Loading...
38A-062 (3) APR 07 2006 2 : 24 PM FR WESTERN BUILDERS1INC467 9559 TO 14135871272 P .01/02 W E S T E R. N B U I L D E R S GENERAL CONTRACTORS & CONSTRUCTION MANAGERS To: SRO Housing/Smitb College Project Team-inspections Company: Charlie Conant- Smith College, Jody Barker—(TDA)Architect, Tony Patillo--City of Northampton,Dave Dietz-Diaz Construction, Valley Concrete Service, Paul O'Conner-Monadnock Engineering Mike Guy—Western Builders, Inc_ Phone: N/A Fax: As Shown From: Mike Flanders `J Phone: (413)467-9171 Fax: (413)467-9559 Date: 4/6/2006 S Time: 1:55 Plwt -- Pages(including cover): 2 Regarding: SRO Housing—Smith College-Earle Street Project Inspection Reports The following test inspection reports were rWeived from Allied Testing Services for the SRO Housing Project— 180 Earle Street, Northampton,M.A. Captioned Inspection Report: Concrete FWd Reuort#8 4/3/2006 Distribution- 1_ Charlie Conant Smith College (413) 585--2398 Fax 2, Jody Barker TDA (413) 582—9882 Fax 3_ Dave Dietz Dietz Construction (413) 527—3370 Fax 4. Mike Guy Western Builders (413) 584—0492 Fax 5. Tony Patillo Building Dept. (413) 587— 1272 Fax 6. Paul O'Connor Monadnock Eng. (603) 899—9714 Fax 7. Russell/Jeff Valley Concrete (413)648--5321 Fax Please call or e-mail me with any questions, concerns,or comments regarding testing reports, NTike Flanders Western Builders,Inc_ CC: Project Inspections File: SRO Housing Project File(Allied Testing) 73 Pleasant Sheet,P.O.Box 587 Granby, MA 01033 Phone (413)467-9171 (413)467-9559 E-Mail mfland wwWmbuildws_carn APR 07 2006 2 : 24 PM FR WESTERN BUILDERSiINC467 9559 TO 14135871272 P . 02i02 ALLIED TESTING LABORATORIES, INC. 1 1 S St.George'road a Springfield,Massachusetts 01 104 Phone:(41 J) 736-1846 Fax: (413) 736-1838 CONCRETE FIELD REPORT NO. 8 DATE: 04/03/06 Client: Wegtem Builders Project: New SRO Housing, Smith Collage, 180--182 Earle Street, Northampton, MA Contractor: Western Builders Producer: Construction Service Location of Concrete Placement: Slab an Grade - Basement Storage/ Mechanical. Room Reported to: Western Builders, - Attention! Mike Flanders CYLINDER.FABRICATION - ASTM C31 DATE CAS's: 04/03/06 IDENTIFICATION TIME TRUCK CIASS EXACT LOCATION A,B,C,D 8.30 284 4000 Slab on Grade, Basement Storage/ Mechanical Room. SLUMP TESTS - ASPM 01.43 AIR CONTENT TESTS - ASTM 0173 or C231 Time Truck Slump Ti%e Truck No. Air Content (Z) 8:30 284 5J" 8:30 284 4.4% AMBIENT TEMPERATURE CONCRETE TEMPERATURE - ASTM C1064 Time Temperature Time Truck No. Tem erature 8:30 40°F 8:310 284 570P Weather. Sunny Temp.: 40's No. Yds. : 29+/- Respectfully submitted, ALLIED TESTING LABORATORIES, INC RECEIVED By: Richard Bellucci President "OR 0 5 2006 VVESTERN BUILDERS MEMBER: A_S.T.M_ / A.C.I. / A.W.S. / A.S.N.T. / M_C.1.B. / f.A.C.R.S. * TOTAL PAGE . 02 FEB 09 2006 2: 52 PM FR WESTERN BUILDERS INC467 9559 TO 14135871272 P .01 E T E R' N BUILD E R GENERAL CONTRACTORS & CONSTRUCTION MANAGERS To: Tony Patiillo Company- Northampton Building Department Phone: (413) 587 - 1240 Fax: (413) 587- 1272 From: Mike Flanders Phone: (413}467-9X71 Fax: (413)467-9559 Date: 2/9/2006 Time: 2:42 PM Pages(including cover): 4 Regarding: SRO Dousing—Snaith College— 180 Earle Street,Northampton Tony: Attached are the Field Observation Reports#1 (12/'13!2005)&42(1!31!2006)as prepared by Mr_ Paul O'Conner, Structural Engineer!tom Monadnock Engineering for the above referenced project. Paul wanted to make sure you had received aE copy of these reports as soon as possible for your records. Please call me if you should have any questions. Thanks, Mike Flanders Western Builders, Inc. Cc: Mike Guy—Western Builders, 73 Pleasam Street,P,O. Box 587 Granby,MA 01033 Phone (413)467-9171 (413)467-9559 E-Mail mflanders(awestembuils.com FEB 09 2006 2: 53 PM FR WESTERN BUILDERS INC467 9559 TO 14135871272 P . 02 i NUkeflanders From; Paul O'Connor[paulocsreptenh.met] Sent• Thursday, February 09,200611:21 AM To! Michael Flanders;Anthony NOW;Jody Barker subject: SRO Earl Strut Reports MA''i80mj G(?Aa MPT80A jPG(280 KS) KB) Attached are the Flel.d Observatioli Reports #1 and #2 for December 13, 2005 and January 31, 2406 respectively. =RCOPY- M:Lke or Jody could you be sure that Mr. Patillo gsometimes my email doesn't go through to him. Paul. M. O'Connor, Monadnock Engineering 137 Kimball Road RIndge., NST 03461 603-899=9714 1 i FEB 09 2006 2: 53 PM FR WESTERN BUILDERS' INC467 9559 TO 14135871272 P .03 ~ I � 13i`�drlo�t� .r tF ! Field ObservaNen Report a� oma+* ThoummDiDuOuArchiwas t 2YnMe: iSRO Earle Sucid towtion; Jody Rarktr `�r�jet No: 03024 c et�nl esternauitilers obseffutrum Dmember i3,2005 Date., F nb"Utrscter, Time., 10:00 A-M M.O'convM.F.E. loudy,25 deg. a Attesdmnce: Charlie ceft nt,Kw= 'Port NO.: 1 Lov.-cAle,J6dy Balm,Mike rct gnu,and Mike rjuy ; Obserattons: This was the coMmoor's n#eeting#2. Refer to his tniautess dated 12/13/05- 'be Purposeofthis Ming was to cls f r some fwdWon dcmfls„and coordinate subautWs for wnmete and rem, + Excawfion vis just begin at the sift_ In goncM the Wank is being pe fo nned in acro damn with the tt wdou its and saft Cade. FEB 09 2006 2 : 53 PM FR WESTERN BUILDERS', INC467 9559 TO 14135871272 P . 04 `j•fa�aa,e rrflj-d9g-AFP r .. Wim:�"m�c►';a�'�."'� Field Obsierva4on Report Omgmnyt Tbomw Douglas Architects " ct Name: , RO Earle Stmet Ddow. Jody Bmioes• Projeet NO: il)=4 feralWestem Ruild s Obfiervation Januwy 31,2006 �oRrtctchr': +��= tIIO�It1'�14"t'Rx: ime; t 1.00 Ail ed By: ► M.O'COnnM,P.E_ dw '= F40ny.35 deg. a Attendsee: 10M dieCoaant,Jody Bark. N ricale W-PjW kff McAdoo Observations: Tis was the contractor-s mleesting##8. Ref"to his rninutcs, dated 1/31/06. 711 purpose of this tweeting was to clarify some foundation +tails, and coordinate submittals for trusses and floorWstn. * The cR7 qmw bay v rolls,spread faodnRs and frost war,-wvm in place. pockets in fmndatton walls wvw pmvided in lien of heart►har4Mm This was approve bemuse the roof tnwcs%wm ttmmed diffmMtLy d=assumed in,dmgn;bus.the Hs ssx5 tu`bc oolumna were elimirraW and so thwe am no concentrated lcods direct1v over the beam hearing p€►inm * Tim mchor bolt+in the wp of walls appear to be in acoordarza wixh the corftrM ci�gicuxr�et#rs. * Thor bolts W the spm fbotftigs wem not installed 'file rotracm stated that he will install 3/,n adhesive anAon. In geommi the'work is being perfornwd in acoordsom with the mnstrtationt doemnents and Sv= Cock, * TOTAL PAGE . 04 i