38A-103 (10) -10 Planning - Decision City of Northampton Hearing No.: PLN-2008-0001 Date:August 3, 2007 APPLICATION TYPE: SUBMISSION DATE: PS Major Site Plan 715/2007 Applicant's Name: Owner's Name: ury NAME: NAME: COMPA, VCA,Inc. HOSPITAL HILL DEVELOPMENT LLC ADDRESS: ADDRESS: ADDRESS: One Cottage St c%MassDevelopment 1441 Main Street " TOWN: STATE: ZIP CODE: TOWN: STATE: ZIP CODE: TOWN: STATE: AP CODE EASTHAMPTON MA 01027 SPRINGFIELD MA 01103 "'S PHONE NO.: FAX NO.: PHONE NO.: FAX NO.: PHONE Od., —' (413)737-0207 Q EMAIL ADDRESS: EMAIL ADDRESS: EMAIL ADDRESS: Site Information: STREET NO.: SITE ZONING: `' PV SECTION OF BYLAW: NORTHAMPTON MA 01060 Chpt.350-11:Site Plan Approval MAP: BLO MAP DATE: ACTION TAKEN: "4' 1 Approved With Conditions Page: NATURE OF PROPOSED WORK: Construction of a 32,000 square foot building in two phases. HARDSHIP: CONDITION OF APPROVAL: 1)Prior to issuance of a building permit the following items must be addressed: a)proof of recording of easement documents for shared access and maintenance for a common driveway as specified in the zoning ordinance§350-Appendix 1 shall be submitted to Office of Planning and Development. b)the applicant shall submit revised plans showing compliance with the street tree planting requirements of§350-6.5 with sixteen(16)shade trees along street frontage. Gingko proposed maybe in conflict with the location of the proposed sewer line. There shall be adequate separation to prevent long-term root damage to the sewer line. c)Revise planting plan and schedule(locate on plan sheet)and submit to Office of Planning and Development. The "QC"located on the plan shall be included in the schedule. d)Revised plan shall show dumpster location as presented in the hearing behind pick-up/delivery area. e)Lighting plan shall clearly indicate the location of bollards. 2)In accordance with Department of Public Works standards, a sewer cleanout shall be located at the property line. Any proposed industrial discharges shall be permitted through the Northampton Waster Water Treatment Plant. 3)A six-inch fire/domestic water line shall be provided. A one-inch domestic service line branch off the six-inch line inside the building ahead of the backflow preventer shall be provided. 4)Shutoff valves at the property line and near the interconnect to the Earle Street main shall be provided. 5)Four foot sumps for all catch basins shall be provided. 6)No stormwater shall be diverted onto the roadway. 7)CB-3 shall be located on private property and inverts in and out shall be labeled correctly. 8)A driveway curb cut from Department of Public Works is required. 9)Applicant shall verify existing conditions plan and proposed redesign of Earle Street to ensure that proposed utility locations for the building do not interfere with those drainage and sewer utilities in the street GeOTMS®2007 Des Lauriers Municipal Solutions,Inc. .A Planning - Decision City of Northampton Hearing No.: PLN-2008-0001 Date:August 3, 2007 10)Snow shall be maintained on site or removed. 11) The driveway crossing shall be striped in accordance with the City of Northampton standard for pedestrian crossings utilizing the"continental"stripe. 12)Prior to issuance of a certificate of occupancy, the applicant shall. a)submit a lighting plan stamped by an engineer indicating that the lighting conforms to§350-12.2. b)record all necessary easements for stormwater drains crossing lot 12B. c)submit a record plan to Department of Public Works stamped by a Massachusetts registered engineer for the storm drain system crossing lot 12B. d)show proof or recording of all required easements for grading and long term maintenance and repairs of the multi-use cross-country trail. Final easement language shall be coordinated with the City of Northampton. Nothing in this permit shall preclude conformance with DPW stormwater permit issued under separate jurisdiction. FINDINGS: The Planning Board Approved the "Tier 11" Site Plan for the new 32,000 square foot building and common driveway based on the following information and plans submitted with the application: 1. "Site Plan for Light Industrial Development at The Villaage at Hospital Hill",Prepared by Stantec,dated June 2007, Sheets 1-10. 2. "VCA,Inc.Elevations",Prepared by Siegried Porth Architect,dated June 7,2007,Drawing A-2. In reviewing the application materials,public hearing comments and approval criteria in section 350-11.6 of the Zoning Ordinance, the Planning Board determined that The remaining items(Tier 11)from the original and overall site plan for the south campus of the Village at Hospital Hill Tier I approval had been met. This approval is the secondary approval/amendment to the original Tier I plan and as spelled out in Tier I approval the Board found. A.Building elevations,including materials, orientation,fenestration and egresses shown and approved. B.Number and location of bike racks to serve each building shown and approved. C.Building landscaping and amenities, feasibility of walkways for buildings 12A/B,including landscaping along the multi-use trail between lots 11&12A shown and approved. D.Sewer and water tie-ins:locations&pipe sizing for each building and all other utility locations. A minimum 18'horizontal separation should be maintained. Where bends in water lines are anticipated,these shall be reinforced by thrust blocks and shown on detail sheets. E.Final Easements for utility lines that cross private property reviewed and approved. In approving this Tier 11 site plan, the Board granted the wider curb cut of 34'for the common driveway to accommodate larger trucks entering both sites up the substantial grade. The Board also approved the future potential creation of an addition of nine parking spaces outlined on sheet 7. These may be created at the applicants discretion. COULD NOT DEROGATE BECAUSE: FILING DEADLINE: MAILING DATE: HEARING CONTINUED DATE: DECISION DRAFT BY: APPEAL DATE: 7/5/2007 7/19/2007 8/9/2007 REFERRALS IN DATE: HEARING DEADLINE DATE: HEARING CLOSE DATE: FINAL SIGNING BY: APPEAL DEADLINE: 7/12/2007 9/8/2007 7/26/2007 8/9/2007 8/23/2007 FIRST ADVERTISING DATE: HEARING DATE: VOTING DATE: DECISION DATE: 7/12/2007 7/26/2007 7/26/2007 8/3/2007 SECOND ADVERTISING DATE: HEARING TIME: VOTING DEADLINE: DECISION DEADLINE: 7/19/2007 10:50 PM 4/27/2007 10/24/2007 MEMBERS PRESENT: VOTE: Stephen Gilson votes to Grant George Russell votes to Grant Jennifer Dieringer votes to Grant Paul Voss votes to No Action Needed Francis Johnson votes to Grant George Kohout votes to Grant Keith Wilson votes to Grant ' Kenneth Jodrie votes to Grant GeoTMS®2007 Des Lauriers Municipal Solutions,Inc. - c Planning - Decision City of Northampton Hearing No,: PLN-2008-0009 Date: August 3, 2007 MOTION MADE BY: SECONDED BY: VOTE COUNT: DECISION: Keith Wilson George Russell 7-1 Approved with Conditions MINUTES OF MEETING: Available in the Office of Planning$Development. 1, Carolyn Misch,as agent to the Planning Board,certify that this is a true and accurate decision made by the Planning Board and certify that a copy of this and all plans have been tiled with the Board and the City Clerk on August 3,2007. I certify that a copy of this decision has been mailed to the Owner and Applicant Notice of Appeal An appeal from the decision of the Planning Board may be made by any person aggrieved pursuant to MGL Chapt 40A, Section 17 as amended within twenty(20).days after the date of the filing of the notice of the decision with the City Clerk. The date is listed above. Such appeal may be made to the Hampshire Superior Court with a certified copy of the appeal sent to the City Clerk of the City of Northampton. GeoTMS®2007 Des Lauriers Municipal Solutions,Inc. t ' t _� , �