Loading...
38-050 DEMO PERMITS (7) BP-2006-1261 GIs#: COMMONWEALTH OF MASSACHUSETTS CITY OF NORTHAMPTON Lot: -001 Permit: Building Category:demolition BUILDING PERMIT Permit# BP-2006-1261 Project# JS-2006-1865 Est.Cost: Fee: $15.00 PERMISSION IS HEREBY GRANTED TO: Const. Class: Contractor. License: Use Groin S & R CORPORATION 061320 Lot Size(sq. ft.): 226512.00 Owner. HOSPITAL DEVELOPMENT LLC Zoning". PV Applicant: S & R CORPORATION AT. 1 PRINCE ST Applicant Address: Phone: Insurance: 706 BROADWAY ST (978) 441-2000 WC LOWELLMA01854 ISSUED ON 512-512006 0.00:00 TO PERFORM THE FOLLOWING WORK.-DEMOLITION - BLDG 10 POST THIS CARD SO IT IS VISIBLE FROM THE STREET Inspector of Plumbing Inspector of Wiring D.P.W. Building Inspector Underground: Service: Meter: Footings: Rough: Rough: House# Foundation: Driveway Final: Final: Final: Rough Frame: Gas: Fire Department Fireplace/Chimney: Rough: Oil: Insulation: Final: Smoke: Final: THIS PERMIT MAY BE REVOKED BY THE CITY OF NORTHAMPTON UPON VIOLATION OF ANY OF ITS RULES AND REGULATIONS. Certificate of Occupancy Sianature: FeeType: Date Paid: Amount: Building 5/25/2006 0:00:00 $15.00773 212 Main Street,Phone(413)587-1240,Fax: (413)587-1272 Building Commissioner-Anthony Patillo File#BP-2006-1261 APPLICANT/CONTACT PERSON S&R CORPORATION ADDRESS/PHONE 706 BROADWAY ST LOWELL (978)441-2000 PROPERTY LOCATION I PRINCE ST MAP 38A PARCEL 050 001 ZONE PV THIS SECTION FOR OFFICIAL USE ONLY: PERMIT APPLICATION CHECKLIST ENCLOSED REQUIRED DATE ZONING FORM FILLED OUT Fee Paid Building Permit Filled out -07 Lg-- Fee Paid Typeof Construction: DEMOLITION-BLDG 10 New Construction Non Structural interior renovations Addition to Existing Accessory Structure Building Plans Included: Owner/Statement or License 061320 3 sets of Plans/Plot Plan THE ,QLLOWING ACTION HAS BEEN TAKEN ON THIS APPLICATION BASED ON INF9RMATION PRESENTED: VApproved Additional permits required(see below) PLANNING BOARD PERMIT REQUIRED UNDER:§ Intermediate Project: Site Plan AND/OR Special Permit With Site Plan Major Project: Site Plan AND/OR- Special Permit With Site Plan ZONING BOARD PERMIT REQUIRED UNDER: § Finding_ Special Permit Variance* Received&Recorded at Registry of Deeds Proof Enclosed —Other Permits Required: Curb Cut from DPW Water Availability Sewer Availability Septic Approval Board of Health Well Water Potability Board of Health Permit from Conservation Commission —Permit from CB Architecture Committee Permit from Elm Street Co *ssion Signature of Building Official Date Note:Issuance of a Zoning permit does not relieve a applicant's burden to comply with all zoning requirements and obtain all required permits from Board of Health,Conservation Commission,Department of public works and other applicable permit granting authorities. *Variances are granted only to those applicants who meet the strict standards of MGL 40A. Contact Office of Planning&Development for more information. Version 1.7 Commercial Building Permit May 15,2000 Department use only City of Northampton Status of Permit: Building Department Curb Cut/Driveway Permit 212 Main Street Sewer/Septic Availability Room 100 Water/Well Availability Northampton, MA 01060 Two Sets of Structural Plans phone 413-587-1240 Fax 413-587-1272 PlottSite Plans Other Specify APPLICATION TO CONSTRUCT, REPAIR, RENOVATE,CHANGE THE USE OR OCCUPANCY OF,OR DEMOLISH ANY BUILDING OTHER THAN A ONE OR TWO FAMILY DWELLING SECTION 1 -SITE INFORMATION _ tion to be completed by office 1.1 Property Address: 1 Prince Street ?, ap, ,i' Lot Unit Northampton, MA cavo / Building #10 Zone Overlay District 4 i E1rrr� c CB District SECTION 2-PROPERTY OWN ERSHIP/AUTHORIZ AGENT 2.1 Owner of Record: MassDevelopment 1 Prince Street. Haskell Buil Name(Print)J� Current Mailing Address: (41 3 ) 587-6314 Signature Telephone 2.2 Authorized Agent: Name(Print) Current Mailing Address: Signature Telephone SECTION 3-ESTIMATED CONSTRUCTION COSTS Item Estimated Cost(Dollars)to be Official Use Only completed by permit applicant 1. Building (a)Building Permit Fee 2. Electrical (b)Estimated Total Cost of Construction from 6 3. Plumbing Building Permit Fee 4. Mechanical (HVAC) 5. Fire Protection 6. Total =(1 +2+3+4+5) Check Number 6" This Section For Official Use Only Building Permit Number w ( Date W Issued Signature: Building Commissioner/Inspector of Buildings Date Versionl.7 Commercial Building Permit May 15,2000 SECTION 4•CONSTRUCTION SERVICES FOR PROJECTS LESS THAN 35,000 CUBIC FEET OF ENCLOSED SPACE Interior Alterations ❑ Existing Wall Signs ❑ Demolition Repairs❑ Additions ❑ Accessory Building❑ Exterior Alteration ❑ Existing Ground Sign❑ New Signs❑ Roofing❑ Change of Use❑ Other❑ Brief Description Enter a brief description here. Complete demolition of building Of Proposed Work: including foundations SECTION 5-USE GROUP AND CONSTRUCTION TYPE USE GROUP(Check as applicable) CONSTRUCTION TYPE A Assembly ❑ A-1 ❑ A-2 ❑ A-3 ❑ 1A ❑ A-4 ❑ A-5 ❑ 1B ❑ B Business ❑ 2A ❑ E Educational ❑ 2B I ❑ F Factory ❑ F-1 ❑ F-2 ❑ 2C ❑ H High Hazard ❑ 3A ❑ Institutional ❑ 1-1 ❑ 1-2 ❑ 1-3 ❑ 3B ❑ M Mercantile ❑ 4 ❑ R Residential ❑ R-1 ❑ R-2 ❑ R-3 ❑ 5A ❑ S Storage ❑ S-1 ❑ S-2 ❑ 5B ❑ U Utility ❑ Specify: M Mixed Use ❑ Specify: S Special Use ❑ Specify: COMPLETE THIS SECTION IF EXISTING BUILDING UNDERGOING RENOVATIONS,ADDITIONS AND/OR CHANGE IN USE Existing Use Group: Proposed Use Group: Existing Hazard Index 780 CMR 34):! Proposed Hazard Index 780 CMR 34): SECTION 6 BUILDING HEIGHT AND AREA BUILDING AREA EXISTING PROPOSED NEW CONSTRUCTION OFFICE USE ONLY Floor Area per Floor(sf) 1s` 151 2nd 2nd 3 rd 3rd 4 t 4 t Total Area(sf) Total Proposed New Construction(sf) Total Height(ft) Total Height ft 7.Water Supply(M.G.L.c.40,§54) 7.1 Flood Zone Information: 7.3 Sewage Disposal System: Public ❑ Private ❑ Zone Outside Flood Zone❑ Municipal ❑ On site disposal system[] Versionl.7 Commercial Building Permit May 15,2000 8. NORTHAMPTON ZONING Existing Proposed Required by Zoning This column to be filled in by Building Department Lot Size Frontage Setbacks Front Side L: R: L: R: Rear Building Height Bldg. Square Footage Open Space Footage % (Lot area minus bldg&paved parking) #of Parking Spaces Fill: (volume&Location A. Has a Special Permit/Variance/Finding ever been issued for/on the site? NO 0 DONT KNOW 0 YES 0 IF YES, date issued: IF YES: Was the permit recorded at the Registry of Deeds? NO 0 DONT KNOW 0 YES 0 IF YES: enter Book ! Page; and/or Document#' B. Does the site contain a brook, body of water or wetlands? NO 0 DONT KNOW 0 YES IF YES, has a permit been or need to be obtained from the Conservation Commission? Needs to be obtained 0 Obtained 0 , Date Issued: C. Do any signs exist on the property? YES 0 NO 0 IF YES, describe size, type and location: D. Are there any proposed changes to or additions of signs intended for the property? YES 0 NO 0 IF YES, describe size, type and location: E. Will the construction activity disturb(clearing, grading,excavation,or filling)over 1 acre or is it part of a common plan that will disturb over 1 acre? YES NO 0 IF YES, then a Northampton Storm Water Management Permit from the DPW is required. Version 1.7 Commercial Building Permit May 15,2000 SECTION 9-PROFESSIONAL DESIGN AND CONSTRUCTION SERVICES-FOR BUILDINGS AND STRUCTURES SUBJECT TO CONSTRUCTION CONTROL PURSUANT TO 780 CMR 116(CONTAINING MORE THAN 35,000 C.F.OF ENCLOSED SPACE) 9.1 Registered Architect: Not Applicable ❑ Name(Registrant): Registration Number Address Expiration Date Signature Telephone 9.2 Registered Professional Engineer(s): Tighe & Bond Engineers Name Area of Responsibility 53 Southampton Road. Westfield, MA 01085 Address Registration Number `l13-"d-/boo 4.1-3olg Signature Telephone Expiration Date Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date Name Area of Responsibility Address Registration Number Signature Telephone Expiration Date 9.3 General Contractor S&R Corporation, Not Applicable ❑ Company Name: Thomas Guerette Responsible In Charge of Construction 706 Broadway St. , Lowell, MA 01854 Address ( 978)441 -20 Signature Telephone Version 1.7 Commercial Building Permit May 15,2000 SECTION 10-STRUCTURAL PEER REVIEW(780 CMR 110.11) Independent Structural Engineering Structural Peer Review Required Yes 0 No Q SECTION 11 -OWNER AUTHORIZATION-TO BE COMPLETED WHEN OWNERS AGENT OR CONTRACTOR APPLIES FOR BUILDING PERMIT —T I, ✓�'"�- "��l''�'�D, �ryTGG� ��9%homer /"(alfo��v I o�.nc«T as Owner of the subject property hereby authorize G[ to act on my behalf, in all matters relative to work authorized by this building permit application. Signature of Owner /J Date I' as Owner/Authorized Agent hereby declare that the statements and information on the foregoing application are true and accurate, to the best of my knowledge and belief. Signed under the pains and penalties of perjury. Print Name Signature of Owner/Agent Date SECTION 12-CONSTRUCTION SERVICES 10.1 Licensed Construction Supervisor: Not Applicable ❑ Name of License Holder: Thomas Guerette CS 061320 License Number 18 Longwood Ave. , Londonderry, NH 03053 3/19/2007 Address Expiration Date ( 603 ) 488-5042 Signature Telephone SECTION 13-WORKERS'COMPENSATION INSURANCE AFFIDAVIT(M.G.L.c. 152,§25C(6)) Workers Compensation Insurance affidavit must be completed and submitted with this application. Failure to provide this affidavit will result in the denial of the issuance of the building permit. Signed Affidavit Attached Yes 0 No 0 .���ir TCsjt�xtru+teTu�tf, r�, f�r•i;«,�a�iwt.,r,`; BOARD OF BUILDING REGULATIONS License: CONSTRUCTION SUPERVISOR Number: CS 061320 Birthdate: 03/19/1967 Expires: 03/19/2007 Tr.no: 11076 Restricted: 00 THOMAS J GUERETTE 18 LONGWOD AVE �Yc LONDONDERRY, NH 03053 Commissioner i Tighe&Bond Consulting Engineers Environmental Specialists W-3280-9A-14 May 12, 2006 Ms. Sara Northrup, P.E. Project Engineer MassDevelopment Northampton State Hospital Northampton, MA Re: Abatement & Demolition of the Main Building Complex at the former Northampton State Hospital Dear Sara: Tighe & Bond has inspected Building 10 (Fire House) at the Northampton State Hospital to confirm completion of the specified abatement work. All asbestos containing materials and hazardous materials that were identified in the specifications have been removed and abated from the building. This letter serves as the final clearance of the building scheduled for demolition. S&R Corporation is cleared to commence demolition of Building 10. If any questions or comments arise please contact the undersigned at 508-754-2201, ext 123, with any questions. Very truly yours, TIGHE & BOND, INC. ova I-eq— Daniel J. Dragon Environmental Scientist 1:\W\W-3280\OLD MAIN AND BLDGS 3-14\BLDG CLEARANCE LETTERS\BLDG 10 CLEARANCE LETTER FOR DEMO.DOC Copy: Alan Delaney, Director of Engineering Tom Guerrette, S&R Corporation Paul Darling, S&R Corporation 53 Southampton Road• Westfield. MA 01085• Tel. 413-562-1600•Fay. 413-562-5317 Luwtu.tighebond.com FROM :S&R.CORP. NORTHAMTON FAX NO. :4135841568 Apr. 08 2006 12:22PM P1 16MYG A NiSourm company 2025 fi095eveltAve P,O.Box#2025 Springfield,MA avu )lards 31, 2006 90 CORP 706 BROADWAY 5T LOWELL NA 81654 Dear S&R CORP, The addrea® listed balov ham had 'tho gas 09rviCelB) disconnected and is now randy for demolition. ADDRESS: i PRINCE 6T TOWN NORTHATIPTON IJA STATE ; 17a®eaohu®efts Sincerely Terri Miner Workforce planning FROM :S&R.CORP. NORTHAMTON FAX NO. :4135841568 Apr. 08 2006 12:23PM P2 — MAR 30 2606 12; 14 RM FR MASS FLFC COST SERA 592 7691 TO 614135641563 Massael�usetts NectriC A Nave"rind Company March 30,2006 S and R Corp 706 Broadway St. Lowell MA.01854 To Whom It May.Concern, This is to vorify that National Grid has removed the electric service and meter's at 1 Prince St.,Northampton, Massachusetts, for Building Demolition. 'zicerely, i Jim Nichois Supervisor Distribution Design 3N/okp PO box$07 wrinampton.MA 03.%1.0507 413.U2,72oa *+' TOTAL ?AGE. 01 :� The Commonwealth of Massachusetts Department of Industrial Accidents Office of Investigations 600 Washington Street ~. Boston, MA. 02111 Workers` Compensation Insurance Affidavit Name bcL7 ed - r e HvSP,ra1 .lob Location.:1. j'/ ?NG 7.. r-- City__ 1V_&1_2L6.�/7-n,v r27/7 Phone (978)441-2000 ❑ Iam a homeowner performing all work myself_ a I am a sole proprietor and have no one working in any capacity. I am an employer providing workers'compensation for my emp oyees working on FS ao Company Name._ S&R Corporation Address 706 Broadway Street City Lowell, MA 01854 Phone# (978)441-2000 Insurance Company L;he_,r-y M,17-VC.1 Policy#VVC /111.7578.39piV I am a sole proprieto _general contractor or omeowner(circle one)and have hired the contractors listed-below who have the following workers'compensation policies: Company Name n/a address city Phone# Insurance Company Policy# Failure to secure coverage as required under Section 25A of MGLI.52 can lead to the imposition of criminal penalties of fine up to$1,500.00 and/or one years'imprisonment as well as civil penalties in the form of a STOP WORK ORDER and a fine of$100.00 per day against me_ I understand that a copy of this statement may be forwarded to the Office of Investigations of the DIA for coverage verification. I do hereby certif y/11Pder the pains and penalties of perjur,v*at the information provided above is true and correct_ J Signatureue� Date 6-LI 20,ot Print Name T� r�as a- , Phone-# (978)441-2000 Official use only do not write in this area to be completed by city or town official City or Town: Permit/license# Building Dept Ucensing Ud_ check if immediate response is required selectmen ttutth 6cpL Contact person phone 9 Other Tighe&Bond Consulting Engineers Environmental Specialists W-3280-9A-14 May 12, 2006 Ms. Sara Northrup, P.E. Project Engineer MassDevelopment Northampton State Hospital Northampton, MA Re: Abatement 4 Demolition of the Main Building Complex at the former Northampton'State Hospital Dear Sara: Tighe & Bond has inspected Building 10 (Fire House) at the Northampton State Hospital to confirm completion of the specified abatement work. All asbestos containing materials and hazardous materials that were identified in the specifications have been removed and abated from the building. This letter serves as the final clearance !of the building scheduled for demolition. S&R Corporation is cleared to commence demolition of Building 10. If any questions or comments arise please contact the undersignedjat 508-754-2201, ext 123, with any questions. Very truly yours, TIGHE & BOND, INC. Gt - Daniel J. Dragon Environmental Scientist 1:1.W\W-3280\01-1)MAIN AND BLDGS 3-WBLDG CLEARANCE LETTERS\BLDG 10 CLEARANCE LETTER FOR DEMO.DOC Copy: Alan Delaney, Director of Engineering Tom Guerrette, S&R Corporation Paul Darling, S&R Corporation Z ritilltYr1(rt_rtt 1Tr_rill b1' s>i/lr'Ir_1. A/A oloejl-) c1. 1I,JS )62-16(90• VCLV. -413-5621 '' uuv.�.tigltcbon�l.rrm �� C MASSDEVELOPMENT 4196276907 05109/06 11:64am P. 001 From: MAssDEVELOPMENT Northampton Fax: (413) 587-6307 'hone:(41.3) 587-6314 Date: r-06 Pages: 2 Fax number TO: Teri Anderson, Northampton Economia Development 413-587-1275 Ned Huntley, Northampton DPW 413-587-1576 Duane Nichols, Deputy Fire Chief 413-587-1034 Captain Michael Wall, Northampton Police Dept 413-587-1137 Tony Patillo, Northampton Building Commissioner 413-587-1272 Paul Darling, S&R Corporation 413-584-1558 Tom Guerette, S&R Corporation 976-441-2002 Dan Dragon, Tighe&Bond 508-795-1087 Todd Brown, Tighe S Bond 413-562-5317 by email: Alan Delaney, MassDevelopment 978-772-8815 David Webster, MassDevelopment 978-772-8830 Beth Murphy, MassDevelopment 413-755-1349 Comments: Attached please fired project meeting minutes for your file. It you have any questions please call me at 413-587-6314- Sara Northrup, PE Project Engineer - MassDevelopment MASSDEVELOPMENT 4185876807 05105106 11:S4am P. 002 MEMORANDUM TO: FILE FROM: Sara E.Northrup,Project Engineer SUBJECT: Nortbampton State:Hospital Demolition,Proi0ot No-: 06-002 Weekly projcct meeting—S&R Date: May 8, 2006 1.00 pm-- 1 Prince Stroet,Northampton,MA In Attendance: Torn Guerette(Prof. Mgr., S&R) Alan Delaney Wng. Mgr-,MassDcv) Paul Darling(Site Supt-, S&R) Sara Northrup(Proj. Eng.,Massnev) Todd Brown(Tighe&Bond) Summary of Discussions: Project ntcajugs to occur regularly at 1:00 pm on Mondays.Next meeting Monday 5/15 • S&R asbestos abatement on Farm Buildings#10, 11, 12, 14 is substantially complete. • Steam trench abaWnent to commence after May 1.6'x. + Meeting wittlt Fire Chief tentatively this Friday the l2'n. • DEP waivcr approval may be received this week. • Stormwater SWPPP notifications to Fed. State,City getting Massdevclopment signatures. • Temporary pave at entrance on..Burt's Pit OK,restore after project. Submittals: none Action,Items• S&R: Continue to submit needed submittals T&B Provide letter on completed abatement areas. Prepare for meeting on May 12th with Fire Chief. MassDevelopment Documenting security siege. Copy_ Alan M.Delaney,Di=tor of Engineering,MassDDevelopment David Webster,MassDevelopa=t Beth Murphy,MassDevelopmcnt. Paul Darling,S&R Corporation Ned Huntley,Northampton DPW Dwnc Nichols.Deputy Fire Chief Captain Michael Wali,Police Dept Tony PaWlo,l3 iding Commissioner File 1 MASSDEUELOPMENT 413S876307 05102106 10:S8am P. 001 From: ;.;:: .... MAssDEVELOPMENT it n Northampton Fax: (41.3) 587--&107 Phorte:(413) 587--6314 14AY 1 [date: .28*i5r-tis Pages: 2 Fax number To: Teri Anderson, Northampton Economic Development 413-587-1275 Ned Huntley, Northampton DPW 413-587-1576 Duane Nichols, Deputy Fire Chief 413-587-1034 Captain Michael Wall, Northampton Police Dept 413-587-1137 Tony Patillo, Northampton Buildirq Commissioner 413-587-1272 Paul Darling, S&R Corporation 413-584-1568 Tom Guerette, S&R Corporation 978.441-2002 Dan Dragon, Tighe& Bond 508-795-1087 Todd Brown,Tighe& Bond 413-562-5317 by email, Alan Delaney, MassDevelopment 978-772-8815 David Webster, MassDevelopment 978-772-8830 Beth Murphy, MassDevelopment 413-755-1349 Comments: Attached please find project meeting minutes for your file_ r If you have any questions please call me at 413-587-6314.. Sara Northrup, PE Project Engineer__ MassDevelopment MASSDEVELOPMENT 4185876807 05102106 10:68am P. 002 w MEMORANDUM TO: FILE FROM: Sara E.Northrop,Project Engineer SUBJECT: Northampton State Hospital DM- olition, project No.. 06-002 Weekly project meeting—S&R Date. May 1,2006 2:00 pm— 1 Prince Streot,NortliangAaatt,MA In Attendance: r - Tom GuercUe(S&R) Sara.Northrup (Prof. Eng.,MassDev) Alan Delaney(Dir Eng,MassDev) Summary of Diseus%ions: Project meetings to occur regularly at 1:00 pm on Mondays. Next meeting to be May$111. • Utility cutoff work continuing. • Knox boxes should be delivered this week • Reminder from Bldg Commissioner re: Fire Operational Plan. • Reminder from City Engineer to file Stormwater permit with DPW. Asbestos: Farm buildings will commence on May 2,as per notification, Subwlttals; T&B to forward approvals to Massdevelopment.. Action Items- S&R: To file City DPW stormwater permit prior to any demo. To send written job notice to DMH. MV To file Stoarmwater Plan SWPPP w/EPA,. To schedule mccting with.Fire Chief prior to Old Main demolition_ MassDeveloprnent Cly: Alan M.Delaney, Uircctor of Engineering,MasslDevelopment Pant Darlin&S&lt Corporation '1`any Pwillo,Building Commissioner Ned Huntley,Nortbampton.DPW Duane Nichols.. Deputy Fire Chief Captain Michael.Wall.Police Dept Todd M.:Rrawn,Tighe&BoAd File 1