12C-130 (7) 37 CLOVERDALE ST BP-2016-1041
GIs#: COMMONWEALTH OF MASSACHUSETTS
Map:Block: 12C- 130 CITY OF NORTHAMPTON
Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS
Permit: Buildinq DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A)
Category: SOLAR HOT WATER SYSTEM BUILDING PERMIT
Permit# BP-2016-1041
Project# JS-2016-001765
Est. Cost: $17200.00
Fee: $75.00 PERMISSION IS HEREBY GRANTED TO:
Const. Class: Contractor: License:
Use Group: DONAVIN GRATZ 104454
Lot Size(sq. 1): 80063.28 Owner: STIEBEL FRANK
Zoning: RI(100)/URA(100)/WSP(100)/ Applicant: DONAVIN GRATZ
AT. 37 CLOVERDALE ST
Applicant Address: Phone: Insurance:
90 LINSEED RD (413) 588-8560 WC
WEST HATFIELDMA01088 ISSUED ON:2/29/2016 0:00:00
TO PERFORM THE FOLLOWING WORK.-INSTALL SOLAR HOT WATER SYSTEM
POST THIS CARD SO IT IS VISIBLE FROM THE STREET
Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector
Underground: Service: Meter:
Footings:
Rough: Rough: House# Foundation:
Driveway Final:
Final: Final:
Rough Frame:
Gas: Fire Department Fireplace/Chimney:
Rough: Oil: Insulation:
Final: Smoke: Final:
THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF
ANY OF ITS RULES AND REGULATIONS.
Certificate of Occupancy Signature:
FeeType: Date Paid: Amount:
Building 2/29/2016 0:00:00 $75.00
212 Main Street,Phone(413)587-1240,Fax: (413)587-1272
Louis Hasbrouck—Building Commissioner
File 4 BP-2016-1041
APPLICANT/CONTACT PERSON DONAVIN GRATZ
ADDRESS/PHONE 90 LINSEED RD WEST HATFIELD01088(413)588-8560
PROPERTY LOCATION 37 CLOVERDALE ST
MAP 12C PARCEL 130 001 ZONE RI(100)/URA(100)/WSP(100)/
THIS SECTION FOR OFFICIAL USE ONLY:
PERMIT APPLICATION CHECKLIST
ENCLOSED REQUIRED DATE
ZONING FORM FILLED OUT
Fee Paid &V _ _
Building Permit Filled out
Fee Paid
Typeof Construction: INSTALL SOLAR HOT WATER SYSTEM
New Construction
Non Structural interior renovations
Addition to Existing
Accessory Structure
Building Plans Included:
Owner/Statement or License 104454
3 sets of Plans/Plot Plan
THE FOLL WING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON
INFO ATION PRESENTED:
Approved Additional permits required(see below)
PLANNING BOARD PERMIT REQUIRED UNDER:§
Intermediate Project: Site Plan AND/OR Special Permit With Site Plan
Major Project: Site Plan AND/OR Special Permit With Site Plan
ZONING BOARD PERMIT REQUIRED UNDER: §
Finding Special Permit Variance*
Received&Recorded at Registry of Deeds Proof Enclosed
Other Permits Required:
Curb Cut from DPW Water Availability Sewer Availability
Septic Approval Board of Health Well Water Potability Board of Health
Permit from Conservation Commission Permit from CB Architecture Committee
Permit from Elm Street Commission Permit DPW Storm Water Management
ion lay
Signature o B di ficial Date
Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning
requirements and obtain all required permits from Board of Health,Conservation Commission,Department
of public works and other applicable permit granting authorities.
*Variances are granted only to those applicants who meet the strict standards of MGL 40A.Contact Office of
Planning&Development for more information.
Department use only
ity of Northampton Status of Permit:
ilding Department Curb Cut/Driveway Permit
FEB 2 5 2016 212 Main Street Sewer/Septic Availability
Room 100 Water/Well Availability
DEH i_ BUIv lh G INSPECTI�ON o ampton, MA 01060 Two Sets of Structural Plans
NCH- Al��T� - 7-1240 Fax 413-587-1272 Plot/Site Plans
Other Specify
APPLICATION TO CONSTRUCT,ALTER, REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING
SECTION 1 -SITE INFORMATION
1.1 Property Address:
This section to be completed by office
` ( � L
IJL�� �C�(C �1 r��l Map Lot Unit
L)Y-I' urn %h MAT 0b-G Zone Overlay District
Elm St.District CB District
SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT
2.1 Owner of Record:
Name(Print) Current Mailing Address:
Telephone
Signature
2.2 Authorized Agent:
Don avi,n' V-CA_t-L_ -t-!n ��ee( L
Name(Print) ' Current Mailing Address:
X qI 2
Signature Telephone
SECTION 3-ESTIMATED CONSTRUCTION COSTS
Item Estimated Cost(Dollars)to be Official Use Only
completed by permit applicant
1. Building (a)Building Permit Fee
2. Electrical (b)Estimated Total Cost of
Construction from 6
3. Plumbing Building Permit Fee
4. Mechanical (HVAC) 5o
5. Fire Protection yyl
6. Total=(1 +2+3+4+5) ( 7 Check Number
This Section For Official Use Only
Building Permit Number: Date
Issued:
Signature:
Building Commissioner/Inspector of Buildings Date
SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicable)
New House Q Addition ❑ Replacement Windows Alteration(s) F1Roofing
Or Doors ❑
Accessory Bldg. ❑ Demolition ❑ New Signs [O] Decks [❑ Siding[O] Other[[SIJ
F�rSt =l�cr S I be, et d ecS rAC i V% c- - ;'n �;;;� �,1�r e�, (�t
Brief Description of Proposed ` p 1 i
Work: Solar Hot Water and Heating Installation
\ 6' ' A 1 S �SS I S� Moon &1t I S K+CX 1�S ni ked - e u m p s,
Alteration of existing bedroom Yes X No Adding new bedroom Yes K No 1
Attached Narrative Renovating unfinished basement Yes _�C No
Plans Attached Roll -Sheet
6a. If New house and or addition to existing housing, complete the following:
a. Use of building :One Family \,-,/ Two Family Other
b. Number of rooms in each family unit: Number of Bathrooms_
c. Is there a garage attached?
d. Proposed Square footage of new construction. Dimensions
e. Number of stories?
f. Method of heating? Wrwiri, i `r Fireplaces or Woodstoves–� Number of each
g. Energy Conservation Compliance. r Masscheck Energy Compliance form attached? f
h. Type of construction
i. Is construction within 100 ft.of wetlands? Yes ly—LIZ
No.
JIs construction within 100 yr. floodplain Yes No
j. Depth of basement or cellar floor below finished grade L M/
k. Will building conform to the Building and Zoning regulations? �)< Yes No.
I. Septic Tank ?- City Sewer Private well City water Supply
SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN
OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT
as Owner of the subject
property
hereby authorize nVA CA
to act on my b If, i matters relative to work authorized by this building permit application.
Signature of ner Date
I,
0A AV I as Owner/ orize
ge hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge
and belief.
Signed under the pains and penaltiea of perjury.
0 CI ON I
,,01-PrintName
Signature of caner Agent Date
SECTION 8-CONSTRUCTION SERVICES
8.1 Licensed Construction jSupervisor: (� Not Applicable ❑�--� j
Name of License Holder: 1 / `o� L' (/� �S �/��Z ' o L ' —I
�— License Number
10 11�6q.Rd 04t q -IK- 169
Address Expiration Date
l3- C
Signature Telephone
9.Renistered Home Improvement Contractor: Not Applicable ❑
174�n i
Company Name TO I n � Registratioh Number
Ad``drelss ,A/6-
/ i� � � Expiration Date
,(0�¢5� ,�`U ����1S o Telephone 1(���� "[[�O
SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(6))
Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result
in the denial of the issuance of the building permit.
Signed Affidavit Attached Yes....... No...... ❑
11. - Home Owner Exemption
The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families
and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts
as supervisor.CMR 780, Sixth Edition Section 108.3.5.1.
Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there
is,or is intended to be,a one or two fancily dwelling,attached or detached structures accessory to such use and/or farm
structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner.
Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be
responsible for all such work performed under the building permit.'
As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon
completion of the work for which this permit is issued.
Also be advised that with reference to Chapter 152(Workers'Compensation) and Chapter 153 (Liability of Employers to
Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s)
you hire to perform work for you under this permit.
The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of
Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated.
Homeowner Signature
The Commonwealth of Massachusetts
Department of Industrial Accidents
Office of Investigations
I Congress Street, Suite 100
Boston,MA 02114-2017
s° www mass.gov/dia
Workers' Compensation Insurance Affidavit: Builders/Contractors/Electricians/Plumbers
Applicant Information Please Print Le ibl
Name (Business/Organization/Individual): r�Jl K aeLed
Address: ,I
City/State/Zip: &-
AM Q 0 Phone#: 412
Are you an employer?Check theappropriate box: Type of project(required):
1.❑ I am a employer with 4. ❑ I am a general contractor and I
employees (full and/or part-time).* have hired the sub-contractors 6. New construction
2.0 I am a sole proprietor or partner- listed on the attached sheet. 7. ❑Remodeling
ship and have no employees These sub-contractors have g. ❑Demolition
working for me in any capacity. employees and have workers'
[No workers' comp.insurance comp.insurance.# 9. E] Building addition
required.] 5. ❑ We are a corporation and its 10.❑Electrical repairs or additions
3.❑ I am a homeowner doing all work officers have exercised their 11.❑Plumbing repairs or additions
myself. [No workers' comp. right of exemption per MGL 12.❑Roof repairs
insurance required.] t c. 152,§1(4),and we have no c -J
employees. [No workers' 13.IX Other r 1 I� i\S'�4 k
comp.insurance required.]
*Any applicant that checks box#1 must also fill out the section below showing their workers'compensation policy information.
t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such.
$Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have
employees. If the sub-contractors have employees,they must provide their workers'comp.policy number.
I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site
information.
Insurance Company Name: V rt F'1 C _
Policy#or Self-ins. Lic. #: W C L �S aj �j 0)4 Expiration Date: ( 2—
Job Site Address: Zi (, �" ���LA fJs � City/State/Zip: NO rl Oyt
Attach a copy of the workers' compensation policy declaration page(showing the policy number and ex iration date).
Failure to secure coverage as required under Section 25A of MGL c. 152 can lead to the imposition of criminal penalties of a
fine up to$1,500.00 and/or one-year imprisonment, as well as civil penalties in the form of a STOP WORK ORDER and a fine
of up to$250.00 a day against the violator. Be advised that a copy of this statement may be forwarded to the Office of
Investigations of the DIA for insurance coverage verification.
I do hereby certify under a ains and penalties of perjury that the information provided above is true and/correct.
Simature: (-- Date: -2J I >
Phone#: �W— J i� 1 — r 5 L o
Official use only. Do not write in this area,to be completed by city or town official.
City or Town: Permit/License#
Issuing Authority(circle one):
1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector
6.Other
Contact Person: Phone#:
SSOL 27 Premium S'
OL 27 Premium S
SOL 27 Premium S SOL 27 Premium S'
IIL Ii '
SOL 27 Premium S :SOL 27 Premium S
p
I�-r
STIEBEL ELTRON
STIEBEL ELTRON USA
� 17 WEST STREET
—S3 S4 WEST HATFIELD,MA 01088
413.247.3380
'sBi3 400DRAWN BY: - -
ERNIE WILSON
DHW S2 S4 STIEBEL ELTRON USA
17 WEST STREET
I
WEST HATFIELD, MA 01088
PROJECT: Frank's New House
Valved Design
T-1
DRAWING: SII
REVISION:1 DATE:02/24/15
WWW . S T I-E B E L - E L T R 0 N--USA C O M
Thermal-Grid DL2 Installation Guide
(Solar Wave Enhancement of the Resol DL2 v.1) SolarWave Energy, Inc.
SITE: SW-29929 solarwave.com
MAC ID: 00:1E:66:04:2E:06
VERSION:SW-DL2-V3.0.2 7
Included: 1-(rAAJ\,5f%r_W
37 Gloverio"' a s'
• DL2 Data Logger with power supply and VBUS cable connected
• Ethernet cable (1 meter)
• Mounting Hardware
• VBUS Cable Extender
• RESOL Service Center Software and discovery tool software
• Resol Firmware update documentation. Warning, installing RESOL firmware will erase
all Solar Wave firmware.
• Service Center Quick Start Documentation
• Solar Wave Enhanced DL2 Installation Guide(this guide)
• DL2 Installer Information Form (information to be emailed to support@solarwave.com)
To be provided on-site:
Flat blade screwdriver with a 0.10 inch wide blade to connect VBUS cable to Controller
#2 Philips blade screwdriver to mount DL2 and remove cover of controller for VBUS cable
connection
Internet Connection: For proper operation the Solar Wave DL2 must be connected to the
internet via a 100 Mbps Ethernet based local area network (LAN). For further information
view the Internet section of Troubleshooting, in this document.
Installation Instructions:
1. Remove DL2 from box. Make note of the MAC ID on back side of DL2.
Note: MAC ID may also be found on the label on this sheet.
2. Mount the DL2 in a location close enough that the VBUS cable can reach the Controller to
which it will be connected. Cable may be extended if needed.
3. Connect the VBUS cable to the Controller. Polarity does not matter.
4. Connect an Ethernet cable from the local firewall, router, or switch to the DL2.
Find the correct Power Supply attachment and connect it to the Power Supply. Plug in the
,ver Supply.
T AL2 will take about 1 - 2 minutes to initialize once power is connected. When initialized,
Phc 717-242-2150 E-mail: support@solarwave.com Page 1
the circular button on the DL2 will be lit an amber color. If the DL2 is properly connected to a
controller the USED MEMORY LED will begin blinking. This means that data from the controller
is being stored on the DL2.
6. If the DL2 is setup correctly it will automatically begin sending data to the Solar Wave
servers. Please call or e-mail with the MAC ID of the device from step 1 so that we may 1.)
Identify which DL2 has been connected 2.) Confirm that the connection is fine, and 3.) Set up
a site on which data may be viewed.
7. Please fill out the "DL2 Installer Information Form" and return to Solar Wave.
How to Tell If a DL2 is Connected:
First step once the DL2 is installed is to login at http://www.thermal-_rid.com/ using your
email and Password. (If no registered Email and Password is set up contact your installer or
Solar Wave.)
Once logged in, all available sites will be listed under the Site Portfolio section. This section
may only contain one site if the user only has access to one site. The DL2 can be identified by
the `Site' name located on the label on the first page of this manual.
To tell if a site is connected User.email fl.address.Com
❑A site with turquoise blue or white around a site
name indicates that the site is online.
..__.__.. site 1
z Site
A site with gray around the site name indicates 4 site
that the site is not yet connected.
If a site has been selected or there is only one site available, the site name will be
highlighted. To the left of the site name is a connection status bar. Green means connected,
red means disconnected, and gray means disconnected for more than 2 days.
Click on the site name to bring up the timeline which shows DL2 connection status, data
broadcast health status, and alarms. Click on the report link to view the reports. A report will
be created once all of the information needed for the site is received.
--------------- ------- - - ---
Timeline Report
Phone: 617-242-2150 E-mail:support@solarwave.com ,e 2
Trouble Shooting: _
1. USED MEMORY LED
2. Circular LED
Power
If the USED MEMORY LED and Circular LED's do not come on after
the initialization period of 1 - 2 minutes, test the power outlet to make sure it is supplying
power. Also test any power strip or surge protector it is connected to.
Controller Connection
If the Circular LED is tit, but the USED MEMORY LED is not blinking then check the connection
of the VBUS cable. Some controllers have small terminals which make it difficult to connect
the VBUS cable.
Master Device
In order for the DL2 to function properly there must be only one master RESOL device
connected to the DL2. Master devices are all controllers, or WMZ's with a master board
installed. When a master device is connected to the DL2 through a VBUS cable the USED
MEMORY LED wilt begin blinking. When a USED MEMORY block is full it will become solid red
and the next block will begin blinking. The DL2 is in cyclic data logging mode by default. This
means that when the memory is full, old data stored on the DL2 will be erased and new data
will be togged in its place. All old data is already being archived by Solar Wave.
Internet
If the DL2 is connected to a router, switch, or firewall then there should be an LED tit and
blinking located at the Ethernet port of the DL2, as well as at the LAN port of the router,
switch, or firewall indicating that a firm connection has been made. If the LED is not lit solid
or blinking check the cable and connections. If the cable and connection are both fine then
here are a few ways to test the DL2's connection
1. If connected to the same local LAN as the DL2, then the DL2's IP address can be found
using the discovery tool. The discovery tool can be found on the CD included with the DL2 or
at http://www.resol-dl2.de/discover/ . If the DL2 is successfully found then the local area
network connection to the DL2 is fine.
2. If the DL2 Web Server can be brought up in a browser then the DL2 is correctly connected
to the local LAN. The DL2 Web Server can be opened from the discovery tool. See the Web
Server section below.
Phone: 617-242-2150 E-mail:support@solarwave.com Page 3
3. If the internet can be browsed from a laptop and/or desktop that is connected to the
internet through the same set of routers, firewalls, and modems as is the DL2 then the DL2
should be able to send data to the Solar Wave servers.
The DL2 should work with the factory default on most consumer grade (and on many
commercial grade) traffic filtering devices such as firewalls modems and routers, and does
not require any inbound ports to be open. However, it does require that the network ports
mentioned below be open for outbound traffic initiation and for any return traffic.
If the DL2 is still not sending data to the Solar Wave servers then log into your router and
check the security section for these services. The security section may be located in an
advanced section on the router depending on the type. For further explanation of the ports
see the NETWORK CONFIGURATION VARIANTS: section of this document
Service Port Transport Provided by Notes
HTTP �80 TCP Internet Required for data transmission to the
SolarWave server(s)
SSH 22 TCP Internet Required for SolarWave maintainance of the
DL2
NTP 123 UDP Internet or Needed for accurate data timestamps
LAN i
DNS 53 TCP and Internet or Required for domain name resolution by the
UDP LAN DL2
DHCP N/A N/A LAN Recomended for automatic configuration of
networking on the DL2
While Solar Wave recommends this network configuration a number of variants are usable
as discussed in the NETWORK CONFIGURATION VARIANTS: section of this document.
Web Server
If the user and the DL2 are connected to the same local LAN then the user may log into the
DL2 web server. Type the IP address of the DL2 into the address bar of a web browser. (IP
Address can be found using the discovery tool)
User Name: admin Password: admin
PLEASE CONTACT THE FACTORY BEFORE CHANGING ANY CONFIGURATION SETTINGS ON
THE DL2 VIA THE WEB SERVER! DOING SO MAY DISRUPT THE DL2 FUNCTIONALITY.
Phone:617-242-2150 E-mail:support@solarwave.com Page 4
NETWORK CONFIGURATION VARIANTS:
While Solar Wave strongly recommends that the DL2 have access to a DHCP server, it is
possible to set up its net identity via the DL2's web server (please see the illustration of the
web page below). If the web server is used to configure the DL2, the DL2 configuration then
becomes the exclusive responsibility of the DL2 owner.
To set the net identity of the DL2 log in using the DL2's web server. Steps outlined in Web
Server section of Troubleshooting.
Then navigate to the Configuration -> Network section of the web browser to set the net
identity.
RESOL GmbH Hwlortysvario 10 D-45527 H=.V •Tel_149(0)2324-9648-8
-------- ---- -_- ---- _--- -
— -
------ -
-----
Home State Data Cenfigurafion About DL2
Denerxl Nerr 6 - Time Fi-e Update Remoffi 4ec Public recess Oewlopmenr
Prim Configuration
Conf-gur atSon:
Enable L,=.IJ 4trto-Cmiigrv:,!ion"!No-
IP Addres�
NovIPAddres� 192,168,192.10
IP IJetn asl: 255.255.255,0
IPII'(r.oil: 192.168.192.0
IP Gateway. .192.168.192.1
x.
IP I'lameserverx1: 192.168,192.1
IP I Iameserrer,�: —_---
Pror j�Fver.
Pror'y Part: 0
IJTIJ: 1492
save changes)
Pn.iered Ey P.EiOL DL.`reniun 1.y�(_9130_0:118.Oj
Screen image of the network configuration page of a Resol/SolarWave DL2
Phone: 617-242-2150 E-mail:support@solarwave.com Page 5
Explanation of DL2 Network Communication Requirements
DHCP, the dynamic host configuration protocol uses UDP on ports 67, 68, and 69. It is used by
a host on an I/P based network to acquire its net identity. This service is normally provided
on a LAN by one of the following:
1) A cable modem
2) A network router
3) A computer configured to provide DHCP service on the LAN
- HTTP, the hypertext transport protocol uses TCP port 80 and is the protocol used by
virtually all World Wide Web communication. This port MUST be open for outbound traffic
(and any resulting inbound traffic for established connections) over the entire pathway
between the DL2 and the larger internet. Without this the DL2 will be unable to send any data
to the server(s).
SSH, the secure shell protocol uses TCP port 22 and is used for secure communication
between hosts on the internet. This port MUST be open for outbound traffic (and any resulting
inbound traffic for established connections) over the entire pathway between the DL2 and the
larger internet. Without this Solar Wave will not be able to provide any firmware upgrades or
any diagnostic and/or maintenance service.
NTP, the network time protocol, uses UDP port 123 and is used to fetch accurate time
information from specialized servers. The NTP server from which the DL2 fetches time
information can be located either on the local area network (LAN) or located somewhere on
the larger internet. If the DL2 cannot fetch accurate time information from an NTP server the
utility of the data sent to the Solar Wave server(s) WILL be compromised.
DNS, the domain name to internet protocol (I/P) address mapping service, uses TCP
AND UDP port 53. The DL2 uses the DNS to find the I/P address of the Solar Wave servers for
both data transmission as well as for the initialization of the maintenance channel. If the DNS
is not available then the DL2 will not be able to communicate with the Solar Wave server(s).
Furthermore, since no site on the internet can guarantee that its I/P address will never
change, any firewall or other traffic filtering device in the path between the DL2 and the
Solar Wave server(s) that cannot filter based on domain names will need to be reconfigured in
the event that the I/P address of the Solar Wave server(s) changes. Any such reconfiguration
is the exclusive responsibility of the filtering device owner.
Phone:617-242-2150 E-mail:support@solarwave.com Page 6
Next Steps - Please fill out as much of the following information as possible so that we may accurately
develop a monitoring page for your site. Attach a schematic if possible. If information does not fit into
the lines below, please add lines or pages as needed.
Installer Name: lia Jt�''j � irk
Installer E-mail: ��1a );til til^=�2T� ` 1iC � r � rd
l(,�'
Installer Phone: ( 1 )- S .kj
Site Owner Name:
Site Owner E-mail: rJ;'1
City and State, or Zip Code of Site:_ 37 i,lout'r(cV20 - Fb{eivc- _ f nN�S 01062—
Site Owner Phone:
Suggested Name of Site: SfS
Is this system enrolled in an incentive program that requires data reports?
If yes, what program (registration number)?_
Contact who should have access to this site's data: ('r(NIIJ � L1_,
System Description
Collectors Make/Model: C;;
Number of Collectors: Collector Type Flat Plat , Tube, etc.): FL,1- f" 011,-)fL
Tilt Angle: �J 1 Azimuth (Degrees From True South):
System type: Closed loop Drain-back, other"- S trp"e)'-, c,
If P-Glycol Used in Collector Loop, Brand: ,i` P-Glycol Percentage:
Collector Loop Pump (Make/Model): iA_) j� c!N' � f
30 Multispeed S,/j' No): If Yes,to what speed is the pump set? 'rte
Solar Storage Tank Make/Model: PN o SM s) )
Storage Tank Capacity: gallons Number of Tanks:
Controller(Make/Model): 1 o rn 10
Phone: 617-242-2150 E-mail: support@solarwave.com Page 7
Controller System Arrangement:
Sensors Used: Enter Location of sensor Additional Sensors Here
S1: Collector Temp R1: Collector Loop Relay
S2:Tank BottomR2:
S3:
S4:
S5:
CS10 Irradiation Sensor: (Yes/No) Choose one
Flow Meter V40: (Yes/ No) Meter Location: Meter Size:
Grundfos Direct Sensors
VFS: (Yes/No ) Location: Size (Liter/minute):
RPS: (Yes/No ) Location: Size: (Bars)
OHQM/WMZ Circle: Enabled (No, 1, 2)
First HQM/WMZ Second HQM/WMZ
Description: Description:
Hot Temperature Sensor: Hot Temperature Sensor:
Cold Temperature Sensor: Cold Temperature Sensor:
Flow Sensor/Relay: Flow Sensor/Relay:
Max Flow(If Relay Used): Max Flow (If Relay Used):
Notes/Additional Information: (add lines)
Schematic or system drawing (add line or attachments welcome)
Phone:617-242-2150 E-mail: support@solarwave.com Page 8