38A-116 (7) r ® Document IG704TM — 2000 _f cog / Certificate of Substantial Completion PROJECT: PROJECT NUMBER:210621A/ OWNER:❑ (Name and address): CONTRACT FOR:General Construction ARCHITECT:❑ Village at Hospital Hill-Phase II CONTRACT DATE:March 03,2008 63 Musante Drive CONTRACTOR:❑ Northampton,MA 01060 FIELD:❑ TO OWNER: TO CONTRACTOR: (Name and address): (Name and address): OTHER:❑ Village at Hospital Hill II,LLC Williams Building Company,Inc. c/o The Community Builders,Inc. 196 Old Town House Road 322 Main Street West Yarmouth,MA 102673 Springfield,MA 01105 PROJECT OR PORTION OF THE PROJECT DESIGNATED FOR PARTIAL OCCUPANCY OR USE SHALL INCLUDE: Building at 63 Musante Drive including units 63-A,63-B,63-C,63-D,63-E,63-F,63-G,63-H. The Work performed under this Contract has been reviewed and found,to the Architect's best knowledge,information and belief, to be substantially complete.Substantial Completion is the stage;in the progress of the Work when the Work or designated portion is sufficiently complete in accordance with the Contract Documents so that the Owner can occupy or utilize the Work for its intended use.The date of Substantial Completion of the Project or portion designated above is the date of issuance established by this Certificate,which is also the date of commencement of applicable warranties required by the Contract Documents,except as stated below: Warranty Ppce of Commencement All Items 27/09 Dietz&Company Architects,Inc. 7-I 7 O� ARCHITECT BY DATE OF ISSUANCE A list of items to be completed or corrected is attached hereto.The failure to include any items on such list does not alter the responsibility of the Contractor to complete all Work in accordance with the Contract Documents.Unless otherwise agreed to in writing,the date of commencement of warranties for items on the attached list will be the date of issuance of the final Certificate of Payment or the date of final payment. Cost estimate of Work that is incomplete or defective:$15,000 The Contractor will complete or correct the Work on the list f items att hed hereto within sixty(60)days from the above date of Substantial Completion. Williams Building Company,Inc. ) Al CONTRACTOR Ply DATE The Owner accepts the Work or designated porti i as substantially complete and will assume full possession Z00pm(time)on 3/13/09(date). The Community Builders,Inc. jt`jt OWNER BY DATE The responsibilities of the Owner and Contractor for security,maintenance,heat,utilities,damage to the Work and insurance shall be as follows: (Note:Owner's and Contractor's legal and insurance counsel should determine and review insurance requirements and coverage.) The Contractor shall maintain full responsibility for property until Owner begins to occupy building. AIA Document G704TM—2000.Copyright C 1963,1978,1992 and 2000 by The American Institute of Architects.All rights reserved.WARNING:This Ale Document is protected by U.S.Copyright Law and International Treaties.Unauthorized reproduction or distribution of this Ale Document,or any 1 portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law.This document was produced by AIA software at 13:50:22 on 02/26/2009 under Order No.11000356735_1 which expires on 5/15/2009,and is not for resale. User Notes: (2382127436) i February 27, 2008 Project: Village at Hospital Hill, Phase II Project#: 20621 A We consider Building A4 at 63 Musante Drive, Northampton, MA to be substantially complete. The following items remain to be completed: I. Final clean all units. 2. Remove dust covers at all smoke detectors. 3. Install all unit entry letters in hallways. 4. Install pull down ladder to storage room. 5. Seal grout in halls and bath rooms. 6. Install Pergo transition strips and cover at base board heat in unit 125. 7. Complete base at laundry,touch up paint at living room, and install weather stripping at unit entry door in unit 'I 27. 8. Touch up paint at kitchen and stair and adjust inline fan at dryer in unit 129. 17 Aa 9. Caulk at pipe in mechanical room ceiling in unit 130. 4 t _£, , MIA 0 ; 10. Install closer at unit entry door in unit 132. 11. Install butt screws at electric room door. 4 13 6-795-3' 12. Install missing VCT at 3rd floor storage room. Upon completion of the following items, which are expected to be completed within the next two weeks, a final Punch List will beAeveloped and issued. It is z " C� then expected that the Punch List will be completed and occupants will move in. _F a FINAL CONSTRUCTION CONTROL PROJECT NUMBER 20621 PROJECT TITLE Village at Hospital Hill - Phase II PROJECT LOCATION 63 Musante Drive, Northampton, Massachusetts NAME OF BUILDING Building A4 SCOPE OF PROJECT New Construction In accordance with Section 116.0 of the 6th Edition,, Massachusetts State Building Code, I, Marc Sternick Registration No. 8516 being a Registered Professional Architect, hereby certify that I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: ENTIRE ® ARCHITECTURAL ❑ STRUCTURAL ❑ PROJECT MECHANICAL ❑ FIRE PROTECTION ❑ ELECTRICAL ❑ OTHER (Specify) ❑ For the above named project and that, to my knowledge, such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code and all acceptable engineering practices for the proposed;,project. I further certify that I, or my designated representative, have performed the necessary professional services and was present on the construction site on a regular and periodic basis to determine that the work was proceeding in accordance with the documents approved for the building permit and was responsible for the following as specified in section 116.2.2: 1. Review, for conformance to the design concept, shop drawings, samples and other submittals, which are submitted by the contractor in accordance with the requirements of the construction documents. 2. Review and approval of the quality control procedures for all code-required controlled materials. 3. Be present at intervals appropriate to the stage of construction to become, generally familiar with the progress and quality of the work and to determine, in general, if the work is being performed in a manner consistent with the constructio documents. Upon completion of the work, I herewith submit a final report, with the proje pu ch list attached hereto, as to the satisfactory completion and readiness of the pr 'ect for oc pa cy. ignature Subscribed and sworn to before me this z. O? 4 Day of ' IJ - 1 � � Notary Public My commission expires State of , r 1 In the County of I "OF SSS tiS DELBERT B. SECONDARY FINAL CONSTRUCTION CONTROL SMITH,JR. MECHANICAL p 41215 PROJECT NUMBER 20621A 9� ST 4_1 °►►,`sNAL ANG PROJECT TITLE Village at Hospital Hill - Phase II ...•�'' PROJECT LOCATION 63 Musante Drive, Northampton, Massachusetts NAME OF BUILDING Building A4 SCOPE OF PROJECT New Construction In accordance_with Section 116.0 of the 6`h Edition, Massachusetts State Building Code, I, ALe Sr,�tti J? Registration No. ld/5— being a Registered Professional Engineer, hereby certify that I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: ENTIRE ❑ ARCHITECTURAL ❑ STRUCTURAL ❑ PROJECT MECHANICAL FIRE PROTECTION �[ ELECTRICAL ❑ OTHER (Specify) ❑ For the above named project and that, to my knowledge, such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code and all acceptable engineering practices for the proposed project. I further certify that I, or my designated representative, have performed the necessary professional services and was present on the construction site on a regular and periodic basis to determine that the work was proceeding in accordance with the documents approved for the building permit and was responsible for the following as specified in section 116.2.2: 1. Review, for conformance to the design concept, shop drawings, samples and other submittals, which are submitted by the Contractor in accordance with the requirements of the construction documents. 2. Review and approval of the quality control procedures for all code-required controlled materials. 3. Be present at intervals appropriate to the stage of construction to become, generally familiar with the progress and quality oIf the work and to determine, in general, if the work is being performed in a manner consistent with the construction documents. Upon completion of the work, I herewith submit a final report, with the project punch list attached hereto, as to the satisfactory completion and readine*nat roj t for occupancy. e Subscribed and sworn to before me this Day of � Nota Public My commission expires 3U State of ,6n r � �,{ In the County of IV-Ida LJ UX - tHOFAi�.. DOUGLAS y� LAtOIE SECONDARY FINAL CONSTRUCTION CONTROL ELECTRICAL 42833 '�'FSFRISTEP��\?�i'� PROJECT NUMBER 20621A NALEN PROJECT TITLE Village at Hospital Hill - Phase II PROJECT LOCATION 63:Musante Drive, Northampton, Massachusetts NAME OF BUILDING Building A4 SCOPE OF PROJECT New Construction In accordance with Section 116.0 of the 61 Edition, Massachusetts State Building Code, I, Vw5\-ws 1- �o,e, Registration No. AldY33 being a Registered Professional Engineer, hereby ceftify that I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: ENTIRE ❑ ARCHITECTURAL ❑ STRUCTURAL ❑ PROJECT MECHANICAL ❑ FIRE PROTECTION " ❑ ELECTRICAL OTHER (Specify) ❑ For the above named project and that, to my knowledge, such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code and all acceptable engineering practices for the proposed project. I further certify that I, or my designated representative, have performed the necessary professional services and was present on the construction site on a regular and periodic basis to determine that the work was proceeding in accordance with the documents approved for the building permit and was responsible for the following as specified in section 116.2.2: 1. Review, for conformance to the design concept, shop drawings, samples and other submittals, which are submitted by the contractor in accordance with the requirements of the construction documents. 2. Review and approval of the quality control procedures for all code-required controlled materials. 3. Be present at intervals appropriate to the stage of construction to become, generally familiar with the progress and quality of the work and to determine, in general, if the work is being performed in a manner consistent with the construction documents. Upon completion of the work, I herewith submit a final report, with the project punch list attached hereto, as to the satisfactory completion and readiness ofth r ject 7o96u c Sig ur Sj�bscribed and sworn to before me this Day of G� Nd"�t a zpl� Notk Public My commission expires (3V vC State of -1 In the County of Midd t6s , I Con suiting Engin Bering Services , Iric . — {]E I Punchlist Punchlist Date: February 12,2008 Written To: Samantha Wood—Dietz and Company Architects Project Name: Village at Hospital Hill 2, CES Project Number: 27071.00 Written By: Michael Walsh/Steve 4endreau The following punch list includes items which require completion and or correction for the above mentioned project. These items were noted during a field observation on February 12, 2008. Items included in this punch list are limited to those thttt were accessible and visible during the time of our field observation. Completion and or correction of those items included in this punch list does not relieve the contractor of his responsibility to provide complete and operational systems in accordance with the contract documents. Please note: This Punchlist is limited to Building P3 and A4.At the time of the visit access to the water room was not gained. Mechanical/Plumbing Typical for all apartments within A3 and A4: 1. Dwg P-201 requires tempering valve (TVI) that is not installed. 2. Dwg P-201 requires thermometers on cold, hot and blended water piping that are not installed. 3. Dwg. M-201 Detail 2 shows motorized valves where dedicated circulators are installed. CES has no objection to this method of heating control. 4. Dwg P-201 requires Watts floodsafe hoses be installed at all washer locations, currently these are not installed. 5. Specification 15980 requires thermostats to be of the programmable type which the installed thermostats are not. 6. HWS & HWR piping in boiler room is not complete. Zone piping must be connected to zone circulator. 7. In boiler rooms on boiler make-up piping a Watts model 9D dual check valve is installed in lieu of a Watts model 009 reduced pressure backflow preventer as called for on drawings. CES has no objection to this equipment as long as the authority having jurisdiction takes no exception. Wit 'this being said the owner should receive a credit as there is a significant price difference between the two pieces of equipment. 811 Middle Street,Middletown,CT 06457 T 860.632.1682 F.860.632.1768 ces@cesctcom cesctcom Electrical Typical for all apartments within A3 and A4: I. Load centers should be filled to capacity with spare circuit breakers as indicated on contract documents. 2. Some range hoods do not have lamps installed. 3. Exterior lighting and device cover plates are not installed in building A..4. S.-1S/sas/PuncWist—A4.doc 2 I SECONDARY FINAL CONSTRUCTION CONTROL PROJECT NUMBER 20621A PROJECT TITLE ViW ge at Hospital Hill - Phase II PROJECT LOCATION 63 Musante Drive, Northampton, Massachusetts NAME OF BUILDING Building A4 SCOPE OF PROJECT New Construction In accordance with Section 116,0 of the 6th Edition, Massachusetts State Building Code, I, --t� , Registration No.732 s being a Registered Professional Engineer, hereby certify that I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: ENTIRE ❑ ARCHITECTURAL ❑ STRUCTURAL ❑ PROJECT MECHANICAL ❑ FIRE PROTECTION ❑ ELECTRICAL ❑ OTHER(Specify) )d s y _ Cevl�_ For the above named project and that, to my .knowledge, such plans, computations and specifications meet the applicable provisions of tho Massachusetts State Building Code and all acceptable engineering practices for the proposed project. I further certify that I, or my designated representative, have performed the necessary professional services and was present on the cons uction site on a regular and periodic basis to determine that the work was proceeding in accorpance with the documents approved for the building permit and was responsible for the following as specified in section 116.2.2: 1. Review, for conformance to the design concept, shop drawings, samples and other submittals, which are submitted by the contractor in accordance with the requirements of the construction documents. 2. Review and approval of the quality contrtol procedures for all code-required controlled materials. 3. Be present at intervals appropriate to the stage of construction to become, generally familiar with the progress and quality of the work and to determine, in general, if the work is being performed in a manner consistent with the construction documents. Upon completion of the work, I herewith submit a final report, with the project pu lis ttached hereto, as to the satisfactory completion and readiness of the y. i Signa ure Su ed and sworn before me this Day of Pw_UJ1yi is My commission expires C—E- U/a18, a-&fl State of C�A CI!Us t TC S ��1 County of �_tA ►�Q� u I a <���;� •t`��enc •':s.. %s"% �»� I A::j Iii t: :•► Ell i C}°: C) . i The Berkshire Design Group, Inc. MEMORANDUM To: Samantha Wood Dietz &Company Architects From: Mark B. Darnold, P.E. Date: February 27, 2009 Project. Village at Hospital Hill Phase 2 Site Punch List— Building A4 The Berkshire Design Group conducted a site;visit on February 27, 2009 in conjunction with the Secondary Final Construction Control affidavit. This regards the site area immediately adjacent to building A4. Previous punch lists have described areas around Al and A3 and are not reiterated herein. Some of site was found to be snow-covered, which restricted site observation. As such we reserve the right to augment or amend this list when weather conditions permit a more thorough examination, and we issue this list based solely on the items readily observable on February 27, 2009. The following 'punch list' items are missing, incomplete, or inconsistent with the contract documents. Non-observable items have not been evaluated. 1. Final bituminous paving course, including bit. conc. curb, line striping and accessible parking signage and markings have yet to be completed 2. ADA detectable warning strips to be installed 3. There does not appear to be positive drainage from the SW corner of the building. 4. A concrete walkway connection through the parking lot has not been constructed 5. The mailbox pad does not appear to have positive drainage. 6. Fencing work is incomplete. 7. Acceptance of sod to be evaluated in the spring. 8. Plantings are not installed. 9. Play area surfacing was not completely observable. 10. Additionally, we recommend the Own r evaluate a storm-damaged tree (owned by abutter) as to its structural integrity and potential liability. 4 Allen Place • Northampton, Massachusetts 01060 • t 413.582.7000 • f 413.582.7005 • bdq@berkshiredesign.com !1/1 SECONDARY FINAL CONSTRUCTION CONTROL PROJECT NUMBER 20621A PROJECT TITLE Village at Hospital Hill - Phase II PROJECT LOCATION 63Musante Drive, Northampton, Massachusetts NAME OF BUILDING Building A4 SCOPE OF PROJECT New Construction In accordance with Section 116.0 of the 6th Edition, Massachusetts State Building Code, I, 4d i ut-'4&I,- f A 1.-rz `_ Registration No. -�,o t< being', a Registered Professional Engineer, hereby certify thaf I have prepared or directly supervised the preparation of all design plans, computations and specifications concerning: ENTIRE ❑ ARCHITECTURAL ❑ STRUCTURAL PROJECT MECHANICAL ❑ FIRE PROTECTION ❑ ELECTRICAL ❑ OTHER (Specify) ❑ For the above named project and that, to my knowledge, such plans, computations and specifications meet the applicable provisions of the Massachusetts State Building Code and all acceptable engineering practices for the proposed project. I further certify that I, or my designated representative, have performed the necessary professional services and was present on the construction site on a regular and periodic basis to determine that the work was proceeding in accordance with the documents approved for the building permit and was responsible for the following as specified in section 116.2.2: 1. Review, for conformance to the design concept, shop drawings, samples and other submittals, which are submitted by the contractor in accordance with the requirements of the construction documents. 2. Review and approval of the quality control procedures for all code-required controlled materials. 3. Be present at intervals appropriate to the stage of construction to become, generally familiar with the progress and quality of the work and to determine, in general, if the work is being performed in a manner consistent with the construction documents. Upon completion of the work, I herewith submit a final report, with the project punch list attached hereto, as to the satisfactory completion and readiness of the project for occupancy. Signa ure Subscribed and sworn to before me this j Day of ✓ LJr�t Notary Public My commission expires ] 2 l�`ZUdG� State ofIn the County of