Loading...
38A-050 (16) $TORM�ATER MANAGEMENT PERMIT AEP City of Northampton LI ATION DECISION s1�� '� i `� Department of Public Works Project/ Site Name: _Northampton State Hospital (Abatement & Demolition Main Building Complex North Campus) Project Street or Location/Assessor ID:-1 Princq Street/ Applicant Name: S & R Corporation Applicant Address/Phone: 706 Broadway St., Lowell MA 01854/978-441-2002 Owner Name: Mass Development Owner Address/Phone: 1 Prince Street Northampton MA 01060/413-587-6307 Application Submission Date: 5/23/2006 THE FOLLOWING ACTION BY THE NORTHAMPTON DEPARTMENT OF PUBLIC WORKS HAS BEEN TAKEN ON THIS APPLICATION BASED ON INFORMATION PRESENTED: Disapproval of the Stormwater Management Permit Application based on a determination within seven days of the receipt of the application that the application is administratively incomplete (see attached documentation). Approval of the Stormwater Management Permit Application. X Approval of the Stormwater Management Permit Application subject to any conditions, modifications or restrictions required by the Department of Public Works (see below) Disapproval of the Stormwater Management Permit Application based upon a determination that the proposed plan, as submitted, does not meet the purposes set forth in the Northampton Stormwater Management. Standard Permit Conditions: 1. All clearing, grading, demolition, drainage, construction, and development shall be conducted in strict accordance with the folllowing plans and information submitted with the application and as amended by any conditions attached to this pen-nit: M:AStonnwater Pennits\Stonnwater Penn its\Pennits_new applications\001 Prince Street,Old Main Demo.doc Page 1 of 1 a. Stormwater Pollution Prevention;!Plan for Former Northampton State Hospital, Northampton, Massachusetts, dated May 1, 2006, by Tighe & Bond, Inc. 2. The Northampton Department of Public Works (DPW) or its authorized representative shall be provided access to the property to conduct inspections before, during, and after construction activities as necessary. The applicant shall arrange with the DPW to schedule the following inspections: Initial Inspection, Erosion Control Inspection, Bury Inspection, and Final Inspection. The DPW may also conduct random inspections to ensure effective control of erosion and sedimentation during all phases of construction. 3. If construction of the proposed stormwater system has not started within five years of the issue date of this permit, then the permit will expire and a new permit will be required. Construction is defined as clearing, grading, excavation, filling, and installation of drainage structures on the lots specified in this permit. Specific Permit Conditions: 1. The Stormwater Pollution Prevention Plan (SWPPP) and Demolition Site Plans shall be revised to address the following issues and be approved by the Northampton DPW prior to the start of construction: a. Additional erosion and sediment control measures (i.e. hay bales, silt fence, tracking pads, etc.) are necessary for proposed disturbed areas on or near slopes including but not limited to: unpaved access routes, the bowling alley, the red barn, and the brick garage. b. All catch basin inlets must be protected from sediment and other contaminants if they have not been removed or otherwise plugged prior to the commencement of adjacent demolition activities. c. Filter fabric may not be used under catch basin grates in lieu of hay bales and hay bales may not be used on paved surfaces as described in section 7.1.2 of the SWPPP. Sheet D-501 of the Abatement & Demolition Main Building Complex Plans correctly describe the Catch Basin Inlet Erosion Control protocol to be followed. d. Section 1.2 of the SWPPP describes stabilization measures for the disturbed areas in the vicinity of Building 1 and the farm buildings but does not define what measures will be taken in the vicinity of the bowling alley. The SWPPP must define what erosion and sediment control measures will be implemented during demolition of the bowling alley and what stabilization measures will be implemented following demolition. Signature of ity Engineer ate cc. Planning Board c/o Office of Planning and Development Building Department Conservation Commission c/o Office of Planning and Development M:\Stonnwater Pennits\Stonnwater Pennits\Pennits new applications\001 Prince Street,Old Main Demo.doc Page 2 of 2