Device In order for the DL2 to function properly there must be only one master RESOL device connected to the DL2. Master devices are all controllers, or WMZ's with a master board installed. When a master device is connected to the DL2 through a VBUS cable the USED MEMORY LED wilt begin blinking. When a USED MEMORY block is full it will become solid red and the next block will begin blinking. The DL2 is in cyclic data logging mode by default. This means that when the memory is full, old data stored on the DL2 will be erased and new data will be togged in its place. All old data is already being archived by Solar Wave. Internet If the DL2 is connected to a router, switch, or firewall then there should be an LED tit and blinking located at the Ethernet port of the DL2, as well as at the LAN port of the router, switch, or firewall indicating that a firm connection has been made. If the LED is not lit solid or blinking check the cable and connections. If the cable and connection are both fine then here are a few ways to test the DL2's connection 1. If connected to the same local LAN as the DL2, then the DL2's IP address can be found using the discovery tool. The discovery tool can be found on the CD included with the DL2 or at http://www.resol-dl2.de/discover/ . If the DL2 is successfully found then the local area network connection to the DL2 is fine. 2. If the DL2 Web Server can be brought up in a browser then the DL2 is correctly connected to the local LAN. The DL2 Web Server can be opened from the discovery tool. See the Web Server section below. Phone: 617-242-2150 E-mail:support@solarwave.com Page 3 3. If the internet can be browsed from a laptop and/or desktop that is connected to the internet through the same set of routers, firewalls, and modems as is the DL2 then the DL2 should be able to send data to the Solar Wave servers. The DL2 should work with the factory default on most consumer grade (and on many commercial grade) traffic filtering devices such as firewalls modems and routers, and does not require any inbound ports to be open. However, it does require that the network ports mentioned below be open for outbound traffic initiation and for any return traffic. If the DL2 is still not sending data to the Solar Wave servers then log into your router and check the security section for these services. The security section may be located in an advanced section on the router depending on the type. For further explanation of the ports see the NETWORK CONFIGURATION VARIANTS: section of this document Service Port Transport Provided by Notes HTTP �80 TCP Internet Required for data transmission to the SolarWave server(s) SSH 22 TCP Internet Required for SolarWave maintainance of the DL2 NTP 123 UDP Internet or Needed for accurate data timestamps LAN i DNS 53 TCP and Internet or Required for domain name resolution by the UDP LAN DL2 DHCP N/A N/A LAN Recomended for automatic configuration of networking on the DL2 While Solar Wave recommends this network configuration a number of variants are usable as discussed in the NETWORK CONFIGURATION VARIANTS: section of this document. Web Server If the user and the DL2 are connected to the same local LAN then the user may log into the DL2 web server. Type the IP address of the DL2 into the address bar of a web browser. (IP Address can be found using the discovery tool) User Name: admin Password: admin PLEASE CONTACT THE FACTORY BEFORE CHANGING ANY CONFIGURATION SETTINGS ON THE DL2 VIA THE WEB SERVER! DOING SO MAY DISRUPT THE DL2 FUNCTIONALITY. Phone:617-242-2150 E-mail:support@solarwave.com Page 4 NETWORK CONFIGURATION VARIANTS: While Solar Wave strongly recommends that the DL2 have access to a DHCP server, it is possible to set up its net identity via the DL2's web server (please see the illustration of the web page below). If the web server is used to configure the DL2, the DL2 configuration then becomes the exclusive responsibility of the DL2 owner. To set the net identity of the DL2 log in using the DL2's web server. Steps outlined in Web Server section of Troubleshooting. Then navigate to the Configuration -> Network section of the web browser to set the net identity. RESOL GmbH Hwlortysvario 10 D-45527 H=.V •Tel_149(0)2324-9648-8 -------- ---- -_- ---- _--- - — - ------ - ----- Home State Data Cenfigurafion About DL2 Denerxl Nerr 6 - Time Fi-e Update Remoffi 4ec Public recess Oewlopmenr Prim Configuration Conf-gur atSon: Enable L,=.IJ 4trto-Cmiigrv:,!ion"!No- IP Addres� NovIPAddres� 192,168,192.10 IP IJetn asl: 255.255.255,0 IPII'(r.oil: 192.168.192.0 IP Gateway. .192.168.192.1 x. IP I'lameserverx1: 192.168,192.1 IP I Iameserrer,�: —_--- Pror j�Fver. Pror'y Part: 0 IJTIJ: 1492 save changes) Pn.iered Ey P.EiOL DL.`reniun 1.y�(_9130_0:118.Oj Screen image of the network configuration page of a Resol/SolarWave DL2 Phone: 617-242-2150 E-mail:support@solarwave.com Page 5 Explanation of DL2 Network Communication Requirements DHCP, the dynamic host configuration protocol uses UDP on ports 67, 68, and 69. It is used by a host on an I/P based network to acquire its net identity. This service is normally provided on a LAN by one of the following: 1) A cable modem 2) A network router 3) A computer configured to provide DHCP service on the LAN - HTTP, the hypertext transport protocol uses TCP port 80 and is the protocol used by virtually all World Wide Web communication. This port MUST be open for outbound traffic (and any resulting inbound traffic for established connections) over the entire pathway between the DL2 and the larger internet. Without this the DL2 will be unable to send any data to the server(s). SSH, the secure shell protocol uses TCP port 22 and is used for secure communication between hosts on the internet. This port MUST be open for outbound traffic (and any resulting inbound traffic for established connections) over the entire pathway between the DL2 and the larger internet. Without this Solar Wave will not be able to provide any firmware upgrades or any diagnostic and/or maintenance service. NTP, the network time protocol, uses UDP port 123 and is used to fetch accurate time information from specialized servers. The NTP server from which the DL2 fetches time information can be located either on the local area network (LAN) or located somewhere on the larger internet. If the DL2 cannot fetch accurate time information from an NTP server the utility of the data sent to the Solar Wave server(s) WILL be compromised. DNS, the domain name to internet protocol (I/P) address mapping service, uses TCP AND UDP port 53. The DL2 uses the DNS to find the I/P address of the Solar Wave servers for both data transmission as well as for the initialization of the maintenance channel. If the DNS is not available then the DL2 will not be able to communicate with the Solar Wave server(s). Furthermore, since no site on the internet can guarantee that its I/P address will never change, any firewall or other traffic filtering device in the path between the DL2 and the Solar Wave server(s) that cannot filter based on domain names will need to be reconfigured in the event that the I/P address of the Solar Wave server(s) changes. Any such reconfiguration is the exclusive responsibility of the filtering device owner. Phone:617-242-2150 E-mail:support@solarwave.com Page 6 Next Steps - Please fill out as much of the following information as possible so that we may accurately develop a monitoring page for your site. Attach a schematic if possible. If information does not fit into the lines below, please add lines or pages as needed. Installer Name: lia Jt�''j � irk Installer E-mail: ��1a );til til^=�2T� ` 1iC � r � rd l(,�' Installer Phone: ( 1 )- S .kj Site Owner Name: Site Owner E-mail: rJ;'1 City and State, or Zip Code of Site:_ 37 i,lout'r(cV20 - Fb{eivc- _ f nN�S 01062— Site Owner Phone: Suggested Name of Site: SfS Is this system enrolled in an incentive program that requires data reports? If yes, what program (registration number)?_ Contact who should have access to this site's data: ('r(NIIJ � L1_, System Description Collectors Make/Model: C;; Number of Collectors: Collector Type Flat Plat , Tube, etc.): FL,1- f" 011,-)fL Tilt Angle: �J 1 Azimuth (Degrees From True South): System type: Closed loop Drain-back, other"- S trp"e)'-, c, If P-Glycol Used in Collector Loop, Brand: ,i` P-Glycol Percentage: Collector Loop Pump (Make/Model): iA_) j� c!N' � f 30 Multispeed S,/j' No): If Yes,to what speed is the pump set? 'rte Solar Storage Tank Make/Model: PN o SM s) ) Storage Tank Capacity: gallons Number of Tanks: Controller(Make/Model): 1 o rn 10 Phone: 617-242-2150 E-mail: support@solarwave.com Page 7 Controller System Arrangement: Sensors Used: Enter Location of sensor Additional Sensors Here S1: Collector Temp R1: Collector Loop Relay S2:Tank BottomR2: S3: S4: S5: CS10 Irradiation Sensor: (Yes/No) Choose one Flow Meter V40: (Yes/ No) Meter Location: Meter Size: Grundfos Direct Sensors VFS: (Yes/No ) Location: Size (Liter/minute): RPS: (Yes/No ) Location: Size: (Bars) OHQM/WMZ Circle: Enabled (No, 1, 2) First HQM/WMZ Second HQM/WMZ Description: Description: Hot Temperature Sensor: Hot Temperature Sensor: Cold Temperature Sensor: Cold Temperature Sensor: Flow Sensor/Relay: Flow Sensor/Relay: Max Flow(If Relay Used): Max Flow (If Relay Used): Notes/Additional Information: (add lines) Schematic or system drawing (add line or attachments welcome) Phone:617-242-2150 E-mail: support@solarwave.com Page 8