Loading...
25A-129 (12) 69 DAY AVE-UNIT C BP-2016-1048 GIS #: COMMONWEALTH OF MASSACHUSETTS Map:Block: 25A- 129 CITY OF NORTHAMPTON Lot: -001 PERSONS CONTRACTING WITH UNREGISTERED CONTRACTORS Permit: Building DO NOT HAVE ACCESS TO THE GUARANTY FUND (MGL c.142A) Category: SOLAR PANELS BUILDING PERMIT Permit# BP-2016-1048 Project# JS-2016-001772 Est. Cost: $44313.00 Fee: $75.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor: License: Use Group: PIONEER VALLEY PHOTOVOLTAICS 106329 Lot Size(sq. ft.): 18992.16 Owner: GOGGINS KIMBERLY&MICHAEL Zonin,,: URB(100)/ Applicant. PIONEER VALLEY PHOTOVOLTAICS AT: 69 DAY AVE - UNIT C Applicant Address: Phone: Insurance: 311 WELLS ST - SUITE B (413) 772-8788 Workers Compensation GREEN FIELDMA01301 ISSUED ON.•3/1/2016 0:00:00 TO PERFORM THE FOLLOWING WORK.-INSTALL ROOF MOUNTED 9.66 KW SOLAR ARRAY POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W'. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Signature: FeeType: Date Paid: Amount: Building 3/1/2016 0:00:00 $75.00 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Louis Hasbrouck—Building Commissioner File#BP-2016-1048 APPLICANT/CONTACT PERSON PIONEER VALLEY PHOTOVOLTAICS ADDRESS/PHONE 311 WELLS ST- SUITE B GREENFIELD01301 (413)772-8788 PROPERTY LOCATION 69 DAY AVE-UNIT C MAP 25A PARCEL 129 001 ZONE URB(100) THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out Fee Paid Typeof Construction: INSTALL ROOF MOUNTED SOLAR ARRAY , New Construction Non Structural interior renovations Addition to Existing Accessory Structure Buildine Plans Included: Owner/Statement or License 106329 3 sets of Plans/Plot Plan THE FOLLOWI ION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORM N PRESENTED: ZAllp-roved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding Special Permit Variance* Received& Recorded at Registry of Deeds Proof Enclosed Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission Permit from CB Architecture Committee Permit from Elm Street Commission Permit DPW Storm Water Management De litio y Sig re of Building ficial Date Note: Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. * Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. Department use only City of Northampton Status of Permit: Building Department Curb Cut/Drveway.Permit 212 Main Street Sewer/Septic Availa ility __..___. Room 100 Water/Well Availability RECErVE 1 Northampton, MA 01060 Two sets of Structural plans Lj FFEB 6 ph ne 13-587-1240 Fax 413-587-1272 Plot/Site,Plans 201 other specify APPLICATION 10 C NSTRUCT,ALTER,REPAIR,RENOVATE OR DEMOLISH A ONE OR TWO FAMILY DWELLING 146- H ' SECTION 1 -SITE INF0-14MATION 1.1 Property Address: This section to be completed by office 69 Day Ave, Unit C, Northampton MA 01060 Map Lot Unit Zone Overlay District Elm St.District CB District SECTION 2-PROPERTY OWNERSHIP/AUTHORIZED AGENT 2.1 Owner of Record: Goggins,Michael and Kimberly PO Box 1006,Northampton,MA 01061-1006 Name(Print) Current Mailing Address: 413-586-7000 See attachment (A) Telephone Signature 2.2 Authorized Agent: Pioneer Valley Photovoltaics Cooperative,LLC 311 Wells Street,Suite B,Greenfield,MA,01301 Name(Print) Current Mailing Address: 413-772-8788 Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by permit applicant 1. Building $44,313 (a)Building Permit Fee 2. Electrical (b)Estimated Total Cost of Construction from 6 3. Plumbing Building Permit Fee 4. Mechanical(HVAC) 5. Fire Protection 6. Total=(1 +2+3+4+5) $44,313 Check Number 76 This Section For Official Use Only Building Permit Number: DateIssued: Signature: Building Commissioner/Inspector of Buildings Date 'V v*v, - Section 4. ZONING All Information Must Be Completed. Permit Can Be Denied Due To Incomplete Information Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage Setbacks Front Side L: R: L: R: Rear Building Height Bldg.Square Footage % Open Space Footage % (Lot area minus bldg&paved parking) #of Parking Spaces Fill: volume&Location A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO Q DONT KNOW YES 0 IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO 0 DON'T KNOW YES Q IF YES: enter Book Page and/or Document# B. Does the site contain a brook, body of water or wetlands? NO DONT KNOW 0 YES Q IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained 0 Obtained 0 , Date Issued: C. Do any signs exist on the property? YES 0 NO IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES 0 NO Q IF YES, describe size, type and location: E. Will the construction activity disturb(clearing,grading,excavation,or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES 0 NO IF YES,then a Northampton Storm Water Management Permit from the DPW is required. SECTION 5-DESCRIPTION OF PROPOSED WORK(check all applicablel --i New House ❑ Addition ❑ Replacement Windows Alteration(s) 5 Roofing Or Doors 1:1 Accessory Bldg. ❑ Demolition ❑ New Signs [0] Decks [Q Siding[O] Other[I7] Brief Description of Proposed Work: Installation of mounting system for soler panels on south roof of residence. Alteration of existing bedroom Yes X No Adding new bedroom Yes X No Attached Narrative Renovating unfinished basement Yes x _No Plans Attached Roll -Sheet 6a. If New house and or addition to existina housing, complete the foilowina: a. Use of building :One Family Two Family Other b. Number of rooms in each family unit: Number of Bathrooms c. Is there a garage attached? d. Proposed Square footage of new construction. Dimensions e. Number of stories? f. Method of heating? Fireplaces or Woodstoves Number of each g. Energy Conservation Compliance. Masscheck Energy Compliance form attached? h. Type of construction i. Is construction within 100 ft.of wetlands? Yes No. Is construction within 100 yr. floodplain Yes No j. Depth of basement or cellar floor below finished grade k. Will building conform to the Building and Zoning regulations? Yes No. I. Septic Tank City Sewer Private well City water Supply SECTION 7a-OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT Kimberly F. Goggins as Owner of the subject property hereby authorize Philippe Rigollaud to act on my behalf, in all matters relative to work authorized by this building permit application. See attachment (A) Signature of Owner Date Philippe Rigollaud as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate,to the best of my knowledge and belief. Signed under the pains and penalties of perjury. PHILIPPE RIGOLLAUD Print Name 410 01/11/2016 Signature i—eMkient Date SECTION 8-CONSTRUCTION SERVICES 8.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder: Maya Fulford CS-106329 License Number 159 Clark Drive, Giulford VT, 05301 03/14/2016 Addressn -(.� Expiration Date 11,-Y, - r i�P�- 413-772-8788 Signature Telephone 9.Renistered Home Improvement Contractor: Not Applicable ❑ Pioneer Vallev Photovoltaics Cooperative, LLC 140077 Company Name Registration Number 311 Wells Street Suite B Greenfield MA 01301 09/16/2017 Address Expiration Date Telephone 413-772-8788 SECTION 10-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c.152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes....... El No...... ❑ 11. - Home Owner Exemption The current exemption for"homeowners"was extended to include Owner-occupied Dwellings of one(1) or two(2)families and to allow such homeowner to engage an individual for hire who does not possess a license,provided that the owner acts as supervisor.CMR 780, Sixth Edition Section 108.3.5.1. Definition of Homeowner:Person(s)who own a parcel of land on which he/she resides or intends to reside,on which there is,or is intended to be,a one or two family dwelling,attached or detached structures accessory to such use and/or farm structures.A person who constructs more than one home in a two-year period shall not be considered a homeowner. Such"homeowner"shall submit to the Building Official,on a form acceptable to the Building Official,that he/she shall be responsible for all such work performed under the building permit. As acting Construction Supervisor your presence on the job site will be required from time to time,during and upon completion of the work for which this permit is issued. Also be advised that with reference to Chapter 152(Workers' Compensation) and Chapter 153(Liability of Employers to Employees for injuries not resulting in Death)of the Massachusetts General Laws Annotated,you may be liable for person(s) you hire to perform work for you under this permit. The undersigned"homeowner"certifies and assumes responsibility for compliance with the State Building Code,City of Northampton Ordinances,State and Local Zoning Laws and State of Massachusetts General Laws Annotated. Homeowner Signature The Commonwealth of Massachusetts Department of Industrial Accidents I Congress Street,Suite 100 Boston,MA 02114-2017 www mass.gov/dia Workers'Compensation Insurance Affidavit-Builders/Contractors/Electricians/Plumbers. TO BE FILED WITH THE PERMITTING AUTHORITY. Applicant Information Please Print Lc2ibly Name (Business/Organization/Individual): PIONEER VALLEY PHOTOVOLTAICS Address:311 WELLS STREET, SUITE B City/State/Zip:GREENFIELD, MA 01301 Phone#:413-772-8788 Are you an employer?Check the appropriate box: Type of project(required): I_F✓ I am a employer with 34 employees(full and/or part-time).* 7. ❑New construction 2.❑1 am a sole proprietor or partnership and have no employees working for me in 8. ❑Remodeling any capacity.[No workers'comp.insurance required.] 3.R 1 am a homeowner doing all work myself.[No workers'comp.insurance required.]t 9. ❑Demolition 4.E]1 am a homeowner and will be hiring contractors to conduct all work on my property. 1 will 10 E]Building addition ensure that all contractors either have workers'compensation insurance or are sole 11.❑Electrical repairs or additions proprietors with no employees. 12.❑Plumbing repairs or additions 5.rl I am a general contractor and 1 have hired the sub-contractors listed on the attached sheet. These sub-contractors have employees and have workers'comp.insurance.t 13.❑Roof repairs 6.❑We are a corporation and its officers have exercised their right of exemption per MGL c. 14.E✓ Other SOLAR PV 152,§](4),and we have no employees.[No workers'comp.insurance required.] Any applicant that checks box 41 must also fill out the section below showing their workers'compensation policy information. t Homeowners who submit this affidavit indicating they are doing all work and then hire outside contractors must submit a new affidavit indicating such. Contractors that check this box must attached an additional sheet showing the name of the sub-contractors and state whether or not those entities have employees. If the sub-contractors have employees,they must provide their workers'comp.policy number. I am an employer that is providing workers'compensation insurance for my employees. Below is the policy and job site information. Insurance Company Name: EXCELSIOR/PEERLESS Policy#or Self-ins. Lic.#:XWC 570727082 Expiration Date:01/01/2017 Job Site Address:69 Day Ave, Unit C City/State/Zip:Northampton, MA 01060 Attach a copy of the workers'compensation policy declaration page(showing the policy number and expiration date). Failure to secure coverage as required under MGL c. 152,§25A is a criminal violation punishable by a fine up to$1,500.00 and/or one-year imprisonment,as well as civil penalties in the form of a STOP WORK ORDER and a fine of up to$250.00 a day against the violator.A copy of this statement may be forwarded to the Office of Investigations of the DIA for insurance coverage verification. I do hereby certify under the pain7anad enalties of perjury that the information provided above is true and correct Signature: Date: 01/11/2016 Phone#:413-772-8788 Official use only. Do not write in this area,to be completed by city or town official City or Town: Permit/License# Issuing Authority(circle one): 1.Board of Health 2.Building Department 3.City/Town Clerk 4.Electrical Inspector 5.Plumbing Inspector 6.Other Contact Person: Phone#• ® DATE(MM/DO/YYYY) ,ACO `� CERTIFICATE OF LIABILITY INSURANCE 12/30/2015 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Linda Powers NAME: (413)586-0111 aC No:(413)586-6461 Webber 6 Grinnell PHONE 8 North King Street ADDRESS:lpowers@webberandgrinnell.com INSURER(S)AFFORDING COVERAGE NAIC# Northampton MA 01060 INSURERA:Peerless/Liberty INSURED INSURER B Excelsior/Libert 11045 Pioneer Valley PhotoVoltaics Cooperative, Inc. INSURERC:Peerless Indemnity/Liberty 18333 Attn: Kim Pinkham INSURER D:Liber v Mutual Insurance 24198 311 Wells Street, Suite B INSUREREA.I.M. Mutual Greenfield MA 01301 INSURER F, COVERAGES CERTIFICATE NUMBER:Kaster Exp 1-1-2017 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR A L BUD& POLICY EFF POLICY EXP LIMITS LTR TYPE OF INSURANCE POLICY NUMBER MM/D MM/D X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 A CLAIMS-MADE ❑X OCCUR DAMAGES( RENTED 100,000 PREMISES Ea occurrence $ CBP8378623 1/1/2016 1/1/2017 MED EXP(Any one person) $ 5,000 PERSONAL&ADV INJURY $ 1,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 X POLICY❑ PRO LOC PRODUCTS-COMP/OP AGG $ 2,000,000 JECT OTHER: $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 1,000,000 Ea accident B ANY AUTO BODILY INJURY(Per person) $ ALL OWNED X SCHEDULED 13A8372626 1/1/2016 1/1/2017 BODILY INJURY(Per accident) $ AUTOS AUTOS $ NON-OWNED PROPERTY DAMAGE axid X HIRED AUTOS X AUTOS perent _ Underinsured motorist BI split $ 100,000 X UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ _3,000,000 C EXCESS LIAB CLAIMS-MADE AGGREGATE_ $_ 2,000,000 DED X RETENTION$ 10 000 CU8377126 1/1/2016 1/1/2017 $ WORKERS COMPENSATION PER OTH- AND EMPLOYERS'LIABILITY YSTATUTE ER _ ANY PROPRIETOR/PARTNER/EXECUTIVE ❑ NIA E.LEACH ACCIDENT $ 1,00P 000 OFFICER/MEMBER EXCLUDED? D (Mandatory in NH) XWS57072282 1/1/2016 1/1/2017 E.L.DISEASE-EA EMPLOYE $ 1 000 000 If yes,describe under XWS57072282-CT E.L.DISEASE-POLICY LIMIT $ 1,000,000 DESCRIPTION OF OPERATIONS below DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(ACORD 101,Additional Remarks Schedule,may be attached If more space is required) CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE For Information Purposes Only THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE 1l Linda Powers/LMP ©1988-2014 ACORD CORPORATION. All rights reserved. ACORD 25(2014/01) The ACORD name and logo are registered marks of ACORD INS025r7m401) Attachment A AUTHORIZATION TO PROCEED AND SERVE AS AUTHORIZED AGENT I hereby agree to the Project as set out above, and I agree to pay the contract price according to the Terms of Payment. I further agree to the Terms and Conditions attached hereto as a part of this Proposal and Agreement. I hereby authorize Pioneer Valley Photovoltaics Cooperative to proceed with the above-referenced Project in accordance with this Agreement. I further authorize Pioneer Valley PhotoVoltaics Cooperative, or its designated representative, to obtain required permits for this project on behalf of the Owner. Any photographs or videos of this project may be used by Pioneer Valley PhotoVoltaics Cooperative for marketing purposes. A check for the First Payment is enclosed and i am returning this Agreement within 21 days of the Proposal date. rPrnintedame Date r! C �2✓� D t A-S tv Signature J 0 Title Proposal and Agreement Page)of g Kim and Mike Goggins,November 19,2015 Office of Consumer Affairs and Business Regulation y 10 Park Plaza- Suite 5170 Boston, Massachusetts 02116 Home Improvement Codtractor Registration -=- Registration: 140077 - -- Type: Private Corporation ----- :_' Expiration: 9/16/2017 Tr# 270458 PIONEER VALLEY PHOTOVOLTAICS:b-Q: PHILIPPE RIGOLLAUD 311 WELLS ST SUITE B GREENFIELD, MA 01301 Update Address and return card.Mark reason for change. SCA t Co 20M-PISMI ❑ Address j Renewal Employment C Lost Card �fA�r>ones-rrscul��,a,%%F-Ll�l.:ar�rrJe't!,' OBiee of Consumer Affairs&Business Regulation License or registration valid for individal use only OME IMPROVEMENT CONTRACTOR before the expiration date. If found return to: Registration 144077 Type: Office of Consumer Affairs and Business Regulation Expiration 9Mti Q17 Private Corporation 10 Park Plaza-Suite 5170 Boston,MA 02116 PIONEER VALLEY PH070VOLTAM COOP PHILIPPE RIGOLLAUD- 311 WELLS ST SUITE B, GREENFIELD,MA 01301' - -Undersecretary -- Not Valid witkov s� Y Massachusetts -Department of Public Safety Board of Building Regulations and Standards ('on tris hon Supers isor License: CSA06329 Maya Fulford - 154 Clark Drive _ ! Ciulford VT 05391 Pr­611 y ;, ,,t .,.t Expiration Coirimisssoner 03/14/2016 SUNPOWER WMA., . UNMATCHED PERFORMANCE, RELIABILITY & AESTHETICS X SERIES -— f I tli • 21.5%efficiency Ideal for roofs where space is at a premium or where future expansion might be needed. SIGNATUREr,,BLACK x`, 345 PANEL • Maximum performance X21 - 335 PANE Designed to deliver the most energy in HIGHEST EFFICIENCY° demanding real world conditions, in partial shade and hot rooftop temperatures.1,2.3 Generate more energy per square foot • Premium aesthetics X-Series residential panels convert more sunlight to electricity producing 44% SunPower°SignatureT" Black X-Series panels more power per panel,'and 75% more energy per square foot over 25 blend harmoniously into your roof. The most years.',' elegant choice for your home. HIGHEST ENERGY PRODUCTION 7 Produce more energy per rated watt High year one performance delivers 8-10% more energy per rated watt.3 This advantage increases over time, producing 21% more energy over the first 25 years to meet your needs.' M,,,.0 F-,C, y Maxeone Solar Cells:Fundamentally better. ° r t Engineered for performance, designed for durability. � Y d o i ye-Jr,',' Engineered for peace of mind " Y Designed to deliver consistent, trouble-free energy over a very long lifetime.',' r au <: " N d 10 S 20 Designed for durability Years The SunPower Maxeon Solar Cell is the only cell built on a solid copper foundation. Virtually a imperviousPHOTON to the corrosion and cracking that r rC NE;C N 7i iTi S 'S degrade Conventional Panels. w N i;g Same excellent durability as E-Series panels. a #1 Ranked in Fraunhofer durability test.10 a E''11E Wa"` 100%power maintained in Atlas 25' °' E rc,r Lo,,At9 ��',' C JCC .i�G Ff uv comprehensive PVDI Durability test.11 w 2High-Fe ,Iri:_r._e Ai.fi-Ra It -'✓.C_�ia95 sunpowercorp.com 10 Roof 324" ,, — - RIX,F TOP EDGE E-W)centered Array start point Solarmount STANDARD ai;splice bar Standing Seam Metal Roof ( 36" Existing vent Array 290" Solarmount STANDARD mounting rail I 10 { -4811 ( 1"snow break inter row spacing P 9 r v 1611, 4$" +j L-foot mounted on S51 S support I 21" clan cod to standing seams staggered C ands aced not more than 48"apart 32" 48" N (Voo ty r - i - fi N 1 GE 27' 2 1 R 11 , _. —ED3' L � i 24'-2" 53' I - 111 ' 21" _. _: .II_.. :... _- -. LI Standing seams 90:: 1t 6i 125n 3 rail)' at 16"on center N I 1618 (4I, N �I I 125"(4 rail)1 168" Sunpower - 10 61.39"x41.18"x1.81" - - - Reference Roof Plan Railing 293" Array standoffs 9 south be Arra to be Installed on Sunpower The centerline of the clips I—( _ T PPe s cre Ph v',30' ~ installed in a sta ered the uth facia roof of the 61.39" x 41.18"x 1.81" should be 6"to15"from the GOGGINS-11189 / pattern to evenly distribute residence end of the side frame. r 1 Pal nz e:eR fig Day Avenue,Unit C the arradead loadStanding Seams 16"O.C. 16"max rail cantilever c ° Northampton,MA 01060 y . '. }"to(on rc�D.iz"1 February 1, 2016 To Whom It May Concern: The roof structure of Unit C, Day Avenue Condominiums at 69 Day Avenue, Northampton has been reviewed and will be compliant with the most recent building codes for Massachusetts and will support the weight imposed by the specified PV equipment. Signed, Lynn Posner Rice, Architect (PV)2 Goggins — 69 Day Ave — Northampton -,wee Ph o oVo;,a,cs, Kim and Mike Goggins Site: 69 Day Ave, Unit C,Northampton, MA 01060 Office: Goggins Real Estate-413-586-7000 s1 ISMS 8T Array: SPR-X21-345 Modules;4 rows of 7 in portrait Mounting: Unirac Rails, on L-feet Brackets,on S-5!-S clamps «fir Roof Structure:See Building Plans and Certified Design Professional Letter 59 KAY Roofing Material: Englert 1300, 24 gauge,standing seam metal i' \f_ FK:uSE y" , cij rh w e qs SUNPOWER OFFERS THE BEST COMBINED POWER AND PRODUCT WARRANTY POWER WARRANTY PRODUCT WARRANTY t n . e MESAN; ;0 15 20 25 0 5 1;7 15 2.0 25 '!ears Years More guaranteed power:95%for first 5 years,-0.4%/yr.to year 25.8 Combined Power and Product Defect 25 year coverage that includes panel replacement costs.9 ELECTRICAL DATA OPERATING CONDITION AND MECHANICAL DATA X21-335-13LK X21-345 Temperature —401F to+I 851F(—40aC to+85aC) Nominal Power 12(Pnom) 335 W 345 W Max load Wind:50 psf, 2400 Pa, 245 kg/m2 front&back Power Tolerance +5/-0% +5/-0% Snow: 112 psf,5400 Pa, 550kg/m2 front Avg. Panel Efficient 13 21 1% 21 5% Impact Y 1 inch (25 mm)diameter hail at 52 mph (23 m/s) :resistance Rated Voltage(Vmpp) 57.3 V 57.3 V Appearance Class A+ Rated Current(Impp) 5.85 A 6.02 A Solar Cells 96 Monocrystalline Maxeon Gen III Cells Open-Circuit Voltage (Voc) 67.9 V 68.2 V Tempered Glass High Transmission Tempered Anti-Reflective Short-Circuit Current(Isc) 6.23 A 6.39 A Junction Box IP-65 Rated Maximum System Voltage 600 V UL; 1000 V IEC Connectors MCA Compatible Maximum Series Fuse 20 A Frame Class 1 black anodized, highest AAMA Rating Power Temp Coef. (Pmpp) —0.30%/OC Weight 41 lbs(18.6 kg) Voltage Temp Coef. (Voc) —167.4 mV/'C Current Temp Coef. (Isc) 3.5 mA/aC TESTS AND CERTIFICATIONS REFERENCES: Standard tests UL 1703, IEC 61215, IEC 61730 1 All comparisons are SPR-X21-345 vs.a representative conventional panel:240W, Quality tests ISO 9001:2008,ISO 14001:2004 approx.1.6 m2,15%efficiency. EHS Compliance RoHS,OHSAS 18001:2007, lead-free 2 PVEvolution Labs"SunPower Shading Study,"Feb 2013. Ammonia test IEC 62716 3 Typically 8-1 09/o more energy per watt,BEW/DNV Engineering"SunPower Yield Report," Jan 2013,with CFV Solar Test Lab Report#12063,Jan 2013 temp.coef.calculation. Salt Spray test IEC 61701 (passed maximum severity) 4 SunPower 0.25'/o/yr degradation vs. 1.0%/yr conv.panel.Campeau,Z.et al."SunPower PID test Potential-Induced Degradation free: l OOOV 10 Module Degradation Rate,"SunPower white paper,Feb 2013;Jordan,Dirk"SunPower Available listings CEC, UL,TUV,MCS Test Report,"NREL,Oct 2012. 5"SunPower Module 40-Year Useful Life"SunPower white paper,Feb 2013.Useful life is 99 out of 100 panels operating at more than 70%of rated power. 6 Higher than E Series which is highest of all 2600 panels listed in Photon Int'1,Feb 2012. 7 1%more energy than E-Series panels,8%more energy than the average of the top 10 panel companies tested in 2012(151 panels,102 companies),Photon Infl,Mar 2013. 8 Compared with the top 15 manufacturers.SunPower Warranty Review,Feb 2013. 104-,mm 9 Some exclusions apply.See warranty for details. t f41_2­)] 10 X-Series some as E-Series,5 of top 8 panel manufacturers were tested by Fraunhofer ISE,"PV Module Durability Initiative Public Report,"Feb 2013. 11 Compared with the non-stress-tested control panel.X-Series some as E-Series,tested in Atlas 25+Durability test report,Feb 2013. 12 Standard Test Conditions(1000 W/m2 irradiance,AM 1.5,25°C). +6m,T- 13 Based on average of measured power values during production. '1 f'') _ 1 5CCl!1tf l -- 16 1,4inj See http://www.sunpowercorrR.com/facts for more reference information. For further details,see extended datasheet:www.sunDowercorD.com/datusheets Read safety and installation instructions before using this product. ©April 2013 SunPower Corporation.All rights resented.SUNPOWER,the SUNPOWER logo,MAXEON,MORE ENERGY.FOR LIFE.,and SIGNATURE are trademarks or registered trademarks of SunPower SU n pOWerCOrp.COm Corporation.Specifications included in this datusheet are subject to change without notice. Document#504828 Rev A/LTR_EN SOLARMOUNT PV's most versatile mounting system SolarMount is the most versatile PV mounting rail system on the market today. We've engineered installer-friendly components for maximum flexibility, allowing you to solve virtually any PV mounting challenge. The universal SolarMount rail system has three options which can be assembled into a wide variety of PV mounting structures to accommodate any job site. Unirac provides a technical support system complete with installation and code compliance documentation, an on-line estimator and design assistance to help YOU solve the toughest challenges. ■■ U N I RAC MMM •■ Bright 1fmnIjgmSoiar Visit us online at www.unirac.com SOLARMOUNT° RAIL OPTIONS ATTACHMENT OPTIONS KEY BENEFITS PV's most versatile mounting system Flexible Components Speed Installation of SolarMountl Rail SolarMount HD t,J the av daiV y)r,� aadds the 5 In iJ'eunt a- antage Standoffs Maximum flexibility to PV PM,fop d Las c.s., . data s',iisL Use standoffs whenever flashed installations anti an •r applicdxi ai�e i !�e icnv spans. • are required,on tile roofs,for example.Two- Flush,high-profile or piece aluminum standoff allow precise place- low-profile configurations #. ment of a Flashing over a secured base prior to the Roof or ground mount se c„t a', -�-.M„• installation of the standoff itself. ""*•- ` �" '"'"^- �' "- x All standoff types come in four standard All or flat roof het hts: 6,and g j 4, 7 inches.Appropriate flashings are available. Ease of installation ti Installer-friendly p com onents NN, Serrated L-feet � SIAM— Standard for ground mount Installations on Minimized penetration with residential and commercial rroftnps,use L-feet ¢ei�n'- longer attachment spans than alone above asphalt composition shingles or In competitive products conjunction with Flat top standoffs.Mount et standard or light rails.Configure to either of two rail heights,one Prompting air flow for two with customer input ` cooling,the other offering dose-to-the-roof ' Grounding and wire ' aesthetics - v. management options » ._ strut-in-rube Style Legs Complete technical support Quickly set the precise tilt angle required.Styles `�- are available for , high profile lt or z legs per Installation and code railand low profile installations, compliance documentation '"•s `«, "�7, .�--z•* Each series offers three leg lengths so that you ` M1.11 Y can adjust to exactly the tilt angle you want— Online estimator up to a maximum of 6o degrees—without cutting and drilling at the job site. Person-to-person customer service Standard SolarMount° Standard rail give_you ultimate gexlbillty,Including 40 FastFoot bottom mounting and tilt-up options. E st int t Core component for Unirac yi Snow Loan, mounting solutionsMODULE MOUNTING allow leiit>to Tal ion[etc Assembly Sequence is Your Choice w de wToX, we ,.Frty Three rail options to ,r,roof_ accommodate any job site Top Mounting Clamps Bottom Mounting Clips Incorporated into other ideal for fiush mount applica- Use bottom mounting clips Tile Hook major product lines tions,such as residential rooftops, (standard and HD rail only) Made from cast aluminum,the tile hook rr. where it is most cunvenient to whenever you prefer to attachment provides SolarMount with a wore foutings and rails behove preassemble the array using cost-effective solution,or barrel or Spanish o,tolling modules,top moo ating module mounting holes, damps secure)V8rp rn point of Simply fit the dip into its rail tile roofs.All required lag bolts and hardware 3 y ltte module frame h,,ejg you slot r vc t.e i counting bolt for are included.Refer to the tile hook engineering ■ /� hon the constrain is of module a se Uri: ,nr ion.Adjust the data for max load capabilities. c ■ �A montirg holes clip nos cin anywhere along �� V the rad slot. nglt , B N-- tri - h ' ,�j,, Solar . N n _ T r ConWnentS � a 6062-T6 �@L j c tion solar and Sos3-TS iso"nt Galla st frame SxaS-TS a/u e Solartla minuet�, Cod@ Corp/,c °"w rar7 xtrusion he Solar of mo"nt`ng rli s Call Unira Mounter sYste Ps a m i Tilt i s and L nr�rtarnps to yourOr s Or certified, feat building P ab rVo-l'`erP stars g code app lir /e Severe Co doffs warrant zin _ ndition S Y r dated we/dei (very severe} Prod is covered One-piece d steel duct standoffs �'✓arrantyarrantY and by e �)year 18-8 stainless steel a Y ar - limited Paste Tor rom meted finish nerc P/ete SolarMount warranties Installation mania/from, dovvrIlOad�:; our web site. om C' BrigU/V/RA_, 01n, in S�l1r Visit us online at www ,UniraC calf �3777- NMI �Qa k c ©; EcoFasten Solarc,) 877-859-3947 Committed to the Support or Renewable Energy m � I 0 0 y , O. j v .94 d 0 a 0 a; s j z rr T x � N 2X .JU --► �i-- N 00, X Ol cc N O O �— 1,13 - - --o ------ O o C 6o W The Right Way! 29= The S-S-S clamp was created specifically for popular snap-together profiles— including residential profiles by Taylor Metals and Easy Lock Standing Seam. For horizontal seams under .540 inches (like the Firestone UC4)the S-S-S or (A TOW, __a S-S-S Mini can be used to avoid the O necessity of crimping the seam. L- Its simple design and size make it perfect for use with S-5! snow retention 4-' products and other heavy-duty 4) applications. Installation is as simple as setting the patented round-point •0 setscrews into the clamp, placing the clamp on the seam, and tightening them to the specified tension.Then, affix ancillary items using the bolt provided with the product.Go to www.S-5.com/tools for information and tools available for properly attaching and tensioning S-5! clamps. 0LO { tCS The S-S-S Mini is a bit shorter than the U (� S-S-S and has one setscrew rather than •i� two.The mini is the choice for attaching +� all kinds of rooftop accessories:signs, M walkways,satellite dishes, antennas, 0 rooftop lighting, lightning protection systems, solar arrays,exhaust stack N M bracing, conduit,condensate lines, M mechanical equipment—just about The S-5-S Clamp Was M anything!* created specifically for popular snap-together LO `S-Si mini clamps are not compatible with,and should not profiles. —O be used with S-5!SnoRaiI /SnoFence"or Colot Gat] snow retention>ystems- COKM/ M W dimple=4JJJ The strength of the S-5-S clamp is in its simple design. The patented setscrews will slightly it— leaving roof The Right Way! The S-5-S and S-S-S Mini clamps are each furnished with j r° the hardware shown to the right.Each box also includes a bit tip for tightening setscrews using an electric screw M8-1.25 X 16.00 mm gun.A structural aluminum attachment clamp,the S-5-S ---Hex Flange Bolt is compatible with most common metal roofing materials ; excluding copper.All included hardware is stainless 2.00 /� 0.50" (51.00 mm) 12.70 mm) steel.Please visit www.S-5.com for more information including CAD details,metallurgical compatibilities and (2x)MB-1.25 specifications. Threaded Hole 1.50•• The S-5-5 clamp has been tested for load-to-failure (36.00 mm) ' results on most major brands and profiles of standing "'V seam roofing.The independent lab test data found at www.S-5.com can be used for load-critical designs and 0.91" applications.S-5!6 holding strength is unmatched in the (23.00 m ) industry.Profiles that are shaped as illustrated below will work with the S-5-S and 5-5-S Mini.In order for the S-5-S s" or S-5-S Mini to fit these types of seams,the finished seam must: �-_ Four 318-24 X 0.80" (38.00.00 mm) • Beat least 1.00"high. Round-Point Setscrews • Have a height distance less than or equal to 0.25" between the male portion of the panel and female portion of the panel. Example Profiles 1iX16.00mm Hex Flange Bok t A 1.18" w 5 (30.00 mm) Threaded ` Threaded Hole 1.50" 1r� (38.00 mm) 0.91" 23.00 � U,�mm (38.00 mm) " �� Two 3/8-24 X 0.80" Round-Point Setscrews Please note:All measurements are rounded to the second decimal place. 5-51'Warning!Please use this product responsibly! Distributed by Products are protected by multiple U.S.and foreign patents.Visit the website at www.5-5.com for complete information on patents and trademarks.for maximum holding strength,setscrews should be tensioned and re-tensioned as the seam material compresses.Clamp setscrew tension should be verified using a calibrated torque wrench between 160 and 180 inch pounds when used on 22ga steel, and between 130 and 150 inch pounds for all other metals and thinner gauges of steel.Consult the 5-51 website at www.S-S.com for published data regarding holding strength. Copyright 2015 Metal Roof Innovations,ltd.S-5!products are patent protected. S-51 aggressively protects its patents,trademarks and copyrights.Version 031915. TOP O [131 [ae) 90" (2X)M10-1.5 THREADED HOLE1231 S-5-S 2�°" I X.00 yy y 1421 -__.4]��'- 50 (13) SCALE:2X - - - � - I �+ — .31" � I10701 (2X)3/8-24 BACK LEFT FRONT RIGHT THREADED HOLE Notes 1. S-5-S 2. M10-1.5 X 16MM HEX FLANGE BOLT FOR STANDING SEAM SPECIFIC MECHANICAL LOAD TEST 3. 3/8-24 X.8"ROUND POINT SETSCREW INFORMATION AND CLAMP INSTALLATION INFORMATION 4. EXAMPLE PROFILE —2 PLEASE VISIT:WWW.S-5.COM -....._Z MATERIAL: 2 6061 T6 .^� METAL ROOF[NNOVATIDNS,LTD.. 8655 TABLE BUTTE RD —2 ) 1 `� ' n k" COLORADO SPRINGS,CO 60906 JEST ASSEMBLY WEIGHT: T6. 1 719-495-05)8 .42 LBS '' 719-495-0045(FAX) The Right Way! Irk' SUPPLIED HARDWARE: I ( .. .,...,.- n,.... .....,..,».. TITLE S-5_S M� Q ,(ry 3 V snLE RAwwc no 9 0 A CCD xnwN av DMMH 05/15/2012 ` 4 4 OB A _ 4-�\ I� 4 r1I J 3 '075- S O T AR O DBYAL U TENTS MCLVDMGS 8 485983 Bi AVD III LC TE i, - I,III 3 - 6 4 6)(O 6 65UH1 4 DLNO}FLROPPAN PATHNTB ARE ALBO APPLIED FOB AND PENDING _ - GTHEN: NVUVATIONSLTU ILICEN50R05-5[�TECHNOLGGNAGGRP]IVELiYPROSEL�tET PAS T 1 INFAWGEMENt. ___ 3